28
8A000013_AF, Rev 7/31/18 BIN FILL AUGER ASSEMBLY OPERATION REPLACEMENT PARTS PLACE IN COMBINE CAB AFTER ASSEMBLY FOR FUTURE REFERENCE. READ complete manual CAREFULLY BEFORE attempting operation.

BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 1

8A000013_AF, Rev 7/31/18

BIN FIll AugeR

ASSEMBLYOPERATIONREPLACEMENT PARTS

PLACE IN COMBINE CAB AFTER ASSEMBLY FOR FUTURE REFERENCE.

READ complete manual CAREFULLY BEFORE attempting operation.

Page 2: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 2

Thank you for purchasing a Demco Bin Fill Auger. Proper care and use will result in many years of service.

INTRODUCTION

GENERAL INFORMATION1. Read assembly instructions carefully. Study assem-

bly procedures and all illustrations before you begin assembly. Note which parts are used in each step. This unit must be assembled in proper sequence or complications will result.

2. Whenever terms “LEFT” and “RIGHT” are used in this manual it means from a position behind combine and facing forward.

3. When placing a parts order, refer to this manual for proper part numbers and place order by PART NO. and DESCRIPTION.

TABLE OF CONTENTS General Information ............................................................................................................. 2 Safety, Signal Words ............................................................................................................ 3 Product Safety Guideline ..................................................................................................... 4 Product Disclaimer .............................................................................................................. 4 Safety Sign Locations ......................................................................................................... 5 Safety Sign Care ................................................................................................................. 5 General Assembly / General Hydraulics ............................................................................. 6 Parts List ............................................................................................................................. 7 Assembly / Parts List ........................................................................................................... 8-9 Hydraulic Connections ........................................................................................................ 10 2300 & 2500 Series Case IH Hydraulic Reverser ............................................................... 11 Hydraulic Installation & Diagrams ........................................................................................ 12-24 Operation Instructions ......................................................................................................... 25-26 Optional - BFA Extender 2010 ............................................................................................. 27

WARNING: TO AvOID PERSONAL INjURY OR DEATH, OBSERvE THE FOLLOWING INSTRUCTIONS:

Before applying power to any machinery used in conjunction with a Demco Bin Fill Auger, make sure the area is clear of all bystanders.

Never allow anyone in or near the grain tank of a combine during loading or unloading of grain. The accumulation of grain is dangerous and can cause entrapment, resulting in serious injury or death by suffocation.

Beware of and avoid contact with low power lines and other obstructions.

Page 3: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 3

SAFETYTAKE NOTE! THIS SAFETY ALERT SYMBOL FOUND THROUGHOUT THIS MANUAL IS USED TO CALL YOUR ATTENTION TO INSTRUCTIONS INvOLvING YOUR PERSONAL SAFETY AND SAFETY OF OTHERS. FAILURE TO FOLLOW THESE INSTRUCTIONS CAN RESULT IN INjURY OR DEATH!

THIS SYMBOL MEANS

ATTENTION

BECOME ALERT

YOUR SAFETY IS INvOLvED!

SIGNAL WORDS Note use of following signal words DANGER, WARNING, and CAUTION with safety messages. The appropriate signal word for each has been selected using the following guidelines:

DANGER: Indicates an imminently hazardous situation that, if not avoided, will result in death or serious injury. This signal word is to be limited to most extreme situations typically for machine components which, for functional purposes, cannot be guarded.

WARNING: Indicates a potentially hazardous situation that, if not avoided, could result in death or serious injury, and includes hazards that are exposed when guards are removed. It may also be used to alert against unsafe practices.

CAUTION: Indicates a potentially hazardous situation that, if not avoided, may result in minor or moderate injury. It may also be used to alert against unsafe practices.

Page 4: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 4

PRODUCT SAFETY GUIDELINESEvery year many accidents occur which could have been avoided by a few seconds of thought and a more careful approach to handling equipment. You, the operator, can avoid many accidents by observing the following precautions in this section. To avoid personal injury, study the following precautions and insist those working with you, or you yourself, follow them.

• Replaceanydanger,warning,orcautiondecalthatisnotlegibleorismissing.Locationof such decals are indicated in this manual.

• Reviewallsafetyinstructionswithallusersannually.

• Theoperatorshouldbearesponsibleadult.DONOTallowpersonstooperateorassemblethis unit until they have developed an understanding of all safety precautions.

• Neverleaverunningequipmentunattended.

• Beforeapplyingpowertoanyequipment,cleartheareaofallbystanders.

• Neverexceedthelimitsofapieceofmachinery.Ifit’sabilitytodoajobsafelyisinquestionDO NOT attempt it.

•Bewareofandavoidcontactwithlowpowerlinesandotherobstructionswhileoperatingcombines equipped with the Demco Bin Fill Auger.

• CollapseandsecuretheBinFillAugerwhentransportingthecombinetoavoidcontactwith low power lines and other obstructions.

Installing a Demco Bin Fill Auger on any combine is at the discretion of the owner. Although Demco has included all the necessary mounting components and has included or recommended various hydraulic components, it does not assume liabilities, or make any warranties pertaining to the structural aspects of the combines grain tank or the combines hydraulicsystem. See thecombinesowner’s/operator’smanual foradditionalcombinespecificationsandsafetyinformationnotlistedinthismanual.

PERFORMING MAINTENANCE

• Goodmaintenanceisyourresponsibility.Poormaintenanceisaninvitationtotrouble.

• Neveruseyourhandstolocateahydraulicleak.Useasmallpieceofpaperorcardboard.Hydraulicfluidescapingunderpressurecanpenetratetheskin.

• Openingsintheskinandminorcutsaresusceptibletoinfectionfromhydraulicfluid.

• Before disconnecting hydraulic lines, shut off hydraulic supply and relieve all hydraulicpressure.

• Ifequipmenthasbeenalteredinanywayfromtheoriginaldesign,Demcodoesnotacceptanyliability for injury or warranty.

PRODUCT DISCLAIMER

Page 5: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 5

Types of safety signs and locations on equipment are shown in the illustration below. Good safety requires that you familiarize yourself with various safety signs, type of warning, and area or particular function related to that area, that requires your SAFETY AWARENESS.

