Eetu Partala Project engineer, bridges Quality coordinator, Sweco structures, Finland

BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

Embed Size (px)

Citation preview

Page 1: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

Eetu Partala

Project engineer, bridges

Quality coordinator,

Sweco structures, Finland

Page 2: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

Sweco Structures Ltd. BRIDGES AND INFRASTRUCTURES

Page 3: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

Infrastructure BIM development process and application in Finland

•Development process of infra BIM in Finland

•Bridge BIM in practice

•Model based design inspection

•Structure inspection and maintenance

2017-06-19

3

Page 4: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

Building information modelling development in Finland

• Finnish Transport Agency = Liikennevirasto (Fin) – Wide variety of instructions for road, water, bridges and

geotechnical design and execution

– Guidelines for bridge and infrastructure modeling

• Requirements – Detailed BIM requirements for each phase of the project

• Outcome – Improved quality in design

2017-06-19

4

Page 5: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

Building information modelling development in Finland

• The guideline development

process for bridges

–Multi step project, 5D bridge

–Coalition led by Finnish

Transport Agency involving

consultants, contractors,

software houses etc.

–Every subproject with separate

goals and reports

2017-06-19

5

2001-2004

• Development of the 3D process

• Concrete bridge 3D geometry modeling

• Laser mapping

2005-2007

• BIM pilot projects

• Software: Tekla, Solidworks

• Reinforcement modeling

• Model utilization in site survey

2008-2010

• More pilot projects

• More in situ measuring

• Custom component modeling

• Guide for bridge BIM

2011-2013

• BIM guide testing and update

• Model based design inspection

• Open standards

• InfraBIM collaboration with road and bridges

Page 6: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

BIM in practice – Sweco environment

• It saves time

• It saves money

• Improves quality in design

•Makes Tekla easier to use

2017-06-19

6

Environment Common tools, common methods Efficiency & quality

Why do we use Tekla and Sweco Bridge Environment ?

Page 7: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

BIM in practice – Sweco environment

2017-06-19

7

Quality Assurance

Bills of Materials

Scheduling & Status Reports

Hole and Opening Design (Sweco@Hole)

Safety

From traditional use of BIM to … …tailor made Sweco Finland Environment

Visualization and coordination

Page 8: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

BIM in practice – Sweco environment

• Bridge naming, numbering and

modeling instructions

• Predefined settings

–Reports

–Quantities,

–Coordinate information

–Tools

2017-06-19

8

Page 9: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

BIM in practice – Sweco environment

• 50 own custom components

– Bearing, rails, etc.

– Pile and column components

– Plugins: Railing tool

• Tekla Warehouse

• Beam extruder

– Road line coordinates

– CIP reinforcement tool (model)

2017-06-19

9

Page 10: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

• Hundreds of pre-defined model and view settings

• Tens of reports for different use

• For checking, quantity, coordinate reports

10

BIM in practice – Sweco environment

Page 11: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

11

BIM in practice – Drawing settings for concrete bridges

• Drawings are made from the model

• Over 40 drawing view settings

• Every bridge part has its own pre-set view

• Settings using Phase and class numbers

Page 12: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

–Measures

–Layout points

12

BIM in practice – Sweco environment

Page 13: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

BIM in practice – Model based inspection (internal)

2017-06-19

13

• Vital tool for quality control

• Collaboration between the

design team

• Collision check and

commenting

• Reporting

COMMENT TOOL

Page 14: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

BIM in practice – Model based inspection (external)

2017-06-19

14

• 3rd party design inspection

• Inspection is based on the IFC

or native format BIM model

• Comments on a separate

document,

• In model commentary can also

be used

• Instructions for the structural

and model inspection are used

Page 15: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

BIM in practice – Structure inspection and maintenance

2017-06-19

15

Page 16: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

BIM in practice – Structure inspection and maintenance

2017-06-19

16

Hämeensilta I, ylläpitomalli (Tekla Structures) Hämeensilta I, laser scanning (Navisworks Simulate)

Hämeensilta I Hämeensilta I, , laser scanning and IFC model comparison (Navisworks Simulate)

Page 17: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

BIM in practice – Structure inspection and maintenance

2017-06-19

17 Raisionjoen railway bridge, laser scanning and IFC comparison (Navisworks Simulate)

Raisionjoki railway bridge, laser scanning (Navisworks Simulate)

Page 18: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

BIM in practice - Summary

•Structural modeling

•Model based design inspection

•Structure inspection and maintenance

•Laser scan based models

2017-06-19

18

Page 19: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice

DĚKUJI THANK YOU!

2017-06-19

19

Page 20: BIM development and applications in · PDF fileInfrastructure BIM development process and application in Finland •Development process of infra BIM in Finland •Bridge BIM in practice