    BIM FOR K-12 FACILITIES

    MICHIGAN INSTITUTE FOR EDUCATIONAL MANAGEMENT

    BUILDING INFORMATION MODELING

    FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    3/124

    BIM FOR K-12 FACILITIES

    INTRODUCTION

    What is BIM?

    What are the Advantages?

    How can BIM work for you?

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    4/124

    BIM FOR K-12 FACILITIES

    INTRODUCTION :: QUESTION

    What is your rolein educational facilities?

    1. Architect, Engineer,Designer

    2. Constructor

    3. Owner/Operator /Administrator

    4. Facility manager

    5. Educational Leader

    6. Other?

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    5/124

    BIM FOR K-12 FACILITIES

    INTRODUCTION :: QUESTION

    How Many Facilitiesare in your district?

    1. 1-5

    2. 6-14

    3. 15-40

    4. More

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    6/124

    BIM FOR K-12 FACILITIES

    WHAT IS BIM?

    A TECHNOLOGY

    A PROCESS

    A GAME-CHANGER

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    7/124BIM FOR K-12 FACILITIES

    I is forInformation

    Relational

    3D?

    CAD?

    BIM IS: A TECHNOLOGY

    C O OG O O

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    8/124BIM FOR K-12 FACILITIES

    BIM :: TECHNOLOGY :: INFORMATION

    BIM TECHNOLOGY RELATIONAL

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    9/124BIM FOR K-12 FACILITIES

    BIM :: TECHNOLOGY :: RELATIONAL

    BIM TECHNOLOGY RELATIONAL

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    10/124BIM FOR K-12 FACILITIES

    BIM :: TECHNOLOGY :: RELATIONAL

    BIM TECHNOLOGY RELATIONAL

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    11/124BIM FOR K-12 FACILITIES

    Relational data allows coordination,

    and discovery

    of relationships

    allows us to take multiple pieces of Information and cross reference them, making

    connections, finding correlations between content and criteria that inform design

    decisions and streamline coordination.

    BIM :: TECHNOLOGY :: RELATIONAL

    BIM TECHNOLOGY PARAMETRIC

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    12/124BIM FOR K-12 FACILITIES

    BIM :: TECHNOLOGY :: PARAMETRICIn statistics, a parametric model orparametric family orfinite-dimensional model is a family of

    distributions that can be described using a finite number of parameters. These parameters areusually collected together to form a single k-dimensional parameter vector = (1, 2, , k).

    In 3D Software, Parametric means that the Data drives the Form, a reversed relationship from the idea

    of sculpting, or traditional architecture.

    BIM TECHNOLOGY PARAMETRIC

    http://en.wikipedia.org/wiki/Statisticshttp://en.wikipedia.org/wiki/Probability_distributionhttp://en.wikipedia.org/wiki/Parameterhttp://en.wikipedia.org/wiki/Parameterhttp://en.wikipedia.org/wiki/Probability_distributionhttp://en.wikipedia.org/wiki/Statistics
  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    13/124BIM FOR K-12 FACILITIES

    BIM :: TECHNOLOGY :: PARAMETRICParametric Modeling produces very functional traditional objects

    And allows complex data to be used to create solutions to complex problems, or interesting forms.

    BIM TECHNOLOGY 3D

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    14/124BIM FOR K-12 FACILITIES

    BIM :: TECHNOLOGY :: 3D

    IS BIM 3D?

    Not Necessarily, but a Building is 3D, so its likely that 3D

    information is stored in the information Model.If not 3D, What is BIM?

    Constraints

    Relationships

    Organizational Structure

    Parametric

    3D Models, and 2D Drawings are a common side-

    effect of a BIM

    BIM :: TECHNOLOGY :: 1D 2D 3D 4D +

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    15/124BIM FOR K-12 FACILITIES

    3D

    2D1D

    Drawing SheetsGraphics

    BIMDatabase

    4D..

    RapidProto-typingVisualization

    Live motionvisualizations

    data3D+ - CostTime, Etc.

    Ideas

    BIM :: TECHNOLOGY :: 1D, 2D, 3D, 4D +

    BIM :: TECHNOLOGY :: 3D

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    16/124BIM FOR K-12 FACILITIES

    BIM :: TECHNOLOGY :: 3D

    Integrating Information fromMultiple Sources

    Consolidated Information =

    better Database

    WeatherEnvelope /Site Analysis

    AutomatedLEED Scheduling

    Rapid Prototyping

    Energy AnalysisGreen Building Studio

    VRMLwalkthroughs

    Solar RadiationStudies

    Exterior CFDAirflow Analysis

    Finite ElementAnalysis

    Interior CFD& Comfort Levels

    Construction Phasing

    & Scheduling Visualization

    Clash Detection& 3D Coordination

    3D Massing

    And Analysis

    RenderingVisualization

    BIMRevit model

    Artificial Lighting AnalysisDaylighting Analysis

    2D Construction /Bid Documents

    BIM :: TECHNOLOGY :: LIKE CAD?