• Keepsafetysignscleanandlegibleatalltimes.

• Replacesafetysignsthataremissingorhavebecomeillegible.

• Besurethatreplacmentpartscontainsafetysigns,iftheoriginalpartwasprovidedwitha safety sign .

• SafetysignsareavailablefromyourdealerorDemco.

SAFETY SIGN LOCATIONS

SAFETY SIGN CARE

Page 6: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 6

BIN FILL AUGER GENERAL ASSEMBLY

•TherearemanyaspectstotakeintoconsiderationbeforemountingyourBinFillAugertothecombine’sgraintank.Firstdecidewherethepeakofthegrainheapwillbenefityouthemostoncethecombinehopperorgraintankextensionisfull.DuetotheBinFillAugersinfinitepositionsinsidethegraintankthepeak of the grain heap can be placed exactly where you desire.•TheBinFillAugershouldbelocatedasclosetothecenterofthegraintankaspossible,andideallytheBin Fill Auger should be near vertical when operating. However, due to grain tank bracing, location of cross augers, etc. if the Bin Fill Auger cannot be located exactly in the center of the grain tank, there will not be an adverse effect on the operation of the Bin Fill Auger by being positioned in any direction.•Onmostcombinesthetankcrosspipeassembly(Item6onthefollowingpage)shouldbepositionedtothe left side of the fountain augers outlet, running front to rear in the combine tank, so the fountain auger can still fold down into the combine tank.•TheBinFillAugerlatchpinmechanismonthecrosspipeandthereartankmountallowstheaugertoeasily fold 90 degrees from the upright position to the folded position. •Locatethefrontandreartankmountingassemliesasclosetothethetopofthecombinegraintankaspossible. •TheBinFillAugeristhentypicallylocatedtotherearsideofthefountainauger’soutlet.•AlwaysinstalltheBinFillAugersothatthedrivemotorisbelowthedischargeofthefountainorcrossauger when in operation. Hydraulic hoses inside of the combine tank need to routed and secured, to prevent getting entangled in augers and other rotating parts. •ForoptimalperformancetheBinFillAugershouldextend6to8inchesabovethecombine’sbinextension or tip-up boards. •TheBinFillAugerrotationalspeedshouldbeadjustedtopreventgrainfrombeingthrownoutofthetank.

ASSEMBLY SAFETY: Assemble in an area with sufficient space to handle the largest of components related to this product.

When necessary, have someone assist you during the assembly of this product.

GENERAL HYDRAULIC INFORMATION

• WiththeBinFillAugerintheverticalpositionandthemotorportsfacingyou,theleftportisthepower port, and the right is the return port.

• Usecareandkeepthehydraulicsystemcleanfromcontaminates.

• TheBinFillAuger,combinereel,andthechaffspreader(ifequipped)areplumbedinaseriescircuitand can be controlled individually.

• Demcorecommendsusing1/2”wirehydraulichosesforyourhydrauliccircuit.

• Wherepipethreadsareused,DemcorecommendsusingTeflonPasteandnotTeflonTape. Tape over time can disintegrate and cause damage to the hydraulic system.

• ThereturnoilfromthereelisusedtopowertheBinFillAuger,inallcasesexceptwheninstalled on a John Deere 2008 and newer STS 70 series combines. See hydraulic schematics on following pages for proper power supply.

Page 7: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 7

NOTE: Item 11 only required with larger combine tanks. (NewHolland,JD-STS,andsomeCNHmodels.)

37

Figure 1

11

4

1

10

5

6

2

PARTS LISTPlease order replacement parts by PART NO. and DESCRIPTION.

BaseUnitPartsList

7

8

88

8

8

88

8

99

9

9

9

9

9

9

10 10

10

10

10

REF. PART NO. NO. QTY. ASSY. DESCRIPTION 1. R5A000010L0 1 Rear Tank Mount Assembly 2. R5A000011L0 1 Front Tank Mount Assembly 3. R5A000003L0 1 Backbone Collar Assembly 4. R5A000004L0 1 Cross Pipe Pivot Assembly 5. R5A000006L0 1 40”MainAugerAssembly 6. R5A000007L0 1 Tank Cross Pipe Assembly 7. R3A000020L0 2 Backing Plate 8. 1AFC08F0000 8 3/8”SerratedFlangeNut 9. 1AFC12FAAH0 8 3/8”x11/2”HexBolt 10. 1AFC24HBA00 6 1/2”x2”SetScrew 11. R3A000019L0 1 SupportCrossPipe-40”Extension 12. 1AFZ51HEA00 1 1/2”x5”BentPinw/Clip

12

FRONT

REAR

RIGHT

LEFT

Page 8: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 8

NOTE: Depending on the make and model of your combine you may need to either cut or lengthen the crosspipetofityourapplication.Makesurethelengthofthecrosspipeisasexactaspossibletoallowthe latch mechanism at the rear of the tank to function properly. If the cross pipe needs to be extended, the recommended procedure is to bevel the edges of each pipe to create a beveled seem to weld on.

BIN FILL AUGER ASSEMBLY

STEP ONEDetermine the most effective mounting location for yourBinFillAuger.Usethetankmountingbracketsas a template to mark the location of the eight holes necessary to mount the brackets to the wall of the combinesgraintank.(Usethesupportcrosspipetoensure that both tank mounting brackets are aligned witheachother)Drilleight7/16”holes.

STEP TWOBefore fastening the tank mounting brackets to the grain tank, slide the cross pipe pivot assembly to the center of the support cross pipe. Next slide one tank mount bracket onto each end of the support cross pipe and proceed to fasten the tank mounting bracketswiththeprovidedbackingplatesusing3/8”x11/2”hexboltsand3/8”nuts.Seefigure2.(Tankmountingbracketscanalsobemountedverticallyifadditionalstrengthisrequired.)

STEP THREEWith the support cross pipe secured, estimate where the cross pipe pivot assembly will need to be located and position the assembly so that the female receiver is facing the clean grain auger and temporarily secure to the support cross pipe using the provided set screws.

STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily tighten in order to mount the main auger assembly to the cross pipe pivot assembly.

