85
SL NO ITEM QTY UNIT RATE AMOUNT SECTION A: CIVIL WORK DISMETLING A1 Pulling down brick masonry of any thickness in cement or lime mortar with plaster and tiles including disposing the debris beyond the premises as directed and cleaning the site etc.complete as per direction of Engineer-in-charge. GROUND FLOOR 145.28 CUM RATE IN FIGURE RATE IN WORD A2 Pulling down R.C.C. slab of any thickness in cement mortar with plaster and tiles including disposing the debris beyond the premises as directed and cleaning the site etc.complete as per direction of Engineer-in-charge. GROUND FLOOR 5.46 CUM RATE IN FIGURE RATE IN WORD A3 Removing all type of shutters, doors, ventilators and windows, partitions and framework of any size and type with frame including stacking the same at site or disposing beyond the premises as directed including all leads & lifts etc. complete as per direction of Engineer-in-charge. GROUND FLOOR 100.00 NOS RATE IN FIGURE RATE IN WORD BILL OF QUANTITY FOR "RENOVATION OF OFFICE BUILDING AT IB THERMAL POWER STATION , JHARSUGUDA . Page45

BILL OF QUANTITY FOR RENOVATION OF OFFICE · PDF fileSL NO ITEM QTY UNIT RATE AMOUNT SECTION A: CIVIL WORK DISMETLING ... top surface of plinth filling, ... chajja, shelves, columns,

Embed Size (px)

Citation preview

SL NO ITEM QTY UNIT RATE AMOUNT

SECTION A: CIVIL WORK

DISMETLING

A1 Pulling down brick masonry of any thickness in

cement or lime mortar with plaster and tiles

including disposing the debris beyond the premises

as directed and cleaning the site etc.complete as per

direction of Engineer-in-charge.GROUND FLOOR 145.28 CUMRATE IN FIGURE

RATE IN WORD

A2 Pulling down R.C.C. slab of any thickness in

cement mortar with plaster and tiles including

disposing the debris beyond the premises as

directed and cleaning the site etc.complete as per

direction of Engineer-in-charge.GROUND FLOOR 5.46 CUMRATE IN FIGURE

RATE IN WORD

A3 Removing all type of shutters, doors, ventilators

and windows, partitions and framework of any size

and type with frame including stacking the same at

site or disposing beyond the premises as directed

including all leads & lifts etc. complete as per

direction of Engineer-in-charge.GROUND FLOOR 100.00 NOSRATE IN FIGURE

RATE IN WORD

BILL OF QUANTITY FOR "RENOVATION OF OFFICE BUILDING AT IB THERMAL POWER STATION , JHARSUGUDA .

Page45

SL NO ITEM QTY UNIT RATE AMOUNT

EARTH WORK EXCAVATION

A4 Earth work in excavation of foundation trenchesand column foundation in different kinds of soilwithin an initial lift of 1.5m including dressing thesides and levelling the bed & depositing theexcavated materials away from the site within aninitial lead of 50 mtr. as per direction of Engineer-in-charge including cost of all labour, sundries, tools &plants etc. complete as per direction of Engineer-in-charge.GROUND FLOOR 34.73 CUMRATE IN FIGURE

RATE IN WORD

ANTITERMITE TREATMENT

A5 Supplying, diluting and preparing chemical emulsionlike CHLORPYRIPHOS/byflexTC( GODREJHIGH CARE) or other chemicals approved byCentral Insecticides Board or as directed by themanufacturer and spraying the mixture uniformly bysprayer as pre-constructional anti termitetreatment and creating a chemical barrier under andaround the column pits, wall trenches, basementexcavation, top surface of plinth filling, junction ofwalls and floors along with external perimeter of thebuilding, expansion joints, surrounding the pipesand conduits etc. complete at the rate of 7.5 liters(or as directed by the manufacturer) per sqm onvertical and 5.0 liters per sqm on horizontal surfaces,50% of the emulsion to be filled in the holes madein trenches at 150mm center to center etc.completeas per IS:6313/1981(Part-II) and as per thedirection of the Engineer-in-charge including costof all materials, labour, taxes, etc. complete as perdirection of Engineer-in-charge.

GROUND FLOOR 1992.14 SQMRATE IN FIGURE

RATE IN WORD

Page46

SL NO ITEM QTY UNIT RATE AMOUNT

SAND FILLING

A6 Sand filling in foundation trenches and plinthwith sweet river sand, well watered and compacted ,top surface dressed and levelled to propergradient in layers of 0.225 mtr including cost of allmaterials, conveyance, all taxes and royalties, loadingand unloading, including cost of all labour, T&P,sundries etc. complete as per direction of theEngineer-in-charge.

GROUND FLOOR 12.64 CUMRATE IN FIGURE

RATE IN WORD

PLAIN CEMENT CONCRETE

A7 Providing and laying plain cement concrete (1:4:8)in foundation and bottom layers of flooring etc.using 40mm size black hard crusher broken granitemetal of approved quality from approved quarryincluding mixing, lowering laying and compacting toproper thickness, watering and curing to therequired period as per direction of the Engineer-in-charge, including cost of all materials with all taxesand royalities, loading and unloading conveyance, alllabour, all sundries and T&P etc. complete as perdirection of Engineer-in-charge.

GROUND FLOOR 12.64 CUMRATE IN FIGURE

RATE IN WORD

Page47

SL NO ITEM QTY UNIT RATE AMOUNT

FLYASH BRICK WORK IN F & P

A8 Providing FLY ASH brick masonary in cementmortar (1:6) after immersing the bricks for 6 hrs inwater before use with all necessary projections,splays cutting, circular moulding, corbelling etc asper drawings. including cost, conveyance, all taxes,royalties, loading and unloading of all materials,including cost of all labour, scaffolding, wateringand curing, sundries, T&P etc. complete as per thedirection of the Engineer-in-charge. (EXCULDINGCOST OF FLY ASH BRICK ,WHICH WILL BESUPPLIED BY OPGC AT ASH BRICK PLANT )

GROUND FLOOR

a) In Foundation & Plinth 14.55 CUMRATE IN FIGURE

RATE IN WORD

( a ) Super Structure 23.9 CUMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 183.69 CUMRATE IN FIGURE

RATE IN WORD

A9 Fly ash brick masonary work in cement mortar mix(1:4) for half brick (125mm thick) masonary wallswith provision of 2 nos of 6mm dia. M.S roundreinforcement bars at each 3rd layer after immersingthe bricks for 6 hrs in water before use insuperstrure and similar type of work with necessaryprojections, splay cutting circular moulding,corbelling, champhering watering, curing,scaffolding, including cost of all materials, labour ,conveyance, loading and unloading taxes, royalities,scaffolding, watering, curing, sundries, tools andplants, etc., as per the direction of the Engineer-in-charge.(EXCULDING COST OF FLY ASHBRICK ,WHICH WILL BE SUPPLIED BY OPGC AT ASH BRICK PLANT )

GROUND FLOOR 21.00 CUM

Page48

SL NO ITEM QTY UNIT RATE AMOUNT

RATE IN FIGURE

RATE IN WORD

FIRST FLOOR 8.68 CUMRATE IN FIGURE

RATE IN WORD

A10 Providing and casting the Reinforced cement

concrete (1:1.5:3) using 12mm size hard granaite

crusher broken chips including all cost,

conveyance taxes and labour charges etc.

complete as per detailed design and drawing butexcluding, centering & shuttering , formwork ,compaction and curing and cost of reinforcementetc . complete as per the direction of the Engineer-in-charge.GROUND FLOOR 49.58 CUMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 246.93 CUMRATE IN FIGURE

RATE IN WORD

A11 Straightening, cutting, bending & binding of M.S-bar/tor steel reinforcement to R.C.C workincluding ,tying, placing in proper place for castingetc.with all cost of materials ,labour,T&Petc.complete as per direction of the Engineer-in-charge.

GROUND FLOOR 54.49 QtlRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 328.57 QtlRATE IN FIGURE

RATE IN WORD

REINFORCEMENT CEMENT CONCRETE

Page49

SL NO ITEM QTY UNIT RATE AMOUNT

A12 Making the hole of appropriate dia. & appropriatelength as per the specification of hilti or fisher.Putting the rod in position & fixing the hole withappropriate pressure with chemicals specified by thehilti or fisher complete in all respect including costof materials & specified dimension of rod as per thedirection of Engineer-in-charge.

GROUND FLOOR

8mm 150.00 NOSRATE IN FIGURE

RATE IN WORD

16mm 50.00 NOSRATE IN FIGURE

RATE IN WORD

CENTRING AND SHUTTERING

A13 Providing strong, rigid, levelled and plumbedcentering and shuttering to required shape andsize for all kinds of R.C.C. works in the itemsmentioned below with wooden or steel centeringmaterials with all necessary bracing, ties andsupports with level centering covered withbituminous paper including provision of necessaryholes and pockets, electrical conduit pipe, P.H.pipes, fan hooks or boxes, switch and board insertplates, clamps and extension bars etc. and removingthe shuttering after the required interval from thedate of casting, including cost of all materials withtransportation, taxes, loading and unloading etc. andall labour, sundries, T&P scaffolding etc. completeasper the direction of Engineer-in- Charge.

GROUND FLOOR

A) lintel 10.36 SQMRATE IN FIGURE

RATE IN WORD

B) Footing, columns & plinth beam. 53.43 SQMRATE IN FIGURE

RATE IN WORD

Page50

SL NO ITEM QTY UNIT RATE AMOUNT

C) Columns,beams 189.10 SQMRATE IN FIGURE

RATE IN WORD

D) Roof slab(flat roof) 140.90 SQMRATE IN FIGURE

RATE IN WORD

E) stair case 12.87 SQMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR

A)PORGOLA 204.10 SQMRATE IN FIGURE

RATE IN WORD

B) Columns,beams 1206.20 SQMRATE IN FIGURE

RATE IN WORD

C) Roof slab(flat roof) 1062.80 SQMRATE IN FIGURE

RATE IN WORD

D) lintel 42.00 SQMRATE IN FIGURE

RATE IN WORD

E) stair case 38.52 SQMRATE IN FIGURE

RATE IN WORD

Page51

SL NO ITEM QTY UNIT RATE AMOUNT

A14 Providing 16mm thick cement plaster to theinside surface of brick masonary wall with cementmortar (1:6) including racking out joints, scrapingand cleaning the surface and finishing the plastersurface smooth using wooden floats only to properplumbs and level and making grooves, beads anddrip coarse to give required ornamental finish as perdrawings including cost of all materials, conveyance,loading and unloading, all taxes and royalties, alllabour, scaffolding, watering and curing, sundriesand T&P etc. complete as per direction of theEngineer-in-charge

GROUND FLOOR 658.6 SQMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 1095.02 SQMRATE IN FIGURE

RATE IN WORD

A15 Providing 12mm thick cement plaster to the outside surface brick masonry wall with cement mortar(1:6) including racking out joints, scraping andcleaning the surface and finishing the plaster surfacesmooth using wooden floats only to proper plumbsand level and making grooves, beads and drip coarseto give required ornamental finish as per drawingsincluding cost of all materials, conveyance, loadingand unloading, all taxes and royalties, all labour,scaffolding, watering and curing, sundries and T&Petc. complete as per direction of the Engineer-in-charge

GROUND FLOOR 107.33 SQMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 512 SQMRATE IN FIGURE

RATE IN WORD

Page52

SL NO ITEM QTY UNIT RATE AMOUNT

A16 Providing 6mm thick cement plaster with cementmortar of (1:4) to ceilings of roof slabs, stairs,landings, chajja, shelves, columns, beams and loftsetc. including roughening, scraping and cleaning andfinishing the plastered surface smooth using woodenfloats only to proper plumbs and level, makinggrooves, beads and drip coarse to give requiredornamental finish as per drawings including cost ofall materials, conveyance, loading and unloading, alltaxes and royalties, all labour, scaffolding, wateringand curing , sundries and T&P etc. complete as perdirection of the Engineer-in-charge

GROUND FLOOR 93.08 SQMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 1191.95 SQMRATE IN FIGURE

RATE IN WORD

GRADING PLASTER

A17 Providing 2.5cm thick grading concrete (1:2:2) onroof slab with 6mm size hard granite chips on newwork with two coats Sica Latex in 1:4:6 (1sica:4water:6cement)proportion as per drawingsincluding cost of all materials, conveyance, loadingand unloading, all taxes and royalties, all labour,scaffolding, watering and curing , sundries and T&Petc. complete as per direction of the Engineer-in-charge.