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    17/124BIM FOR K-12 FACILITIES

    BIM :: TECHNOLOGY :: LIKE CAD?

    Same Goals

    Same Start Point

    Same EndpointVery different path

    IDEA /CONCEPT

    CONSTRUCTEDFACILITY

    BIM :: TECHNOLOGY :: LIKE CAD?

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    18/124BIM FOR K-12 FACILITIES

    Concepts &Definitions

    Drafting:

    Simple,

    Reliable,

    Easy to understand

    Easy to fix

    Simple to maintain

    Slow

    Inaccurate

    Representational

    BIM :: TECHNOLOGY :: LIKE CAD?

    BIM :: TECHNOLOGY :: LIKE CAD?

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    19/124BIM FOR K-12 FACILITIES

    Concepts &Definitions

    CAD:

    Simple,

    Reliable,

    Less Easy to understand

    Less Easy to fix

    Less Simple to maintain

    Less Slow

    Less Inaccurate

    Representational

    Same Concept bettertechnology.

    BIM :: TECHNOLOGY :: LIKE CAD?

    BIM :: TECHNOLOGY :: LIKE CAD?

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    20/124BIM FOR K-12 FACILITIES

    Concepts &Definitions

    BIM

    Goals are the same, Different technology

    End results are similar, Different path

    Much greater capacity for speed and volume

    Doesnt drive the same way.

    BIM :: TECHNOLOGY :: LIKE CAD?

    IDEA/

    CONCEPT

    CONSTRUCTED

    FACILITY

    BIM @ URS :: CONCEPTS

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    21/124BIM FOR K-12 FACILITIES

    BIM @ URS :: CONCEPTS

    Concepts &Definitions

    BIM

    Who will pilot thedevelopment of theInformation Model?

    There are consequences

    to lettinginexperienced/untrainedusers steer..

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    22/124BIM FOR K-12 FACILITIES

    BIM IS: A PROCESS

    BIM :: PROCESS :: COLLABORATIVE

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    23/124BIM FOR K-12 FACILITIES

    BIM :: PROCESS :: COLLABORATIVE

    BIM :: PROCESS :: COLLABORATIVE

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    24/124BIM FOR K-12 FACILITIES

    BIM work shops

    planning

    design

    how

    design

    planning

    start /context /concepts /ideas/options/evolution /solution/sustain/finish

    VE

    OPTION A

    OPTION B

    Design work shopsesign work shops

    BIM work shops

    BIM work shops

    OPTION 1

    OPTION 2

    OPTION 3

    OPTION 4

    Design work shops

    landscape

    way finding

    BIM :: PROCESS :: COLLABORATIVE

    BIM :: PROCESS :: COLLABORATIVE

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    25/124BIM FOR K-12 FACILITIES

    BIM :: PROCESS :: COLLABORATIVE

    Integrating Information fromMultiple Sources

    BIM :: PROCESS :: COLLABORATIVE

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    26/124BIM FOR K-12 FACILITIES

    BIM :: PROCESS :: COLLABORATIVE

    Integrating Information fromMultiple Sources

    Consolidated Information =

    better Database

    BIM :: PROCESS :: HOLISTIC

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    27/124BIM FOR K-12 FACILITIES

    BIM :: PROCESS :: HOLISTIC

    Integrating as much information as possible into asingle, coordinated database.

