    BINDURA NICKEL CORPORATION LIMITED

    (Incorporated and registered in Zimbabwe with limited liability under Certificate of Registration

    number 552/66 and Certificates of Change of Name dated 22 June 1979)

    Directors: K.K. Mpinga (Chairman) (DRC), D.E.H. Murangari (Managing Director), J.P. Arthur,

    O.M. Chidawu, N.Kudenga, B. Manhando, T. Mashungupa, M.A. Masunda,

    Alternate Director: I.S. Cochrane

    Address: Trojan Nickel Mine, Trojan Mine Road, Bindura, Zimbabwe

    COMPLETION OF COMPETENT PERSONS REPORT AND 28%

    INCREASE IN ORE RESERVES AT TROJAN NICKEL MINE

    Bindura Nickel Corporation Limited (BNC or the Company) is pleased to announce the

    completion of a competent persons review by SRK Consulting (UK) Limited (SRK) of its

    Business Plan for the re-start of operations at Trojan Mine. SRK reviewed the updated mine

    plan targeting the higher grade ore zones in the early years of production at Trojan. The

    report is independent confirmation that the plan is realistic and achievable and enables BNC

    to update its Ore Reserves statement to total reserves of 3.168Mt at an average grade of

    1.04% for 32,975 tonnes of nickel, a 28% increase to the previously reported Trojan

    reserves as at 31 March 2010 of 25,810 tonnes of contained nickel.

    The table below presents BNCs latest Mineral Resource and Ore Reserve Statements for

    Trojan as at 30 June 2013, audited by SRK and reported in accordance with the JORC Code.

  • 7/27/2019 BIND Completion of competent persons report.pdf

    2/2

    Table 1: SRK Audited Mineral Resource and Ore Reserve Statement at 30 June

    2013

    Ore Reserve Mineral Resource

    Tonnage Grade Nickel Tonnage Grade Nickel

    Category (kt) (%) (t) Category (kt) (%) (t)

    Proved 2,166 0.89 19,254 Measured 2,235 1.01 22,572

    Probable 1,002 1.37 13,721 Indicated 1,946 1.52 29,583

    Total 3,168 1.04 32,975 Sub-total 4,181 1.25 52,155

    Inferred 4,038 1.63 65,817

    Total 8,219 1.44 117,971

    (1) Ore Reserves are reported as delivered to the concentrator and exclude all metallurgical recoveries.(2) Mineral Resources are stated inclusive of Ore Reserves.(3) Ore Reserves are restricted to 37L and above.(4) Mineral Resource and Ore Reserve depleted for actual mining during April to June 2013.

    BNCs Business Plan is based on the exploitation of the Measured, Indicated and Inferred

    Resources on and above 49L which are projected to support mining for some 10 years. The

    construction of the infrastructure required to access deeper levels has already commenced.

    SRK has reviewed the Business Plan for the re-start of operations at Trojan and considers

    the plan to be both realistic and achievable. SRK has also reviewed the production schedule

    on which the Trojan Business Plan is based and while this incorporates a portion of Inferred

    material, and therefore has a higher element of risk than if this was not the case, considers

    this to have been appropriately derived from the Mineral Resource model.

    An off-take agreement has been signed with Glencore which gives clarity on the revenue

    assumptions made going forward. SRK is satisfied that the terms of this have been

    appropriately reflected in the BNC Business Plan.

    BNC has developed operating costs from first principles and using experience from previous

    operating history at the mine, processing and administration facilities. SRK has reviewed the

    operating and capital cost assumptions and considers these to have been developed in a

    thorough manner and to be reasonable for the purposes of the Trojan Business Plan.

    By Order of the Board

    C.F. Mukanganga

    Company Secretary

    7 October 2013