FIRST FLOOR 864.5 SQMRATE IN FIGURE

RATE IN WORD

Page53

SL NO ITEM QTY UNIT RATE AMOUNT

WOODEN WORK , FLUSH DOOR , GLASS

DOOR , STRUCTURAL GLAZING , NCL

WINDOW , UPVC LOUVERS

A18 Supplying, fitting and fixing in position well dressed,well seasoned sal wood choukaths of size(75mm x125mm ) which should be free fromserious defects such as dead knots, flows etc. in allfloors including two coats of coaltarring to wall sidefaces, 6 nos. of W.I. Clamps and required screwswith approved quality including cost, conveyance,royalties and taxes of all materials and cost of alllabour with T & P required for the work andcomplete as per the direction of Engineer-in-charge.

GROUND FLOOR 0.20 CUMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 0.29 CUMRATE IN FIGURE

RATE IN WORD

Page54

SL NO ITEM QTY UNIT RATE AMOUNT

A19 Providing and fixing of 4 mm thick Aluminium

Composite Panels(ACP) on finished exterior walland column of Durabuid make with aluminium skinthickness of 0.5 mm on both side with top to becoated with Polyvinylidene Fluoride (PVDF) basedcoat of 24 micron or more , the core being 3 mmthick Low Density Polyethelene (LDPE) and theback aluminium sheet to be coated with service coatof 5 to 7 micron. The ACP to be cut to sizes as perthe reccomonded grid with all side routed minimumof 25 mm with with all four corner to be stiffenedusing proper aluminium extruded profile and panelsto be fixed to the aluminum subframe erected to thewalls or column using 50x25x1.5 mm rectangularhollow section with the hel of screws or rivetting.The aluminium sub-frame to be fabricated as pergrid and tobe erected to the wall or column using L-clamp and acnchored to the wall using fastener ofFisher or Hilti make self expanding midium dutyanchors ( nylon or polymide sleeve with wall fixingscrews to be GI ). A minimum 15 mm expansiongaps to be maintained between ACP panels and to bewith natural cure weather silicone sealants of 15x10

of Momentive (formerly GE Bayer ) or Dow

Corning make with proper masking to the ACP

edges to avoid spillage of silicone sheet surface. The

rates to be inclusive of all materials like ACP, sub-

frame sections, L-brackets, anhors and all

accessories like screws, aluminum profiles, GI

screws/aluminium rivets , sillicone sealants ,masking

tapes , backer rods etc and labour charges with

fabrication and erection - all complete as per

direction of Engineer - in- charge .GROUND FLOOR 291.3 SQMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 271.29 SQMRATE IN FIGURE

RATE IN WORD

Page55

SL NO ITEM QTY UNIT RATE AMOUNT

A20 Providing and fixing of Structural Glazing with NCL Seccolor PPS sections to be fabricated fromroll formed sections made of pre-painted steel (base steel as per IS-513 of 0.6 mm thick “D” quality, galvanized as per IS-277 with zinc of 150 Gm/Sq.mtr).The glass holding section made of 304 gradestainless steel of 0.8 mm thick. CRCA Sections withPolyurithene Coating are to be used as stiffenersinside the PPS section as per the design requirement.Design calculations are to be made to suit windpressures as given in IS 875.with paint specificationbeing with primer of 5-7 microns and finished paintwith polyster paint (Black /Pearl white/

Chocolate Brown) of 12-16 microns alongwith thealkyd backer at the back of 5-7 microns and Thesection should be of 50x100 mm for frameverticals, 33x58 mm for frame horizontals, sectionfor reinforcement should be of 31x55 mm / 48x98mm(CRCA), Glass holding section should be of32.5x37 mm for top and bottom grids, in betweenshould be of 32.5x18 mm. Outer frame in top-hung and side-hung door will be46 mm x 52 mm and openable shutter will be 46mm x46 mm. .Accessories / gaskets are to be usedas per the manufacturer’s supply and specificationlike Brackets made of CRCA powder coated /Electroplated. Gasket made of Ethyl PropyleneDiamine Monomer and Silicone of natural cure,with Good U.V. Resistance to be used. The sectionsare to be cut to length ,mitre joined by means of selfexpanding screws and frames are fixed to theconcrete/masonry walls by means of self expandingscrews and glass to be used of 6 mm toughenedReflective of Saint Gobain make & FOR at IbThermal Power Station site.GROUND FLOOR 166.81 SQMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 182.00 SQMRATE IN FIGURE

RATE IN WORD

Page56

SL NO ITEM QTY UNIT RATE AMOUNT

A21

Providing and fixing of NCL Seccolor Partly fixPartly openable windows to be fabricated fromroll formed sections made of pre-painted steel (base steel as per IS-513 of 0.6 mm thick “D” quality, galvanized as per IS-277 with zinc of 120 Gm/Sq.mtr)with paint specification being with primer of 5-7microns and finished paint with polyster paint(Black /Pearl white/ Chocolate Brown) of 12-16microns alongwith the alkyd backer at the back of 5-7 microns and the sizes of outer frame being of46x52 mm and shutter being 46x 46 mm, with allvertical and horizontal mullions are of 46x70 mmwith adequate stiffening as per wind design andfixed beadings are of 18x25 mm, sections for glassbeading should be of 18 x 25mm .

Accessories / gaskets are to be used as per themanufacturer’s supply and specification like handlebeing made of high grade Aluminium powdercoated and with nylon receiver and gasket will bemade of EPDM.All corner brackets are to be madeof CRCA with zinc phosphating. The sections are tobe cut to length ,mitre joined with corner bracketand frames are fixed to the concrete/masonry wallsby means of self expanding screws and glass to beused of 5 mm clear with all taxes and FOR site at IbThermal Power Station site all complete Accessories/ gaskets are to be used as per the manufacturer’ssupply and specification like handle being made ofhigh grade Aluminium powder coated and withnylon receiver and gasket will be made of EPDM.Allcorner brackets are to be made of CRCA with zincphosphating. The sections are to be cut to length,mitre joined with corner bracket and frames arefixed to the concrete/masonry walls by means ofself expanding screws and glass to be used of 5 mmclear with all taxes and FOR site at Ib ThermalPower Station site all complete..GROUND FLOOR 108.84 SQMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 66.77 SQMRATE IN FIGURE

Page57

SL NO ITEM QTY UNIT RATE AMOUNT

RATE IN WORD

A22 Providing, erecting and fitting polycarbonate-sheet-

covered- arched-shaped shed over passage of1.835 mtr width on terrace floor on a steel tubularstructure to be fabricated and erected using TATAmake Square and Rectangular Hollow Closedstructural ( SHS/RHS) with 50x25x2.9 mm RHS inevery rafter at 1.235 mtr spacing centre to centreand 0.9 mtr spacing in all purlins of the shed-structure . The covering will have 6 mm LexanMultiwall Polycarbonate sheet of Sabir India (formerly GE Plastics India) of 1.2 mtr width to befixed using specific two component profile of60x35x2.5 mm powdercoated aluminium profilewith EPDM gasket, fixed at every 1.235 mtr spacingalong with all rafter line. Both the end of the sheetto be clamped to the steel structure using 50x50x5mm powder coated aluminium angle. The steelshade structure should be supported by steel columnof 150 mm dia iron pipe of TATA make to beerected on the floor of terrace at every 3.0 mtrspacing with 250 mm braced-truss between them at2.4 mtr level and the post to be grouted to theterrace slab using base plate of 250x250x10 mm MS plate with 4 nos chemicalanchors using Fisher make injection mortar andthreaded steel rod of 10 mm dia with zinc platting.All welding in steel structure should be minimum of6 mm fillet type and the steel structure to be paintedwith 2-coat of satin matt synthetic enamle paint ofICI make, over a coat of Zinc Chrmate primer , allto be sprayed after proper surface treatment. Therate should innclude cost of all materials, accessories, taxes and labour charges - all complette FOR siteas per direction of Engineer-in-charge .

FIRST FLOOR 30 SQMRATE IN FIGURE

RATE IN WORD

Page58

SL NO ITEM QTY UNIT RATE AMOUNT

A23 Providing, fitting and installing porch at entrancewith cantilevered glass structure supported onsteel member along the glass joints with one/two/four way fin spider with routel of Hafele maketo hold glass. The glass should be of 13.2 toughenedlaminated clear type. The entire structure should bestring supported by stainless steel (SS) ropes with SScoupling at the wall and glass end. The rate shouldbe inclusive of cost of all materials, cost of labourand all taxes - FOR site all complete as per thedirection of site engineer.FIRST FLOOR 41.82 SQMRATE IN FIGURE

RATE IN WORD

FLOORING / SKIRTING / DADO

A24 Providing, fittting and fixing of flooring of fully

vitrified totally monolythic in structure ceramic tilespigmented thorugh out the body ( having highbreaking strength of 1600 kg/Sqm) of size 600 mmx 600 mm mirror stone of any approved make with1:1 cement mortar flush jointed with white cementpointing with a admixture of pigment same ascolour of the tile inclusive of all cost of labourmaterial , T & P as per the detail deisgn andspecification mirror stone in the main office area.The joints to be finished with a silicon basedadhesive of any approved make and shade. The costalso includes laying of a pvc sheet and spreading ofpop over it to avoid damage to the flooring surfaceas per direction of Engineer-in-charge. GROUND FLOOR 1,978.28 SQMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 743.13 SQMRATE IN FIGURE

RATE IN WORD

Page59

SL NO ITEM QTY UNIT RATE AMOUNT

A25 Providing & fixing vitrified tile of size 600mmx600mm x 10mm of approved make confirming to ISspecifications having minimum breaking strength1400 kg/sq.cm in skirting over 12mm thickcement mortar (1:3) to proper slope, line and levelincluding cutting to required size and shape, fixing atcorners and splays etc. including filling the jointswith silicon sealant to match the shade of tiles asper the design & drawing with cost of all materials,labour, conveyance, taxes , T&P etc. complete as perthe direction of E-I-C.

