BIM Course #1
Fundamental Understanding
of Building Information Modeling
Placed in 3rd year Construction Documents (including Commercial &
Industrial Focus)
On‐Line Technology Learning to supplement the knowledge of the
apprenticeship instructor
Fundamentals Core Curriculum Computer Mediated
8/14/2018
2
Fundamental Content
BIM Defined
Evolving Construction Industry
Level of Detail/Development
Project Delivery & Deployment Methods
Prefabrication
Project Software
InternetCloud Communication
Project Software
InternetCloud Communication
Project Software
InternetCloud CommunicationProject
ExecutivesProject ExecutivesProject Executives
Project Managers/Project EngineersProject Managers/Project EngineersProject Managers/Project Engineers
Milestones of BIM OwnerOwner
Architect& Engineer
Architect& Engineer
Owner
Architect& Engineer
Trades & Subcontractors (Field)Trades & Subcontractors (Field)Trades & Subcontractors (Field)
Superintendents,Quality, Safety,Others
Superintendents,Quality, Safety,Others
Superintendents,Quality, Safety,Others
8/14/2018
3
COURSE OBJECTIVES
8/14/2018
4
SM
E C
onte
nt
Sample of Outlining Content
8/14/2018
5
Examples of Course Assets
Examples of Course Assets
Examples of Course Assets
8/14/2018
6
Examples of Course Assets
Development Storyboards(handful of examples)
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:BIM1‐What is BIM
Welcome screen ‐ Collage• Uses standard VO Welcome script. Has
copyright lower left.• STANDARD SCRIPT:
Welcome to “BIM – Building Information Modeling. This course contains audio narration with on‐screen text, visuals, and activities. You will use the navigation to advance through the course and to play and pause as needed. Select the ETA [ee‐tee‐aye] logo to access the menu. Select NEXT to begin."
• Descriptive opportunity taken from the first lines of the content to describe to the student exactly why they are taking this course and the impact it will have on his/her career.
5‐22 000
_________
1
2
3
FPO (Image: For Placement Only)
BIM : Building Information Modeling
ETA
Sample of Storyboards
8/14/2018
7
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:
Introduction
What is BIM
Objectives:
1. Define BIM as it relates to its function and role within the industry
2. Compare traditional construction prints to 2D and 3D drawings
3. Identify the role of the Levels of Development (LOD)
BIM1‐What is BIM
5‐22 010
FPO
Image Left / Bullets Right• Text appears with VO
Narration: In this course, you will define BIM and connect its function and role in our industry; compare traditional construction prints to tow and three dimensional drawings; and identify to roles of various levels of development.
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:
Continuous Improvement
Construction methods are continuously improving due to new technologies of efficiency and deliverables
BIM1‐What is BIM
5‐9 020
Icon Titles and Bullets• Icons appears with narration
below.
Narration: Not only do new technologies impact construction methods, the lifespan of a project (from conception to long‐range maintenance) continues to be enhanced by new technologies.
Impact of New
Technologies
Lifespan of the
Project
ConstructionMethods
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:
BIM Evolution
BIM developed to streamline the process of project planning and delivery for the entirety of the project lifecycle
BIM1‐What is BIM
9‐15 030
Icon Titles and Bullets• Icons appears with narration
below.
Narration: BIM, or Building Information Modeling, is more than a single technology or software and a 3D model – it is a concept that encompasses new engineer/documentation software, craft coordination, prefabrication methods, instant communications, metadata, greatly improved layout techniques, increased productivity, and increased return on investments.B.I.M.
Craft Coordination
Prefabrication Methods
Instant Communication
Metadata
Improved Layout
Techniques
Increased Productivity
Better R.O.I.
New Software
8/14/2018
8
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:
The Three Parts of BIM
BIM1‐What is BIM
08031‐41
Icon Titles + Bullets; Selecting an Icon opens text box with additional narration
Narration: Three main parts of BIM: Detailing, Modeling, and Coordination. Depending on the amount of work, these parts can be one person, or spread across several.
Select each icon for additional information. (see NOTES below)
FPO
FPO
FPO
Detailing
Coordination
Modeling
• Detailing is the layout• Any content that is required to be in the
model • Historically done by foreman but now done
electronically
• Modeling consists of transferring the detailing (markup), and drawing it 3D using an authoring software
• Coordination is utilizing models from several trades, merging them together, and verifying the content of the finished model is constructible and avoids collisions
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:
Provides Spatial Information
Construction was typically built from 2D construction drawings until proliferation of BIM
BIM1‐What is BIM
09045‐49
Image appears at start of narration; bullets appear with text of narration.
Narration: BIM models can provide all information needed to design, coordinate, procure, schedule, sequence, prefabricate, build, test, commission, maintain the building.
BIM can provide information needed to:• Design• Coordinate• Procure• Schedule• Pre‐fabricate• Build• Test• Commission• Maintenance
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:
BIM Today
BIM1‐What is BIM
10056‐61
Narration: Today, with the addition of computer based technology and modeling called BIM, the ability to visualize construction in 3D view or spatial communication allows for more understanding than a 2D image along with including embedded information (data) such as equipment specifications, installation parameters, etc.
8/14/2018
9
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:
Aid in Field Installation
BIM1‐What is BIM
210
Image left + Bullets right
Narration: It also makes it easier to imagine the outcome of structures and allows for a tighter schedule on a project.