    Informing design Decisions

    Capturing Intentions and Values

    Measuring Solutions

    BIMinformation

    BIM :: PROCESS :: HOLISTIC :: INFORMING THE PROCESS

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    28/124

    BIM FOR K-12 FACILITIES

    Ideas/Sketches/Tests/Validation/Revisions/Refinements/Solutions

    Aspirations.. what do we want the school to be

    BIM :: PROCESS :: HOLISTIC :: INFORMING THE PROCESS

    WeatherEnvelope /Site Analysis

    AutomatedLEED Scheduling

    Rapid Prototyping

    Energy AnalysisGreen Building Studio

    VRMLwalkthroughs

    Solar RadiationStudies

    Exterior CFDAirflow Analysis

    Finite ElementAnalysis

    Interior CFD& Comfort Levels

    Artificial Lighting AnalysisDaylighting Analysis

    Construction Phasing& Scheduling Visualization

    Clash Detection& 3D Coordination

    3D MassingAnd Analysis

    RenderingVisualization

    Laser Scanning

    BIM :: PROCESS :: HOLISTIC :: PRE BIM

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    29/124

    BIM FOR K-12 FACILITIES

    BIM :: PROCESS :: HOLISTIC :: PRE BIM

    Design/StudyModel

    Draft/ModelFiles

    LightingAnalysissoftware

    StructuralAnalysisModel

    VisualizationModel

    Com-CheckData

    EnergyAnalysisModel

    Formal

    Investigati

    on

    Construction

    Documents

    LightLe

    vels

    Analysis

    StructuralValidation

    3DRenderings,

    MaterialStudie

    s,

    Animations/Vid

    eo

    Co

    de

    Co

    mpliance/

    Ap

    proval

    DesignIntent

    /ClientBuy-

    In

    2

    DPlots/

    D

    WF/PDF

    Design

    Validation,

    CodeCompliance

    DesignIntent/

    Clie

    ntBuy-In,

    Fundraising

    CarbonLoad,Operational

    Costs,SystemS

    izing,LEED

    Documentation

    DesignValidation,

    Code

    Compliance/

    Approval,LEED

    BIM :: PROCESS :: HOLISTIC :: CONSOLIDATION

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    30/124

    BIM FOR K-12 FACILITIES

    BIM :: PROCESS :: HOLISTIC :: CONSOLIDATION

    BIMRevit model

    Construction Documents

    Accurate, Synchronized

    3D Information

    Staging/Scheduling

    Clash Detection

    Shop Drawing Verification

    Renderings

    Design Intent

    Client Buy-In

    Public Support

    Fundraising

    QTO

    Live Costs/ Quantities

    GBXML

    Energy Model

    Lighting Levels

    Comcheck

    Database Plug-ins

    Structural Validation

    Energy Modeling

    System Sizing

    Design Analysis

    Delivery

    IFC

    Facilities Management

    BIM :: PROCESS :: HOLISTIC

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    31/124

    BIM FOR K-12 FACILITIES

    BIM :: PROCESS :: HOLISTIC

    Integrating Information fromMultiple Sources

    Consolidated Information =

    better Database

    Construction

    Documents

    Renderings

    QTO

    AnalysisData

    Extensions

    Delivery

    BIMRevit model

    BIM :: PROCESS :: ITERATIVE

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    32/124

    BIM FOR K-12 FACILITIES

    BIM :: PROCESS :: ITERATIVE

    Initial

    Planning

    Planning

    Requirements Analysis & Design

    Implementation

    TestingEvaluation

    Deployment

    BIM :: PROCESS :: FRONT-LOADED

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    33/124

    BIM FOR K-12 FACILITIES

    Kickoff

    All Hands

    Define Parameters, Goals

    Define success for the phase

    Round1Team Requirements

    Design Goals

    Evaluate/Steer

    Round 2Team Requirements

    Design Goals

    Evaluate/Steer

    Round 3Team Requirements

    Design Goals

    Evaluate/Steer

    QC

    Team Requirements

    Design Goals

    Evaluate/Steer

    Closeout

    All Hands

    Prep for next phase

    BIM :: PROCESS :: FRONT LOADED

    BIM :: PROCESS :: ITERATIVE :: DIVERGENCE/GOALS

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    34/124

    BIM FOR K-12 FACILITIES

    BIM :: PROCESS :: ITERATIVE :: DIVERGENCE/GOALS

    Not more meetingsmore information transfer

    Not more drawingsricherdiscussions

    Phase/Effort/Focus

    Way points, Collaborationsessions, Contact

    Data points, steeringopportunities

    All-Hands, Review, Goals andlimitations

    Individual design solutionprogress/direction

    BIM :: PROCESS :: ITERATIVE ::

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    35/124

    BIM FOR K-12 FACILITIES

    BIM :: PROCESS :: ITERATIVE ::

    Not more meetingsmore information transfer

    Not more drawingsricherdiscussions

    More integrated andfrequent contact reduces

    the time individualdesigners and disciplines

    spend developingpotentially divergent

    strategies.

    BIM :: PROCESS :: ITERATIVE :: TIME & ENERGY SAVINGS

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    36/124

    BIM FOR K-12 FACILITIES

    BIM :: PROCESS :: ITERATIVE :: TIME & ENERGY SAVINGS

    Not more meetingsmore information transfer

    Not more drawingsricherdiscussions

    More integrated andfrequent contact reduces

    the time spentdeveloping potentiallydivergent strategies.

    Integrated Modeling and

    design can create morefocus, and reduce losttime, increasingefficiency.

    BIM :: PROCESS :: FRONT-LOADED

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    37/124

    BIM FOR K-12 FACILITIES

    BIM :: PROCESS :: FRONT LOADED

    If

    Drawings, Documentsare side effects of awell-constructedBuilding InformationDatabase

    Then

    Building the databasehas to come first.

    So

    Database DevelopmentPrecedes traditionaloutput.

    This is good because

    Good Data makes gooddesign

    Early Data means moreinformed decisions

    Early Data = Opportunityfor early analysis.