GROUND FLOOR 82.43 SQMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 36.35 SQMRATE IN FIGURE

RATE IN WORD

A26 Providing & fixing Rustic Finish tile of size300mmx300mm confirming to IS specifications infloors over 25mm thick cement mortar (1:1) toproper slope, line and level including cutting torequired size and shape, fixing at corners and splaysetc. including filling the joints with silicon sealantto match the shade of tiles as per the design &drawing with cost of all materials, labour,conveyance, taxes , T&P etc. complete as per thedirection of E-I-C. (IN TOILET)

GROUND FLOOR 99.81 SQMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 43.84 SQMRATE IN FIGURE

RATE IN WORD

Page60

SL NO ITEM QTY UNIT RATE AMOUNT

A27 Providing premium quality 6mm thick glazed ceramic tiles up to required height from floor levelof approved colour and make like H.R. Johnson /Bell/ Regency or equivalent confirming to ISspecification in Dado fixed in neat cement slurryafter soaking the tiles in water and fixing over 12mmthick cement plaster in CM (1:3) , filling joints withwhite cement mixed with colouring pigments tomatch the colour and shade including washing andcleaning with Oxalic acid including cost of allmaterials, labour, taxes, transportation, loading &unloading, royalties, sundries, T&P, watering andcuring etc. complete in all floors as per direction ofthe Engineer-in-Charge

In skirtting

GROUND FLOOR 331.50 SQMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 161.54 SQMRATE IN FIGURE

RATE IN WORD

A28 Providing & fixing antiskid vitrified tile on floorsof size 600mmx 600mm x 10mm of approvedmake confirming to IS specifications havingminimum breaking strength 1400 kg/sq.cm infloors over 25mm thick cement mortar (1:1) toproper slope, line and level including cutting torequired size and shape, fixing at corners and splaysetc. including filling the joints with silicon sealantto match the shade of tiles as per the design &drawing with cost of all materials, labour,conveyance, taxes , T&P etc. complete as per thedirection of E-I-C. ( OPEN DINING)

FIRST FLOOR 81.04 SQMRATE IN FIGURE

RATE IN WORD

Page61

SL NO ITEM QTY UNIT RATE AMOUNT

A29 Providing & fixing ANTISKID vitrified tile of size600mmx 600mm x 10mm of approved makeconfirming to IS specifications having minimumbreaking strength 1400 kg/sq.cm in skirting over 12mm thick cement mortar (1:3) to proper slope,line and level including cutting to required size andshape, fixing at corners and splays etc. includingfilling the joints with silicon sealant to match theshade of tiles as per the design & drawing withcost of all materials, labour, conveyance, taxes , T&Petc. complete as per the direction of E-I-C. (OPEN DINING)

skirting

FIRST FLOOR 5 SQMRATE IN FIGURE

RATE IN WORD

PAINTING AND WALL FINISH

A30 Providing & Painting two coats with Plasticemulsion paint of approved shade (ASIANPAINTS, BERGER, ) over a coat of primer bymeans of roller to inside surface of new wallsincluding preparation of base with a approvedquality acrylic based putty and finishing the surface,smooth including all cost of materials, labour,scaffolding, T&P etc. complete as per the directionof E-I-C.

GROUND FLOOR 1,052.09 SQMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 2,144.20 SQMRATE IN FIGURE

RATE IN WORD

Page62

SL NO ITEM QTY UNIT RATE AMOUNT

A31 Painting two coats with Water soluble weather coatpaints of approved shade to the outside walls (ASIAN PAINTS or BERGER) over a coat ofcement wash & primer by means of rollers tooutside surface of new walls with a approved qualityexterior grade putty after scraping, cleaning thesurface including all cost of materials, scaffolding,labour, watering & curing T&P etc complete as perdirection of E-I-C.

GROUND FLOOR 981.83 SQMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 439.82 SQMRATE IN FIGURE

RATE IN WORD

A32 Providing and fixing of pantry counter with granite slab on marble verticals as per the detaildirection of E-I-C .GROUND FLOOR 9.96 SQMRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 37.19 SQMRATE IN FIGURE

RATE IN WORD

A33 Providing , fitting and fixing of Stainless steel of 304 grade in Hand Railing using 50mm dia. of2mm thick circular pipe with Balustrade 32mm x32mm x 2mm @ 0.9 mtr.c/c and stainless squarepipe bracing of size 32mm x32mm x 2mm in 3 rowsin stair case as per approved design and specification, buffing , polishing etc., with cost , conveyance ,taxes of all materials , labour , T&P etc., required forthe complete in all respect as per the direction of theEngineer-in-charge.

GROUND FLOOR 35.54 MTRRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 22.26 MTRRATE IN FIGURE

RATE IN WORD

TOTAL COST FOR CIVIL CONSTRUCTION WORKRATE IN FIGURE

RATE IN WORD

Page63

SL NO ITEM QTY UNIT RATE AMOUNT

TOILET RENOVATION

PH AND SANITARY

A34 Supplying all materials , labours , taxes and tools andplants for fitting and fixing of CPVC pipes of100% lead free and conforming to ASTM F442Specific-2 CPVC(Make-ASTRAL/ ASHIRBAD/Equivalent) with good quality including fittings andlaying as per the site requirement etc., all completeincluding testing as per the direction of Engineer-in-charge.

GROUND FLOOR

a.15mm dia 42.00 MTRRATE IN FIGURE

RATE IN WORD

b. 20mm dia 60.00 MTRRATE IN FIGURE

RATE IN WORD

25. 25mm dia 48.00 MTRRATE IN FIGURE

RATE IN WORD

b. 32mm dia 80.00 MTRRATE IN FIGURE

RATE IN WORD

FIRST FLOOR

a.15mm dia 20.00 MTRRATE IN FIGURE

RATE IN WORD

b. 20mm dia 28.00 MTRRATE IN FIGURE

RATE IN WORD

25. 25mm dia 28.00 MTRRATE IN FIGURE

RATE IN WORD

Page64

SL NO ITEM QTY UNIT RATE AMOUNT

b. 32mm dia 48.00 MTR50mm dia 10.00 MTRRATE IN FIGURE

RATE IN WORD

A35 Supplying all materials, labour, T&P and cuttingholes through existing brick or laterite masonry wallfor taking H.C.I. Pipes and fittings includingmaking good the damages etc.all complete as perP.H. Specification and direction of the Engineer incharge.For 15mm to 50mm PVC pipe to pass in 125mm to250mm thick wallGROUND FLOOR 45.00 NOSRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 30.00 NOSRATE IN FIGURE

RATE IN WORD

A36 Supplying all labour T&P and materials and makinggrooves in brick walls vertically and horizontally tothe required depth and width for fixing pipes ofsizes 20mm dia to 32mm dia in the grooves,testing the pipe line against leakage,and filling thegrooves with cement mortar(1:4) to bring thesurface to original level including cost of materials,curing and conveyance of materials etc. complete asper direction of the Engineer-in-charge

GROUND FLOOR 100.00 MTRRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 50.00 MTRRATE IN FIGURE

RATE IN WORD

Page65

SL NO ITEM QTY UNIT RATE AMOUNT

WATER SUPPLY AND PH

A37 Providing and fixing white vitreous china wall

mounted water closet ( European type W.C. pan)with seat cover and lid with fittings & C.I / M.Schair brackets ,40mm flush bend , overflowarrangement with specials of standard make &mosquito proof coupling of approved municipaldesign complete including painting of fittings andbrackets, cutting and making good the walls andfloors wherever required.( parryware KalahariWallvit Pan make cat no - 0298 & Hindware Cat .No - 20061 ) as per direction of Engineer-in-chargeGROUND FLOOR 14 EACHRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 6.00 EACHRATE IN FIGURE

RATE IN WORD

A38 Providing and fixing Metro Flush valve concealed

type with cover plate 40mm size complete including

painting of fittings and brackets, cutting and making

good the walls and floors wherever required.( jaquar

Allied make cat no - 1091)as per direction of

Engineer-in-chargeGROUND FLOOR 14 EACHRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 6.00 EACHRATE IN FIGURE

RATE IN WORD

A39 Providing and fixing Hand Sower ( Health Fucet

) with 8 mm dia , 1 m long flexible tube and wall

hook complete including painting of fittings and

brackets, cutting and making good the walls and

floors wherever required.( jaquar Allied make cat no -

573 ) as per direction of Engineer-in-chargeGROUND FLOOR 3.00 EACHRATE IN FIGURE

Page66

SL NO ITEM QTY UNIT RATE AMOUNT

RATE IN WORD

FIRST FLOOR 3.00 EACHRATE IN FIGURE

RATE IN WORD

A40 Providing and fixing white vitreous china counter

wash basin of size 550 x 450 mm flat back withCI/MS barckets , 15mm CP brass pillar tap ( 1 No.) CP brass china with rubber plug and 32mm CPbrass waste of standard pattern, including paintingof fittings and brackets, cutting and making goodthe walls wherever require & complete.( parrywareStainzfree make cat no - 0418 / Hindware washbasn oval cat no . - 10017) as per direction ofEngineer-in-chargeGROUND FLOOR 21 EACHRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 10.00 EACHRATE IN FIGURE

RATE IN WORD

A41 Providing and fixing white vitreous china flat black

or wall type lipped front urinal basin of 430 x 260 x

350 mm and 340 x 410 x 265 mm sizes respectively

with standard flush pipe and CP brush spreders

with brush unions and GI clamps complete,

including painting of fittings and brackets, cutting

and making good the walls and floors wherever

required. ( parrywareNew magnum Urinal make cat

no - C0575 / Hindware Urinal Flat back large Cat

No - 60002 ) as per direction of Engineer-in-chargeGROUND FLOOR 16 EACHRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 10 EACHRATE IN FIGURE

RATE IN WORD

Page67

SL NO ITEM QTY UNIT RATE AMOUNT

A42 Providing and fixing Sensor Concealed type

flushing valve for urinal complete set withinstallation Box with control cock .Having workefficiency of 0.3 to 10 bar pressure , can work as amixer of hot & cold water & can discharge water 1Lto 6 L at one time . ( Jaquare sensor Cat No -51077) as per direction of Engineer-in-chargeGROUND FLOOR 14 EACHRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 8.00 EACHRATE IN FIGURE

RATE IN WORD

A43 Providing and fixing Urinal Partition . (parrywarepartition Large Cat No - 0507 / Hindware divisionplate cat no - 61001) as per direction of Engineer-in-charge GROUND FLOOR 13.00 EACHRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 8.00 EACHRATE IN FIGURE

RATE IN WORD

A44 Providing and fixing bevelled edge mirror of superior glass ( of approved quality ) complete with6mm thick bwr ply fixed at the back with 3" x1.5"teak wood beading all around ,CP brass screws andwashers in the toilet .The expose wooden surfaceshall be polished with a cut of mellamine andcomplete as per direction of Engineer-in-charge.GROUND FLOOR 21.00 NOSRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 10.00 NOSRATE IN FIGURE

RATE IN WORD

Page68

SL NO ITEM QTY UNIT RATE AMOUNT

A45 Providing and fixing towel ring complete with

brackets fixed to wooden cleats with CP brass

screws with concealed fitting arrangement of

approved quality colour and make.(Jaquar make cat

no -1121 ) as per direction of Engineer-in-chargeGROUND FLOOR 13.00 EACHRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 6.00 EACHRATE IN FIGURE