Figure 3

Figure 2

Page 9: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 9

PARTS LISTPlease order replacement parts by PART NO. and DESCRIPTION.

Main Auger Assembly Parts List

STEP FIVEWith both the backbone collar and cross pipe pivot assemblies secured, insert the male end of the collar assemblyintothefemaleendofthecrosspipepivotassembly.Tightenbothsetscrews.Seefigure3.

NOTE: Setyourbinfillaugertothepostionwhichbestfitsyourapplication.Makesurethattheaugerwillnotintefere or come in conatct with any other braces, brackets, or augers inside the combine tank. Insure there is plentyofclearanceforthebinfillaugertorotatebetweenboththefoldedandtheuprightpositions.

* Indicates items not shown in illustrations.

Figure 4

1

2 3

4

5 6

7

8

9 1011

5

13

REF. PART NO. NO. QTY. ASSY. DESCRIPTION 1. 1AFC08E0000 3 5/16”SerratedFlangeNut 2. 1AFC37E00L0 3 5/16”x3/4”SerratedFlangeBolt 3. 1AFC37F00L5 4 3/8”SerratedFlangeBolt 4. 1AKMABD0000 1 Hydraulic Motor DH-80 5. 1AL00004000 2 Bearing Flangets 6. 1ALAA003000 1 Bearing1”SelfAligning 7. R5A000003L0 1 Backbone Collar Assembly 8. R5A000005L0 1 Auger Flighting Assembly 9. R3A000002L0 1 Top Auger Plate 10. R3A000003L0 1 Bottom Auger Plate 11. R3A000009L0 1 Backbone Tube *12. 1AF064DAA00 1 1/4”x1”WoodruffKey(HalfMoon) 13. 1AF030QCA00 1 1”ShaftCoupler

Page 10: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 10

HYDRAULIC CONNECTION

NOTE: Read the following information before begining to connect the hydraulics.

(Bulkhead Fittings)

STEP ONE ThehydraulicmotorprovidedwithyourBinFillAugerhastwo1/2”FNPTports.Whenlookingdirectlyatthemtheporttoyourleftisthe“ControlFloworCF”port.Theporttoyourrightisthe“ExcessorEX”port.

STEP TWOFastenthe1/2”hosestotheBinFillAugermotor,makenoteofwhichlineisthe“CFandwhichistheEX.”

STEP THREEThelocationofthebulkheadfittingswillbedeterminedbythemakeandmodelofyourcombine.Followtheappropriate recomendations below.

When determining the length of hydraulic hose needed, compensate for when the auger is in the storage position(foldedinsidethetank)andintheuprightposition.

Usecautionwhenroutingallhydraulichosesinsidethegraintank.Avoidmovingpartsandsharpsurfacesthat can damage the hoses.

1400 and 1600 Case IH Series Installthetwobulkheadfittingsonthebottomleftside of the grain tank, ahead of the unloading auger on the sloped surface.

2100, 2300, and 2500 Case IH Series Ifthe“EZ-Connect”hydraulicconnectionisused,you can access the grain tank thru the grain sampler access port in the left front corner of the grain tank; otherwise, install the two bulkhead fittingsonthebottomleftsideofthegraintank,aheadoftheunloadingauger.(Important: see page11forCaseIHhyd.reverserinformation)

John Deere 20 Series Installthetwobulkheadfittingsonthebottomleftside of the grain tank, ahead of the unloading auger on the sloped surface.

John Deere 9000 Series Ifthe“EZ-Connect”hydraulicconnectionisused,you can access the grain tank thru the grain sampler access port in the left front corner of the grain tank; otherwise, install the two bulkhead fittingsonthebottomleftsideofthegraintank,ahead of the unloading auger.

New Holland TR Series 96/97/98/99Installthetwobulkheadfittingsonthebottomrightside of the grain tank, ahead of the loading auger on the sloped surface.

John Deere STS SeriesIfthe“EZ-Connect”hydraulicconnectionisused,you can access the grain tank thru the grain sampler access port in the left front corner of the grain tank; otherwise, install the two bulkhead fittingsonthebottomleftsideofthegraintank,ahead of the unloading auger.

Page 11: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 11

Figu

re 5

2300

& 2

500

Serie

s C

ASE

IH H

YDR

AU

LIC

REv

ERSE

R

CH

ECK

vA

LvE

INST

ALL

ATIO

N

WA

RN

ING

Sto

p co

mbi

ne e

ngin

e, s

et p

arki

ng

brak

e, a

nd w

ait f

or a

ll m

ovin

g pa

rts

on m

achi

ne to

com

e to

a c

ompl

ete

stop

bef

ore

inst

allin

g, s

ervi

cing

, ad

just

ing,

or r

epai

ring.

Als

o be

su

re c

ombi

ne is

on

a le

vel s

urfa

ce.

2001

Mod

el y

ear a

nd n

ewer

Cas

e IH

com

bine

s m

ay b

e eq

uipp

ed w

ith

a hy

drau

lic h

eade

r rev

erse

r. T

his

reve

rser

mot

or is

loca

ted

on th

e le

ft si

de o

f the

feed

er h

ouse

.

Whe

n in

stal

ling

a D

emco

Bin

Fill

A

uger

on

thes

e un

its a

che

ck v

alve

ne

eds

to b

e in

stal

led

on th

e re

el

retu

rn li

ne o

f the

reve

rser

mot

or.

The

reel

retu

rn p

ort o

n th

e re

vers

er

motorisidentifiedas“T”.TheT

port

is th

e to

p po

rt to

you

r lef

t whe

n fa

cing

the

reve

rser

mot

or.

To in

stal

l the

che

ck v

alve

, sim

ply

disc

onne

ct th

e ho

se o

n th

e T

port

of th

e re

vers

er m

otor

. S

crew

the

mal

e en

d of

the

chec

k va

lve

into

th

e T

port.

The

n co

nnec

t the

hos

e w

hich

you

dis

conn

ecte

d fro

m th

e T

port

to th

e fe

mal

e en

d of

the

checkvalve.(SeeFigure5.)