    OPERATIONS :: CHANGES :: CONTRACTS & BILLING

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    38/124

    BIM FOR K-12 FACILITIES

    OPERATIONS :: CHANGES :: CONTRACTS & BILLING

    OPERATIONS :: CHANGES :: CONTRACTS & BILLING

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    39/124

    BIM FOR K-12 FACILITIES

    O O S C G S CO C S & G

    OPERATIONS :: CHANGES :: CONTRACTS & BILLING

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    40/124

    BIM FOR K-12 FACILITIES

    OPERATIONS :: CHANGES :: CONTRACTS & BILLING

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    41/124

    BIM FOR K-12 FACILITIES

    BIM@URS :: DESIGN :: DESIGN PROCESS ITERATIONS

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    42/124

    BIM FOR K-12 FACILITIES

    BIM :: PROCESS :: IPD

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    43/124

    BIM FOR K-12 FACILITIES

    Shared Risk

    Collaborative DesignShared Reward

    Project Savings

    performance goals

    IPD = Integrated Project Delivery

    Leverage the benefits of BIM

    IS NOT BIMNor is BIM IPD

    Owner/Operator(district)

    Designers

    (Architects,Engineers

    Constructors

    (Contractor,CM, GC)

    IntegratedContract

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    44/124

    BIM FOR K-12 FACILITIES

    A GAME-CHANGER

    BIM :: GAME CHANGER

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    45/124

    BIM FOR K-12 FACILITIES

    BIM AFFECTS NEARLY EVERY ASPECT OF THEFACILITY DESIGN AND CONSTRUCTINO PROCESS.

    CONTRACTS

    BILLING

    DISTRICT / ARCHITECT / CONSULTANT RELATIONSHIPS

    DESIGN PROCESS

    UNDERSTANDING THE DESIGN

    BIDDING MATERIALS

    CONSTRUCTION MANAGEMENT

    OPPORTUNITIES FOR OPERATIONS

    DESIGN :: LEVERAGE THE TOOLS

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    46/124

    BIM FOR K-12 FACILITIES

    Increased value

    Creative solutions

    Better Facilities

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    47/124

    BIM FOR K-12 FACILITIES

    ADVANTAGES FOR OPERATORS

    DURING DESIGN

    DURING CONSTRUCTION

    AFTER OCCUPANCY

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    48/124

    BIM FOR K-12 FACILITIES

    DESIGN ADVANTAGES

    Clarity of Communication, Interaction

    Coordination, Synergy

    Documentation

    Analysis (LEED?)

    DESIGN ADVANTAGES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    49/124

    BIM FOR K-12 FACILITIES

    Have you everreceived BIM documents

    for a facility or remodel?

    1. None

    2. One

    3. Several4. Dont Know

    DESIGN ADVANTAGES :: COMMUNICATION

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    50/124

    BIM FOR K-12 FACILITIES

    Clear communication

    Pre-Visualization

    Documented Goals

    DESIGN ADVANTAGES :: CONSOLIDATED GOALS

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    51/124

    BIM FOR K-12 FACILITIES

    Zero-Carbon Campus

    Diversity/DensityLand Use/Zoning

    Utility

    Network

    Green Building

    Consumption/Waste

    SocialBen

    efits

    AffordableHuman Scale

    Mixed UseMedium Density

    PlanningPolicy MakingSmart Growth

    ParksParkingBike Path

    Street NetworkMass Transportation

    Energy UseWater Distribution

    DrainageRenewable Energy

    LEED CertificationOperation & Maintenance

    RecyclingComposting

    Local EconomyGreen Purchasing

    Improvedqualityoflife

    Betterhe

    alth

    Stronger

    community

    EXAMPLE :: VALIDATE FORM :: RAPID PROTOTYPING

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    52/124

    BIM FOR K-12 FACILITIES

    VALIDATING DESIGN

    VR Tours make design decisions accessible.

    Rapid Prototypes enhance conversations about form.

    DESIGN ADVANTAGES :: COORDINATION

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    53/124

    BIM FOR K-12 FACILITIES

    DESIGN ADVANTAGES :: DOCUMENTATION

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    54/124

    BIM FOR K-12 FACILITIES

    2D document review,integrated into the model

    DESIGN ADVANTAGES :: DOCUMENTATION

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    55/124

    BIM FOR K-12 FACILITIES

    3D clash detection andcoordination review,based directly on themodel

    DESIGN ADVANTAGES :: ANALYSIS

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    56/124

    BIM FOR K-12 FACILITIES

    You can Leverage the BIM Database(if the Data is in there.)

    Performance

    Cost

    Sustainability

    Efficiency

    Future extensions

    DESIGN ADVANTAGES :: ANALYSIS

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    57/124

    BIM FOR K-12 FACILITIES

    Solar Envelope

    Solar Radiation

    PV Performance

    Prevailing Wind

    Average Temperatures

    Average Cloud Cover

    DESIGN ADVANTAGES :: ANALYSIS

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    58/124

    BIM FOR K-12 FACILITIES

    Integrated Sustainability goals and tracking(Is BIM sustainable? Depends on how its used.)

