  • PILE BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUE

    ------------------ ------------------

    Project Name :

    Location :

    Borehole No. : BH-1

    Date :

    ------------------ ------------------

    MAYERHOF Formula : K1 K2

    Skin, Ps = K1 x Nav x As SAND 2.0 400

    Bearing, Pb = K2 x Nb x Ab SILT 2.5 250

    Ult. Load, Pu = Ps + Pb CLAY 3.0 100

    All. Load, Pa = Ps/Fs + Pb/Fb

    Factor of safety : Skin, Fs = 2

    Bearing, Fb = 3

    ------------------ ------------------

    To calculate allowable soil bearing capacity :

    Pile used : Type : s

    (c = circular) Width, b = 0.4 m Perimeter: 1.600

    (s = square) (= dia. for type c) Ab: 0.160

    Qa(conc): 1800

    ========== ========== ====== ========== ========== ============ =======================

    Depth Soil SPT Skin Total Base Working Load

    Type N As Fric Skin Load Fs = 2.0 Fb = 3

    (m) (m) (kN) (kN) (kN) (KN)

    ------------------ ------------------ ---------- ------------------ ------------------ -------------------- ---------------------------------------

    0.0 SAND 0 0.0 0.0 0.0 0.0 0.0

    1.5 SAND 11 2.4 52.8 52.8 704.0 261.1

    3.0 SAND 12 2.4 57.6 110.4 768.0 311.2

    4.5 SAND 15 2.4 72.0 182.4 960.0 411.2

    6.0 SILT 17 2.4 102.0 284.4 680.0 368.9

    7.5 SILT 19 2.4 114.0 398.4 760.0 452.5

    9.0 SILT 19 2.4 114.0 512.4 760.0 509.5

    10.5 SILT 17 2.4 102.0 614.4 680.0 533.9

    12.0 SILT 19 2.4 114.0 728.4 760.0 617.5

    13.5 SILT 11 2.4 66.0 794.4 440.0 543.9

    15.0 SILT 18 2.4 108.0 902.4 720.0 691.2

    16.5 SILT 17 2.4 102.0 1,004.4 680.0 728.9

    18.0 SILT 19 2.4 114.0 1,118.4 760.0 812.5

    19.5 SILT 20 2.4 120.0 1,238.4 800.0 885.9

    21.0 SILT 18 2.4 108.0 1,346.4 720.0 913.2

    22.5 SILT 14 2.4 84.0 1,430.4 560.0 901.9

    24.0 SILT 0 2.4 0.0 1,430.4 0.0 715.2

    25.5 SILT 22 2.4 132.0 1,562.4 880.0 1,074.5

    27.0 SILT 20 2.4 120.0 1,682.4 800.0 1,107.9

    28.5 SILT 20 2.4 120.0 1,802.4 800.0 1,167.9

    30.0 SILT 22 2.4 132.0 1,934.4 880.0 1,260.5

    31.5 SILT 25 2.4 150.0 2,084.4 1,000.0 1,375.5

    33.0 SILT 23 2.4 138.0 2,222.4 920.0 1,417.9

    34.5 SILT 23 2.4 138.0 2,360.4 920.0 1,486.9

    36.0 SILT 24 2.4 144.0 2,504.4 960.0 1,572.2

    37.5 SILT 23 2.4 138.0 2,642.4 920.0 1,627.9

    39.0 SILT 25 2.4 150.0 2,792.4 1,000.0 1,729.5

    40.5 SILT 26 2.4 156.0 2,948.4 1,040.0 1,820.9

    42.0 SILT 50 2.4 300.0 3,248.4 2,000.0 2,290.9

    43.5 SILT 2.4 0.0 3,248.4 0.0 1,624.2

    45.0 SILT 2.4 0.0 3,248.4 0.0 1,624.2

    46.5 SILT 2.4 0.0 3,248.4 0.0 1,624.2

    For a designed load of 100 KN, the estimated depth is 16.5m.

    Note : 1. The clay skin friction for the top soil layer is assume to be 7.5kN/m2

    2. The pile is designed as floating pile where the pile would settle together with the soil and therefore there

    is no effective negetive skin friction.

    3. The final depth of piles penetration shall be decided on site by load test.

  • LARSEN & TOUBRO LIMITED E&C DIVISION

    GEOTECHNICAL INVESTIGATION REPORT INSIDE

    AREA

    DOCUMENT NO. A067-LT-00-CV-04-RP-0004

    PROJECT :Additional Gas Processing Facilities (Phase-IV)

    REVISION : 01

    CUSTOMER : ONGC,HAZIRA

    Sheet No.1053

    11-06-2012

  • KCT Consultancy Services, Ahmedabad

    /$56(1728%52/,0,7('/$56(1728%52/,0,7('/$56(1728%52/,0,7('/$56(1728%52/,0,7('TECHNICAL REPORT

    OF

    GEOTECHNICAL INVESTIGATION

    FOR

    PROPOSED STRUCTURES INSIDE PLANT AREA UNDER PROJECT OF ADDITIONAL GAS PROCESSING FACILITES (PHASE 4) FOR

    ONGC AT HAZIRA, SURAT (INSIDE PLANT AREA)

    BY:

    DR.K.C.THAKER B.E.(CIVIL) ; M.TECH (S.M.); (I.I .T, BOMBAY) Ph.D.(I.I.T., BOMBAY);F.I .E.(INDIA); F.I.G.S.

    K.K.THAKER B.E. (CIVIL) GOLD MEDALIST; M.E (GEOTECH) M.B.A.(FINANCE);M.I.E(INDIA); M.I.G.S; M.G.I.C.E.A.

    .&7&RQVXOWDQF\6HUYLFHV.&7&RQVXOWDQF\6HUYLFHV.&7&RQVXOWDQF\6HUYLFHV.&7&RQVXOWDQF\6HUYLFHV

    OFFICE : Plot no.1,Sayona Silver Estate-Part II ,

    Behind Si lver Oak Club, Beside Auda Water Tank Opp. Sarjan RMC Plant,

    Gota, Ahmedabad 382 481 Phone :- 65103088/89/90,9825064378,

    August - 2010

    Sheet No.1054

    11-06-2012

  • KCT Consultancy Services, Ahmedabad

    GEOTECHNICAL INVESTIGATION REPORT FOR PROPOSED STRUCTURES OF ADDITIONAL GAS PROCESSING FACILITES PROECT (PHASE 4 INSIDE OF PLANT) OF ONGC AT HAjIRA, SURAT

    1.0 Introduction For foundation analysis of the structures of Additional Gas Processing Facilities Project (Phase 4) of ONGC at Hajira, Surat, It is necessary, 1. To determine the subsoil profile of the site and to know physical properties and strength

    characteristics of soil at various depths. 2. To suggest suitable foundation and to know the safe bearing pressure and probable

    settlement of foundation. 3. To know any adverse soil conditions to the foundation structures and to take

    precautionary measures.

    For this purpose, the geotechnical investigation was entrusted to us by Larsen and Toubro Limited. Following points were decided, 1. No. Bore holes 4 nos. in side plant boundary 2. Standard penetration tests are conducted at regular interval. 3. Collection of Undisturbed soil samples at regular interval. 4. Collection of disturbed samples during drilling and from SPT. 5. To find physical properties and strength characteristics of samples as per the testing

    schedules. 6. To locate ground water table, if any. 7. To conduct block vibration test. 8. To conduct electrical resistivity test. 9. Interpretation of results, Analysis and Recommendations.

    Based on the above points the detailed Geotechnical Investigation Program included the following: (A) Field Investigation 1. Drilling of bore hole. 2. Collection of soil samples ( Disturbed and Undisturbed ) 3. Conducting Standard Penetration Test. 4. Conducting Block Vibration Test. 5. Conducting Electrical Resistivity Test

    (B) Laboratory Investigation 1. Bulk Density and moisture content 2. Grain size analysis 3. Consistency limits 4. Shear tests 5. Consolidation tests 6. Chemical analysis of soil and water

    (C) Recommendations Based on above investigations, the results are to be obtained. The findings would be based on interpretation of results, analysis and computations as per relevant Indian standards.

    Sheet No.1055

    11-06-2012

  • KCT Consultancy Services, Ahmedabad

    2.0 Field Investigation 2.1 BoringThe exploratory boreholes of 150mm diameter were drilled by rotary drilling method. The depth of the test bore at the proposed location is as under:

    Bore Hole No. Co-Ordinates Reduced

    Level (m) Depth Investigated

    (m) N E BH 4 365 1025 98.466 20 BH 5 780 1100 99.423 25 BH 6 799 1170 99.620 20 BH 9 1065 1750 99.232 20

    2.2 Sampling 2.2.1 Disturbed samples Disturbed samples were collected during boring and from the split spoon sampler. The samples recovered were logged, labeled and placed in polyethylene bags and sent to laboratory for testing.

    2.2.2 Undisturbed samples Undisturbed soil samples were collected in thin walled Shelby tubes as per IS 2132 at regular intervals. The samples collected were sealed properly using wax, labeled and transported to the laboratory.

    2.2.3 Standard penetration test The standard penetration tests were conduct in accordance with IS:2131-1981 in test bore at regular intervals. The test gives N Value, the blow counts of last 30 cm penetration of split spoon sampler with 63.5 kg hammer falling from 76 cm height.

    2.2.4 Block Vibration Test For determining various parameters influencing the design of machine foundation like physical properties of elastic base of the foundation, block vibration test was conducted. For this purpose Oscillator was fixed on the PCC block cast of size 1.00 x 0.75 x 0.75 m at Co ordinates N 789 and E 1087, and vibration was induced. The vibration peak ups were attached, on this block to measure the frequency and amplitude. The test was conducted as per the provisions of IS 5249 1969. Various dynamic properties as listed below were calculated for 10sq.mt area.

    Cu - Coefficient of elastic uniform compression ( kg / cu.cm ) C - Coefficient of elastic uniform shear ( Kg / cu.cm ) C - Coefficient of elastic non uniform compression ( Kg / cu.cm ) C Coefficient of elastic non uniform shear ( Kg / cu.cm )

    The above coefficients are reported for foundation contact area, A of 10.0 sq. m

    2.2.5 Electrical Resistivity Test Geophysical Survey In all geophysical surveys, Electrical Resistivity method is best and reliable to know geological formation of the the area. All geological formations possess properties called electrical resistivity when the current flows through them. Resistivity thus

    Sheet No.1056

    11-06-2012

  • KCT Consultancy Services, Ahmedabad

    is defined as the resistance offered by a unit cube of material to direct current flowing through it in a direction perpendicular to two of its opposite faces. The numerical value of the resistivity is expressed in ohm. m in general. Thus the electrical resistivity is principally based on the study of resistance offered by the sub-surface formation to the flow of current. The study in turns helps in evaluation of the characteristic of the sub surface layers in terms of electrical resistivity. Vertical electrical soundings (VES) have been conducted by using resistivity meter of I G I S make direct current in deployed during survey as per IS : 3043. Two metal stakes called current electrodes into the sub surface transmit the current and the potential response is observed by means two copper electrodes called potential electrodes. Apparent resistivity is calculated from the equation:- = 2SR K = 2S = Geometric factor for electrode spacing (Wenners configuration) R = Resistance in Ohms S = Spacing between adjacent electrodes in (m) = Resistivity in ohm.m. Test was conducted at Co ordinates: N 762 E 1087

    3.0 Laboratory investigation The laboratory tests were conducted on the samples collected. The following laboratory tests were conducted on undisturbed and disturbed soil samples collected from various depths to find physical properties and strength characteristics.