Part#1AKGANGANG0

Page 12: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 12

Figu

re 6

CA

SE IH

INST

ALL

ATIO

N(W

ith C

haff

Spre

ader

)

WA

RN

ING

Sto

p co

mbi

ne e

ngin

e, s

et p

arki

ng

brak

e, a

nd w

ait f

or a

ll m

ovin

g pa

rts

on m

achi

ne to

com

e to

a c

ompl

ete

stop

bef

ore

inst

allin

g, s

ervi

cing

, ad

just

ing,

or r

epai

ring.

Als

o be

su

re c

ombi

ne is

on

a le

vel s

urfa

ce.

Dis

conn

ect t

he re

turn

hos

e on

the

bottomsideofthechaffspreader’s

flowcontrolvalveEXport“Tee”.Run

a ne

w h

ose

from

this

Tee

to th

e IN

portoftheBinFillAuger’sflow

control

valv

e. T

hen

plum

b ac

cord

ingl

y to

the

diag

ram

sho

wn

to th

e rig

ht.

The

retu

rn

hoseroutedfrom

theEXportofthe

Bin

Fill

Aug

er th

en c

onne

cts

to th

e ho

se p

revi

ousl

y di

scon

nect

ed fr

om

chaffspreader’sflow

controlvalveto

com

plet

e a

serie

s ci

rcui

t.

Hyd

raul

ic c

ompo

nent

s sh

own

in

bold

das

hed

lines

on

the

diag

ram

to

the

right

, ind

icat

e ne

w h

ydra

ulic

co

mpo

nent

s re

com

men

ded

with

the

use

of a

Dem

co B

in F

ill A

uger

. A

ll ot

her h

ydra

ulic

com

pone

nts

show

n ar

e ex

istin

g fro

m th

e m

anuf

actu

rer.

Page 13: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 13

Figu

re 7

WA

RN

ING

Sto

p co

mbi

ne e

ngin

e, s

et p

arki

ng

brak

e, a

nd w

ait f

or a

ll m

ovin

g pa

rts

on m

achi

ne to

com

e to

a c

ompl

ete

stop

bef

ore

inst

allin

g, s

ervi

cing

, ad

just

ing,

or r

epai

ring.

Als

o be

su

re c

ombi

ne is

on

a le

vel s

urfa

ce.

* O

n th

e le

ft si

de o

f the

com

bine

, ab

ove

the

left

front

whe

el, l

ocat

e th

e the“Tee”fittingthatlinksthereel

circ

uits

retu

rn li

nes

toge

ther

. O

n th

e bo

ttom

sid

e of

the

Tee

you

will

not

ice

a re

turn

hos

e th

at h

as a

90

deg

ree

hardelbow

fittingattachedtothe

hose

. Dis

conn

ect t

his

retu

rn h

ose

from

the

Tee.

Thi

s ho

se w

ill b

ecom

e th

e po

wer

sou

rce.

Run

a s

hort

leng

th

of h

ose

from

the

90 d

egre

e el

bow

to

theINportofflow

controlvalvewhich

will

con

trol t

he s

peed

of t

he B

in F

ill

Aug

er.

Then

plu

mb

acco

rdin

gly

to

the

diag

ram

sho

wn

to th

e rig

ht.

The

returnhoseroutedfrom

theEXportof

theBinFillAuger’sflow

controlvalve

then

con

nect

s to

the

exis

ting

Tee

to

com

plet

e a

serie

s ci

rcui

t.*

Hyd

raul

ic c

ompo

nent

s sh

own

in

bold

das

hed

lines

on

the

diag

ram

to

the

right

, ind

icat

e ne

w h

ydra

ulic

co

mpo

nent

s re

com

men

ded

with

the

use

of a

Dem

co B

in F

ill A

uger

. A

ll ot

her h

ydra

ulic

com

pone

nts

show

n ar

e ex

istin

g fro

m th

e m

anuf

actu

rer.

CA

SE IH

INST

ALL

ATIO

N(W

ithou

t Cha

ff Sp

read

er)

Page 14: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 14

Figu

re A

Figu

re B

5088

, 608

8, &

708

8 C

ASE

IH H

YDR

AU

LIC

REv

ERSE

R

CH

ECK

vA

LvE

INST

ALL

ATIO

N

Che

ck V

alve

Par

t #

1AKGANGANG0

WA

RN

ING

Sto

p co

mbi

ne e

ngin

e, s

et p

arki

ng

brak

e, a

nd w

ait f

or a

ll m

ovin

g pa

rts

on m

achi

ne to

com

e to

a c

ompl

ete

stop

bef

ore

inst

allin

g, s

ervi

cing

, ad

just

ing,

or r

epai

ring.

Als

o be

su

re c

ombi

ne is

on

a le

vel s

urfa

ce.

5088

, 608

8, a

nd 7

088

Cas

e IH

co

mbi

nes

may

be

equi

pped

with

a

hydr

aulic

hea

der r

ever

ser.

Thi

s re

vers

er m

otor

is lo

cate

d on

the

left

side

of t

he fe

eder

hou

se.

See

Fi

gure

A.

Whe

n in

stal

ling

a D

emco

Bin

Fill

A

uger

on

thes

e un

its a

che

ck v

alve

ne

eds

to b

e in

stal

led

on th

e re

el

retu

rn li

ne o

f the

reve

rser

mot

or.

The

reel

retu

rn p

ort o

n th

e re

vers

er

motorisidentifiedas“T”.TheT

port

is th

e to

p po

rt to

you

r lef

t whe

n fa

cing

the

reve

rser

mot

or.

To in

stal

l the

che

ck v

alve

, sim

ply

disc

onne

ct th

e ho

se o

n th

e T

port

of th

e re

vers

er m

otor

. S

crew

the

mal

e en

d of

the

chec

k va

lve

into

th

e T

port.

The

n co

nnec

t the

hos

e w

hich

you

dis

conn

ecte

d fro

m th

e T

port

to th

e fe

mal

e en

d of

the

chec

k va

lve.

Page 15: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 15

WA

RN

ING

Sto

p co

mbi

ne e

ngin

e, s

et p

arki

ng

brak

e, a

nd w

ait f

or a

ll m

ovin

g pa

rts

on m

achi

ne to

com

e to

a c

ompl

ete

stop

bef

ore

inst

allin

g, s

ervi

cing

, ad

just

ing,

or r

epai

ring.