    DESIGN ADVANTAGES :: ANALYSIS :: PROGRAM VALIDATION

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    59/124

    BIM FOR K-12 FACILITIES

    Real-time feedback onprogram requirements

    DESIGN ADVANTAGES :: ANALYSIS

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    60/124

    BIM FOR K-12 FACILITIES

    True Daylighting and Artificial lighting levels

    Direct from Construction Documents

    Actual light fixtures and materials

    DESIGN ADVANTAGES :: ANALYSIS

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    61/124

    BIM FOR K-12 FACILITIES

    Airflow

    Fume Hoods

    Thermal Transfer, ComfortAcoustics

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    62/124

    BIM FOR K-12 FACILITIES

    Coordination

    Just -In-Time

    Schedule Tracking

    VerificationOverall Efficiency

    CONSTRUCTION ADVANTAGES

    CONSTRUCTION ADVANTAGES :: COORDINATION

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    63/124

    BIM FOR K-12 FACILITIES

    CONSTRUCTION ADVANTAGES :: JUST-IN-TIME

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    64/124

    BIM FOR K-12 FACILITIES

    CONSTRUCTION ADVANTAGES :: SCHEDULE TRACKING

    S i / Pl i

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    65/124

    BIM FOR K-12 FACILITIES

    Sequencing / Planning

    Maintaining Deadlines

    CONSTRUCTION ADVANTAGES :: VERIFICATION

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    66/124

    BIM FOR K-12 FACILITIES

    CONSTRUCTION ADVANTAGES :: EFFICIENCYEliminate Waste

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    67/124

    BIM FOR K-12 FACILITIES

    Eliminate Waste

    Enhance Safety

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    68/124

    BIM FOR K-12 FACILITIES

    WHAT DO YOU WANT IN YOUR DATABASE?

    Inventory

    Moves, Occupancy, Scheduling

    Maintenance, Tracking, fulfillmentOrganization, Filing, paperwork, Warranties

    FACILITIES MANAGEMENT

    FACILITIES MANAGEMENT :: QUESTION

    H d

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    69/124

    BIM FOR K-12 FACILITIES

    How do you manageFacility and maintenance

    information?

    1. Paper, Files

    2. Digital Files, Spreadsheets

    3. Database4. FM Software

    FM ADVANTAGES :: INVENTORY

    Wh t i t Wh

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    70/124

    BIM FOR K-12 FACILITIES

    What equipment, Where

    FM ADVANTAGES :: OCCUPANCY

    Class Scheduli

    ng

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    71/124

    BIM FOR K-12 FACILITIES

    Class Scheduling

    Move Coordination

    EquipmentLocations

    FM ADVANTAGES :: MAINTENENCE

    Equipment

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    72/124

    BIM FOR K-12 FACILITIES

    EquipmentStatus

    MaintenanceSchedules

    WarrantyInformation

    Parts List,ReplacementPart Inventory

    FM ADVANTAGES :: MAINTENENCE

    Equipment

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    73/124

    BIM FOR K-12 FACILITIES

    EquipmentStatus

    MaintenanceSchedules

    WarrantyInformation

    Parts List,ReplacementPart Inventory

    FM ADVANTAGES :: MAINTENENCE

    Equipment

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    74/124

    BIM FOR K-12 FACILITIES

    EquipmentStatus

    MaintenanceSchedules

    WarrantyInformation

    Parts List,ReplacementPart Inventory

    FM ADVANTAGES :: DOCUMENTATION

    COBIE

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    75/124

    BIM FOR K-12 FACILITIES

    COBIEConstruction to Operations Building Information Exchange

    A Filing system for Building DocumentsPlans, drawings, details

    Warranty Documents

    Instruction Manuals

    Replacement Part Inventory

    OperateBuildDesign

    Space, System& Equipment

    Layout

    Product Data,As-Built Layout,Tag/ Serial #,

    Warranties, Spares

    FM ADVANTAGES :: DOCUMENTATION

    Other Tools

    for managing FM Data

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    76/124

    BIM FOR K-12 FACILITIES

    Other Tools for managing FM Data

    COBIE

    Web-based FM Products

    SharePoint and other document management andworkflow systems.

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    77/124

    BIM FOR K-12 FACILITIES

    HOW TO ASK FOR BIM THAT PAYS

    HOW TO UTILIZE BIM DURING OCCUPANCY

    HOW BIM CAN WORK FOR YOU

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    78/124

    BIM FOR K-12 FACILITIES

    ASSESS PROBLEMS / COSTS

    SELECT ISSUES

    PLAN

    SPECIFYVERIFY

    HOW TO ASK FOR BIM THAT PAYS

    BIM FOR YOU :: QUESTION

    What concern

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    79/124

    BIM FOR K-12 FACILITIES

    What concerndo you think BIM may best help

    solve for your school system?