    Tests Recomnd procedure Type Samples 1. Sample Preparation IS 2720 Pt I DS / UDS 2. Moisture Content IS 2720 Pt II DS / UDS 3. Dry Unit Weight LAMBE UDS 4. Specific Gravity IS 2720 Pt III DS 5. Liquid Limit IS 2720 DS 6. Plastic Limit IS 2720 Pt V DS 7. Grain Size Analysis IS 2720 Pt IV DS 8. Soil Classification IS 1498 DS / UDS 9. Consolidation IS 2720 Pt XV UDS 10. Triaxial Comp. Test IS 2720 Pt X UDS 11. Laboratory permeability IS 2720 Part XVII UDS

    4.0 Results 1. The location plan of Bore hole is shown in fig no.1 2. The bore log details of Bore hole are shown in fig nos. 2 to 5 3. Results of permeability of Bore hole are given in table no 1 4. The Chemical analysis of soil and water is given in table nos.2 & 3 5. Laboratory test results of Bore hole are appended in table nos. 4 to 7 6. Results of BVT are shown in fig nos. 6 & 7 7. Results of ERT are given in fig no. 8

    5.0 General stratification The soil deposits at Hajira are alluvial in nature formed by River Tapti and its interaction with the sea over the geological history. The layers consist of plastic clays from stiff to very stiff consistency at top. The subsequent layer consists of plastic clays and silts from very

    Sheet No.1057

    11-06-2012

  • KCT Consultancy Services, Ahmedabad

    soft to stiff consistency, followed by silty sands with density varying from loose to dense and very dense.

    6.0 Discussion

    Two foundation options are suggested:

    1. Pile Foundations : For heavy equipment and major structures, pile foundations are recommended. Due to proximity to process areas driven piles are not permitted and bored cast-in-situ piles are recommended. Piles of 500 mm diameter with depth of embedment of 16 m are suitable. Pile calculations are given in Appendix 1. The lateral capacities are 4.5 t for a fixed headed pile and 2.0 t for a free headed pile. The lateral capacity is also to be confirmed by means of a lateral load test on a test pile. The tests have to be carried out as per IS 2911 / Part 4 1985.

    2. Open foundations for lightly loaded structures and equipment : The possibility of placing the light to intermediate loaded structures and equipment foundations, open shallow foundations can be explored. The minimum depth of foundation recommended is 2 m from FGL. The permissible settlement is 25mm. The recommended bearing capacity values borehole wise for permissible settlements for 25mm are as given in Section 7 (Conclusion) below and the calculations are appended in Appendix 2. 7.0 Conclusions 1) Two foundation options are recommended. Option 1 : For process equipments and heavily loaded structures, Bored cast in- situ piles, 500 mm diameter, length of embedment of 16 and cutoff level approximately at 2.50 m from NGL having capacities given below may be provided,

    Axial Compression 65 TLateral Fixed Head 4.5 TLateral Free Head 2.0 TUplift 24 T

    Option 2: For light to moderately loaded structures and equipment foundations, open foundations with minimum depth of 2m below FGL is recommended. A 30 cm thick, well compacted coarse sand layer below the bottom of foundation is recommended.

    The net safe bearing pressures as tabulated below are recommended.

    Size of Foundation Recommended net Safe Bearing

    Pressure (T/m2)

    Depth (m) Width (m)

    2.0 1.0 14 2.0 2.0 8

    Sheet No.1058

    11-06-2012

  • KCT Consultancy Services, Ahmedabad

    2.0 3.0 62.0 Strip 5 2.5 1.0 15 2.5 2.0 10 2.5 3.0 7 2.5 Strip 6

    2) Ground water table is encountered at around 3.50 m from EGL, during investigation, which is likely to rise up to two mt from ground level in monsoon. Design groundwater level shall be at EL 99.500 to account for rain and tidal effects.

    3) From results of chemical soil as reported in table 2 & 3, the sub soil is classified in class 2 based on sulphite Content (SO3), as per the table no. 4 under clauses 8.2.2.4 and 9.1.2 of IS: 456, 2000. PPC or PSC with minimum cement content of 330kg/m3 and maximum face water-cement ratio of 0.5 can be used for all RCC in foundation structures. OPC may be used provided the C3A content is within 5 to 8% as per IS 456, Table 4, Note 6. Alternatively, OPC mixed with fly ash as per the provisions of IS 456 and IS 3812 may be used with validation of concrete characteristics through testing. Minimum cement content in piles shall be 400kg/m3 as per the requirements of IS 2911. As the chloride content is high, clear cover to the reinforcement in foundation systems shall at least be 65 mm.

    4) Suitable side slope in excavation and any measures if required and so far as is reasonably practicable shall be provided to prevent dislodgement of earth or any other material forming the side of excavation.

    5) Considering the swelling characteristic adequate measures shall be taken to mitigate adverse consequences of swelling and shrinking due to moisture movement. A layer of compacted coarse sand having 300 mm thickness shall be provided under the pile caps and aprons around the structures and in plinths under floor finishes.

    7) The comments given in this report and the opinion expressed are based on the ground conditions encountered during site work and on the results of tests made in field and in the laboratory. There may however, special conditions prevailing at the site which have not been disclosed by the investigation and which have not been taken in to account in the report. Any variation in stratification in any of the foundation location shall be studied thoroughly before executing the foundation work

    (K.K.Thaker) (Dr. K.C.Thaker)

    Sheet No.1059

    11-06-2012

  • $33(1',;$33(1',;$33(1',;$33(1',;,,,,Calculation of Safe Load on Bored Cast in Situ Pile

    (As per IS: 2911 (Part I / Sec II))1) Design StipulationsPile Diameter: 0.50m Existing GWT level: 0.00m Pile Cut-Off level: 2.50m from existing ground level. Pile Termination level: 18.50m from E.G.L For maximum overburden pressure at Pile tip 15 x diameter of pile length of pile has been taken

    2) Soil Parameters Considered Layer Thickness

    m CohesionKg / cm2

    Angle of Internal Friction

    Field Densitygm / cc

    SPT N Value

    5.10 0.39 9 1.76 8 7.50 0.00 25 1.70 10 12.4 0.00 34 1.90 19

    3) Ultimate End Bearing Capacity Que = Ap (0.5 * D * * N + Pd * Nq) Where, Ap = Cross sectional Area = 0.196 m2D = Pile Stem Diameter = 0.50 m = Bulk Unit Weight of soil at Pile tip = 0.90 T/m3N = Bearing Capacity factor = 41.06 Pd = Effective overburden pressure at pile tip = 5.56 T/m2Nq = Bearing Capacity factor = 42.80 Ultimate End Bearing Capacity Que =0.196*(0.5*0.50*0.90*41.06+5.56*42.8) = 48.48 T

    Pd Level for this pile = 7.50 m Layer No.1 Effective overburden pressure due to this layer = 0.00 x 1.76 +5.10 x (1.76 - 1) = 3.88 T/m2Layer No.2 Effective overburden pressure due to this layer = 2.40 x (1.70 - 1) =1.68 T/m2Layer No.3 No contribution from this layer Total effective overburden pressure up to 7.50m level from EGL= 5.56T/m2.

    4) Ultimate Skin Friction Capacity Qsg = [K * Pdi * tan () * Asi] for all layers Where, K = Earth Pressure Coefficient Pdi = Effective Overburden pressure for ith layer = Angle of wall friction for ith layer Asi = Surface area of pile stem for ith layer

    Qsc = [ * C * as] for all layers Where, = Reduction factor C = Average Cohesion Asi = Surface area of pile stem for ith layer

    Layer no. 1: K: 1.00 Pd1 : 1.94 T/m2 tan () : 0.16 As1 : 4.08 m2Qsg = K*Pd1*tan ()*As1 =1.00*1.94*0.16*4.08 = 1.25 T Reduction factor (): 0.40 Average Cohesion(C): 3.90 T/m2. Qsc = *C*As1 = 0.40*3.90*4.08 = 6.37 T Total net skin friction of this layer = 7.62T/m2

    Sheet No.1060

    11-06-2012

  • Layer no. 2: K: 1.50 Pd2: 4.72 T/m2. tan () : 0.47 As2 : 11.78 m2. Qsg = K*Pd2*tan ()*As2 =1.50*4.72*0.47*11.78 = 38.82 T Reduction factor (): 0.40 Average Cohesion(C): 0.00 T/m2. Qsc = a*C*As2 =0.40*0.00*11.78 = 0.00 T Total net skin friction of this layer = 38.82 T/m2.

    Layer no. 3: K: 2.00 Pd3 : 5.56 T/m2. tan () : 0.67 As3 : 9.26 m2.Qsg = K*Pd3*tan ()*As3 =2.00*5.56*0.67*9.26 = 69.38 T Reduction factor (): 0.30 Average Cohesion(C): 0.00 T/m2. Qsc = *C*As3 =0.30*0.00*9.26 = 0.00 T Total net skin friction of this layer = 69.38T/m2.

    Total Skin Friction Capacity Qus = Qsg + Qsc = 115.82 T Total Ultimate Pile Capacity Qu = Qus + Que = 164.30 T Net Ultimate Pile Capacity Qu/FOS = 65.7 T

    5) Safe Load in Compression in Ton

    Pile Diameter in m Pile Length after cutoff in m

    14.0 16.0 18.0

    0.45 45.1 52.8 60.5

    0.50 56.3 65.7 75.1

    Calculating safe load on pile in uplift for various diameters,

    6) Safe Load in Uplift in Ton

    Pile Diameter in m Pile Length after cutoff in m

    14.0 16.0 18.0

    0.45 30.9 38.6 46.2

    0.50 36.9 46.4 55.7

    7) Computation of Lateral Capacity Lateral capacity is computed based up on the allowable top deflection of 5.0mm. Free Length L1 is 0.00 m and overall nature of soil is clayey.

    For a Fixed Head Pile of 500 mm diameter, soil constant K2= 48.8 Kg/cm3 (From IS Code), E = 273861.27 Kg/cm2, I = 306640.63 cm4, R = 203.67, L1/R = 0.00. Depth of Fixity Lf = 443.99 cm = 4.4 m Total Ultimate Horizontal Load Capacity H [As per IS Code] =12EIY/(L1+Lf)3 = 5.76 T Ultimate Horizontal Load Capacity is recommended as 4.50 T Moment Reduction Factor m = 0.825(From IS Code) Total Ultimate Moment Capacity M [As per IS Code] =mH (L1+Lf)/2 = 8.24 ~ 8.2 Tm

    Recommended Lateral Capacities For Fixed Head Piles Pile Diameter in m 0.45 0.50

    Horizontal Load Capacity in T 4.0 4.5

    For a Free Head Pile of 500 mm diameter, soil constant K2= 48.8 Kg/cm3 (From IS Code), E = 273861.27 Kg/cm2, I = 306640.63 cm4, R = 203.67, L1/R = 0.00. Depth of Fixity Lf = 391.05 cm = 3.9 m

    Sheet No.1061

    11-06-2012

  • Total Ultimate Horizontal Load Capacity H [As per IS Code] = 3EIY/(L1+Lf)3 = 2.1 T Ultimate Horizontal Load Capacity is recommended as 2.0 T Moment Reduction Factor m = 0.4 (From IS Code) Total Ultimate Moment Capacity M [As per IS Code] = mH (L1+Lf) = 3.13 ~3.0 Tm

    Recommended Lateral Capacities For Free Head Piles Pile Diameter in m 0.45 0.50

    Horizontal Load Capacity in T 1.9 2.0

    8) Notes: 1) Initial and routine pile load tests shall be carried out on the piles at site to confirm the capacity of pile worked out theoretically.

