BIM ADOPTION TO ENSURE DELIVERY OF HIGH-QUALITY PROJECTS AND LARGE-SCALE CONSTRUCTION Planning
Kamal FarahMember of the board of DirectorsECC Group
ECC Group Overview
ECC Group’s Added Value
ECC Group’s Added Value
Why BIM?
• Better Systems into Better Cost Savings
• BIM is not a piece of software, it’s a way to manage projects
• More efficient way of working
• BIM sets a new way for team collaboration and communication
• Better record keeping
• More added value to the client
BIM Integration in ECC
• Improves Efficiency
• Improves Planning
• Improves Commercial
• BIM for FM
CASE STUDYProject Name : NSHAMA – Rawda and UNA
BENEFITS :
▪ Consultant/Authority approval process time reduced drastically.
▪ Better understanding of the design/facility.
▪ Site team engagement for better execution & rework is reduced dramatically.
▪ Significate wastage reduction throughout the project’s lifecycle.
CASE STUDYProject Name : NSHAMA – Rawda and UNA
CHALLENGES:
▪ Accommodating tight constraints on site.
▪ Optimal planning between all disciplines on site.
▪ Proposing different design options as per updated site conditions.
CASE STUDY Project Name : Park Ridge
BENEFITS :
▪ Automation in model development -reducing the shop drawing production time drastically.
▪ QA/QC Automation Model checker to ensure model integrity.
CASE STUDYProject Name : Park Ridge
BENEFITS :
▪ Information integration with all departments ensured data integrity.
▪ 4D site progress tracking.
CASE STUDYProject Name : Park Ridge
CHALLENGES:
• Allowed us to fulfill unique project site execution requests
• Helped in the coordination of site logistics to aid in ensuring efficient execution of structural works.
International Standards ▪ ECC BIM Standards prepared based on ISO 19650 – 01 & 02
▪ Standards are followed, maintained and updated.
BIM’s ROI
Return on investment for BIM captured in two dimensions
• Organization Dimension (Total Cost Vs Total Savings)
• Stakeholder Dimension (BIM Project Cost Vs Project Savings)
4%
8%
9%
11%
12%
16%
0% 5% 10% 15% 20%
Organization
Stakeholder
BIM ROI2019-2020 2018-2019 Pilot Project
Current Development & Future Plans
• Now able to build a 3D environment, electronically which helps us in • Data capture • Coordination on the site • Clash Detection• Efficient Planning • Improve transparency within disciplines • Minimize Rework• Gives Clients better end product.
• 4D
• 5D
• 6D
BIM is not the TARGET