    1. Maintenance Costs

    2. Records; Filing, Organization

    3. Optimal Design(efficiency & performance)

    4. Decrease construction costs

    MAKE BIM PAY :: COSTS

    START WITH THE END IN MIND

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    80/124

    BIM FOR K-12 FACILITIES

    START WITH THE END IN MIND

    HOLISTIC VIEW OF FACILITIES PROBLEMS / COSTS

    LOOK AT OPERATIONS, WHAT ISSUES CAN YOU ADDRESS

    PLAN TO USE THE DATA

    SPECIFY HOW YOU WILL USE THE DATA

    TO THOSE THAT WILL PROVIDE IT

    VERIFY DATA DELIVERY

    MAKE BIM PAY :: COSTS

    2009 Private Sector Office Building Expense Ratios

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    81/124

    BIM FOR K-12 FACILITIES

    Fixed Expenses,35%

    Cleaning, 12%

    Repairs, 15%

    Utilities, 19%

    Grounds, 2%

    Security, 6% Admin,11%

    2009 Private Sector Office Building Expense Ratios(BOMA)

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    82/124

    MAKE BIM PAY :: COSTS

    Energy Costs = $1/SF/year on average

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    83/124

    BIM FOR K-12 FACILITIES

    Energy Costs = $1/SF/year on average

    Statistic: http://www.ase.org/uploaded_files/greenschools/School+Energy+Guidebook_9-04.pdf

    Image: (Courtesy of Washington State Department of General Administration)

    30 Year HVAC System Cost

    Energy

    Maintenance

    Replacement

    Installation

    MAKE BIM PAY :: COSTSA typical school district with 4,000 students

    $400 000 f l t d

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    84/124

    BIM FOR K-12 FACILITIES

    pays over $400,000 for energy-relatedutilities each year. Incorporatingenergy-efficient design improvementscould potentially save that district over

    $100,000 annually, enough to pay forthree maintenance positions;replacement of gym bleachers; all roofmaintenance, repair, and replacementneeds over the life of the facilities; orannual requirements for instructionalsupplies.

    --US Department of Energy, "Energy Smart Building Choices"

    http://www.nrel.gov/docs/fy01osti/30559.pdf

    (Chart) 38th Annual Maintenance & Operations Cost Study forSchools

    Apr 1, 2009 12:00 PM, By Joe Agron ([email protected])How the M&O budget is split

    (based on median dollars per FTE student)

    Data from the 38th Annual Maintenance & Operations CostStudy for Schools

    48%

    32%

    7%

    5%

    8%

    Payroll Energy / Utilities

    Equipment Contract Labor

    Other

    MAKE BIM PAY :: PLANPayback:

    Existing Standards:

    http://www.wbdg.org/tools/cobiex.php
  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    85/124

    BIM FOR K-12 FACILITIES

    Payback:

    Did you ask for it?

    What are your capabilities?

    What needs do you want toaddress?

    Can your AEC team deliver?

    COBIE = Construction OperationsBuilding Information Exchange

    CIS/2 = CIMsteel Integration Standards(structural Steel Only)

    Penn State BIM Delivery Standard

    NIBS National BIM Standard

    Your Own RequirementsAIA IPDG and E202

    Model Progression Matrix

    What processes will you use tomanage BIM data after

    construction?What processes will benefit?

    How will you verify thatdeliverables will meet yourneeds?

    MAKE BIM PAY :: PLANProcess ::

    http://www.wbdg.org/tools/cobiex.phphttp://cic.nist.gov/vrml/cis2.htmlhttp://www.engr.psu.edu/ae/cic/bimex/procedure.aspxhttp://www.buildingsmartalliance.org/index.php/nbims/http://www.aia.org/contractdocs/AIAS077630http://www.aia.org/contractdocs/AIAB078915?dvid=&recspec=AIAB078915http://www.aecbytes.com/feature/2008/MPSforBIM.htmlhttp://www.aecbytes.com/feature/2008/MPSforBIM.htmlhttp://www.aia.org/contractdocs/AIAB078915?dvid=&recspec=AIAB078915http://www.aia.org/contractdocs/AIAS077630http://www.buildingsmartalliance.org/index.php/nbims/http://www.engr.psu.edu/ae/cic/bimex/procedure.aspxhttp://cic.nist.gov/vrml/cis2.htmlhttp://www.wbdg.org/tools/cobiex.phphttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/URS%20Technical%20Plan.pdf
  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    86/124

    BIM FOR K-12 FACILITIES

    Process ::BIM Planning Guide, LOD/ResponsibilityMatrix, Model Coordination andCollaboration Procedures