    (K.K.Thaker)

    Sheet No.1062

    11-06-2012

  • Sr.

    Leng

    thW

    idth

    CI

    Nc

    Nq

    - 1NJ

    Sc

    Sq

    SJ

    dcdq

    dJic

    iqiJ

    J0.

    5 J

    No.

    mm

    mK

    g/cm

    2de

    gree

    gm/c

    cW

    qWJ

    t / m

    2

    11.

    001.

    002.

    000.

    399

    6.82

    0.72

    0.57

    1.30

    1.20

    0.80

    1.44

    1.00

    1.00

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    1.00

    15

    22.

    002.

    002.

    000.

    399

    6.82

    0.72

    0.57

    1.30

    1.20

    0.80

    1.22

    1.00

    1.00

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.75

    13

    33.

    003.

    002.

    000.

    399

    6.82

    0.72

    0.57

    1.30

    1.20

    0.80

    1.15

    1.00

    1.00

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.67

    12

    44.

    004.

    002.

    000.

    399

    6.82

    0.72

    0.57

    1.30

    1.20

    0.80

    1.11

    1.00

    1.00

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.63

    12

    51.

    001.

    002.

    500.

    399

    6.82

    0.72

    0.57

    1.30

    1.20

    0.80

    1.56

    1.00

    1.00

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.75

    16

    62.

    002.

    002.

    500.

    399

    6.82

    0.72

    0.57

    1.30

    1.20

    0.80

    1.28

    1.00

    1.00

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.63

    14

    73.

    003.

    002.

    500.

    399

    6.82

    0.72

    0.57

    1.30

    1.20

    0.80

    1.19

    1.00

    1.00

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.58

    13

    84.

    004.

    002.

    500.

    399

    6.82

    0.72

    0.57

    1.30

    1.20

    0.80

    1.14

    1.00

    1.00

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.56

    12

    91.

    001.

    003.

    000.

    399

    6.82

    0.72

    0.57

    1.30

    1.20

    0.80

    1.67

    1.00

    1.00

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.50

    17

    102.

    002.

    003.

    000.

    399

    6.82

    0.72

    0.57

    1.30

    1.20

    0.80

    1.33

    1.00

    1.00

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.50

    14

    113.

    003.

    003.

    000.

    399

    6.82

    0.72

    0.57

    1.30

    1.20

    0.80

    1.22

    1.00

    1.00

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.50

    13

    124.

    004.

    003.

    000.

    399

    6.82

    0.72

    0.57

    1.30

    1.20

    0.80

    1.17

    1.00

    1.00

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.50

    13

    1) F

    acto

    r of s

    afet

    y is

    2.5

    2) D

    epth

    of f

    ound

    atio

    n sh

    all b

    e fr

    om E

    G L

    Dep

    th o

    f Fo

    unda

    tion

    Wat

    er T

    able

    C

    orre

    ctio

    nB

    earin

    g C

    apac

    ity F

    acto

    rsS

    hape

    Fac

    tors

    Not

    e :-

    Pro

    pose

    d st

    ruct

    ures

    of p

    lant

    of A

    dditi

    onal

    gas

    pro

    cess

    ing

    faci

    litie

    s pr

    ojec

    t (P

    hase

    4 )

    of O

    NG

    C a

    t Haz

    ira, S

    urat

    , L &

    T L

    tdFo

    r Is

    olat

    ed S

    quar

    e Fo

    otin

    g

    Proj

    ect :

    Dep

    th F

    acto

    rsIn

    clin

    atio

    n Fa

    ctor

    sU

    nit W

    eigh

    tS

    afe

    Bea

    ring

    Cap

    acity

    Siz

    e of

    Fou

    ndat

    ion

    She

    ar P

    aram

    eter

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    adA

    PP

    EN

    DIX

    - 2

    a (B

    oreh

    ole

    No.

    4)

    Cal

    cula

    tion

    of n

    et S

    afe

    Bea

    ring

    Cap

    acity

    Bas

    ed o

    n Sh

    ear P

    aram

    eter

    s C

    - I

    qu =

    1 /

    FS [

    2 / 3

    C N

    c dc

    Sc

    ic +

    Jd (N

    q - 1

    ) Sq

    dq iq

    Wq

    + 0.

    5 J B

    NJ S

    J dJiJ

    WJ]

    She

    et N

    o.10

    63

    11-0

    6-20

    12

  • Sr.

    Leng

    thW

    idth

    CI

    Nc

    Nq

    - 1NJ

    Sc

    Sq

    SJ

    dcdq

    dJic

    iqiJ

    J0.

    5 J

    No.

    mm

    mK

    g/cm

    2de

    gree

    gm/c

    cW

    qWJ

    t / m

    2

    11.

    001.

    002.

    000.

    4612

    7.55

    1.07

    0.87

    1.30

    1.20

    0.80

    1.46

    1.23

    1.23

    1.00

    1.00

    1.00

    1.71

    0.86

    1.00

    1.00

    20

    22.

    002.

    002.

    000.

    4612

    7.55

    1.07

    0.87

    1.30

    1.20

    0.80

    1.23

    1.12

    1.12

    1.00

    1.00

    1.00

    1.71

    0.86

    1.00

    0.75

    17

    33.

    003.

    002.

    000.

    4612

    7.55

    1.07

    0.87

    1.30

    1.20

    0.80

    1.15

    1.08

    1.08

    1.00

    1.00

    1.00

    1.71

    0.86

    1.00

    0.67

    16

    44.

    004.

    002.

    000.

    4612

    7.55

    1.07

    0.87

    1.30

    1.20

    0.80

    1.12

    1.06

    1.06

    1.00

    1.00

    1.00

    1.71

    0.86

    1.00

    0.63

    16

    51.

    001.

    002.

    500.

    4612

    7.55

    1.07

    0.87

    1.30

    1.20

    0.80

    1.58

    1.29

    1.29

    1.00

    1.00

    1.00

    1.71

    0.86

    1.00

    0.75

    22

    62.

    002.

    002.

    500.

    4612

    7.55

    1.07

    0.87

    1.30

    1.20

    0.80

    1.29

    1.14

    1.14

    1.00

    1.00

    1.00

    1.71

    0.86

    1.00

    0.63

    18

    73.

    003.

    002.

    500.

    4612

    7.55

    1.07

    0.87

    1.30

    1.20

    0.80

    1.19

    1.10

    1.10

    1.00

    1.00

    1.00

    1.71

    0.86

    1.00

    0.58

    17

    84.

    004.

    002.

    500.

    4612

    7.55

    1.07

    0.87

    1.30

    1.20

    0.80

    1.14

    1.07

    1.07

    1.00

    1.00

    1.00

    1.71

    0.86

    1.00

    0.56

    17

    91.

    001.

    003.

    000.

    4612

    7.55

    1.07

    0.87

    1.30

    1.20

    0.80

    1.69

    1.35

    1.35

    1.00

    1.00

    1.00

    1.71

    0.86

    1.00

    0.50

    24

    102.

    002.

    003.

    000.

    4612

    7.55

    1.07

    0.87

    1.30

    1.20

    0.80

    1.35

    1.17

    1.17

    1.00

    1.00

    1.00

    1.71

    0.86

    1.00

    0.50

    20

    113.

    003.

    003.

    000.

    4612

    7.55

    1.07

    0.87

    1.30

    1.20

    0.80

    1.23

    1.12

    1.12

    1.00

    1.00

    1.00

    1.71

    0.86

    1.00

    0.50

    18

    124.

    004.

    003.

    000.

    4612

    7.55

    1.07

    0.87

    1.30

    1.20

    0.80

    1.17

    1.09

    1.09

    1.00

    1.00

    1.00

    1.71

    0.86

    1.00

    0.50

    18

    1) F

    acto

    r of s

    afet

    y is

    2.5

    2) D

    epth

    of f

    ound

    atio

    n sh

    all b

    e fr

    om E

    G L

    Dep

    th o

    f Fo

    unda

    tion

    Wat

    er T

    able

    C

    orre

    ctio

    nB

    earin

    g C

    apac

    ity F

    acto

    rsS

    hape

    Fac

    tors

    Not

    e :-

    Pro

    pose

    d st

    ruct

    ures

    of p

    lant

    of A

    dditi

    onal

    gas

    pro

    cess

    ing

    faci

    litie

    s pr

    ojec

    t (P

    hase

    4 )

    of O

    NG

    C a

    t Haz

    ira, S

    urat

    , L &

    T L

    tdFo

    r Is

    olat

    ed S

    quar

    e Fo

    otin

    g

    Proj

    ect :

    Dep

    th F

    acto

    rsIn

    clin

    atio

    n Fa

    ctor

    sU

    nit W

    eigh

    tS

    afe

    Bea

    ring

    Cap

    acity

    Siz

    e of

    Fou

    ndat

    ion

    She

    ar P

    aram

    eter

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    ad AP

    PE

    ND

    IX -

    2 b

    (Bor

    ehol

    e N

    o. 5

    )

    Cal

    cula

    tion

    of n

    et S

    afe

    Bea

    ring

    Cap

    acity

    Bas

    ed o

    n Sh

    ear P

    aram

    eter

    s C

    - I

    qu =

    1 /

    FS [

    2 / 3

    C N

    c dc

    Sc

    ic +

    Jd (N

    q - 1

    ) Sq

    dq iq

    Wq

    + 0.

    5 J B

    NJ S

    J dJiJ

    WJ]

    She

    et N

    o.10

    64

    11-0

    6-20

    12

  • Sr.

    Leng

    thW

    idth

    CI

    Nc

    Nq

    - 1NJ

    Sc

    Sq

    SJ

    dcdq

    dJic

    iqiJ

    J0.

    5 J

    No.

    mm

    mK

    g/cm

    2de

    gree

    gm/c

    cW

    qWJ

    t / m

    2

    11.

    001.

    002.

    000.

    242

    5.46

    0.13

    0.10

    1.30

    1.20

    0.80

    1.41

    1.00

    1.00

    1.00

    1.00

    1.00

    1.70

    0.85

    1.00

    1.00

    7

    22.

    002.

    002.

    000.

    242

    5.46

    0.13

    0.10

    1.30

    1.20

    0.80

    1.20

    1.00

    1.00

    1.00

    1.00

    1.00

    1.70

    0.85

    1.00

    0.75

    6

    33.