RATE IN WORD

A46 Providing and fixing Stainless Steel Coat hanger

at every toilet required colour and shade with

necessary screws etc. complete.(Jaquar make cat no -

1161) as per direction of Engineer-in-chargeGROUND FLOOR 14.00 EACHRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 6.00 EACHRATE IN FIGURE

RATE IN WORD

A47 Providing and fixing toilet paper holder .(Jaquar make cat no -1151)as per direction of Engineer-in-chargeGROUND FLOOR 14.00 EACHRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 6.00 EACHRATE IN FIGURE

RATE IN WORD

Page69

SL NO ITEM QTY UNIT RATE AMOUNT

A48 Providing and fixing liquid shop container

109mm wide , 125mm distance from wall ofstandard shape with bracket of same materials withsnap fittings of approved quality colour and make,weighting not less tham 105mgs ( Prayag orequivalent )./parryware Sapphire Soap dish Cat No -T6103A1) as per direction of Engineer-in-chargeGROUND FLOOR 27.00 EACHRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 12.00 EACHRATE IN FIGURE

RATE IN WORD

INTERNAL SEWERAGE DISPOSSAL & SANITARY INSTALLATION

A49 Supply of all materials, joining materials , labour andT&P and laying UPVC SWR PIPES of Standardmake with ISI Mark duly approved by the Engineer-in-charge including jointing, earthwork in excvationof trenches in all kind of soil to the required depthand refilling of pipe line trenches in 0.3048 mtrslayers with 300 mm deep sand around cushion dulywatered and rammed or fixing to walls, floors withsupply of necessary clamps, nails and cutting thepipe to length with wastage including supply of allClamps, Clips, Endcaps & jointing materials etc,complete as per standard specification and directionof Engineer-in-charge. 100mm dia ( ISI Marked ) asper direction of Engineer-in-charge

GROUND FLOOR 101.00 MTRRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 66.00 MTRRATE IN FIGURE

RATE IN WORD

Page70

SL NO ITEM QTY UNIT RATE AMOUNT

A50 Supplying all materials, labour T&P for jointing ofthe UPVC SWR pipe fittings of standard makeduly approved by the Engineer-in-charge withjoining material etc. suitably required for fixing on100mm dia soil waste pipe complete with requissitetesting as directed by Engineer-in-charge.

GROUND FLOOR

a) 100mm dia "P" Trap 12.00 EACHRATE IN FIGURE

RATE IN WORD

b) 100mm dia Bend Plain 9.00 EACHRATE IN FIGURE

RATE IN WORD

c) 100mm dia Door Bend 9.00 EACHRATE IN FIGURE

RATE IN WORD

d) 100mm dia Terminal Guard 8.00 EACHRATE IN FIGURE

RATE IN WORD

e) W.C. connector 12.00 EACHRATE IN FIGURE

RATE IN WORD

f) 100mm Cowl 14.00 EACHRATE IN FIGURE

RATE IN WORD

FIRST FLOOR

a) 100mm dia "P" Trap 6.00 EACHRATE IN FIGURE

RATE IN WORD

b) 100mm dia Bend Plain 6.00 EACHRATE IN FIGURE

RATE IN WORD

c) 100mm dia Door Bend 6.00 EACHRATE IN FIGURE

RATE IN WORD

Page71

SL NO ITEM QTY UNIT RATE AMOUNT

d) 100mm dia Terminal Guard 4.00 EACHRATE IN FIGURE

RATE IN WORD

e) W.C. connector 6.00 EACHRATE IN FIGURE

RATE IN WORD

f) 100mm Cowl 8.00 EACHRATE IN FIGURE

RATE IN WORD

G) 100X100X100 MM DIA SINGLE JUNCTIONWITH DOOR 4.00 EACHRATE IN FIGURE

RATE IN WORD

H) 100X100X100 MM DIA DOUBLE JUNCTIONWITH DOOR 6.00 EACHRATE IN FIGURE

RATE IN WORD

A51 Supplying all material, labour , T&P & fitting ,fixingthe following different water supply fittings of ISIapproved make with ISI Mark including supply of allnecessary jointing materials etc. all complete asdirected by the Engineer-in-charge.GM FULLWAY VALVE Conforming to IS-778(Make-AN/ATUM/LAXMI).

GROUND FLOOR

25mm dia Fullway valve 10.00 EACHRATE IN FIGURE

RATE IN WORD

32mm diaFullway valve 10.00 EACHRATE IN FIGURE

RATE IN WORD

50mm diaFullway valve 3.00 EACHRATE IN FIGURE

RATE IN WORD

Page72

SL NO ITEM QTY UNIT RATE AMOUNT

FIRST FLOOR

25mm dia Fullway valve 6.00 EACHRATE IN FIGURE

RATE IN WORD

32mm diaFullway valve 6.00 EACHRATE IN FIGURE

RATE IN WORD

50mm diaFullway valve 2.00 EACHRATE IN FIGURE

RATE IN WORD

A52 Providing and fixing 15mm nominal bore brass

Pillar cock long neck with Aerator for wash basin

with popup waste system of approved quality.

(Jaquar make cat no -021 continental) as per

direction of Engineer-in-charge GROUND FLOOR 21.00 EACHRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 10.00 EACHRATE IN FIGURE

RATE IN WORD

A53 Fixing of long Bib cock to the sink of jaquar make( cat no. 107 continental) as per direction ofEngineer-in-charge GROUND FLOOR 3.00 NOSRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 1.00 NOSRATE IN FIGURE

RATE IN WORD

A54 Providing and fixing 15mm nominal bore brass bib cock with wall flange in the wc of approvedquality.(Jaquar make cat no -047/Parryware cascadeangle valve T0704A1) as per direction of Engineer-in-charge GROUND FLOOR 14.00 EACH

Page73

SL NO ITEM QTY UNIT RATE AMOUNT

RATE IN FIGURE

RATE IN WORD

FIRST FLOOR 6.00 EACHRATE IN FIGURE

RATE IN WORD

A55 Providing and fixing 15mm nominal angular stop

cock of approved quality.(Jaquar make cat no -051

/ Parryware cascade angle valve T0707A1) as per

direction of Engineer-in-charge i) 15mm nominal boreGROUND FLOOR 45.00 EACHRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 26.00 EACHRATE IN FIGURE

RATE IN WORD

A56 Providing and fixing of a stainless steel sink of

size 24"x18" to the pantry as per the directions of

the EIC inclusive of all cost of labour materials T&P

etc. complete as per direction of Engineer-in-chargeGROUND FLOOR 3.00 NOSRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 1.00 NOSRATE IN FIGURE

RATE IN WORD

TOTAL COST FOR TOILET RENOVATION RSRATE IN FIGURE

RATE IN WORD

RATE IN WORD

Page74

SL NO ITEM QTY UNIT RATE AMOUNT

B.1 Providing and fixing gypboard suspended false

ceiling (single/double layers) in different levels ,recesses , flat areas as per design with G.I.Framework (of perimeter channels, intermediatechannels and ceiling sections) and 12.5 mm tapededge gypboard screw fixed to ceiling section as perdesign , complete with fixing and finishing oftapered and square edges of board with jointingcompound paper tape and 2 coats suitable primerincluding all cost of materials , labour, overheads T& P etc., complete as per direction of Engineer-in-charge.GROUND FLOOR 791.31 sqmRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 247.06 sqmRATE IN FIGURE

RATE IN WORD

B2 Providing, and painting the Gypsum Board ceilingarea with plastic emulsion paint as per the detaildesign and specification as per direction of Engineer-in-charge.GROUND FLOOR 791.31 sqmRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 247.06 sqmRATE IN FIGURE

RATE IN WORD

SECTION - B. ( INTERIOR WORK )

Page75

SL NO ITEM QTY UNIT RATE AMOUNT

B3

Providing and fixing of Suspended Ceiling System with Prima Fine Fissured Microlook tiles of size600mmx 600mm with humidity resistance of 99%.Silhoutte reveal profile grid system with 15mm whiteflanges incorporation a 3mm or 6mm central recess.Main runner should be spaced at 1200mm c/csecurely fixedto the structural soffit by approvedhangers at 1200mm maximum center and not morethan 150 mm from spliced joints. The last hanger atthe end of each main runner should not be greatedthan 600mm from the adjacent wall. 1200 mm longcross tees to be interlocked between main runners at600mm centres to form 1200x600mm module.600x600mm module to be formed by fitting 600mmlong cross tees centrally between the 1200mm crosstees. The 1200 mm cross tees to have centralbirdsmouth notches to facilitate fitting of 600mmcross tees. Wall angles in white colour to be securedto walls at 450mm maximum centres as perdirection of Engineer-in-charge.

GROUND FLOOR 1187.0 sqmRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 370.60 sqmRATE IN FIGURE

RATE IN WORD

B4 Providing and fixing of 12mm toughened glass

PARTITION fixed to the floor and partition byManet fittings of any approved make as per thedetail design and specifications. This is also inclusiveof providing a pattern with stickers as per the detaildesignand specifications as per direction of Engineer-in-charge.GROUND FLOOR 19.25 sqmRATE IN FIGURE

RATE IN WORD

Page76

SL NO ITEM QTY UNIT RATE AMOUNT

B5 Providing , fitting and fixing 75mm thick double

skinned partition suitably fixed to the wall andfloor and storage unit with 55mm x 40mmsecondary hard wood frame work at 600 mm C / Cwith 6mm thick BWR ply on both side and finishedwith 1mm thick laminates fixed to the ply on bothsides as per the design and specification withnecessary teak wood plain / moulded beadingincluding the cost of all materials , labour , nails,screw adhesives, overhead T & P etc. complete. Theexposed frame work shall be finished withautomative paint.as per the detail design andspecifications as per direction of Engineer-in-charge.

