 CALLERI Contratista Cantera Tipo Torres Cabure Don Alfredo Copa Total general  viajes m3/viajes m3 Calleri Bruto 226.00 67.00 53.00 66.00 412.00 Bruto 290.00  20 5,800.00 Piedra Bola 43.00 18.00 14.00 9.00 84.00 Piedra Bola 30.00  18.75 562.50 Sub b ase 2.00 1.00 1.00 1.00 5.00 Subba se 5 19.5 97.50 Grillado 4.00 1.00 1.00 1.00 7.00 Grillado 7 18.5 129.50 Total Calleri 275.00 87.00 69.00 77.00 508.00 viajes m3/viajes m3 Total general 275.00 87.00 69.00 77.00 508.00 Bruto 122.00  20.25 2,470.50 Piedra Bola 54.00  19 1,026.00 Subbase - Grillado - viajes m3/viajes m3 Bruto 8,270.50 Piedra Bola 1,588.50 Subbase 97.50 Grillado 129.50

Binder 1

Embed Size (px)

DESCRIPTION

consumo material

Citation preview

  • CALLERI Contratista

    Cantera Tipo Torres Cabure Don Alfredo Copa Total general viajes m3/viajes m3

    Calleri Bruto 226.00 67.00 53.00 66.00 412.00 Bruto 290.00 20 5,800.00

    Piedra Bola 43.00 18.00 14.00 9.00 84.00 Piedra Bola 30.00 18.75 562.50

    Subbase 2.00 1.00 1.00 1.00 5.00 Subbase 5 19.5 97.50

    Grillado 4.00 1.00 1.00 1.00 7.00 Grillado 7 18.5 129.50

    Total Calleri 275.00 87.00 69.00 77.00 508.00 viajes m3/viajes m3

    Total general 275.00 87.00 69.00 77.00 508.00 Bruto 122.00 20.25 2,470.50

    Piedra Bola 54.00 19 1,026.00

    Subbase -

    Grillado -

    viajes m3/viajes m3

    Bruto 8,270.50

    Piedra Bola 1,588.50

    Subbase 97.50

    Grillado 129.50

  • Suma de Peso Seco Contratista

    Cantera Tipo Torres Cabure Don Alfredo Copa Total general Peso Esp. Vol./viaje

    Calleri Bruto 7,313,261.72 2,135,775.80 1,717,039.94 2,149,892.82 13,315,970.28 1.61 20.07

    Piedra Bola 1,361,597.04 570,628.80 436,163.40 283,116.60 2,651,505.84 1.67 18.90

    Subbase 67,375.60 31,335.30 28,945.16 28,267.64 155,923.70 1.59 19.61

    Grillado 126,673.12 30,368.80 30,559.20 31,168.48 218,769.60 1.69 18.49

    Total Calleri 8,868,907.48 2,768,108.70 2,212,707.70 2,492,445.54 16,342,169.42

    Total general 8,868,907.48 2,768,108.70 2,212,707.70 2,492,445.54 16,342,169.42

  • Cuenta de Chofer Fecha

    Cantera Patente Tipo 4/6 4/7 4/8 4/9 4/11 4/13 4/14 4/15 4/16 4/17 4/20 4/21 4/23 4/24 4/27 4/30 Total general

    Calleri LFP 871 Bruto 9 5 5 6 1 4 4 3 6 5 2 3 53

    Piedra Bola 3 5 1 1 4 14

    Subbase 1 1

    Grillado 1 1

    DHO 197 Bruto 7 2 2 2 13

    Piedra Bola 4 4

    Grillado 1 1

    KRR 300 Bruto 10 8 6 4 7 2 2 3 3 3 3 1 4 56

    Piedra Bola 3 5 1 4 13

    Subbase 1 1

    Grillado 1 1

    DGO 964 Bruto 3 7 1 4 4 5 5 3 32

    Piedra Bola 1 2 3

    Grillado 1 1

    LJG 059 Bruto 11 9 1 3 8 1 2 5 5 4 8 4 1 5 67

    Piedra Bola 4 4 1 4 5 18

    Subbase 1 1

    Grillado 1 1

    FQQ 443 Bruto 9 7 7 4 5 4 5 2 3 46

    Piedra Bola 1 1 1 1 2 4 10

    DOK 262 Bruto 10 8 5 7 3 3 36

    Piedra Bola 2 3 1 6

    Grillado 1 1

    RXL 076 Bruto 2 5 4 7 1 1 4 4 6 5 1 3 43

    Piedra Bola 3 1 1 2 7

    Subbase 1 1

    NVN 917 Bruto 11 8 6 5 7 1 1 5 5 4 8 5 66

    Piedra Bola 3 3 1 2 9

    Subbase 1 1

    Grillado 1 1

    Total Calleri 63 51 1 55 12 56 29 10 33 4 32 33 39 49 20 21 508

    150428 Transporte de suelo Abril 01150428 Transporte de suelo Abril 02