    003.

    002.

    000.

    242

    5.46

    0.13

    0.10

    1.30

    1.20

    0.80

    1.14

    1.00

    1.00

    1.00

    1.00

    1.00

    1.70

    0.85

    1.00

    0.67

    5

    44.

    004.

    002.

    000.

    242

    5.46

    0.13

    0.10

    1.30

    1.20

    0.80

    1.10

    1.00

    1.00

    1.00

    1.00

    1.00

    1.70

    0.85

    1.00

    0.63

    5

    51.

    001.

    002.

    500.

    242

    5.46

    0.13

    0.10

    1.30

    1.20

    0.80

    1.51

    1.00

    1.00

    1.00

    1.00

    1.00

    1.70

    0.85

    1.00

    0.75

    7

    62.

    002.

    002.

    500.

    242

    5.46

    0.13

    0.10

    1.30

    1.20

    0.80

    1.26

    1.00

    1.00

    1.00

    1.00

    1.00

    1.70

    0.85

    1.00

    0.63

    6

    73.

    003.

    002.

    500.

    242

    5.46

    0.13

    0.10

    1.30

    1.20

    0.80

    1.17

    1.00

    1.00

    1.00

    1.00

    1.00

    1.70

    0.85

    1.00

    0.58

    6

    84.

    004.

    002.

    500.

    242

    5.46

    0.13

    0.10

    1.30

    1.20

    0.80

    1.13

    1.00

    1.00

    1.00

    1.00

    1.00

    1.70

    0.85

    1.00

    0.56

    5

    91.

    001.

    003.

    000.

    242

    5.46

    0.13

    0.10

    1.30

    1.20

    0.80

    1.61

    1.00

    1.00

    1.00

    1.00

    1.00

    1.70

    0.85

    1.00

    0.50

    8

    102.

    002.

    003.

    000.

    242

    5.46

    0.13

    0.10

    1.30

    1.20

    0.80

    1.31

    1.00

    1.00

    1.00

    1.00

    1.00

    1.70

    0.85

    1.00

    0.50

    6

    113.

    003.

    003.

    000.

    242

    5.46

    0.13

    0.10

    1.30

    1.20

    0.80

    1.20

    1.00

    1.00

    1.00

    1.00

    1.00

    1.70

    0.85

    1.00

    0.50

    6

    124.

    004.

    003.

    000.

    242

    5.46

    0.13

    0.10

    1.30

    1.20

    0.80

    1.15

    1.00

    1.00

    1.00

    1.00

    1.00

    1.70

    0.85

    1.00

    0.50

    6

    1) F

    acto

    r of s

    afet

    y is

    2.5

    2) D

    epth

    of f

    ound

    atio

    n sh

    all b

    e fr

    om E

    G L

    Dep

    th o

    f Fo

    unda

    tion

    Wat

    er T

    able

    C

    orre

    ctio

    nB

    earin

    g C

    apac

    ity F

    acto

    rsS

    hape

    Fac

    tors

    Not

    e :-

    Pro

    pose

    d st

    ruct

    ures

    of p

    lant

    of A

    dditi

    onal

    gas

    pro

    cess

    ing

    faci

    litie

    s pr

    ojec

    t (P

    hase

    4 )

    of O

    NG

    C a

    t Haz

    ira, S

    urat

    , L &

    T L

    tdFo

    r Is

    olat

    ed S

    quar

    e Fo

    otin

    g

    Proj

    ect :

    Dep

    th F

    acto

    rsIn

    clin

    atio

    n Fa

    ctor

    sU

    nit W

    eigh

    tS

    afe

    Bea

    ring

    Cap

    acity

    Siz

    e of

    Fou

    ndat

    ion

    She

    ar P

    aram

    eter

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    ad AP

    PE

    ND

    IX -

    2 C

    (B

    oreh

    ole

    No.

    6)

    Cal

    cula

    tion

    of n

    et S

    afe

    Bea

    ring

    Cap

    acity

    Bas

    ed o

    n Sh

    ear P

    aram

    eter

    s C

    - I

    qu =

    1 /

    FS [

    2 / 3

    C N

    c dc

    Sc

    ic +

    Jd (N

    q - 1

    ) Sq

    dq iq

    Wq

    + 0.

    5 J B

    NJ S

    J dJiJ

    WJ]

    She

    et N

    o.10

    65

    11-0

    6-20

    12

  • Sr.

    Leng

    thW

    idth

    CI

    Nc

    Nq

    - 1NJ

    Sc

    Sq

    SJ

    dcdq

    dJic

    iqiJ

    J0.

    5 J

    No.

    mm

    mK

    g/cm

    2de

    gree

    gm/c

    cW

    qWJ

    t / m

    2

    11.

    001.

    002.

    000.

    3813

    7.82

    1.20

    0.99

    1.30

    1.20

    0.80

    1.47

    1.23

    1.23

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    1.00

    18

    22.

    002.

    002.

    000.

    3813

    7.82

    1.20

    0.99

    1.30

    1.20

    0.80

    1.23

    1.12

    1.12

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.75

    15

    33.

    003.

    002.

    000.

    3813

    7.82

    1.20

    0.99

    1.30

    1.20

    0.80

    1.16

    1.08

    1.08

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.67

    15

    44.

    004.

    002.

    000.

    3813

    7.82

    1.20

    0.99

    1.30

    1.20

    0.80

    1.12

    1.06

    1.06

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.63

    14

    51.

    001.

    002.

    500.

    3813

    7.82

    1.20

    0.99

    1.30

    1.20

    0.80

    1.58

    1.29

    1.29

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.75

    20

    62.

    002.

    002.

    500.

    3813

    7.82

    1.20

    0.99

    1.30

    1.20

    0.80

    1.29

    1.15

    1.15

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.63

    17

    73.

    003.

    002.

    500.

    3813

    7.82

    1.20

    0.99

    1.30

    1.20

    0.80

    1.19

    1.10

    1.10

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.58

    16

    84.

    004.

    002.

    500.

    3813

    7.82

    1.20

    0.99

    1.30

    1.20

    0.80

    1.15

    1.07

    1.07

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.56

    15

    91.

    001.

    003.

    000.

    3813

    7.82

    1.20

    0.99

    1.30

    1.20

    0.80

    1.70

    1.35

    1.35

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.50

    22

    102.

    002.

    003.

    000.

    3813

    7.82

    1.20

    0.99

    1.30

    1.20

    0.80

    1.35

    1.17

    1.17

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.50

    18

    113.

    003.

    003.

    000.

    3813

    7.82

    1.20

    0.99

    1.30

    1.20

    0.80

    1.23

    1.12

    1.12

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.50

    17

    124.

    004.

    003.

    000.

    3813

    7.82

    1.20

    0.99

    1.30

    1.20

    0.80

    1.17

    1.09

    1.09

    1.00

    1.00

    1.00

    1.76

    0.88

    1.00

    0.50

    16

    1) F

    acto

    r of s

    afet

    y is

    2.5

    2) D

    epth

    of f

    ound

    atio

    n sh

    all b

    e fr

    om E

    G L

    Dep

    th o

    f Fo

    unda

    tion

    Wat

    er T

    able

    C

    orre

    ctio

    nB

    earin

    g C

    apac

    ity F

    acto

    rsS

    hape

    Fac

    tors

    Not

    e :-

    Pro

    pose

    d st

    ruct

    ures

    of p

    lant

    of A

    dditi

    onal

    gas

    pro

    cess

    ing

    faci

    litie

    s pr

    ojec

    t (P

    hase

    4 )

    of O

    NG

    C a

    t Haz

    ira, S

    urat

    , L &

    T L

    tdFo

    r Is

    olat

    ed S

    quar

    e Fo

    otin

    g

    Proj

    ect :

    Dep

    th F

    acto

    rsIn

    clin

    atio

    n Fa

    ctor

    sU

    nit W

    eigh

    tS

    afe

    Bea

    ring

    Cap

    acity

    Siz

    e of

    Fou

    ndat

    ion

    She

    ar P

    aram

    eter

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    ad AP

    PE

    ND

    IX -

    2 d

    (Bor

    ehol

    e N

    o. 9

    )

    Cal

    cula

    tion

    of n

    et S

    afe

    Bea

    ring

    Cap

    acity

    Bas

    ed o

    n Sh

    ear P

    aram

    eter

    s C

    - I

    qu =

    1 /

    FS [

    2 / 3

    C N

    c dc

    Sc

    ic +

    Jd (N

    q - 1

    ) Sq

    dq iq

    Wq

    + 0.

    5 J B

    NJ S

    J dJiJ

    WJ]

    She

    et N

    o.10

    66

    11-0

    6-20

    12

  • Sr. N

    o.C

    omp

    Inde

    x C

    cD

    epth

    ofFo

    otin

    g D

    W

    idth

    ofFo

    otin

    g B

    H

    Void

    s R

    atio

    e0

    Fiel

    dD

    ensi

    tyJ

    dp 0

    SBC

    'p('p

    +p0)

    /p0

    Cor

    rect

    ion

    for d

    epth

    Con

    solid

    atio

    nSe

    ttlem

    ent S

    c

    mm

    mgm

    / cc

    mT

    / m2

    T / m

    2T

    / m2

    mm

    10.

    152.

    001.

    002.

    000.

    821.

    763.

    005.

    2815

    3.68

    1.70

    0.7

    0.66

    17.5

    20.

    152.

    002.

    003.

    150.

    821.

    763.

    586.

    2913

    3.98

    1.63

    0.7

    0.73

    28.2

    30.

    152.

    003.

    003.

    150.

    821.

    763.

    586.

    2912

    5.22

    1.83

    0.7

    0.80

    38.0

    40.

    152.

    004.

    003.

    150.

    821.

    763.

    586.

    2912

    6.11

    1.97

    0.7

    0.85

    45.5

    50.

    152.

    501.

    002.

    000.

    821.

    763.

    506.

    1616

    4.00

    1.65

    0.7

    0.65

    16.2

    60.

    152.

    502.

    002.

    650.

    821.

    763.

    836.

    7314

    4.89

    1.73

    0.7

    0.73

    26.4

    70.

    152.

    503.

    002.

    650.

    821.

    763.

    836.

    7313

    6.13

    1.91

    0.7

    0.75

    32.4

    80.

    152.

    504.

    002.

    150.

    821.

    763.

    586.

    2912

    7.70

    2.22

    0.7

    0.81

    34.8

    90.

    153.

    001.

    002.

    000.

    821.

    764.

    007.

    0417

    4.32

    1.61

    0.7

    0.63

    15.2

    100.

    153.

    002.

    002.

    150.

    821.

    764.

    087.

    1714

    6.04

    1.84

    0.7

    0.73

    24.0

    110.

    153.

    003.

    002.

    150.

    821.

    764.

    087.

    1713

    7.23

    2.01

    0.7

    0.73

    27.4

    120.

    153.

    004.

    002.

    150.

    821.

    764.

    087.