Als

o be

su

re c

ombi

ne is

on

a le

vel s

urfa

ce.

* O

n th

e le

ft si

de o

f the

com

bine

, ab

ove

the

left

front

whe

el, l

ocat

e th

e the“Tee”fittingthatlinksthereel

circ

uits

retu

rn li

nes

toge

ther

. S

ee

Figu

re B

on

prev

ious

pag

e. D

isco

nnec

t th

is re

turn

hos

e fro

m th

e Te

e.

* Thi

s ho

se w

ill b

ecom

e th

e po

wer

so

urce

. R

un a

sho

rt le

ngth

of

hose

from

the

hose

just

you

just

disconnectedtotheINportofflow

co

ntro

l val

ve w

hich

will

con

trol t

he

spee

d of

the

Bin

Fill

Aug

er.

Then

pl

umb

acco

rdin

gly

to th

e di

agra

m

show

n to

the

right

. Th

e re

turn

hos

e routedfrom

theEXportoftheBin

FillAuger’sflow

controlvalvethen

conn

ects

to th

e ex

istin

g Te

e to

co

mpl

ete

a se

ries

circ

uit.

* H

ydra

ulic

com

pone

nts

show

n in

bo

ld d

ashe

d lin

es o

n th

e di

agra

m

to th

e rig

ht, i

ndic

ate

new

hyd

raul

ic

com

pone

nts

reco

mm

ende

d w

ith th

e us

e of

a D

emco

Bin

Fill

Aug

er.

All

othe

r hyd

raul

ic c

ompo

nent

s sh

own

are

exis

ting

from

the

man

ufac

ture

r.

5088

, 608

8, &

708

8 C

ASE

IH IN

STA

LLAT

ION

Page 16: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 16

Figu

re 8

jOH

N D

EER

E IN

STA

LLAT

ION

“Pr

ior t

o ST

S 70

Ser

ies”

(W

ith C

haff

Spre

ader

)

WA

RN

ING

Sto

p co

mbi

ne e

ngin

e, s

et p

arki

ng

brak

e, a

nd w

ait f

or a

ll m

ovin

g pa

rts

on m

achi

ne to

com

e to

a c

ompl

ete

stop

bef

ore

inst

allin

g, s

ervi

cing

, ad

just

ing,

or r

epai

ring.

Als

o be

su

re c

ombi

ne is

on

a le

vel s

urfa

ce.

Dis

conn

ect t

he re

turn

hos

e on

the

bottomsideofthechaffspreader’s

flowcontrolvalveEXport“Tee”.Run

a ne

w h

ose

from

this

Tee

to th

e IN

portoftheBinFillAuger’sflow

control

valv

e. T

hen

plum

b ac

cord

ingl

y to

th

e di

agra

m s

how

n to

the

right

. Th

e returnhoseroutedfrom

theEXportof

theBinFillAuger’sflow

controlvalve

then

con

nect

s to

the

hose

pre

viou

sly

disconnectedfrom

chaffspreader’s

flowcontrolvalvetocom

pleteaseries

circ

uit.

Hyd

raul

ic c

ompo

nent

s sh

own

in

bold

das

hed

lines

on

the

diag

ram

to

the

right

, ind

icat

e ne

w h

ydra

ulic

co

mpo

nent

s re

com

men

ded

with

the

use

of a

Dem

co B

in F

ill A

uger

. A

ll ot

her h

ydra

ulic

com

pone

nts

show

n ar

e ex

istin

g fro

m th

e m

anuf

actu

rer.

Page 17: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 17

Figu

re 9

jOH

N D

EER

E IN

STA

LLAT

ION

“Pr

ior t

o ST

S 70

Ser

ies”

(With

out C

haff

Spre

ader

)

WA

RN

ING

Sto

p co

mbi

ne e

ngin

e, s

et p

arki

ng

brak

e, a

nd w

ait f

or a

ll m

ovin

g pa

rts

on m

achi

ne to

com

e to

a c

ompl

ete

stop

bef

ore

inst

allin

g, s

ervi

cing

, ad

just

ing,

or r

epai

ring.

Als

o be

su

re c

ombi

ne is

on

a le

vel s

urfa

ce.

*Locatetheexisting“Tee”fitting

that

link

s th

e re

el c

ircui

t ret

urn

lines

to

geth

er. D

isco

nnec

t the

retu

rn h

ose

at th

e Te

e th

at ru

ns b

ack

to th

e re

el

mot

or.

This

hos

e w

ill b

ecom

e th

e po

wer

sou

rce.

Rou

te th

is h

ose

to

theINportofflow

controlvalvewhich

will

con

trol t

he s

peed

of t

he B

in F

ill

Aug

er.

Then

plu

mb

acco

rdin

gly

to th

e di

agra

m s

how

n to

the

right

. Th

e re

turn

hoseroutedfrom

theEXportofthe

BinFillAuger’sflow

controlvalvethen

conn

ects

to th

e ex

istin

g Te

e, w

here

th

e pr

evio

us h

ose

was

dis

conn

ecte

d,

to c

ompl

ete

a se

ries

circ

uit.

* H

ydra

ulic

com

pone

nts

show

n in

bo

ld d

ashe

d lin

es o

n th

e di

agra

m

to th

e rig

ht, i

ndic

ate

new

hyd

raul

ic

com

pone

nts

reco

mm

ende

d w

ith th

e us

e of

a D

emco

Bin

Fill

Aug

er.

All

othe

r hyd

raul

ic c

ompo

nent

s sh

own

are

exis

ting

from

the

man

ufac

ture

r.

Page 18: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 18

Figu

re 1

0

jOH

N D

EER

E IN

STA

LLAT

ION

“20

08 M

odel

Yea

r to

Cur

rent

, STS

70

Serie

s” (W

ith H

ydra

ulic

Rev

erse

val

ve)

WA

RN

ING

Sto

p co

mbi

ne e

ngin

e, s

et p

arki

ng

brak

e, a

nd w

ait f

or a

ll m

ovin

g pa

rts

on m

achi

ne to

com

e to

a c

ompl

ete

stop

bef

ore

inst

allin

g, s

ervi

cing

, ad

just

ing,

or r

epai

ring.