I Full height partition up to a height of 2.4m

GROUND FLOOR 708.09 sqm

RATE IN FIGURE

RATE IN WORD

FIRST FLOOR 89.74 sqmRATE IN FIGURE

RATE IN WORD

B6 Providing , fitting and fixing 75mm thick double

skinned partition suitably fixed to the wall andfloor and storage unit with 55mm x 40mmsecondary hard wood frame work at 600 mm C / Cwith 6mm thick BWR ply on both side and finishedwith 1mm thick laminates fixed to the ply on bothsides as per the design and specification withnecessary teak wood plain / moulded beadingincluding the cost of all materials , labour , nails,screw adhesives, overhead T & P etc. complete. Theexposed frame work shall be finished withautomative paint. The top portion for the low heightpartitions shall be finished with a 12mm glass on topand etched to a pattern as per the detail design andspecifications as per direction of Engineer-in-charge.Low Height partition upto a height of 1.2m

GROUND FLOOR 200.91 sqmRATE IN FIGURE

Page77

SL NO ITEM QTY UNIT RATE AMOUNT

RATE IN WORD

B7 Providing and fixing of 12mm toughened glass

door fixed to the floor and partition by Manetfittings of any approved make with 750mm SS finishhandles and with proper locking arrangement as perthe detail design and specifications. This is alsoinclusive of providing a pattern with stickers as perthe detail design and specifications as per directionof Engineer-in-charge.GROUND FLOOR 11.38 sqmRATE IN FIGURE

RATE IN WORD

B8 Providing ,fitting and fixing of 35 MM thick partly glazed flush door finished with 1 mm thicklaminate on both site with 6 mm thick float glassetched with a suitable pattern as per thespecification complete with all materials , inlcusiveall hardware material, hinges , nails, screws,doorknobs, handles , locks, door closer, stopper etc.complete with the cost of all materials , labour and T& P and overheads etc. complete. The exposedwood work/ lipping shall be finished withautomative paint as per direction of Engineer-in-chargeGROUND FLOOR 38.38 sqmRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 17.56 sqmRATE IN FIGURE

RATE IN WORD

B9 Glass door with 125mm x35 mm thick wooden

frames on all sides fixing of 8mm th glass etched to

attain a pattern to the frames by wooden beading

and finishing the beading with automative paints as

per the detail design and specification as per

direction of Engineer-in-charge.GROUND FLOOR 88.47 sqmRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 29.28 sqmRATE IN FIGURE

Page78

SL NO ITEM QTY UNIT RATE AMOUNT

RATE IN WORD

B10 Providing and fixing of soft boards to the partition

and wall in the areas required as per the detail design

and specifications and including cost of fixing of the

soft board, fabric, labour, T&P etc complete as per

the detail design and specifications with a teak wood

frame of size 25mm x 25mm. This also includes

painting the exposed surface with automative paint

as per direction of Engineer-in-chargeGROUND FLOOR 8.83 sqmRATE IN FIGURE

RATE IN WORD

B11 Providing,fitting and fixing the vertical blinds for

all existing window and partitions with 100mm size

strips of fabric of approved make and shade and

inclusive of all cost of labour,materials , T& p all

inclusive as per direction of Engineer-in-charge. GROUND FLOOR 408.97 sqmRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 10.11 sqmRATE IN FIGURE

RATE IN WORD

B12 Providing and fixing wooden panelling suitablyfixed to the walls with 19 mm board( over woodenblocks for levelling the surface ) finished with acombination of 1mm thick laminate complete withnecessary Hardwood, skirting , mouldings etc. as perthe detail design including the cost of all materials,labour, overheads and T & P etc. complete. Theexposed frame work shall be finished withautomative paint as per direction of Engineer-in-chargeGROUND FLOOR 93.91 SQM RATE IN FIGURE

RATE IN WORD

FIRST FLOOR 96.51 SQMRATE IN FIGURE

RATE IN WORD

T O TA L OF SECTION. "B" Rs. - RATE IN FIGURE

Page79

SL NO ITEM QTY UNIT RATE AMOUNT

RATE IN WORD

SECTION C : FURNITURE & FIXTURE

C1 Providing and fixing of Designer table of size1800x900x750with a side extension unit of size1050x450x750 made out of 19mm BWR board & 6mm bwr ply on the back side and finished with1mm laminates as per approved design and drawing. The wooden lipping to be finished withautomative paint & the internal surface to bepaintaied with enamel paint to match the laminateshade and as approved design and drawing by theEIC.GROUND FLOOR 2.00 nosRATE IN FIGURE

RATE IN WORD

C2 Providing and fixing of Designer table of size

1800x750x750with a side extension unit of size1050x450x750 made out of 19mm BWR board & 6mm bwr ply on the back side and finished with1mm laminates as per approved design and drawing.The wooden lipping to be finished with automativepaint & the internal surface to be paintaied withenamel paint to match the laminate shade and asapproved design and drawingby the EIC.GROUND FLOOR 16.00 nosRATE IN FIGURE

RATE IN WORD

C3 Providing and fixing of Executive desk of size

1500x675x750with a side extension unit of size900x450x750 made out of 19mm BWR board & 6mm bwr ply on the back side and finished with1mm laminates as per approved design and drawing.The wooden lipping to be finished with automativepaint & the internal surface to be painted withenamel paint to match the laminate shade and asapproved design and drawingby the EIC.GROUND FLOOR 26.00 nosRATE IN FIGURE

RATE IN WORD

Page80

SL NO ITEM QTY UNIT RATE AMOUNT

C4 Providing, fitting and fixing the reception table

made out of 19mm thick block board finished with

1mm thick laminates and automotive paint and

4mm thick ACP with stainless steel pipes and 12mm

glass as per detail design and specification including

cost of all materials , labour, hardware if any etc.

complete.The internal surface to be finished with

enamel paint as per direction of Engineer-in-charge. GROUND FLOOR 1.00 noRATE IN FIGURE

RATE IN WORD

C5 Providing, fitting and fixing the conference table

made out of 19mm thick block board finished with

1mm thick laminates and automotive paint , stainless

steel pipes and 12 mm glass as per detail design and

specification including cost of all materials , labour,

hardware if any etc. complete. The internal surface

to be painted with enamel paint to match the

laminate shade and as approved by the EIC.GROUND FLOOR

( 9 SEATER) 2.00 noRATE IN FIGURE

RATE IN WORD

( 8 SEATER) 3.00 noRATE IN FIGURE

RATE IN WORD

(4SEATER) 3.00 noRATE IN FIGURE

RATE IN WORD

15 S EATER 1.00 noRATE IN FIGURE

RATE IN WORD

FIRST FLOOR

28 S EATER 1.00 noRATE IN FIGURE

RATE IN WORD

Page81

SL NO ITEM QTY UNIT RATE AMOUNT

C6 Providing and fixing center table made out of

teak wood with 12mm thick glass table top. The

exposed surface to be polished with mellamine as

per the detail design and specification inclusive of all

materials , labour , T & P etc. complete as per

direction of Engineer-in-charge.GROUND FLOOR 13.00 nosRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 8.00 nosRATE IN FIGURE

RATE IN WORD

C7 Providing and fixing corner table made out of

teak wood with 12mm thick glass table top. The

exposed surface to be polished with mellamine as

per the detail design and specification inclusive of all

materials , labour , T & P etc. complete as per

direction of Engineer-in-charge.GROUND FLOOR 7.00 nosRATE IN FIGURE

RATE IN WORD

FIRST FLOOR 10.00 nosRATE IN FIGURE

RATE IN WORD

C8 Providing, fitting and fixing the dining table made out of 19mm thick block board finished with 1mmthick laminates and automotive paint , the top of thetable is finished with granite as per detail design andspecification including cost of all materials , labour,hardware if any etc. complete as per direction ofEngineer-in-charge. FIRST FLOOR 4.00 nosRATE IN FIGURE

RATE IN WORD

Page82

SL NO ITEM QTY UNIT RATE AMOUNT

C9 Providing and fixing of storage cabinet to theother area with 19mm BWR board & 6 mm th bwrply at the back side and finished with 1mm laminates and finished the wooden lipping with a automotivepaint & the internal surface to be painted withenamel paint to match the laminate shade and as perapproved design and drawing approved by the EIC.GROUND FLOOR

upto 2'-6" 91.57 sqmRATE IN FIGURE

RATE IN WORD

PANTRY 13.48 sqmRATE IN FIGURE

RATE IN WORD

FULL HEIGHT UPTO 7'-0" 62.50 sqmRATE IN FIGURE

RATE IN WORD

FIRST FLOOR

upto 2'-6" 7.56 sqmRATE IN FIGURE

RATE IN WORD

PANTRY 14.14 sqm

RATE IN FIGURE

RATE IN WORD

C10 Providing and fixing of planter to the conferencehall with 19mm BWR board and finished with 1mmlaminates and finished the wooden lipping with aautomotive paint & the internal surface to bepainted with enamel paint to match the laminateshade and as per approved design and drawingapproved by the EIC.FIRST FLOOR 15.00 sqmRATE IN FIGURE

RATE IN WORD

Page83

SL NO ITEM QTY UNIT RATE AMOUNT

C11 Providing and fixing of 75-150 thick parttition withACP panel/ vinyl sheet as a backdrop for the

Reception as per approved design and drawing.

The structure shall be made of wooden members55mmx 40mm and then over it 6mm bwr ply shallbe fixed and then the ACP shall be fixed to thepartitions. The joints shall be finished with siliconadhesive to match withe the shade of the ACP. Theinternal surface to be painted with plastic emoultionpaint to match the laminate as per direction ofEngineer-in-charge .GROUND FLOOR 6.69 sqmRATE IN FIGURE

RATE IN WORD

C12 Providing and fixing of white board magnetic

types inclusive of all cost of materials, labour, T&Petc complete etc as per direction of Engineer-in-charge.GROUND FLOOR 17.47 sqmRATE IN FIGURERATE IN WORD

FIRST FLOOR 2.97 sqmRATE IN FIGURERATE IN WORD

C13 SOFA

Sofa shall be as per the approved shade and as perapproved design and drawing and the minimum costof the fabric shall be Rs. 600/sft as per direction ofEngineer-in-charge GROUND FLOOR

threeSeater 10.00 noRATE IN FIGURE

RATE IN WORD

TWOSeater 6.00 noRATE IN FIGURE

RATE IN WORD

FIRST FLOOR

threeSeater 8.00 noRATE IN FIGURE

Page84

SL NO ITEM QTY UNIT RATE AMOUNT

RATE IN WORD

TWOSeater 6.00 noRATE IN FIGURE

RATE IN WORD

TOTAL OF SECTION C

RATE IN FIGURE

RATE IN WORD

Page85

SL NO ITEM QTY UNIT RATE AMOUNT

I. POINT WIRING :-

D 1Supply and fixing the following size of modular gridplate & cover plate mounted on same size of recesszinc chromate passivated flush metal box includingrequired no. of 240volt 6 amp switch or blank platecomplete with all other materials as required.

GROUND FLOOR :-a) 2 Mod. (2 nos. sw.) 6 No.

Rate in FigureRate in Word

b) 3 Mod. (3 nos. sw.) 29 No.Rate in FigureRate in Word

c) 4 Mod. (4 nos. sw.) 10 No.Rate in FigureRate in Word

d) (i) 6 Mod. (6 nos. sw.) 6 No.Rate in FigureRate in Word

(ii) 6 Mod. (5 nos. sw. + 1 no. blank plate) 6 No.Rate in FigureRate in Word

(iii) 6 Mod. (4 nos. sw. + 2 nos. blank plate) 6 No.Rate in FigureRate in Word

e) (i) 8 Mod. (8 nos. sw.) 3 No.Rate in FigureRate in Word

(ii) 8 Mod. (7 nos. sw. + 1 nos. blank plate) 2 No.Rate in FigureRate in Word

SECTION D: ELECTRIFICATION OF THE ENTIREOFFICE SPACE

Page86

SL NO ITEM QTY UNIT RATE AMOUNT

(iii) 8 Mod. (6 nos. sw. + 2 nos. blank plate) 4 No.Rate in FigureRate in Word

(iv) 8 Mod. (4 nos. sw. + 4 nos. blank plate) 5 No.Rate in FigureRate in Word

f) (i) 12 Mod. (8 nos. sw. + 4 nos. blank plate) 4 No.Rate in FigureRate in Word

(ii) 12 Mod. (6 nos. sw. + 6 nos. blank plate) 5 No.Rate in FigureRate in Word

FIRST FLOOR :-

a) 2 Mod. (2 nos. sw.) 2 No.Rate in FigureRate in Word

b) 3 Mod. (3 nos. sw.) 1 No.Rate in FigureRate in Word

c) 4 Mod. (2 nos. sw. +2 nos. blank Plate) 1 No.Rate in FigureRate in Word

d) (i) 6 Mod. (6 nos. sw.) 6 No.Rate in FigureRate in Word

(ii) 6 Mod. (5 nos. sw. + 1 no. blank plate) 3 No.Rate in FigureRate in Word

(iii) 6 Mod. (4 nos. sw. + 2 nos. blank plate) 1 No.Rate in FigureRate in Word

e) (i) 8 Mod. (8 nos. sw.) 1 No.Rate in FigureRate in Word

(ii) 8 Mod. (4 nos. sw. + 4 nos. blank plate) 9 No.Rate in FigureRate in Word

Page87

SL NO ITEM QTY UNIT RATE AMOUNT

D2 Supply and fixing of 6A modular switch & socketoutlet complete with 1 no of 240 volt 6 amp 4 pinuniversal round/flat pin combined shuttered socketoutlet & 1 no. of 240 volt 6 amp control switchmounted on modular grid plate, all housed in a 3module recessed zinc chromate passivated flushmetal box including mosaic white cover plate ofapproved make with all other accessories etc. asrequired.