    MAKE BIM PAY :: PLANProcess ::

    http://localhost/var/www/apps/conversion/tmp/Support/_Standards/URS%20Technical%20Plan.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/URS%20Technical%20Plan.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/Model%20Based%20Cost%20Estimation%20Template.pdf
  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    87/124

    BIM FOR K-12 FACILITIES

    Process ::BIM Planning Guide, LOD/ResponsibilityMatrix, Model Coordination andCollaboration Procedures

    MAKE BIM PAY :: PLANPlanni

    ng Construction

    http://localhost/var/www/apps/conversion/tmp/Support/_Standards/Model%20Based%20Cost%20Estimation%20Template.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/Model%20Based%20Cost%20Estimation%20Template.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/Model%20Review%20And%20Coordination%20Template.pdf
  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    88/124

    BIM FOR K-12 FACILITIES

    Planning ConstructionUsage

    MAKE BIM PAY :: PLAN

    Computer Power :: Computer Benchmarking New Hardware Standards

    http://localhost/var/www/apps/conversion/tmp/Support/_Standards/Model%20Review%20And%20Coordination%20Template.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdf
  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    89/124

    BIM FOR K-12 FACILITIES

    Computer Power :: Computer Benchmarking, New Hardware Standards

    Interoperability ::Regional reference directory, configuration, installation, and unified template

    Dataset Integrity ::Training, Review Tools

    Process ::BIM Planning Guide, LOD/Responsibility Matrix, Model Coordination and CollaborationProcedures

    OPERATIONS :: CHANGES :: CONTRACTS & BILLING

    http://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdf
  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    90/124

    BIM FOR K-12 FACILITIES

    http://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdfhttp://localhost/var/www/apps/conversion/tmp/Support/_Standards/LOD%20Matrix%20Template%20sample.pdf
  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    91/124

    BIM FOR K-12 FACILITIES

    You don't have to invest in software.

    You don't have to invest in computer hardware.

    You do have to have a plan.You do have to know your data is good.

    HOW TO UTILIZE BIM FOR FM

    BIM FOR FM :: CHOOSE PLATFORMCONSISTENCY

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    92/124

    BIM FOR K-12 FACILITIES

    CONSISTENCY

    USABILITY

    FOCUSED ON GOALS

    Doesnt have to be:

    Facilities Management Software

    Revit

    What will work?Any ODBC Database: SQL Server, MS Access, Oracle

    Spreadsheet / Data Manipulator: Excel

    BIM FOR FM :: SPECIFY DATAOPERATIONAL NEEDS

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    93/124

    BIM FOR K-12 FACILITIES

    MAINTENANCE CRITERIA

    INDUSTRY STANDARDS

    BIM FOR FM :: SPECIFY DATA :: INDUSTRY STANDARDDSIndustry Consensus Standards

    National BIM Standard http://www.facilityinformationcouncil.org/bim/

    http://www.facilityinformationcouncil.org/bim/http://www.facilityinformationcouncil.org/bim/
  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    94/124

    BIM FOR K-12 FACILITIES

    National BIM Standard http://www.facilityinformationcouncil.org/bim/

    http://www.facilityinformationcouncil.org/bim/pdfs/NBIMSv1_p1.pdf

    AIA http://www.aia.org/ipdg

    CIS/2 http://cic.nist.gov/vrml/cis2.html

    COBIE http://www.wbdg.org/resources/cobie.php

    Municipal

    State of Wisconsin Wisconsin DSF BIM Guidelines and Standards http://www.doa.state.wi.us/dsf/masterspec_view_new.asp?catid=61&locid=4

    State of Texas Press Release and Contact http://www.tfc.state.tx.us/communities/facilities/prog/construct/