    1713

    8.02

    2.12

    0.7

    0.77

    31.3

    Ofa

    ctor

    rela

    ted

    topo

    repr

    essu

    repa

    ram

    eter

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    ad

    Cal

    cula

    tion

    of S

    ettle

    men

    t (B

    H 4

    )Se

    ttlem

    ent S

    C =

    { ( C

    C H

    ) / (

    1 +

    e0 )

    } lo

    g 10 {

    ( P 0

    + 'P

    ) / P

    0 }

    Proj

    ect:-

    Pro

    pose

    d st

    ruct

    ures

    of p

    lant

    of A

    dditi

    onal

    gas

    pro

    cess

    ing

    faci

    litie

    s pr

    ojec

    t (Ph

    ase

    4 ) o

    f ON

    GC

    at H

    azira

    , Sur

    at, L

    & T

    Ltd

    She

    et N

    o.10

    67

    11-0

    6-20

    12

  • Sr. N

    o.C

    omp

    Inde

    x C

    cD

    epth

    ofFo

    otin

    g D

    W

    idth

    ofFo

    otin

    g B

    H

    Void

    s R

    atio

    e0

    Fiel

    dD

    ensi

    tyJ

    dp 0

    SBC

    'p('p

    +p0)

    /p0

    Cor

    rect

    ion

    for

    dept

    hC

    onso

    lidat

    ion

    Settl

    emen

    t Sc

    mm

    mgm

    / cc

    mT

    / m2

    T / m

    2T

    / m2

    mm

    10.

    182.

    001.

    002.

    000.

    911.

    713.

    005.

    1320

    5.01

    1.98

    0.7

    0.66

    25.8

    20.

    182.

    002.

    003.

    150.

    911.

    713.

    586.

    1117

    5.38

    1.88

    0.7

    0.73

    41.5

    30.

    182.

    003.

    003.

    150.

    911.

    713.

    586.

    1116

    7.01

    2.15

    0.7

    0.80

    54.9

    40.

    182.

    004.

    003.

    150.

    911.

    713.

    586.

    1116

    8.19

    2.34

    0.7

    0.85

    65.2

    50.

    182.

    501.

    002.

    000.

    911.

    713.

    505.

    9922

    5.51

    1.92

    0.7

    0.65

    24.2

    60.

    182.

    502.

    002.

    650.

    911.

    713.

    836.

    5418

    6.64

    2.02

    0.7

    0.73

    38.8

    70.

    182.

    503.

    002.

    650.

    911.

    713.

    836.

    5417

    8.28

    2.27

    0.7

    0.75

    46.9

    80.

    182.

    504.

    002.

    150.

    911.

    713.

    586.

    1117

    10.3

    82.

    700.

    70.

    8149

    .5

    90.

    183.

    001.

    002.

    000.

    911.

    714.

    006.

    8424

    6.02

    1.88

    0.7

    0.63

    23.0

    100.

    183.

    002.

    002.

    150.

    911.

    714.

    086.

    9720

    8.28

    2.19

    0.7

    0.73

    35.2

    110.

    183.

    003.

    002.

    150.

    911.

    714.

    086.

    9718

    9.84

    2.41

    0.7

    0.73

    39.6

    120.

    183.

    004.

    002.

    150.

    911.

    714.

    086.

    9718

    10.8

    72.

    560.

    70.

    7744

    .8

    Ofa

    ctor

    rela

    ted

    topo

    repr

    essu

    repa

    ram

    eter

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    ad

    Cal

    cula

    tion

    of S

    ettle

    men

    t (B

    H 5

    )Se

    ttlem

    ent S

    C =

    { ( C

    C H

    ) / (

    1 +

    e0 )

    } lo

    g 10 {

    ( P

    0 + 'P

    ) / P

    0 }

    Proj

    ect:-

    Pro

    pose

    d st

    ruct

    ures

    of p

    lant

    of A

    dditi

    onal

    gas

    pro

    cess

    ing

    faci

    litie

    s pr

    ojec

    t (Ph

    ase

    4 ) o

    f ON

    GC

    at H

    azira

    , Sur

    at, L

    & T

    Ltd

    She

    et N

    o.10

    68

    11-0

    6-20

    12

  • Sr. N

    o.C

    omp

    Inde

    x C

    cD

    epth

    ofFo

    otin

    g D

    W

    idth

    ofFo

    otin

    g B

    H

    Void

    s R

    atio

    e0

    Fiel

    dD

    ensi

    tyJ

    dp 0

    SBC

    'p('p

    +p0)

    /p0

    Cor

    rect

    ion

    for

    dept

    hC

    onso

    lidat

    ion

    Settl

    emen

    t Sc

    mm

    mgm

    / cc

    mT

    / m2

    T / m

    2T

    / m2

    mm

    10.

    292.

    001.

    002.

    000.

    921.

    73.

    005.

    107

    1.66

    1.33

    0.7

    0.66

    17.1

    20.

    292.

    002.

    002.

    000.

    921.

    73.

    005.

    106

    2.54

    1.50

    0.7

    0.73

    27.1

    30.

    292.

    003.

    002.

    000.

    921.

    73.

    005.

    105

    3.05

    1.60

    0.7

    0.80

    34.2

    40.

    292.

    004.

    002.

    000.

    921.

    73.

    005.

    105

    3.38

    1.66

    0.7

    0.85

    39.6

    50.

    292.

    501.

    001.

    500.

    921.

    73.

    255.

    537

    2.33

    1.42

    0.7

    0.65

    15.7

    60.

    292.

    502.

    001.

    500.

    921.

    73.

    255.

    536

    3.17

    1.57

    0.7

    0.73

    22.8

    70.

    292.

    503.

    001.

    500.

    921.

    73.

    255.

    536

    3.60

    1.65

    0.7

    0.75

    26.0

    80.

    292.

    504.

    001.

    500.

    921.

    73.

    255.

    535

    3.86

    1.70

    0.7

    0.81

    29.5

    90.

    293.

    001.

    001.

    000.

    921.

    73.

    505.

    958

    3.40

    1.57

    0.7

    0.63

    13.2

    100.

    293.

    002.

    001.

    000.

    921.

    73.

    505.

    956

    4.02

    1.68

    0.7

    0.73

    17.3

    110.

    293.

    003.

    001.

    000.

    921.

    73.

    505.

    956

    4.28

    1.72

    0.7

    0.73

    18.1

    120.

    293.

    004.

    001.

    000.

    921.

    73.

    505.

    956

    4.43

    1.74

    0.7

    0.77

    19.7

    Ofa

    ctor

    rela

    ted

    topo

    repr

    essu

    repa

    ram

    eter

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    ad

    Cal

    cula

    tion

    of S

    ettle

    men

    t (B

    H 6

    )Se

    ttlem

    ent S

    C =

    { ( C

    C H

    ) / (

    1 +

    e0 )

    } lo

    g 10 {

    ( P

    0 + 'P

    ) / P

    0 }

    Proj

    ect:-

    Pro

    pose

    d st

    ruct

    ures

    of p

    lant

    of A

    dditi

    onal

    gas

    pro

    cess

    ing

    faci

    litie

    s pr

    ojec

    t (Ph

    ase

    4 ) o

    f ON

    GC

    at H

    azira

    , Sur

    at, L

    & T

    Ltd

    She

    et N

    o.10

    69

    11-0

    6-20

    12

  • Sr. N

    o.D

    epth

    of

    Foot

    ing

    D

    Wid

    th o

    f Fo

    otin

    g B

    m

    vH

    'pSB

    COf

    acto

    rre

    late

    d to

    por

    e pr

    essu

    repa

    ram

    eter

    Cor

    rect

    ion

    for

    dept

    hC

    onso

    lidat

    ion

    Settl

    emen

    t Sc

    mm

    mT

    / m2

    T / m

    2m

    m

    12.

    001.

    000.

    121.

    505.

    8818

    0.3

    0.73

    23.2

    22.

    002.

    000.

    121.

    507.

    9315

    0.3

    0.76

    32.6

    32.

    003.

    000.

    121.

    509.

    6015

    0.3

    0.80

    41.3

    42.

    004.

    000.

    121.

    509.

    9314

    0.3

    0.83

    44.3

    52.

    501.

    000.

    121.

    008.

    8920

    0.3

    0.73

    23.3

    62.

    502.

    000.

    121.

    0010

    .88

    170.

    30.

    7328

    .6

    72.

    503.

    000.

    121.

    0011

    .76

    160.

    30.

    7531

    .9

    82.

    504.

    000.

    121.

    0011

    .85

    150.

    30.

    7833

    .4

    93.

    001.

    000.

    120.

    5014

    .08

    220.

    30.

    7318

    .5

    103.

    002.

    000.

    120.

    5014

    .22

    180.

    30.

    7318

    .7

    113.

    003.

    000.

    120.

    5014

    .49

    170.

    30.

    7319

    .0

    123.

    004.

    000.

    120.

    5014

    .17

    160.

    30.

    7519

    .1

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    ad

    Cal

    cula

    tion

    of S

    ettle

    men

    t (B

    H 9

    )

    Settl

    emen

    t SC =

    mv

    H 'P

    Proj

    ect:-

    Prop

    osed

    stru

    ctur

    esof

    plan

    tofA

    dditi

    onal

    gas

    proc

    essi

    ngfa

    cilit

    ies

    proj

    ect(

    Phas

    e4

    )ofO

    NG

    Cat

    Haz

    ira,

    Sura

    t, L

    & T

    Ltd

    She

    et N

    o.10

    70

    11-0

    6-20

    12

  • Sr. N

    o.C

    omp

    Inde

    x C

    cD

    epth

    of

    Foot

    ing

    D

    Wid

    th o

    f Fo

    otin

    g B

    H

    Void

    s R

    atio

    e0

    Fiel

    dD

    ensi

    tyJ

    dp 0

    'p('p

    +p0)

    /p0

    Ofac

    tor

    rela

    ted

    to

    pore

    pres

    sure

    para

    met

    er

    Cor

    rect

    ion

    for d

    epth

    Con

    solid

    atio

    nSe

    ttlem

    ent S

    cA

    llow

    able

    Bea

    ring

    Pres

    sure

    mm

    mgm

    / cc

    mT

    / m2

    T / m

    2m

    mT

    / m2

    10.

    152.

    001.

    002.

    000.

    821.

    763.

    005.

    285.

    942.

    130.

    70.

    6625

    24

    20.

    152.

    002.

    003.

    150.

    821.

    763.

    586.

    293.

    421.

    540.

    70.

    7325

    11

    30.

    152.

    003.

    003.

    150.

    821.

    763.

    586.

    293.

    071.

    490.

    70.

    8025

    7

    40.

    152.

    004.

    003.

    150.

    821.

    763.

    586.

    292.

    841.

    450.

    70.

    8525

    6

    50.

    152.

    501.

    002.

    000.

    821.

    763.

    506.

    167.

    172.

    160.

    70.

    6525

    29

    60.

    152.

    502.

    002.

    650.

    821.

    763.

    836.

    734.

    551.

    680.

    70.

    7325

    13

    70.

    152.

    503.

    002.

    650.

    821.

    763.

    836.

    734.

    361.

    650.

    70.

    7525

    9

    80.

    152.

    504.

    002.

    150.

    821.

    763.

    586.

    294.

    871.

    770.

    70.

    8125

    8

    90.