GROUND FLOOR :- 70 No.Rate in FigureRate in Word

FIRST FLOOR :- 9 No.Rate in FigureRate in Word

D3Supply and fixing of 6/16A modular switch &socket outlet complete with 1 no of 240 volt 6/16amp 4 pin universal round/flat pin combinedshuttered socket outlet & 240 volt 16 amp controlswitch mounted on modular grid plate, all housed ina 4 module recessed zinc chromate passivated flushmetal box including mosaic white cover plate ofapproved make with all other accessories etc. asrequired.

GROUND FLOOR :- 12 No.Rate in FigureRate in Word

FIRST FLOOR :- 4 No.Rate in FigureRate in Word

D4 Circuit wiring for 6A Power Plug / Light point inexisting 3/4" PVC pipe with single core 1.5 sq.mm(2Run) +1.0 sq.mm (1run) PVC insulated un-sheathed FRLS Cu.conductor wire of approvedmake complete with with all other necessarymaterials & labour.

GROUND FLOOR :- 3900 mtrRate in FigureRate in WordFIRST FLOOR :- 1150 mtrRate in FigureRate in Word

Page88

SL NO ITEM QTY UNIT RATE AMOUNT

D5 Circuit wiring for Lighting Switch Board & 6/16APower Plug point in existing 3/4" PVC pipe withsingle core 2.5 sq.mm (2Run) +1.5 sq.mm (1run)PVC insulated un-sheathed FRLS Cu.conductorwire of approved make complete with with all othernecessary materials & labour.

GROUND FLOOR :- 2700 mtr

Rate in FigureRate in Word

FIRST FLOOR :- 350 mtrRate in FigureRate in Word

D6 Sub-main wiring for Xerox point /ELDB & PowerPlug in existing 3/4" PVC pipe with single core 4sq.mm (2Run) + 2.5 sq.mm (1run) PVC insulated un-sheathed FRLS Cu.conductor wire of approvedmake complete with with all other necessarymaterials & labour.

GROUND FLOOR :- 330 mtrRate in FigureRate in Word

FIRST FLOOR :- 60 mtrRate in FigureRate in Word

D7 Sub-main wiring for Lighting & Power distributionboard in existing 1" or 3/4" good quality PVC pipewith single core 10sq.mm (4Run) + 6 sq.mm (1run)PVC insulated un-sheathed FRLS Cu.conductorwire of approved make complete with with all othernecessary materials & labour.

GROUND FLOOR :- 100 mtrRate in FigureRate in Word

Page89

SL NO ITEM QTY UNIT RATE AMOUNT

D8 Sub-main wiring for Lighting & Power distributionboard in existing 1" or 3/4" good quality PVC pipewith single core 10sq.mm (2Run) + 6 sq.mm (1run)PVC insulated un-sheathed FRLS Cu.conductorwire of approved make complete with with all othernecessary materials & labour.

FIRST FLOOR :- 60 mtrRate in FigureRate in Word

D9 Supply & fixing of 4 way, single pole and Neutral,sheet steel MCB double door distribution boxcomplete with tinned copper busbar, neutral link,earth bar, din rail, detachable gland plate including 4nos of 10 Amps rating, 240Volts, 'B' curve Singlepole Miniature Circuit Breaker of approved makecomplete with connections, testing andcommissioning including all other materials etc. asrequired. - FOR ELDB

GROUND FLOOR :- 3 No.Rate in FigureRate in WordFIRST FLOOR :- 1 No.Rate in FigureRate in Word

D10 Supply & fixing of 3 ph. 6 way, triple pole andNeutral, sheet steel MCB double door distributionbox complete with tinned copper busbar, neutrallink, earth bar, din rail, detachable gland plateincluding 18 nos of 6 to 32 Amps rating, 240Volts,'C' curve Single pole Miniature Circuit Breaker & 1no. of 40A, 30mA 4P RCCB, of approved makecomplete with connections, testing andcommissioning including all other materials etc. asrequired. - FOR LIGHTING & POWER DB

GROUND FLOOR :- 3 No.Rate in FigureRate in Word

Page90

SL NO ITEM QTY UNIT RATE AMOUNT

D11 Supply & fixing of 1 ph.12 way, single pole andNeutral, sheet steel MCB double door distributionbox complete with tinned copper busbar, neutrallink, earth bar, din rail, detachable gland plateincluding 10 nos of 6 to 32 Amps rating, 240Volts,'C' curve Single pole Miniature Circuit Breaker & 1no 40A, 30mA DP RCCB of approved makecomplete with connections, testing andcommissioning including all other materials etc. asrequired. - FOR LIGHTING & POWER DB

FIRST FLOOR :- 2 No.Rate in FigureRate in Word

D12 Supply, Installation, Testing, and commissioning ofExhaust fan of size 300mm dia with 900 r.p.msuitable to work on 230/ 250 volts, 50HZ completewith mounting frame and louvers including makingthe hole to suit the size of above fan, making goodthe damage, connections, with 1.5 sq.mm PVCinsulated, copper conductor, single core cable etc asrequired.

GROUND FLOOR :- 6 No.Rate in FigureRate in Word

FIRST FLOOR :- 12 No.Rate in FigureRate in Word

D13 Earthing with copper earth plate electrode of 600mm x 600 mm x 3 mm thick including accessoriesand providing masonary enclosure with cover platehaving locking arrangement and 2.5 mtr. long 50dia.G.I pipe for watering, including 25 x 3 mm size Cu.flat etc. complete with charcole / coke and salt etc.as required.GROUND FLOOR :- 5 No.Rate in FigureRate in Word

Page91

SL NO ITEM QTY UNIT RATE AMOUNT

D14 Earthing with G.I earth plate electrode of 600 mmx 600 mm x 3 mm thick including accessories andproviding masonary enclosure with cover platehaving locking arrangement and 2.5 mtr. long 50dia.G.I pipe for watering, including 25 x 3 mm size G.I.flat etc. complete with charcole / coke and salt etc.as required.GROUND FLOOR :- 2 No.Rate in FigureRate in WordFIRST FLOOR :- 2 No.Rate in FigureRate in Word

D15 Supply & laying of 50 sq.mm single core PVCinsulated Al. flexible cable at 0.5 mm below groundlevel for earth electrode, including soldering /termination etc. with all required materials asrequired.GROUND FLOOR :- 150 mtr.Rate in FigureRate in Word

FIRST FLOOR :- 50 mtr.Rate in FigureRate in Word

D16 Supply & laying of 25 sq.mm single core PVCinsulated copper wire at 0.5 mm below ground levelfor earth electrode, including soldering /termination etc. with all required materials asrequired.GROUND FLOOR :- 125 mtr.Rate in FigureRate in Word

Page92

SL NO ITEM QTY UNIT RATE AMOUNT

D17 Design, fabrication, assembly, wiring, supplying,installation, testing and commissioning of frontoperated cubicle type compartmentalised frontaccess free standing, dust and vermin proof (IP 65ingress protection) Panel boards suitable for use at415 volts, 3 phase 4 wire 50 Hertz system suitablefor fault level of required value symmetrical at 415volts, including 3 mm thick gland plates at top &bottom and including lifting hooks and including GIearth strip of required size with 2 nos earthingterminals complete with interconnections etc as perspecifications, as required and as below.

a) 1 no. 160A,35kA 415V 4P MCCB.b) 1 no. 200A Copper Bus-barc) 4 nos. of 40A, 415V 4P MCB.d) 4 nos. of 32A, 415V 4P MCB.e) 1 no. 100A,25kA 415V TP MCCB.

The panel board should containToggle switch for 3 ph.(R,Y,B) Indicator should befixed at a suitable place of floor level on a brickstructure base /in 100 X 50 MM ISMC frame alongwith other necessay materials and labour.

GROUND FLOOR (A-BLOCK) :- 1 No.Rate in FigureRate in Word

D18 Design, fabrication, assembly, wiring, supplying,installation, testing and commissioning of frontoperated cubicle type compartmentalised frontaccess free standing, dust and vermin proof (IP 65ingress protection) Panelboards suitable for use at415 volts, 3 phase 4 wire 50 Hertz system suitablefor fault level of required value symmetrical at 415volts, including 3 mm thick gland plates at top &bottom and including lifting hooks and including GIearth strip of required size with 2 nos earthingterminals complete with interconnections etc as perspecifications, as required and as below.

a) 1 no. 160A,35kA 415V 4P MCCB.b) 1 no. 200A Copper Bus-barc) 1 no. of 63A, 415V 4P MCB.d) 4 nos. of 40A, 415V 4P MCB.e) 2 nos. of 32A, 415V 4P MCB.

Page93

SL NO ITEM QTY UNIT RATE AMOUNT

f) 2 no. of 25A / 32A, 230V DP MCB.The panel board should contain

Toggle switch for 3 ph.(R,Y,B) Indicator should befixed at a suitable place of floor level on a brickstructure base /in 100 X 50 MM ISMC frame alongwith other necessay materials and labour.

GROUND FLOOR (B-BLOCK) :- 1 No.Rate in FigureRate in Word

D19 Design, fabrication, assembly, wiring, supplying,installation, testing and commissioning of frontoperated cubicle type compartmentalised frontaccess free standing, dust and vermin proof (IP 65ingress protection) Panelboards suitable for use at415 volts, 3 phase 4 wire 50 Hertz system suitablefor fault level of required value symmetrical at 415volts, including 3 mm thick gland plates at top &bottom and including lifting hooks and including GIearth strip of required size with 2 nos earthingterminals complete with interconnections etc as perspecifications, as required and as below.

a) 1 no. 160A,35kA 415V 4P MCCB.b) 1 no. 200A Copper Bus-barc) 5 nos. of 40A, 415V 4P MCB.d) 3 nos. of 32A, 415V 4P MCB.e) 1 no. 100A, 25kA 415V TP MCCB.

The panel board should containToggle switch for 3 ph.(R,Y,B) Indicator should befixed at a suitable place of floor level on a brickstructure base /in 100 X 50 MM ISMC frame alongwith other necessay materials and labour.

