Biogas complex Biogas complex Pig factory Pig factory Agrarian company LAN ltd. Agrarian company LAN ltd. Presenter Presenter Mazur Grygoriy Mazur Grygoriy MNC Group MNC Group

Biogas complex Pig factory LAN ltd. Grygoriy MNC · Project developer – MNC Project Group (Kharkov)- 5 year in biogas ... •Top-management looking for possibility of biogas project

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Biogas complex Pig factory LAN ltd. Grygoriy MNC · Project developer – MNC Project Group (Kharkov)- 5 year in biogas ... •Top-management looking for possibility of biogas project

Biogas complex Biogas complex Pig factory Pig factory 

Agrarian company LAN ltd.Agrarian company LAN ltd.

Presenter Presenter –– Mazur Grygoriy Mazur Grygoriy MNC GroupMNC Group

Page 2: Biogas complex Pig factory LAN ltd. Grygoriy MNC · Project developer – MNC Project Group (Kharkov)- 5 year in biogas ... •Top-management looking for possibility of biogas project

•6.000 pig•3.300 hectares of land•1.120.000 euro – turnover •120.000 euro – profitable

Cherkasskiy Dmitry – owner Good credit history (Megabank, BM Bank, Sberbank)Good agrarian practice (Khlebnoye and Terkurij skhid)Project developer – MNC Project Group (Kharkov)- 5 year in biogas

ООО “Агрофирма ЛАН”Харьковская область, Барвенковский район,с. Мечибилово, ул. Ленина, д.1,код ЕГРПОУ 31787016, св. №27667831,р/с 260091992 в ВАТ «Мегабанк» г. Харьков,МФО 351629, тел./факс (05757) 7 82 35, 7 82 36

Page 3: Biogas complex Pig factory LAN ltd. Grygoriy MNC · Project developer – MNC Project Group (Kharkov)- 5 year in biogas ... •Top-management looking for possibility of biogas project

•10 ton manure par day – in lagoon Using

•15.000 kilowatt per month electricity•400 ton non-organic fertilizer per year (120.000 euro)

Planning •To build biogas station 1 megawatt for producing own electricity and organic fertilizer•Top-management looking for possibility of biogas project from 2009

ООО “Агрофирма ЛАН”Харьковская область, Барвенковский район,с. Мечибилово, ул. Ленина, д.1,код ЕГРПОУ 31787016, св. №27667831,р/с 260091992 в ВАТ «Мегабанк» г. Харьков,МФО 351629, тел./факс (05757) 7 82 35, 7 82 36

Page 4: Biogas complex Pig factory LAN ltd. Grygoriy MNC · Project developer – MNC Project Group (Kharkov)- 5 year in biogas ... •Top-management looking for possibility of biogas project

Aim Aim –– economical and ecological goalseconomical and ecological goalsInvestments Investments –– 3.291.000 euro 3.291.000 euro

Payback period Payback period –– 5,2 year5,2 yearPreferences & Green tariff ?Preferences & Green tariff ?

Technical solution Technical solution –– corrosioncorrosion--resistant complex from Lipp resistant complex from Lipp Gmbx (Germany) and Microturbine Capstone (USA) Gmbx (Germany) and Microturbine Capstone (USA)

Specification:Specification: loading capacity, hydrolysis tank, 3 fermentators, loading capacity, hydrolysis tank, 3 fermentators, microturbine 1mWtmicroturbine 1mWt

50 years50 years100 patents100 patents

10.000 10.000 partnerspartners

Biogas complex 1 megawattBiogas complex 1 megawatt for producing electricity and organic fertilizer for producing electricity and organic fertilizer

Welcome to biogas station in Ukraine!!!Welcome to biogas station in Ukraine!!!