    153.

    001.

    002.

    000.

    821.

    764.

    007.

    048.

    412.

    190.

    70.

    6325

    34

    100.

    153.

    002.

    002.

    150.

    821.

    764.

    087.

    176.

    381.

    890.

    70.

    7325

    15

    110.

    153.

    003.

    002.

    150.

    821.

    764.

    087.

    176.

    381.

    890.

    70.

    7325

    12

    120.

    153.

    004.

    002.

    150.

    821.

    764.

    087.

    175.

    891.

    820.

    70.

    7725

    9

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    ad

    Allo

    wab

    le B

    earin

    g Pr

    essu

    re fo

    r 25

    mm

    Set

    tlem

    ent (

    BH

    4)

    Settl

    emen

    t SC =

    { ( C

    C H

    ) / (

    1 +

    e0 )

    } lo

    g 10 {

    ( P

    0 + 'P

    ) / P

    0 }

    Proj

    ect:-

    Pro

    pose

    d st

    ruct

    ures

    of p

    lant

    of A

    dditi

    onal

    gas

    pro

    cess

    ing

    faci

    litie

    s pr

    ojec

    t (Ph

    ase

    4 ) o

    f ON

    GC

    at H

    azira

    , Sur

    at, L

    & T

    Ltd

    She

    et N

    o.10

    71

    11-0

    6-20

    12

  • Sr. N

    o.C

    omp

    Inde

    x C

    cD

    epth

    of

    Foot

    ing

    D

    Wid

    th o

    f Fo

    otin

    g B

    H

    Void

    s R

    atio

    e0

    Fiel

    dD

    ensi

    tyJ

    dp 0

    'p('p

    +p0)

    /p0

    Ofac

    tor

    rela

    ted

    to

    pore

    pres

    sure

    para

    met

    er

    Cor

    rect

    ion

    for d

    epth

    Con

    solid

    atio

    nSe

    ttlem

    ent S

    cA

    llow

    able

    Bea

    ring

    Pres

    sure

    mm

    mgm

    / cc

    mT

    / m2

    T / m

    2m

    mT

    / m2

    10.

    182.

    001.

    002.

    000.

    911.

    713.

    005.

    134.

    791.

    930.

    70.

    6625

    19

    20.

    182.

    002.

    003.

    150.

    911.

    713.

    586.

    112.

    821.

    460.

    70.

    7325

    9

    30.

    182.

    003.

    003.

    150.

    911.

    713.

    586.

    112.

    541.

    420.

    70.

    8025

    6

    40.

    182.

    004.

    003.

    150.

    911.

    713.

    586.

    112.

    361.

    390.

    70.

    8525

    5

    50.

    182.

    501.

    002.

    000.

    911.

    713.

    505.

    995.

    781.

    960.

    70.

    6525

    23

    60.

    182.

    502.

    002.

    650.

    911.

    713.

    836.

    543.

    731.

    570.

    70.

    7325

    10

    70.

    182.

    503.

    002.

    650.

    911.

    713.

    836.

    543.

    581.

    550.

    70.

    7525

    7

    80.

    182.

    504.

    002.

    150.

    911.

    713.

    586.

    113.

    981.

    650.

    70.

    8125

    6

    90.

    183.

    001.

    002.

    000.

    911.

    714.

    006.

    846.

    761.

    990.

    70.

    6325

    27

    100.

    183.

    002.

    002.

    150.

    911.

    714.

    086.

    975.

    191.

    740.

    70.

    7325

    12

    110.

    183.

    003.

    002.

    150.

    911.

    714.

    086.

    975.

    191.

    740.

    70.

    7325

    10

    120.

    183.

    004.

    002.

    150.

    911.

    714.

    086.

    974.

    811.

    690.

    70.

    7725

    8

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    ad

    Allo

    wab

    le B

    earin

    g Pr

    essu

    re fo

    r 25

    mm

    Set

    tlem

    ent (

    BH

    5)

    Settl

    emen

    t SC =

    { ( C

    C H

    ) / (

    1 +

    e0 )

    } lo

    g 10 {

    ( P

    0 + 'P

    ) / P

    0 }

    Proj

    ect:-

    Pro

    pose

    d st

    ruct

    ures

    of p

    lant

    of A

    dditi

    onal

    gas

    pro

    cess

    ing

    faci

    litie

    s pr

    ojec

    t (Ph

    ase

    4 ) o

    f ON

    GC

    at H

    azira

    , Sur

    at, L

    & T

    Ltd

    She

    et N

    o.10

    72

    11-0

    6-20

    12

  • Sr. N

    o.C

    omp

    Inde

    x C

    cD

    epth

    of

    Foot

    ing

    D

    Wid

    th o

    f Fo

    otin

    g B

    H

    Void

    s R

    atio

    e0

    Fiel

    dD

    ensi

    tyJ

    dp 0

    'p('p

    +p0)

    /p0

    Ofac

    tor

    rela

    ted

    to

    pore

    pres

    sure

    para

    met

    er

    Cor

    rect

    ion

    for d

    epth

    Con

    solid

    atio

    nSe

    ttlem

    ent S

    cA

    llow

    able

    Bea

    ring

    Pres

    sure

    mm

    mgm

    / cc

    mT

    / m2

    T / m

    2m

    mT

    / m2

    10.

    292.

    001.

    002.

    000.

    921.

    703.

    005.

    102.

    601.

    510.

    70.

    6625

    .010

    .4

    20.

    292.

    002.

    002.

    000.

    921.

    703.

    005.

    102.

    311.

    450.

    70.

    7325

    .05.

    2

    30.

    292.

    003.

    002.

    000.

    921.

    703.

    005.

    102.

    081.

    410.

    70.

    8025

    .03.

    7

    40.

    292.

    004.

    002.

    000.

    921.

    703.

    005.

    101.

    931.

    380.

    70.

    8525

    .03.

    0

    50.

    292.

    501.

    001.

    500.

    921.

    703.

    255.

    534.

    181.

    760.

    70.

    6525

    .012

    .8

    60.

    292.

    502.

    001.

    500.

    921.

    703.

    255.

    533.

    571.

    650.

    70.

    7325

    .06.

    8

    70.

    292.

    503.

    001.

    500.

    921.

    703.

    255.

    533.

    421.

    620.

    70.

    7525

    .05.

    3

    80.

    292.

    504.

    001.

    500.

    921.

    703.

    255.

    533.

    141.

    570.

    70.

    8125

    .04.

    4

    90.

    293.

    001.

    001.

    000.

    921.

    703.

    505.

    958.

    102.

    360.

    70.

    6325

    .018

    .2

    100.

    293.

    002.

    001.

    000.

    921.

    703.

    505.

    956.

    622.

    110.

    70.

    7325

    .010

    .3

    110.

    293.

    003.

    001.

    000.

    921.

    703.

    505.

    956.

    622.

    110.

    70.

    7325

    .09.

    0

    120.

    293.

    004.

    001.

    000.

    921.

    703.

    505.

    956.

    092.

    020.

    70.

    7725

    .07.

    7

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    ad

    Allo

    wab

    le B

    earin

    g Pr

    essu

    re fo

    r 25

    mm

    Set

    tlem

    ent (

    BH

    6)

    Settl

    emen

    t SC =

    { ( C

    C H

    ) / (

    1 +

    e0 )

    } lo

    g 10 {

    ( P

    0 + 'P

    ) / P

    0 }

    Proj

    ect:-

    Pro

    pose

    d st

    ruct

    ures

    of p

    lant

    of A

    dditi

    onal

    gas

    pro

    cess

    ing

    faci

    litie

    s pr

    ojec

    t (Ph

    ase

    4 ) o

    f ON

    GC

    at H

    azira

    , Sur

    at, L

    & T

    Ltd

    She

    et N

    o.10

    73

    11-0

    6-20

    12

  • Sr. N

    o.D

    epth

    of

    Foot

    ing

    D

    Wid

    th o

    f Fo

    otin

    g B

    m

    vH

    'pOf

    acto

    rre

    late

    d to

    po

    repr

    essu

    repa

    ram

    eter

    Cor

    rect

    ion

    for

    dept

    h S

    ettle

    men

    t Sc

    Allo

    wab

    le

    Bea

    ring

    Pres

    sure

    mm

    mT

    / m2

    mm

    T / m

    2

    12.

    001.

    000.

    121.

    506.

    350.

    30.

    7325

    .019

    22.

    002.

    000.

    121.

    506.

    080.

    30.

    7625

    .011

    32.

    003.

    000.

    121.

    505.

    810.

    30.

    8025

    .09

    42.

    004.

    000.

    121.

    505.

    610.

    30.

    8325

    .08

    52.

    501.

    000.

    121.

    009.

    520.

    30.

    7325

    .021

    62.

    502.

    000.

    121.

    009.

    520.

    30.

    7325

    .015

    72.

    503.

    000.

    121.

    009.

    210.

    30.

    7525

    .013

    82.

    504.

    000.

    121.

    008.

    870.

    30.

    7825

    .011

    93.

    001.

    000.

    120.

    5019

    .04

    0.3

    0.73

    25.0

    30

    103.

    002.

    000.

    120.

    5019

    .04

    0.3

    0.73

    25.0

    24

    113.

    003.

    000.

    120.

    5019

    .04

    0.3

    0.73

    25.0

    22

    123.

    004.

    000.

    120.

    5018

    .53

    0.3

    0.75

    25.0

    21

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    ad

    Cal

    cula

    tion

    of S

    ettle

    men

    t (B

    H 9

    )

    Settl

    emen

    t SC =

    mv

    H 'P

    Proj

    ect:-

    Prop

    osed

    stru

    ctur

    esof

    plan

    tofA

    dditi

    onal

    gas

    proc

    essi

    ngfa

    cilit

    ies

    proj

    ect(

    Phas

    e4

    )ofO

    NG

    Cat

    Haz

    ira,

    Sura

    t, L

    & T

    Ltd

    She

    et N

    o.10

    74

    11-0

    6-20

    12

  • KCT Consultancy Services.,Ahmedabad

    NOTATIONS C Cohesion I Angle of internal f r ic t ion of soi l DS Disturbed Sample UDS Undisturbed Sample NMC Natural Moisture Content NP Non Plast ic Soi ls G Specif ic Gravity G Gravel Content M Si l t Content S Sand Content C Clay Content LL Liquid Limit PL Plast ic L imit PI Plast ic i ty Index Cc Compression Index K Coeff ic ient of Permeabi l i ty UCS Unconf ined Compression N SPT Value BH Bore Hole Suff ix The Number of Bore Holes Nc,Nq,NJ Bearing Capacity Factor Sc,Sq,SJ Shape Factors D Depth of foundat ion FS Factor of Safety Cv Coeff ic ient of consol idat ion UU Unconsol idated undrained t r iaxial test CU Consol idated undrained t r iaxial test CD Consol idated drained t r iaxial test GC Clayey Gravels GP Poorely Graded Gravels GW Wel l Graded Gravels SC Clayey Sand SM Si l ty Sand SW Wel Graded Sand SP Poorly Graded Sand CH Clays of High Plast ic i ty CI Clays of Intermediate Plast ic i ty CL Clays of Low Plast ic i ty MH Si l ts of High Plast ic i ty MI Si l ts of Intermediate Plast ic i ty ML Si l ts of Low Plast ic i ty

    Sheet No.1075

    11-06-2012

  • KCT Consultancy Services.,Ahmedabad

    REFERENCE Indian Standards Murthy V.N.S. Lambe T.W. Peck, R.S.Hanson W.E. Nayak, N.V. Kaniraj S.R. Alam Singh

    IS 2720 Pt I I , I I I , IV, V, XII I , XXXI,XXVII,XXVIS1498,IS6403,IS 1904 Soi l Mechanics and Foundat ion engineering Dhanpat Rai and Sons Delhi Soi l test ing for Engineers Wi ley Easter Ltd. , New Delhi Foundat ion Engineering Asia Publ ishing House Foundat ion Engineering Manual Dhanpat Rai & Sons. Design Aids in soi l mechanics and Foundat ion Engineering Tata Mc Graw Hi l l Publ ishing Co. Ltd. Modern Geotechnical Eng. IBT Publ ishing & Distr ibutors Delhi .