Als

o be

su

re c

ombi

ne is

on

a le

vel s

urfa

ce.

On

the

left

side

of t

he c

ombi

ne, a

bove

th

e fro

nt d

rive

whe

el, l

ocat

e th

e re

el

cont

rol v

alve

. D

isco

nnec

t the

exi

stin

g hosefrom

theportidentifiedas“P”

whi

ch is

the

mai

n pr

essu

re li

ne.

This

ho

se w

ill b

ecom

e th

e po

wer

sou

rce.

Fa

sten

a n

ew h

ose

to th

is h

ose

and

rout

e it

to th

e IN

por

t of t

he B

in F

ill

Auger’sflow

controlvalve.Then

plum

b ac

cord

ingl

y to

the

diag

ram

sh

own

to th

e rig

ht.

The

retu

rn h

ose

routedfrom

theEXportoftheBill

FillAuger’sflow

controlvalvethen

connectstothe“P”portofthereel

cont

rol v

alve

, to

com

plet

e a

serie

s ci

ruit.

Hyd

raul

ic c

ompo

nent

s sh

own

in

bold

das

hed

lines

on

the

diag

ram

to

the

right

, ind

icat

e ne

w h

ydra

ulic

co

mpo

nent

s re

com

men

ded

with

the

use

of a

Dem

co B

in F

ill A

uger

. A

ll ot

her h

ydra

ulic

com

pone

nts

show

n ar

e ex

istin

g fro

m th

e m

anuf

actu

rer.

Page 19: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 19

Figu

re 1

1

CN

H IN

STA

LLAT

ION

for 7

010,

801

0, C

R94

0,C

R90

40, C

R96

0, C

R90

60, C

R97

0, C

R90

70, C

R98

0, C

R90

80 C

OM

-B

INES

WA

RN

ING

Sto

p co

mbi

ne e

ngin

e, s

et p

arki

ng

brak

e, a

nd w

ait f

or a

ll m

ovin

g pa

rts

on m

achi

ne to

com

e to

a c

ompl

ete

stop

bef

ore

inst

allin

g, s

ervi

cing

, ad

just

ing

or re

pairi

ng.

Als

o be

sur

e co

mbi

ne is

on

a le

vel s

urfa

ce.

Loca

te th

e ch

aff s

prea

der c

ontro

l val

ve

(FigureC)ontheleftrearsideofthe

com

bine

. D

isco

nnec

t the

pre

ssur

e ho

se fr

om th

e po

rt on

rear

sid

e of

this

va

lve,

that

pow

ers

the

chaf

f spr

eade

rs.

This

por

t will

be

the

pow

er s

ourc

e fo

r th

e B

in F

ill A

uger

. R

un a

hos

e fro

m

this

por

t to

the

IN p

ort o

f the

Bin

Fill

Auger’sflow

controlvalve.Thenplum

bac

cord

ingl

y to

the

diag

ram

sho

wn

to th

e rig

ht.

The

retu

rn h

ose

rout

ed

fromtheEXportoftheBinFillAuger’s

flowcontrolvalvethenconnects

to th

e ho

se th

at w

as p

revi

ousl

y di

scon

nect

ed, t

o co

mpl

ete

a se

ries

circ

uit.

Hyd

raul

ic c

ompo

nent

s sh

own

in

bold

das

hed

lines

on

the

diag

ram

to

the

right

, ind

icat

e ne

w h

ydra

ulic

co

mpo

nent

s re

com

men

ded

with

the

use

of a

Dem

co B

in F

ill A

uger

. A

ll ot

her h

ydra

ulic

com

pone

nts

show

n ar

e ex

istin

g fro

m th

e m

anuf

actu

rer.

Figu

re C

PRES

-SU

RE

RET

UR

N

(EX

)

PRES

-SU

RE

RET

UR

N

(EX

)

Page 20: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 20

CIH

INST

ALL

ATIO

N fo

r 712

0, 8

120,

& 9

120

CO

MB

INES

WA

RN

ING

Figu

re E

Figu

re D

Sto

p co

mbi

ne e

ngin

e, s

et p

arki

ng

brak

e, a

nd w

ait f

or a

ll m

ovin

g pa

rts

on m

achi

ne to

com

e to

a c

ompl

ete

stop

bef

ore

inst

allin

g, s

ervi

cing

, ad

just

ing

or re

pairi

ng.

Als

o be

sur

e co

mbi

ne is

on

a le

vel s

urfa

ce.

Loca

te th

e ch

aff s

prea

der c

ontro

l val

ve

(FigureD)ontheleftrearsideofthe

com

bine

. Fo

llow

ste

el p

ress

ure

line

backtotheJunctionPoint(F

igureE).

Dis

conn

ect t

he b

otto

m, p

ress

ure

hose

fro

m th

e ba

ck s

ide

of th

e Ju

nctio

n P

oint

that

pow

ers

the

chaf

f spe

ader

s.

This

por

t will

be

the

pow

er s

ourc

e fo

r th

e B

in F

ill A

uger

. R

un a

hos

e fro

m

this

por

t to

the

IN p

ort o

f the

Bin

Fill

Auger’sflow

controlvalve.Thenplum

bac

cord

ingl

y to

the

diag

ram

sho

wn

to th

e rig

ht.

The

retu

rn h

ose

rout

ed

fromtheEXportoftheBinFillAuger’s

flowcontrolvalvethenconnects

to th

e ho

se th

at w

as p

revi

ousl

y di

scon

nect

ed, t

o co

mpl

ete

a se

ries

circ

uit.

Hyd

raul

ic c

ompo

nent

s sh

own

in

bold

das

hed

lines

on

the

diag

ram

to

the

right

, ind

icat

e ne

w h

ydra

ulic

co

mpo

nent

s re

com

men

ded

with

the

use

of a

Dem

co B

in F

ill A

uger

. A

ll ot

her h

ydra

ulic

com

pone

nts

show

n ar

e ex

istin

g fro

m th

e m

anuf

actu

rer.