GROUND FLOOR (C-BLOCK) :- 1 No.Rate in FigureRate in Word

Page94

SL NO ITEM QTY UNIT RATE AMOUNT

D20 Design, fabrication, assembly, wiring, supplying,installation, testing and commissioning of frontoperated cubicle type compartmentalised frontaccess free standing, dust and vermin proof (IP 65ingress protection) Panel boards suitable for use at415 volts, 3 phase 4 wire 50 Hertz system suitablefor fault level of required value symmetrical at 415volts, including 3 mm thick gland plates at top &bottom and including lifting hooks and including GIearth strip of required size with 2 nos earthingterminals complete with interconnections etc as perspecifications, as required and as below.

a) 1 no. 125A, 35kA 415V 4P MCCB.b) 1 no. 200A Copper Bus-barc) 3 nos. of 40A, 415V 4P MCB.d) 4 nos. of 32A, 415V 4P MCB.e) 2 nos. of 40A, 415V DP MCB.f) 1 nos. of 32A, 415V DP MCB.

The panel board should containToggle switch for 3 ph.(R,Y,B) Indicator should befixed at a suitable place of floor level on a brickstructure base /in 100 X 50 MM ISMC frame alongwith other necessay materials and labour.

FIRST FLOOR :- 1 No.Rate in FigureRate in Word

D21 Surface wiring for Sub main with following 1.1 kvgrade XLPE / PVC insulated, PVC sheathed AYFYAl conductor cable of approved make from LTmain panel board to sub-panel board complete withdressing etc along with other necessary materials likeG.I rigid conduits and labour.

GROUND FLOOR 3.5c x 95 sq.mm 1.1kv grade AYFY AL. cable 45 mtrRate in FigureRate in Word

FIRST FLOOR :-3.5c x 70 sq.mm 1.1kv grade AYFY AL. cable 15 mtrRate in FigureRate in Word

Page95

SL NO ITEM QTY UNIT RATE AMOUNT

D22 Supply & making end termination with brasscompression gland and aluminium lugs for followingsize of PVC insulated PVC sheathed / XLPEaluminium conductor cable of 1.1 kv grade asrequired

GROUND FLOOR 3.5c x 95 sq.mm 1.1kv grade AYFY AL. cable 6 noRate in FigureRate in WordFIRST FLOOR :-3.5c x 70 sq.mm 1.1kv grade AYFY AL. cable 2 noRate in FigureRate in Word

D23 Supply and fixing hard drawn PVC recessed and/orsurface conduits including cost of providing saddles,elbow, bend etc for surface conduiting and/or costof cutting and filling chases for recessed conduitingcomplete as per specifications as required and asbelow.

i) 25 mm dia.GROUND FLOOR 4,750 mtr.Rate in FigureRate in WordFIRST FLOOR :- 1,200 mtr.Rate in FigureRate in Word

ii) 32 mm dia.GROUND FLOOR 900 mtr.Rate in FigureRate in Word

FIRST FLOOR :- 200 mtr.Rate in FigureRate in Word

D24 Supply and fixing PVC flexible conduit complete asrequired as below.

i) 25 mm dia.GROUND FLOOR 1,250 mtr.Rate in FigureRate in Word

FIRST FLOOR :- 300 mtr.Rate in Figure

Rate in Word

Page96

SL NO ITEM QTY UNIT RATE AMOUNT

ii) 32 mm dia.GROUND FLOOR 150 mtr.Rate in FigureRate in Word

FIRST FLOOR :- 50 mtr.Rate in FigureRate in Word

Sub - Total =Rate in FigureRate in Word

II. DATA WIRING :-

D25 Supply of cat-6 LAN/Data Cable (wiring should bedone in PVC pipe through existing G.I trunk line).1box contains 305 meter data cable.

GROUND FLOOR 33 BoxRate in FigureRate in Word

FIRST FLOOR :- 4 BoxRate in FigureRate in Word

D26 Supply & installation of following ports 19" patchpanel suitable for rack mounting (Make :-D-LINK /Equivalent) for CAT 6 cables DES 3226.

I) 24 portGROUND FLOOR 8 NoRate in FigureRate in Word

FIRST FLOOR :- 1 NoRate in FigureRate in Word

D27 Supply of 2mtr / 1mtr long patch cord (Make :- D-LINK / Equivalent)For 1 mtr. LongGROUND FLOOR 176 No

Page97

SL NO ITEM QTY UNIT RATE AMOUNT

Rate in FigureRate in Word

FIRST FLOOR :- 15 NoRate in FigureRate in Word

For 2 mtr. LongGROUND FLOOR 176 NoRate in FigureRate in Word

FIRST FLOOR :- 15 NoRate in FigureRate in Word

D28 Supply & fixing of 24", 42U Floor mounting typemodem rack with following accessories. 6000

1. 230 V , AC distribution box with 8 nos of 5Asocket outlets- 1no2. Cable manager- 9 nos.3.Cantilever shelf- 9nos.4.Single fan module- 2set.5.Mounting kit-3 packet(Make- VAL RACK, VEROPRESIDENT,HCL)

GROUND FLOOR 1 SetRate in FigureRate in Word

D29 Supply & Fixing of 24 port Managed Switch.100/1000Mbps.GROUND FLOOR 8 No.Rate in FigureRate in Word

FIRST FLOOR :- 1 No.Rate in FigureRate in Word

Page98

SL NO ITEM QTY UNIT RATE AMOUNT

D30 Supply & fixing of information outlet box suitablefor RJ 45 terminals including mounting box(G.I/PVC) & top cover , to be fixed in concealedmanner in partition/wall by necessary bolts & nutsor as directed by site-incharge. (MAKE - D-LINK / Equivalent) Single type.

GROUND FLOOR 176 No.Rate in FigureRate in Word

FIRST FLOOR :- 15 No.Rate in FigureRate in Word

D31 Laying of LAN cable including supply of 3/4" or 1"dia. PVC conduit including termination & linktesting of LAN cable at both the end.GROUND FLOOR 10005 Mtr.Rate in FigureRate in Word

FIRST FLOOR :- 1220 Mtr.Rate in FigureRate in Word

Sub -Total =Rate in FigureRate in Word

III. PHONE WIRING :-

D32 Supply & laying of the following sizes of phonewires of approved make In existing G.I trunk / PVC pipe & complete in all respect.A) 2 pairs telephone wires ( 0.5 sqmm)GROUND FLOOR 9300 MtrRate in FigureRate in Word

FIRST FLOOR :- 450 MtrRate in FigureRate in Word

Page99

SL NO ITEM QTY UNIT RATE AMOUNT

D33 Supply & fixing of Telephone point suitable for RJ11 telephone socket including mounting box(G.I/PVC) & top cover of approved make to befixed in concealed manner in partition/wall bynecessary bolts & nuts or as directed by site-incharge.

GROUND FLOOR 177 No.Rate in FigureRate in Word

FIRST FLOOR :- 6 No.Rate in FigureRate in Word

D34 Supply & fixing of following Cu. Bus-bar including

the cost of Insulator, Nut, bolt & washer etc. with all

accessories for permanent earthing.a) 400 mm x 50 mm x 6 mm Cu flat.

GROUND FLOOR 1 No.Rate in FigureRate in Word

D35 Supply & laying of single core 16 sq.mm flexibleFRLS cu. Wire from UPS room to server room forEPBX earthing.GROUND FLOOR 30 mtrRate in FigureRate in Word

Sub -Total =Rate in FigureRate in Word

IV. COMPUTER WIRING :-

D36Supply and fixing of computer point complete with3 nos of 240 volt 6 amp 4 pin universal round/flatpin combined shuttered socket outlet & 2 nos. of240 volt 6 amp control switch mounted on modulargrid plate & all housed in a 8 module recessed zincchromate passivated flush metal box includingmosaic white cover plate of approved make with allother accessories etc.as required.

GROUND FLOOR 145 pointRate in FigureRate in Word

Page100

SL NO ITEM QTY UNIT RATE AMOUNT

D37Supply and fixing of computer point complete with2 nos of 240 volt 6 amp 4 pin universal round/flatpin combined shuttered socket outlet & 2 nos. of240 volt 6 amp control switch mounted on modulargrid plate, all housed in a 6 module recessed zincchromate passivated flush metal box includingmosaic white cover plate of approved mae with allother accessories etc.as required.

GROUND FLOOR 21 pointRate in FigureRate in Word

FIRST FLOOR 15 pointRate in FigureRate in Word

D38Supply and fixing of 6/16A modular switch &socket outlet complete with 1 no of 240 volt 6/16amp 4 pin universal round/flat pin combinedshuttered socket outlet & 240 volt 16 amp controlswitch mounted on modular grid plate, all housed ina 4 module recessed zinc chromate passivated flushmetal box including mosaic white cover plate ofapproved make with all other accessories etc. asrequired.

GROUND FLOOR 2 eachRate in FigureRate in Word

FIRST FLOOR 1 eachRate in FigureRate in Word

D39 Circuit wiring for Comp. socket outlet in existingG.I trunk with single core 2.5 sq.mm (2Run) +1.5sq.mm (1run) PVC insulated un-sheathed FRLSCu.conductor wire of approved make complete withwith all other necessary materials & labour.

GROUND FLOOR 2300 mtrRate in FigureRate in Word

FIRST FLOOR 150 mtrRate in FigureRate in Word

Page101

SL NO ITEM QTY UNIT RATE AMOUNT

D40 Sub main wiring in existing 32mm dia. good qualityPVC pipe with single core 6 sq mm (2 run) + 4sq.mm (1 run) PVC insulated heavy duty(unsheathed) FRLS copper conductor wire ofapproved make from Main panel board to computerdistribution board through UPS / UPS O/G DBcomplete with PVC bend, saddle, screw etc alongwith other necessary materials and labour.

GROUND FLOOR 35 mtrRate in FigureRate in Word

FIRST FLOOR 20 mtrRate in FigureRate in Word

D41 Sub main wiring in existing 32mm dia. good qualityPVC pipe with single core 10 sq mm (2 run) + 6sq.mm (1 run) PVC insulated heavy duty(unsheathed) FRLS copper conductor wire ofapproved make from UPS DB to computerdistribution board complete with PVC bend,saddle, screw etc along with other necessarymaterials and labour.

GROUND FLOOR 110 mtrRate in FigureRate in Word

D42 Sub main wiring in existing 3/4" dia. good qualityPVC pipe with single core 16 sq mm (3 run) PVCinsulated heavy duty (unsheathed) FRLS copperconductor wire of approved make from UPS toMain UPS distribution board complete with PVCbend, saddle, screw etc along with other necessarymaterials and labour.

GROUND FLOOR 20 mtrRate in FigureRate in Word

Page102

SL NO ITEM QTY UNIT RATE AMOUNT

D43 Sub main wiring in existing 3/4" dia. good qualityPVC pipe with single core 16 sq mm (5 run) PVCinsulated heavy duty (unsheathed) FRLS copperconductor wire of approved make from Main PanelBoard to UPS complete with PVC bend, saddle,screw etc along with other necessary materials andlabour.

GROUND FLOOR 20 mtrRate in FigureRate in Word

D44 Supply & making end termination with brasscompression gland and copper lugs for followingsize of PVC insulated PVC sheathed / XLPEaluminium conductor cable of 1.1 kv grade asrequired

a) 5 X 16 sq.mm 1.1kv grade Cu. WireGROUND FLOOR 4 noRate in FigureRate in Word

b) (2 X 10 + 1 X 6) or 3 x 16 sq.mm Cu. Wire.GROUND FLOOR 12 noRate in FigureRate in Word

D45 Supply & fixing of 32 A DP MCB wih 2 pole plasticenclouser of approved make for UPS incomingcomplete with all other materials as required.