    Army Corps of Engineers https://cadbim.usace.army.mil/default.aspx

    GSA 3D-4D Building Information Modeling

    Higher EdIndiana University http://www.indiana.edu/~uao/iubim.html

    Penn Sate university http://www.engr.psu.edu/ae/cic/bimex/procedure.aspx

    Corporate

    General Motors

    GAP, Target, Wal-Mart, Starbucks, Sams Clubs

    Yum Brands

    BIM FOR FM :: SPECIFY DATA :: CHOOSE A PILOT

    http://www.facilityinformationcouncil.org/bim/http://www.facilityinformationcouncil.org/bim/pdfs/NBIMSv1_p1.pdfhttp://www.aia.org/ipdghttp://cic.nist.gov/vrml/cis2.htmlhttp://www.wbdg.org/resources/cobie.phphttp://www.doa.state.wi.us/dsf/masterspec_view_new.asp?catid=61&locid=4http://www.tfc.state.tx.us/newsevents/texas-adopts-building-information-modeling-bim-capabilityhttps://cadbim.usace.army.mil/default.aspxhttp://www.gsa.gov/Portal/gsa/ep/channelView.do?pageTypeId=17109&channelId=-24291http://www.indiana.edu/~uao/iubim.htmlhttp://www.engr.psu.edu/ae/cic/bimex/procedure.aspxhttp://www.engr.psu.edu/ae/cic/bimex/procedure.aspxhttp://www.indiana.edu/~uao/iubim.htmlhttp://www.gsa.gov/Portal/gsa/ep/channelView.do?pageTypeId=17109&channelId=-24291http://www.gsa.gov/Portal/gsa/ep/channelView.do?pageTypeId=17109&channelId=-24291http://www.gsa.gov/Portal/gsa/ep/channelView.do?pageTypeId=17109&channelId=-24291https://cadbim.usace.army.mil/default.aspxhttp://www.tfc.state.tx.us/newsevents/texas-adopts-building-information-modeling-bim-capabilityhttp://www.doa.state.wi.us/dsf/masterspec_view_new.asp?catid=61&locid=4http://www.wbdg.org/resources/cobie.phphttp://cic.nist.gov/vrml/cis2.htmlhttp://www.aia.org/ipdghttp://www.facilityinformationcouncil.org/bim/pdfs/NBIMSv1_p1.pdfhttp://www.facilityinformationcouncil.org/bim/
  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    95/124

    BIM FOR K-12 FACILITIES

    Indiana University BIM Capabilities Matrix(prequalified BIM providers)

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    96/124

    BIM FOR K-12 FACILITIES

    CONCLUSION

    Opportunitiesto increase value

    Reduce cost

    improve facility performance

    A Better Design Process

    A Better Construction Process

    Tools to manage Facilities and Maintenance

    Leverage for the future

    BIM FOR K-12 FACILITIES

    THANK YOU

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    97/124

    BIM FOR K-12 FACILITIES

    THANK YOU

    QUESTIONS

    BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    98/124

    BIM FOR K-12 FACILITIES BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    99/124

    BIM FOR K-12 FACILITIES BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    100/124

    BIM FOR K-12 FACILITIES BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    101/124

    BIM FOR K-12 FACILITIES BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    102/124

    BIM FOR K-12 FACILITIES BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    103/124

    BIM FOR K-12 FACILITIES BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    104/124

    BIM FOR K-12 FACILITIES BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    105/124

    BIM FOR K-12 FACILITIES BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    106/124

    BIM FOR K-12 FACILITIES BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    107/124

    BIM FOR K-12 FACILITIES BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    108/124

    BIM FOR K-12 FACILITIES BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    109/124

    BIM FOR K-12 FACILITIES BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    110/124

    BIM FOR K-12 FACILITIES BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    111/124

    BIM FOR K-12 FACILITIES BIM FOR K-12 FACILITIES :: EFFECTIVE PROCESSES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    112/124

    BIM FOR K-12 FACILITIES

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    113/124

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    114/124

    BIM FOR K-12 FACILITIES

    AIA, Continuing Education

    POP QUIZ

    INTRODUCTIONThe BIM acronym stands for:

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    115/124

    BIM FOR K-12 FACILITIES

    1. BetterInvest More

    2. Building Information Modeling3. Building Interesting Machines

    4. Base InformationManagement

    INTRODUCTIONTo Use an Autodesk Revit

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    116/124

    BIM FOR K-12 FACILITIES

    BIM Database you can

    use:

    1. Autodesk Revit

    2. Microsoft Access or Excel

    3. Revit Compatible FM Software

    4. Any of the above

    INTRODUCTIONIs BIM good for sustainable

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    117/124

    BIM FOR K-12 FACILITIES

    design?

    1. No2. Depends on how you use it

    3. Yes, Always

    4. Only when created with

    recycled computers.

    INTRODUCTIONIs BIM an extra cost?

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    118/124

    BIM FOR K-12 FACILITIES

    1. Depends on what the

    operating definition of BIM is.2. Depends on what the

    definition of IS is.

    3. Yes, Always.

    4. No, Never.

    INTRODUCTIONIs a BIM a 3D Model?

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    119/124

    BIM FOR K-12 FACILITIES

    1. Yes

    2. No3. Maybe

    INTRODUCTIONWhat do the innards of a

    t l k t lik ?

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    120/124

    BIM FOR K-12 FACILITIES

    true BIM look most like?

    1. A CAD Drawing2. A 3D Model

    3. A Relational Database

    4. An Amphibian

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    121/124

    BIM FOR K-12 FACILITIES

    POP QUIZ

    This concludes the AIA, Continuing Education

    MICHIGAN INSTITUTE FOR EDUCATIONAL MANAGEMENT

  • 8/8/2019 BIM for Facilities MEIM 10-10-5

    122/124

    BIM FOR K-12 FACILITIES

    BUILDING INFORMATION MODELING

    FOR K-12 FACILITIES