Figu

re 1

2

Page 21: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 21

Figu

re 1

3

NEW

HO

LLA

ND

TR

SER

IES

INST

ALL

ATIO

N(W

ith C

haff

Spre

ader

)

WA

RN

ING

Sto

p co

mbi

ne e

ngin

e, s

et p

arki

ng

brak

e, a

nd w

ait f

or a

ll m

ovin

g pa

rts

on m

achi

ne to

com

e to

a c

ompl

ete

stop

bef

ore

inst

allin

g, s

ervi

cing

, ad

just

ing

or re

pairi

ng.

Als

o be

sur

e co

mbi

ne is

on

a le

vel s

urfa

ce.

Dis

conn

ect t

he re

turn

hos

e on

the

bottomsideofthechaffspreader’s

flowcontrolvalveEXport“Tee”.Run

a ne

w h

ose

from

this

Tee

to th

e IN

portoftheBinFillAuger’sflow

control

valv

e. T

hen

plum

b ac

cord

ingl

y to

th

e di

agra

m s

how

n to

the

right

. Th

e returnhoseroutedfrom

theEXportof

theBinFillAuger’sflow

controlvalve

then

con

nect

s to

the

hose

pre

viou

sly

disconnectedfrom

thechaffspreader’s

flowcontrolvalve,thatshouldreturnto

thefiltertocompleteaseriescircuit.

Hyd

raul

ic c

ompo

nent

s sh

own

in

bold

das

hed

lines

on

the

diag

ram

to

the

right

, ind

icat

e ne

w h

ydra

ulic

co

mpo

nent

s re

com

men

ded

with

the

use

of a

Dem

co B

in F

ill A

uger

. A

ll ot

her h

ydra

ulic

com

pone

nts

show

n ar

e ex

istin

g fro

m th

e m

anuf

actu

rer.

Page 22: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 22

NEW

HO

LLA

ND

TR

SER

IES

INST

ALL

ATIO

N(W

ithou

t Cha

ff Sp

read

er)

Figu

re 1

4

WA

RN

ING

Sto

p co

mbi

ne e

ngin

e, s

et p

arki

ng

brak

e, a

nd w

ait f

or a

ll m

ovin

g pa

rts

on m

achi

ne to

com

e to

a c

ompl

ete

stop

bef

ore

inst

allin

g, s

ervi

cing

, ad

just

ing,

or r

epai

ring.

Als

o be

su

re c

ombi

ne is

on

a le

vel s

urfa

ce.

*Locatetheexisting“Tee”fitting

that

link

s th

e re

el c

ircui

ts re

turn

line

s to

geth

er.

Dis

conn

ect t

he re

turn

hos

e fro

m th

e Te

e th

at ru

ns b

ack

to th

e filter.Runanew

hosefromtheTeeto

theINportoftheBinFillAuger’sflow

co

ntro

l val

ve.

Then

plu

mb

acco

rdin

gly

to th

e di

agra

m s

how

n to

the

right

. Thereturnhoseroutedfrom

theEX

portoftheBinFillAuger’sflow

control

valv

e th

en c

onne

cts

to th

e ho

se th

at

was

pre

viou

sly

disc

onne

cted

from

th

e ex

istin

g Te

e to

com

plet

e a

serie

s ci

rcui

t.*

Hyd

raul

ic c

ompo

nent

s sh

own

in

bold

das

hed

lines

on

the

diag

ram

to

the

right

, ind

icat

e ne

w h

ydra

ulic

co

mpo

nent

s re

com

men

ded

with

the

use

of a

Dem

co B

in F

ill A

uger

. A

ll ot

her h

ydra

ulic

com

pone

nts

show

n ar

e ex

istin

g fro

m th

e m

anuf

actu

rer.

Page 23: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 23

Figu

re 1

5

GLE

AN

ER R

SER

IES

INST

ALL

ATIO

N(W

ith C

haff

Spre

ader

)

WA

RN

ING

Sto

p co

mbi

ne e

ngin

e, s

et p

arki

ng

brak

e, a

nd w

ait f

or a

ll m

ovin

g pa

rts

on m

achi

ne to

com

e to

a c

ompl

ete

stop

bef

ore

inst

allin

g, s

ervi

cing

, ad

just

ing

or re

pairi

ng.

Als

o be

sur

e co

mbi

ne is

on

a le

vel s

urfa

ce.

Dis

conn

ect t

he re

turn

hos

e on

the

bottomsideofthechaffspreader’s

flowcontrolvalveEXport“Tee”.Run

a ne

w h

ose

from

this

Tee

to th

e IN

portoftheBinFillAuger’sflow

control

valv

e. T

hen

plum

b ac

cord

ingl

y to

th

e di

agra

m s

how

n to

the

right

. Th

e returnhoseroutedfrom

theEXportof

theBinFillAuger’sflow

controlvalve

then

con

nect

s to

the

hose

pre

viou

sly

disconnectedfrom

thechaffspreader’s

flowcontrolvalve,thatshouldreturnto

thefiltertocompleteaseriescircuit.

Hyd

raul

ic c

ompo

nent

s sh

own

in

bold

das

hed

lines

on

the

diag

ram

to

the

right

, ind

icat

e ne

w h

ydra

ulic

co

mpo

nent

s re

com

men

ded

with

the

use

of a

Dem

co B

in F

ill A

uger

. A

ll ot

her h

ydra

ulic

com

pone

nts

show

n ar

e ex

istin

g fro

m th

e m

anuf

actu

rer.

Page 24: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 24

Figu

re 1

6

GLE

AN

ER R

SER

IES

INST

ALL

ATIO

N(W

ithou

t Cha

ff Sp

read

er)

WA

RN

ING

Sto

p co

mbi

ne e

ngin

e, s

et p

arki

ng

brak

e, a

nd w

ait f

or a

ll m

ovin

g pa

rts

on m

achi

ne to

com

e to

a c

ompl

ete

stop

bef

ore

inst

allin

g, s

ervi

cing

, ad

just

ing,

or r

epai

ring.

Als

o be

su

re c

ombi

ne is

on

a le

vel s

urfa

ce.