• More efficient to build and construct
• Earlier prefabrication• Earlier procurement• Seamless procurement
141‐153
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:BIM1‐What is BIM
240167‐170
Small team of reps from each contractor performed coordination
Each reviewed and revised drawing and
realigned where needed
Coordination drawings often major milestone
on major projects
History of Spatial Coordination
Icon Titles + Bullets
Narration: A small team of representatives from each contractor performs coordination.
Each team carefully reviews and revises drawings and realigns them where needed.
When they are satisfied that they had eliminated all the “clashes,” they submitted their final drawings to the Design Teams for review and approval. The submission of these coordination drawings was often a major milestone
These often become major milestones on major projects.
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:
This design coordination ensured that their designs could be constructed and would fit within the allocated spaces in the structure
7
FPO
Traditional Drafting and Coordination Process
BIM1‐What is BIM
279192‐195
Animated, vertical line. Time‐line moves as if view is scrolling down with narration.
Narration: … and also provide some level of design coordination to ensure that their designs could be constructed and would fit within the allocated spaces in the structure.
8/14/2018
10
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:BIM1‐What is BIM
5‐22 000
_________
1
2
3
ETAKNOWLEDGE CHECK
Test your knowledge!Select True or False, then SUBMIT your response for Each question.
NOTE: Selecting TRUE or FALSE
returns feedback. Select True or
False to answer each question.
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:BIM1‐What is BIM
5‐22 000
_________
1
2
3
ETAKNOWLEDGE CHECK
Lorem ipsum dolor amet kale chips everyday carry leggings pabst, forage httl of tdtrd bushwick trty‐htartd affogato cliche wtoke.
True
False Submit
NOTE: KCs may be informal and not called out as such, as shown in templates that follow. Provide directions and very short text on screen to indicate how to answer questions. Use for grouped sets of questions (minimum 3 or more).
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:BIM1‐What is BIM
5‐22 000
_________
1
2
3
ETAKNOWLEDGE CHECK
Test your knowledge!Each multiple‐choice question has four answer choices. Read each question and answer choice carefully and choose the ONE best answer. Try to answer all questions. In general, if you have some knowledge about a question, it is better to try to answer it.
NOTE: Selecting correct or incorrect
answer returns feedback.
8/14/2018
11
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:BIM1‐What is BIM
5‐22 000
_________
1
2
3
ETAKNOWLEDGE CHECK
Lorem ipsum dolor amet kale chkps evekryay cally lekings pabst, forage hkll of lodard bushwick try‐hard affogato ______ wohe. Quinoa locavore post‐irknic occhpy flknnel, pork belly legkikngsactkally paleo fankny pack chkch‐key hexkgon viral crkcifkx.
A. cliche
B. viral
Submit
C. organic
D. Post‐ironic
NOTE: KCs may be informal and not called out as such, as shown in templates that follow. Provide directions and very short text on screen to indicate how to answer questions. Use for grouped sets of questions (minimum 3 or more).
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:BIM1‐What is BIM
5‐22 000
_________
1
2
3
ETAKNOWLEDGE CHECK
Test your knowledge!Match the definition with its term by placing the letter of the definition in the space preceding the description.
NOTE: Selecting correct answer
returns feedback at end of
matching exercise.
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:BIM1‐What is BIM
5‐22 000
_________
1
2
3
ETAKNOWLEDGE CHECK
___ Cred bruvch favm‐to‐tave, povkbevlly orvavic picned snfies
___ YOLO cray kombucha poutine edison bclb dicupt hashtag
Submit
___ SXSW put a bivd on it ramps l thundercats phgto bosth
___ Chambray shoreditch knausgaardbrggoklyn mixspe
___ Heirloom neutra fxr dvlar tovstkitsch.
B. Vegan
C. Leggings
D. Hisster
E. Hst yoga
A. Biodiesel
NOTE: KCs may be informal and not called out as such, as shown in templates that follow. Provide directions and very short text on screen to indicate how to answer questions. Use for one set of matching (5 or more).
8/14/2018
12
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:
Types of Models
To understand how an MEP contractor’s detailing and coordination efforts relate to BIM there is the need to understand what is meant by “The Model.”
BIM1‐What is BIM
570329‐334
Character + Text
Narration: Considerable effort has gone to defining the term through establishing standards, practice documents, and industry nomenclature, yet none of this has aligned and expectations of what the Model actually represents.
“Model” from one stakeholder may represent a version of the project that is completely different from what another stakeholder was expecting to receive.
Developer Notes:
Navigation Notes:Next:
Back:
Menu:
Line #:Module: Dev Slide #:
Level of Development Specifications
These levels were created to assist everyone involved in BIM process to understand each person’s responsibilities
Six Levels of Development, but only 300, 350, and 400 are relevant to MEP contractors
BIM1‐What is BIM
700436‐438
Text and images: “300,” “350,” and “400” boxes are highlighted and animated to the right.
Narration: Although there are six Levels of Development (100, 200, 300, 350, 400, and 500), the levels most important to MEP contractors are LOD 300, LOD 350, and LOD 400.
Levels of Development
100
200
300
350
400
500
300
350
400
Fundamentals(#1)
2019 – Q1
Master PlanThe quick brown fox
jumps over the lazy dog. The quick brown fox
jumps
Modelers(#3)
Field Layout Tools(#2b)
Construction Workflows
(#2a)
8/14/2018