    Sheet No.1076

    11-06-2012

  • KCT Consultancy Services, Ahmedabad

    TABLE NO. 1

    RESULTS OF LABORATORY PERMEABILITY

    Sr. No.

    Bore Hole No.

    Depth (m) Permeabil ity (mm/s)

    1.

    BH 4 2.50

    0.66 x 10- 6

    2.

    BH 5 2.50

    0.68 x 10- 6

    3.

    BH 6 2.50

    0.60 x 10- 6

    4.

    BH 9 5.50

    0.58 x 10- 6

    ( K K Thaker)

    Sheet No.1077

    11-06-2012

  • Sr. No. BH No. Depth (m) pH SO3 in 2:1 Water : Soil

    Extract(mg/l)

    Chlorides

    1 BH 4 2.50 7.45 886 2013

    2 BH 5 4.50 7.63 926 2003

    3 BH 6 2.50 7.72 947 2014

    4 BH 9 2.50 7.75 868 2045

    Sr. No. Location pH Sulphate (SO3) (mg/l)

    Chloride(mg/l)

    Organic Inorganic

    1 BH 4 7.65 Nil 905 1081 1036

    2 BH 5 7.72 Nil 895 1015 1028

    3 BH 6 7.53 Nil 907 1059 1053

    4 BH 9 7.63 Nil 884 1083 1026

    For KCT Consultancy Services

    (K K Thaker)

    Total Dissolved Solids

    Table No. 2Results of Chemical Analysis of Soil

    Table No. 3Results of Chemical Analysis of Ground Water

    Sheet No.1078

    11-06-2012

  • 4mgm

    / cc

    %%

    %%

    %%

    %%

    %K

    g/cm

    2%

    Kg/

    cm2

    Deg

    ree

    Kg/

    cm2

    %%

    10.

    00D

    S-

    10.6

    4-

    13

    5442

    5529

    26-

    --

    CH

    --

    --

    --

    --

    20.

    50S

    PT

    --

    -1

    1047

    4254

    2826

    --

    -C

    H-

    --

    -19

    --

    -

    31.

    50S

    PT

    --

    -1

    844

    4754

    2529

    --

    -C

    H-

    --

    -16

    --

    -

    42.

    50U

    DS

    1.76

    21.3

    42.

    642

    646

    4655

    2629

    80.

    2654

    .3C

    H0.

    399

    -0.

    15-

    -0.

    8245

    .1

    53.

    00S

    PT

    --

    -2

    943

    4657

    3126

    --

    -C

    H-

    --

    -8

    --

    -

    64.

    50S

    PT

    --

    -2

    1071

    1751

    3615

    --

    -M

    H-

    --

    -2

    --

    -

    75.

    50U

    DS

    1.70

    35.7

    02.

    642

    7915

    4N

    PN

    PN

    P-

    --

    SM

    -25

    --

    --

    1.11

    52.6

    86.

    00S

    PT

    --

    -1

    876

    1550

    3911

    --

    -M

    H-

    --

    -10

    --

    -

    97.

    50S

    PT

    --

    -0

    972

    1955

    4114

    --

    -M

    H-

    --

    -8

    --

    -

    108.

    50U

    DS

    1.76

    22.0

    62.

    660

    1679

    550

    428

    --

    -M

    H-

    28-

    --

    -0.

    8445

    .7

    119.

    00S

    PT

    --

    -1

    8313

    3N

    PN

    PN

    P-

    --

    SM

    --

    --

    15-

    --

    1210

    .50

    SP

    T-

    --

    082

    144

    NP

    NP

    NP

    --

    -S

    M-

    --

    -19

    --

    -

    1311

    .50

    DS

    --

    -1

    8213

    4N

    PN

    PN

    P-

    --

    SM

    --

    --

    --

    --

    1412

    .00

    SP

    T-

    --

    083

    143

    NP

    NP

    NP

    --

    -S

    M-

    --

    -22

    --

    -

    1513

    .50

    SP

    T-

    --

    180

    154

    NP

    NP

    NP

    --

    -S

    M-

    --

    -28

    --

    -

    1614

    .50

    DS

    --

    -2

    7915

    4N

    PN

    PN

    P-

    --

    SM

    --

    --

    --

    --

    1715

    .00

    SP

    T-

    --

    082

    153

    NP

    NP

    NP

    --

    -S

    M-

    --

    -41

    --

    -

    1816

    .50

    SP

    T-

    --

    482

    122

    21N

    PN

    P-

    --

    SM

    --

    --

    59-

    --

    1917

    .50

    DS

    --

    -4

    8212

    220

    NP

    NP

    --

    -S

    M-

    --

    --

    --

    -

    2018

    .00

    SP

    T-

    --

    133

    3432

    4029

    11-

    --

    CI

    --

    --

    > 10

    0-

    --

    2120

    .00

    SP

    T-

    --

    478

    144

    24N

    PN

    P-

    --

    SM

    --

    --

    94-

    --

    Gravel

    Sand

    Type

    of

    Sam

    ple

    BH

    No.

    :-

    Dep

    th

    Soil Classification

    Proj

    ect :

    -

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    adR

    ES

    ULT

    S O

    F LA

    BO

    RA

    TO

    RY

    TE

    ST

    Prop

    osed

    str

    uctu

    res

    of p

    lant

    of A

    dditi

    onal

    gas

    pro

    cess

    ing

    faci

    litie

    s pr

    ojec

    t (Ph

    ase

    4 ) o

    f ON

    GC

    at H

    azira

    , Sur

    at, L

    & T

    Ltd

    Gra

    in S

    ize

    Ana

    lysi

    sFi

    eld

    Den

    sity

    Nat

    ural

    Moi

    stur

    eC

    onte

    nt

    Specific Gravity

    Shrinkage

    Limit

    SPT N Value

    Void Ratio

    Silt

    Clay

    Liquid

    Limit

    Plastic

    Limit

    Shea

    r Par

    amet

    er

    Swelling

    Pressure

    Con

    sist

    ancy

    lim

    its

    Porosity

    Sr No

    Rock Quality

    Designation

    CI

    Unconfined

    Compression

    Test

    Compression Index C

    C

    Free Swell Index

    Plasticity

    Index

    She

    et N

    o.10

    79

    11-0

    6-20

    12

  • 5mgm

    / cc

    %%

    %%

    %%

    %%

    %K

    g/cm

    2%

    Kg/

    cm2

    Deg

    ree

    Kg/

    cm2

    %%

    10.

    00D

    S-

    --

    -

    21.

    50S

    PT

    --

    -1

    1342

    4459

    3029

    --

    -C

    H-

    --

    -16

    --

    -

    32.

    50U

    DS

    1.71

    23.2

    42.

    650

    1044

    4658

    2929

    70.

    2246

    .3C

    H0.

    4612

    -0.

    18-

    -0.

    9147

    .6

    43.

    00S

    PT

    --

    -1

    1343

    4355

    2629

    --

    -C

    H-

    --

    -4

    --

    -

    54.

    50S

    PT

    --

    -0

    8612

    2N

    PN

    PN

    P-

    --

    SM

    --

    --

    6-

    --

    65.

    50U

    DS

    1.76

    31.5

    42.

    642

    8412

    2N

    PN

    PN

    P-

    --

    SM

    -26

    --

    --

    0.97

    49.3

    76.

    00S

    PT

    --

    -0

    1450

    3653

    4013

    --

    -M

    H-

    --

    -9

    --

    -

    87.

    50S

    PT

    --

    -6

    7912

    3N

    PN

    PN

    P-

    --

    SM

    --

    --

    27-

    --

    98.

    50U

    DS

    1.95

    28.4

    32.

    656

    7912

    3N

    PN

    PN

    P-

    --

    SM

    -32

    --

    --

    0.75

    42.7

    109.

    00S

    PT

    --

    -6

    7715

    2N

    PN

    PN

    P-

    --

    SM

    --

    --

    30-

    --

    1110

    .50

    SP

    T-

    --

    478

    153

    NP

    NP

    NP

    --

    -S

    M-

    --

    -23

    --

    -

    1211

    .50

    DS

    --

    -5

    7814

    3N

    PN

    PN

    P-

    --

    SM

    --

    --

    --

    --

    1312

    .00

    SP

    T-

    --

    381

    133

    NP

    NP

    NP

    --

    -S

    M-

    --

    -45

    --

    -

    1413

    .50

    SP

    T-

    --

    383

    122

    NP

    NP

    NP

    --

    -S

    M-

    --

    -39

    --

    -

    1514

    .50

    DS

    --

    -6

    8012

    2N

    PN

    PN

    P-

    --

    SM

    --

    --

    --

    --

    1615

    .00

    SP

    T-

    --

    056

    2420

    2415

    9-

    --

    SC

    --

    --

    38-

    --

    1716

    .50

    SP

    T-

    --

    283

    123

    NP

    NP

    NP

    --

    -S

    M-

    --

    -80

    --

    -

    1817

    .50

    DS

    --

    -0

    8512

    3N

    PN

    PN

    P-

    --

    SM

    --

    --

    --

    --

    1918

    .00

    SP

    T-

    --

    083

    152

    NP

    NP

    NP

    --

    -S

    M-

    --

    -92

    --

    -

    2019

    .50

    SP

    T-

    --

    030

    3832

    3530

    5-

    --

    MI

    --

    --

    77-

    --

    2120

    .50

    DS

    --

    -7

    7614

    3N

    PN

    PN

    P-

    --

    SM

    --

    --

    --

    --

    2221

    .00

    SP

    T-

    --

    328

    3732

    3630

    6-

    --

    MI

    --

    --

    83-

    --

    2322

    .50

    SP

    T-

    --

    1619

    3233

    3832

    6-

    --

    MI

    --

    --

    91-

    --

    2423

    .50

    UD

    S2.

    2623

    .51

    2.65

    1225

    3033

    3629

    7-

    --

    MI

    0.10

    36-

    --

    -0.