*Locatetheexisting“Tee”fitting

that

link

s th

e re

el c

ircui

ts re

turn

line

s to

geth

er.

Dis

conn

ect t

he re

turn

hos

e fro

m th

e Te

e th

at ru

ns b

ack

to th

e filter.Runanew

hosefromtheTeeto

theINportoftheBinFillAuger’sflow

co

ntro

l val

ve.

Then

plu

mb

acco

rdin

gly

to th

e di

agra

m s

how

n to

the

right

. Thereturnhoseroutedfrom

theEX

portoftheBinFillAuger’sflow

control

valv

e th

en c

onne

cts

to th

e ho

se th

at

was

pre

viou

sly

disc

onne

cted

from

th

e ex

istin

g Te

e to

com

plet

e a

serie

s ci

rcui

t.*

Hyd

raul

ic c

ompo

nent

s sh

own

in

bold

das

hed

lines

on

the

diag

ram

to

the

right

, ind

icat

e ne

w h

ydra

ulic

co

mpo

nent

s re

com

men

ded

with

the

use

of a

Dem

co B

in F

ill A

uger

. A

ll ot

her h

ydra

ulic

com

pone

nts

show

n ar

e ex

istin

g fro

m th

e m

anuf

actu

rer.

Page 25: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 25

OPERATING SAFETY

• ReadandfollowthisOwner’s/Operator’sManualbeforeoperation.

• Bewareofandavoidcontactwithlowpowerllinesandotherobstructions.

•Installandsecureallguardsandshieldsbeforeoperation.

• Keephands,feet,hair,andclothingawayfromallmovingparts.

• Beforeapplyingpowertoanyequipment,cleartheareaofallbystanders

• Besureallhydrauliclines,fittings,andcouplersaretightbeforeandduringoperation.

• Shutoffcombineenginebeforeconnectinganyhydraulicstomachine.

OPERATION

The Demco Bin Fill Auger is designed to mount inside of a combine grain tank and direct the grain to a desired location. The Bin Fill Auger is also designed to reduce the strain on the OEM clean grain auger system and improve grain quality. Power is provided by the combines hydraulics.

STEP ONEOnce the Bin Fill Auger has been properly installed to the combines hydraulic system, with the lines underpressure,opentheflowcontrolvalveslightly.ThiswillcausehydraulicfluidtoflowtotheBinFillAuger and purge any air from the system.

INITIAL OPERATION

STEP TWOWhen the Bin Fill Auger begins to operate, inspect the system for leaks. Tighten or replace any hoses orfittingsifaleakisfound.

STEP THREEMake sure the engine is off and the machine has stopped.UseFigure 17 as a reference and adjust the Bin Fill Auger to the desired location. Once a location has been determined, Demco recommends removing one set screw at a time and drilling a small countersunk hole in the location of each set screw. This will aid the set screw in locking to the pipe and give the operator a reference point as to thepositionoftheauger.(Replaceandtightenallsetscrewswhencomplete)

STEP ONEIfequipped,usetheflowcontrolvalvetosetthespeed of the Bin Fill Auger.

OPERATING THE BIN FILL AUGER

STEP TWOOnce the speed has been set the Bin Fill Auger will run when the reel or chaff spreader circuit is engaged.

STEP ONEMake sure the engine is off and the machine has stopped, before entering the grain tank.

FOLDING THE BIN FILL AUGER

STEP TWOEnter the grain tank of the combine and grasp the bottom of the hydraulic motor with one hand.

STEP THREEUseyourotherhandtopullthelatchtowardyouand allow the Bin Fill Auger to rotate 90 degrees into the tank.

Page 26: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 26

Please order replacement parts by PART NO. and DESCRIPTION.

Figure 17

Page 27: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 27

Please order replacement parts by PART NO. and DESCRIPTION.

REF. PART NO. NO. QTY. ASSY. DESCRIPTION 1. R5A000004L0 1 Cross Pipe Assembly 2. R3A000079L0 1 16”BFAExtenderPipe 3. 1AR00000100 1 PlasticBarrelPlug-2.130”Dia.

If you have questions not answered in this manual, require additional copies, or if your manual is damaged, please contact your dealer or Demco P.O. Box 160, 1300 38th Ave. West, Spencer, Iowa 51301,Ph:(712)262-2992

OPTIONAL EQUIPMENT - BFA EXTENDER 2010

1

3

2

Figure 18

Figure 19

ASSEMBLY of BFA EXTENDER 20101)Loosen(2)setscrewsthatconnectthemainauger assembly to the existing cross pipe pivot.

2)Removethemainaugerassembly.

3)Rotateexistingcrosspipepivottoverticalposition. See Figure 19.

4)Insert16”BFAextenderpipeinexistingcrosspipe pivot. Tighten all set screws in existing cross pipe pivot.

5)Installplasticbarrelpluginthetopoftheofthe16”extenderpipe.

6)Slidenewcrosspipeassemblyover16”extenderpipe. Adjust to preferred position and height, and tighten the two sets crews.

7)Attachmainaugerassemblytonewcrosspipeassembly, and tighten the two remaining set screws.

8)TightenalljamnutsonsetscrewstosecureBinFill Auger and BFA Extender assemblies.

Existing Cross Pipe Pivot

NOTE: Set your Bin Fill Auger to the postion which bestfitsyourapplication.Makesurethattheaugerwill not intefere or come in conatct with any other braces, brackets, or augers inside the combine tank. Insure there is plenty of clearance for the Bin Fill Auger to rotate between both the folded and the upright positions.

WARNING: TO AvOID PERSONAL INjURY OR DEATH, OBSERvE THE FOLLOWING INSTRUCTIONS:

•Bewareofandavoidcontactwithlowpowerlinesand other obstructions while operating combines equipped with the Demco Bin Fill Auger and BFA Extender.

• Collapse and secure the Bin Fill Auger whentransporting the combine to avoid contact with low power lines and other obstructions.

9A000051 = BFA Extender 2010 Complete Assembly

Page 28: BIN FIll AugeR · temporarily secure to the support cross pipe using the provided set screws. STEP FOUR Slide the backbone collar to the center of the main auger assembly and temporarily

Page 28