2424 yearsyears2200.000.000 00.000.000

USD for USD for innovationinnovation

4.000 partners4.000 partners

Page 5: Biogas complex Pig factory LAN ltd. Grygoriy MNC · Project developer – MNC Project Group (Kharkov)- 5 year in biogas ... •Top-management looking for possibility of biogas project

Potential for CO2 Emission reductions

Methodic - ACM0010 “Consolidated baseline methodology for GHG emission

reductions from manure managementsystems”, Development of the electricity

carbon emission factors for Ukraine. Baseline Study for Ukraine.

Greenhouse gas reduction, 9000 t. CO2 equivalent

2012 2013 2014 2015 2016 2017 2018 2019 2020

manure waste system 832 832 832 832 832 832 832 832 832

electricity 8633 8592 8601 8601 8601 8471 8332 8300 7642

All Baseline 9465 9424 9432 9433 9432 9302 9164 9132 8474

Greenhouse gas reducing 9465 9424 9432 9433 9432 9302 9164 9132 8474

Page 6: Biogas complex Pig factory LAN ltd. Grygoriy MNC · Project developer – MNC Project Group (Kharkov)- 5 year in biogas ... •Top-management looking for possibility of biogas project

Project economy Project economy 

Profitable Profitable –– 1.040.000 euro/ year1.040.000 euro/ year

Income from sale of COIncome from sale of CO22 emission emission reductions (ERUs) reductions (ERUs) 7200072000 euroeuro

Investments Investments –– 3.291.000 euro 3.291.000 euro 

Revenue 750.000 euro/year Revenue 750.000 euro/year 

Green tariff ?Green tariff ?

Payback period Payback period –– 5,2 year5,2 year

Page 7: Biogas complex Pig factory LAN ltd. Grygoriy MNC · Project developer – MNC Project Group (Kharkov)- 5 year in biogas ... •Top-management looking for possibility of biogas project

Table Financing Plan

Project cash flow

Движение ликвидности попроекту

Год

0 1 2 3 4 5 6 7 8 9 …Чистое движение ликвидности -3291 489 609 617 645 676 710 730 729 729 724

Аккумулированное движениеликвидности

-3291 -2802 -2193 -1576 -931 -254 455 1185 1915 2643 3367

Page 8: Biogas complex Pig factory LAN ltd. Grygoriy MNC · Project developer – MNC Project Group (Kharkov)- 5 year in biogas ... •Top-management looking for possibility of biogas project

Table Financing Plan

Risk factors

Page 9: Biogas complex Pig factory LAN ltd. Grygoriy MNC · Project developer – MNC Project Group (Kharkov)- 5 year in biogas ... •Top-management looking for possibility of biogas project

MNC pure water

MNC biogas

LIPP Germany

Participant of the

Global Green Business 2009 

Republic of Korea

UkrNIIspirtbioprod

Ukraine

AAT Abwasser Austria

Capstone  USA

Institute of Gas

Ukraine

Consultant in program 

TAM‐BAS

From EBRD

Partner in 

Program

UKEEP

From EBRD

Participant 

Tallberg forum  2010

Sweden

CompetenceCompetence

ProfessionalismProfessionalism

ExperienceExperience

Foundation 

2006

Investment forum

Ukraine –Berlin 

20‐22 June 2011

Page 10: Biogas complex Pig factory LAN ltd. Grygoriy MNC · Project developer – MNC Project Group (Kharkov)- 5 year in biogas ... •Top-management looking for possibility of biogas project

We looking investors / We looking investors / credits for this projectcredits for this project

Common to Common to cooperation !!!cooperation !!!+38 057 752 30 74 +38 057 752 30 74 +38+38 057057 752 30 75752 30 75+38 067 708 77 58+38 067 708 77 [email protected]@mnc.in.ua www.mnc.in.uawww.mnc.in.ua

Page 11: Biogas complex Pig factory LAN ltd. Grygoriy MNC · Project developer – MNC Project Group (Kharkov)- 5 year in biogas ... •Top-management looking for possibility of biogas project

Grygoriy  MazurGrygoriy  Mazur

61166 61166 Ukraine, KharkovUkraine, KharkovNovgorodskaja str. Novgorodskaja str. 11, 11, officeoffice 402402