Bim pxp Part deux

Bim pxp

  • Upload
    benson

  • View
    24

  • Download
    4

Embed Size (px)

DESCRIPTION

Bim pxp. Part deux. BIM Project execution plan ( pxP ). Why have one ? - managing expectations Who writes it? Who owns it? Is it part of the contract or independent?. introduction. Brief introduction to project specific PxP and it’s intent. i.e. -level 2 BIM on this project - PowerPoint PPT Presentation

Citation preview

Dg Bim pxp

Bim pxp Part deuxBIM Project execution plan (pxP)Why have one? - managing expectationsWho writes it?Who owns it?Is it part of the contract or independent?

introductionBrief introduction to project specific PxP and its intent.i.e.-level 2 BIM on this project-Following XYZ industry standard-Collaborative BIMDefinitions Provide some definitions to acronyms used throughout the PxPi.e.-BIM-BIM-Model-LODProject information

Project information BIM Leadership

Project information Roles and responsibilitiesBim goals and objectives Goals

Bim goals and objectives uses

Bim goals and objectives phases

Bim goals and objectives deliverableBIM Models?-Design BIM -Coordination Model-As-Built Model2D Drawings?PDFs only?Bim process

Bim process

Bim process data exchange

Bim process Project units and originUnitsProject units to be used by all disciplinesOriginBim process model breakdown

Bim process lod

Bim process lod and responsibility matrix

Bim process model delivery schedule

Bim process meetings

Bim process coordination3D BIM to 3D BIMLink using shared coordinates2D DWG to 3D BIMLink using shared coordinatesClash DetectionHow? When?Using Navis/RevitVisual/Manual or AutomaticClash ReportingHow? Email? Via web? Word/Excel?

Bim process model managementProject Model ManagerInitial Responsibilitiesi.e.-Establish model origin/orientation/units-Establish LOD/modelling protocolOn-going Responsibilitiesi.e.-Collect incoming models-Validate files are compliant and usable-Release to team

Bim process qa check model validation

Bim process qa check model validationEnsure model aligns spatiallyModel does not contain other discipline design informationRemove any unused links or attachmentsPurge out all relevant unwanted itemsCompact/compress filesAudit using software auditing toolsCAD Standards checkModel file naming conforms to project protocolsBim process software specific bim protocolEstablish standard worksets in discipline modelsEstablish 3D DWG Export - shared coordinatesEstablish 2D DWG Export Export from plan views and shared coordinates

Elevation/Sections/Details from SHEETSBim process model file naming

Infrastructure software

Infrastructure data exchangeFTP?Email?Cloud Server?Private Server?

RevisionStatusIssue Procedure

Infrastructure communicationDefine general communication protocolsi.e.Email?Webex?Project Management Software?Skype?Key perfomance indicators

summary