    4531

    .0

    2525

    .00

    SP

    T-

    --

    1525

    3030

    3631

    5-

    --

    MI

    --

    --

    > 10

    0-

    --

    Fille

    d up

    Cla

    y of

    hig

    h pl

    astic

    ity w

    ith d

    ebris

    and

    gra

    vels

    -

    Gravel

    Sand

    Type

    of

    Sam

    ple

    BH

    No.

    :-

    Dep

    th

    Soil Classification

    Proj

    ect :

    -

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    adR

    ES

    ULT

    S O

    F LA

    BO

    RA

    TO

    RY

    TE

    ST

    Prop

    osed

    str

    uctu

    res

    of p

    lant

    of A

    dditi

    onal

    gas

    pro

    cess

    ing

    faci

    litie

    s pr

    ojec

    t (Ph

    ase

    4 ) o

    f ON

    GC

    at H

    azira

    , Sur

    at, L

    & T

    Ltd

    Gra

    in S

    ize

    Ana

    lysi

    sFi

    eld

    Den

    sity

    Nat

    ural

    Moi

    stur

    eC

    onte

    nt

    Specific Gravity

    Shrinkage

    Limit

    SPT N Value

    Void Ratio

    Silt

    Clay

    Liquid

    Limit

    Plastic

    Limit

    Shea

    r Par

    amet

    er

    Swelling

    Pressure

    Con

    sist

    ancy

    lim

    its

    Porosity

    Sr No

    Rock Quality

    Designation

    CI

    Unconfined

    Compression

    Test

    Compression Index C

    C

    Free Swell Index

    Plasticity

    Index

    She

    et N

    o.10

    80

    11-0

    6-20

    12

  • 6mgm

    / cc

    %%

    %%

    %%

    %%

    %K

    g/cm

    2%

    Kg/

    cm2

    Deg

    ree

    Kg/

    cm2

    %%

    10.

    00D

    S-

    --

    -

    21.

    50S

    PT

    --

    -0

    2539

    3656

    2729

    7-

    61.3

    CH

    --

    --

    18-

    --

    32.

    50U

    DS

    1.70

    23.4

    02.

    650

    2437

    3954

    2628

    80.

    2152

    .4C

    H0.

    242

    -0.

    29-

    -0.

    9248

    .0

    43.

    00S

    PT

    --

    -1

    1943

    3751

    2625

    --

    -C

    H-

    --

    -4

    --

    -

    54.

    50S

    PT

    --

    -1

    8610

    3N

    PN

    PN

    P-

    --

    SM

    --

    --

    6-

    --

    65.

    50D

    S-

    --

    016

    6420

    5239

    13-

    --

    MH

    --

    --

    --

    --

    76.

    00S

    PT

    --

    -1

    1867

    1454

    4014

    --

    -M

    H-

    --

    -4

    --

    -

    87.

    50S

    PT

    --

    -0

    8214

    4N

    PN

    PN

    P-

    --

    SM

    --

    --

    12-

    --

    98.

    50U

    DS

    1.78

    29.3

    42.

    671

    8214

    3N

    PN

    PN

    P-

    --

    SM

    -28

    --

    --

    0.94

    48.5

    109.

    00S

    PT

    --

    -13

    7112

    4N

    PN

    PN

    P-

    --

    SM

    --

    --

    20-

    --

    1110

    .50

    SP

    T-

    --

    1269

    154

    NP

    NP

    NP

    --

    -S

    M-

    --

    -33

    --

    -

    1211

    .50

    DS

    --

    -1

    8710

    2N

    PN

    PN

    P-

    --

    SM

    --

    --

    --

    --

    1312

    .00

    SP

    T-

    --

    183

    133

    NP

    NP

    NP

    --

    -S

    M-

    --

    -42

    --

    -

    1413

    .50

    SP

    T-

    --

    285

    103

    NP

    NP

    NP

    --

    -S

    M-

    --

    -44

    --

    -

    1514

    .50

    DS

    --

    -56

    2216

    6N

    PN

    PN

    P-

    --

    GM

    --

    --

    --

    --

    1615

    .00

    SP

    T-

    --

    085

    123

    NP

    NP

    NP

    --

    -S

    M-

    --

    -48

    --

    -

    1716

    .50

    SP

    T-

    --

    157

    2418

    2113

    8-

    --

    SC

    --

    --

    52-

    --

    1817

    .50

    UD

    S1.

    9921

    .34

    2.66

    221

    3839

    5527

    28-

    --

    CH

    0.41

    18-

    0.11

    --

    0.62

    38.3

    1918

    .00

    SP

    T-

    --

    126

    3637

    5122

    29-

    --

    CH

    --

    --

    51-

    --

    2020

    .00

    SP

    T-

    --

    025

    3936

    5628

    28-

    --

    CH

    --

    --

    72-

    --

    Fille

    d up

    Cla

    y of

    hig

    h pl

    astic

    ity w

    ith d

    ebris

    and

    gra

    vels

    -

    Gravel

    Sand

    Type

    of

    Sam

    ple

    BH

    No.

    :-

    Dep

    th

    Soil Classification

    Proj

    ect :

    -

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    adR

    ES

    ULT

    S O

    F LA

    BO

    RA

    TO

    RY

    TE

    ST

    Prop

    osed

    str

    uctu

    res

    of p

    lant

    of A

    dditi

    onal

    gas

    pro

    cess

    ing

    faci

    litie

    s pr

    ojec

    t (Ph

    ase

    4 ) o

    f ON

    GC

    at H

    azira

    , Sur

    at, L

    & T

    Ltd

    Gra

    in S

    ize

    Ana

    lysi

    sFi

    eld

    Den

    sity

    Nat

    ural

    Moi

    stur

    eC

    onte

    nt

    Specific Gravity

    Shrinkage

    Limit

    SPT N Value

    Void Ratio

    Silt

    Clay

    Liquid

    Limit

    Plastic

    Limit

    Shea

    r Par

    amet

    er

    Swelling

    Pressure

    Con

    sist

    ancy

    lim

    its

    Porosity

    Sr No

    Rock Quality

    Designation

    CI

    Unconfined

    Compression

    Test

    Compression Index C

    C

    Free Swell Index

    Plasticity

    Index

    She

    et N

    o.10

    81

    11-0

    6-20

    12

  • 9mgm

    / cc

    %%

    %%

    %%

    %%

    %K

    g/cm

    2%

    Kg/

    cm2

    Deg

    ree

    Kg/

    cm2

    %%

    10.

    00D

    S-

    --

    -

    21.

    50S

    PT

    --

    -0

    2238

    4057

    3027

    --

    -C

    H-

    --

    -15

    --

    -

    32.

    50U

    DS

    1.76

    26.5

    72.

    640

    1248

    4054

    2727

    70.

    2853

    .1C

    H0.

    3813

    -0.

    17-

    -0.

    9047

    .3

    43.

    00S

    PT

    --

    -2

    1545

    3858

    2929

    --

    -C

    H-

    --

    -8

    --

    -

    54.

    50S

    PT

    --

    -0

    8215

    3N

    PN

    PN

    P-

    --

    SM

    --

    --

    13-

    --

    65.

    50U

    DS

    1.86

    31.0

    52.

    632

    8113

    4N

    PN

    PN

    P-

    --

    SM

    -29

    --

    --

    0.85

    46.0

    76.

    00S

    PT

    --

    -2

    8610

    2N

    PN

    PN

    P-

    --

    SM

    --

    --

    21-

    --

    87.

    50S

    PT

    --

    -2

    7915

    4N

    PN

    PN

    P-

    --

    SM

    --

    --

    24-

    --

    98.

    50U

    DS

    1.95

    24.6

    12.

    642

    8212

    4N

    PN

    PN

    P-

    --

    SM

    -33

    --

    --

    0.69

    40.7

    109.

    00S

    PT

    --

    -2

    8014

    4N

    PN

    PN

    P-

    --

    SM

    --

    --

    28-

    --

    1110

    .50

    SP

    T-

    --

    1667

    134

    21N

    PN

    P-

    --

    SM

    --

    --

    32-

    --

    1211

    .50

    DS

    --

    -5

    7714

    4N

    PN

    PN

    P-

    --

    SM

    --

    --

    --

    --

    1312

    .00

    SP

    T-

    --

    384

    103

    NP

    NP

    NP

    --

    -S

    M-

    --

    -44

    --

    -

    1413

    .50

    SP

    T-

    --

    577

    153

    NP

    NP

    NP

    --

    -S

    M-

    --

    -43

    --

    -

    1514

    .50

    DS

    --

    -15

    6813

    4N

    PN

    PN

    P-

    --

    SM

    --

    --

    --

    --

    1615

    .00

    SP

    T-

    --

    5820

    166

    NP

    NP

    NP

    --

    -G

    M-

    --

    -54

    --

    -

    1716

    .50

    SP

    T-

    --

    5619

    196

    NP

    NP

    NP

    --

    -G

    M-

    --

    -64

    --

    -

    1817

    .50

    DS

    --

    -16

    4222

    2029

    209

    --

    -S

    C-

    --

    --

    --

    -

    1918

    .00

    SP

    T-

    --

    1323

    3133

    3630

    6-

    --

    MI

    --

    --

    59-

    --

    2020

    .00

    SP

    T-

    --

    225

    4033

    3832

    6-

    --

    MI

    --

    --

    94-

    --

    Fille

    d up

    Cla

    yey

    San

    d w

    ith d

    ebris

    and

    gra

    vels

    -

    Gravel

    Sand

    Type

    of

    Sam

    ple

    BH

    No.

    :-

    Dep

    th

    Soil Classification

    Proj

    ect :

    -

    KC

    T C

    onsu

    ltan

    cy S

    ervi

    ces,

    Ahm

    edab

    adR

    ES

    ULT

    S O

    F LA

    BO

    RA

    TO

    RY

    TE

    ST

    Prop

    osed

    str

    uctu

    res

    of p

    lant

    of A

    dditi

    onal

    gas

    pro

    cess

    ing

    faci

    litie

    s pr

    ojec

    t (Ph

    ase

    4 ) o

    f ON

    GC

    at H

    azira

    , Sur

    at, L

    & T

    Ltd

    Gra

    in S

    ize

    Ana

    lysi

    sFi

    eld

    Den

    sity

    Nat

    ural

    Moi

    stur

    eC

    onte

    nt

    Specific Gravity

    Shrinkage

    Limit

    SPT N Value

    Void Ratio

    Silt

    Clay

    Liquid

    Limit

    Plastic

    Limit

    Shea

    r Par

    amet

    er

    Swelling

    Pressure

    Con

    sist

    ancy

    lim

    its

    Porosity

    Sr No

    Rock Quality

    Designation

    CI

    Unconfined

    Compression

    Test

    Compression Index C

    C

    Free Swell Index

    Plasticity

    Index

    She

    et N

    o.10

    82

    11-0

    6-20

    12

  • She

    et N

    o.10

    83

    11-0

    6-20

    12

  • 4N-365, E-102598.466m20.0 m

    From To

    m m m N 1 N 2 N 3 N0.00 0.00 0.00 0.50 DS - - - - - -0.50 0.50 0.50 1.50 SPT 6 9 10 19 - -1.001.50 1.50 1.50 2.50 SPT 5 6 10 16 - -2.002.50 2.50 2.50 3.00 UDS - - - - -