GROUND FLOOR 1 No.Rate in FigureRate in Word

FIRST FLOOR 1 No.Rate in FigureRate in Word

Page103

SL NO ITEM QTY UNIT RATE AMOUNT

D46 Supply & fixing of 8 way, single pole and Neutral,sheet steel MCB double door distribution boxcomplete with tinned copper busbar, neutral link,earth bar, din rail, detachable gland plate, including 1no. of 25A & 2 no.of 40 Amps rating, 240Volts, 'C'curve single pole Miniature Circuit Breaker & 1 no80A, 4P MCI of approved make complete withconnections, testing and commissioning including allother accessories etc. as required. - FOR MAINUPS DB

GROUND FLOOR 2 No.Rate in FigureRate in Word

D47 Supply & fixing of 1 ph.12 way, single pole andNeutral, sheet steel MCB double door distributionbox omplete with tinned copper busbar, neutral link,earth bar, din rail, detachable gland plate, including10 nos of 6 to 32 Amps rating, 240Volts, 'C' curveSingle pole Miniature Circuit Breaker & 1 no 25A,30mA DP RCCB of approved make complete withconnections, testing and commissioning including allother accessories etc. as required. - FOR LIGHTING & POWER DB

FIRST FLOOR 1 No.Rate in FigureRate in Word

D48 Supply & fixing of 3 ph.4 way, triple pole andNeutral, sheet steel MCB double door distributionbox omplete with tinned copper busbar, neutral link,earth bar, din rail, detachable gland plate, including12 nos of 6 to 32 Amps rating, 240Volts, 'C' curveSingle pole Miniature Circuit Breaker & 1 no 40A,30mA DP RCCB of approved make complete withconnections, testing and commissioning including allother accessories etc. as required. - FOR COMPUTER DB

GROUND FLOOR 5 No.Rate in FigureRate in Word

Sub - Total =Rate in FigureRate in Word

Page104

SL NO ITEM QTY UNIT RATE AMOUNT

V. FITTING & FIXTURE :-

D49 Supply, Installation, Testing & commissioning of 1 x18 watt down lighter fitting having bright anodisedaluminium reflector & integral control gear, exceldigital balast, 1 nos of 18 watt CFL lamp etc ofapproved make complete with all other necessaryfixing materials including group cutting and above.

GROUND FLOOR 28 No.Rate in FigureRate in Word

FIRST FLOOR 19 No.Rate in FigureRate in Word

D50 Supply, Installation, Testing & commissioning of 2 x18 watt down lighter fitting having bright anodisedaluminium reflector with cross louvers & toughenedglass cover, excel digital balast, 2 nos of 18 watt CFLlamp etc of approved make complete with all othernecessary fixing materials including group cuttingand above.

GROUND FLOOR 394 No.Rate in FigureRate in Word

FIRST FLOOR 116 No.Rate in FigureRate in Word

D51 Supply, Installation, Testing & commissioning of 2 x36 watt CFL commercial mirror optic luminairfitting for direct & indirect lighting application wiredwith VPIT copper ballast etc of approved make with2 nos of 36 watt CFL lamp etc. of approved makecomplete with all other necessary fixing materialsincluding group cutting and above.

GROUND FLOOR 102 No.Rate in FigureRate in Word

FIRST FLOOR 4 No.Rate in FigureRate in Word

Page105

SL NO ITEM QTY UNIT RATE AMOUNT

D52 Supply, Installation, Testing & commissioning ofrecess mounting mirror optic 3 x 14 watt luminairfitting with housing made of CRCA MS white epoxypowder coated sheet & perforated CRCA MS panelsseparating the light sources, prewired with highefficiency electronic ballest, push fit type lampholder & mains connector & 3 nos of 14 watt T5lamp of approved make.complete with all othernecessary fixing materials including group cuttingand above.

GROUND FLOOR 82 No.Rate in FigureRate in Word

FIRST FLOOR 36 No.Rate in FigureRate in Word

D53 Supply, Installation,Testing & commissioning ofrecessed multi option swivel type halogen downlighter fitting suitable for 12V/50W Halogenincluding transformer of approved make completewith all other necessary fixing materials includinggroup cutting and above.

GROUND FLOOR 29 No.Rate in FigureRate in Word

FIRST FLOOR 5 No.Rate in FigureRate in Word

D54 Supply, Installation,Testing & commissioning ofSurface mounting 1 x 36/40W flourscent tube lightfitting including 1 no. of 36/40watt luminairs ofapproved make complete with all materials & labour

GROUND FLOOR 4 No.Rate in FigureRate in Word

FIRST FLOOR 4 No.Rate in FigureRate in Word

Sub -Total =Rate in FigureRate in Word

Page106

SL NO ITEM QTY UNIT RATE AMOUNT

VI WIRING FOR AIR - CONDITIONING :-

D55 Supply & fixing of 1 no. 16/20/25A DP MCB with2 pole plastic enclouser of approved make for1.0Tr. /1.5 Tr/2.0Tr. AC point complete with allother required materials as required.

GROUND FLOOR 42 eachRate in FigureRate in Word

FIRST FLOOR 6 eachRate in FigureRate in Word

D56 Supply & fixing of 1 no. 32A FP MCB with 4 poleplastic enclouser of approved make for 5.8Tr. ACpoint complete with all other required materials asrequired.

GROUND FLOOR 6 eachRate in FigureRate in Word

FIRST FLOOR 2 eachRate in FigureRate in Word

D57 Supply & fixing of 1 no. 40A FP MCB with 4 poleplastic enclouser of approved make for 8.5Tr. ACpoint complete with all other required materials asrequired.

GROUND FLOOR 8 eachRate in FigureRate in Word

FIRST FLOOR 2 eachRate in FigureRate in Word

D58 Sub-main wiring for 1.0 Tr. AC in existing 3/4"PVC pipe with single core 2.5 sq.mm (2Run) + 1.5sq.mm (1run) PVC insulated un-sheathed FRLSCu.conductor wire of approved make complete withwith all other necessary materials & labour.

GROUND FLOOR 475 mtrRate in FigureRate in Word

Page107

SL NO ITEM QTY UNIT RATE AMOUNT

D59 Sub-main wiring for 1.5Tr. AC in existing 3/4"PVC pipe with single core 4 sq.mm (2Run) + 2.5sq.mm (1run) PVC insulated un-sheathed FRLSCu.conductor wire of approved make complete withwith all other necessary materials & labour.

GROUND FLOOR 360 mtrRate in FigureRate in Word

FIRST FLOOR 60 mtrRate in FigureRate in Word

D60 Sub-main wiring for 2.0Tr. AC in existing 3/4"PVC pipe with single core 6 sq.mm (2Run) + 4.0sq.mm (1run) PVC insulated un-sheathed FRLSCu.conductor wire of approved make complete withwith all other necessary materials & labour.

GROUND FLOOR 140 mtrRate in FigureRate in Word

FIRST FLOOR 60 mtrRate in FigureRate in Word

D61 Sub-main wiring for Indoor & Outdoor unit / ACdistribution board of 5.8 Tr. Scroll compressor unitin existing 1" or 3/4" good quality PVC pipe withsingle core 6 sq.mm (4 Run) + 4 sq mm (1run)PVC insulated un-sheathed FRLS Cu. conductorwire of approved make complete with with all othernecessary materials & labour.

GROUND FLOOR 185 mtrRate in FigureRate in Word

FIRST FLOOR 130 mtrRate in FigureRate in Word

Page108

SL NO ITEM QTY UNIT RATE AMOUNT

D62 Sub-main wiring for Indoor & Outdoor unit of 8.5Tr. Scroll compressor unit in existing 1" or 3/4"good quality PVC pipe with single core 10 sq.mm(4Run)+ 6 sq mm (1run ) PVC insulated un-sheathed FRLS Cu. conductor wire of approvedmake complete with with all other necessarymaterials & labour.

GROUND FLOOR 200 mtrRate in FigureRate in Word

FIRST FLOOR 80 mtrRate in FigureRate in Word

D63 Sub-main wiring for AC distribution board inexisting 1" or 3/4" good quality PVC pipe withsingle core 16 sq.mm (4Run) + 10 sq.mm (1run)PVC insulated un-sheathed FRLS Cu.conductorwire of approved make complete with with all othernecessary materials & labour.

GROUND FLOOR 50 mtrRate in FigureRate in Word

D64 Supply & fixing of 3 ph.4 way, triple pole andNeutral, sheet steel MCB double door distributionbox complete with tinned copper busbar, neutrallink, earth bar, din rail, detachable gland plateincluding 12 nos of 16/20/25 Amps rating,240Volts, 'C' curve Single pole Miniature CircuitBreaker & 1 no 32A, 4P MCB Isolator, , ofapproved make, complete with connections, testingand commissioning including all other accessoriesetc. as required. - FOR ACDB

GROUND FLOOR 1 No.Rate in FigureRate in Word

FIRST FLOOR 1 No.Rate in FigureRate in Word

Page109

SL NO ITEM QTY UNIT RATE AMOUNT

D65 Supply & fixing of 3 ph.6 way, triple pole andNeutral, sheet steel MCB double door distributionbox complete with tinned copper busbar, neutrallink, earth bar, din rail, detachable gland plateincluding 18 nos of 16/20/25 Amps rating,240Volts, 'C' curve Single pole Miniature CircuitBreaker & 1 no 63A, 4P MCB Isolator of approvedmake complete with connections, testing andcommissioning including all other accessories etc. asrequired. - FOR ACDB

GROUND FLOOR 2 No.Rate in FigureRate in Word

Sub -Total =Rate in FigureRate in Word

VII MAIN PANEL & EARTHING :-

D66 Earthing with copper earth plate electrode of 600

mm x 600 mm x 6 mm thick including accessories

and providing masonary enclosure with cover plate

having locking arrangement and watering pipe,

including 50 x 6 mm size Cu. flat etc. complete with

charcole / coke and salt etc. as required.GROUND FLOOR 2 No.Rate in FigureRate in Word

D67 Supply and laying of the following earthing clampedto wall with suitable clamps saddles and fixing bolts/in ground including the cost of digging and backfilling with sand and brick protection as required and complete as required to comply with IS 3043:1987

GROUND FLOOR

50 mm x 6 mm copper strip 40 mtr.Rate in FigureRate in Word

Page110

SL NO ITEM QTY UNIT RATE AMOUNT

D68 Design, fabrication, assembly, wiring, supplying,installation, testing and commissioning of frontoperated cubicle type compartmentalised frontaccess free standing, dust and vermin proof (IP 65ingress protection) Panel boards suitable for use at415 volts, 3 phase 4 wire 50 Hertz system suitablefor fault level of required value symmetrical at 415volts, including 3 mm thick gland plates at bottomand including lifting hooks and including GI earthstrip of required size with 2 nos earthing terminalscomplete with interconnections etc as perspecifications, as required and as below.

All live accessible parts shall be shrouded and allequipment shall be finger touch proof. The Busbarsinsulation shall be with heat shrinkable sleeves.SMC/DMC shrouds and busbar supports shall beused. Padlocking facility shall be provided on alloutgoing feeders doors and switch handles shall belockable in OFF position

All kA values indicated shall be Ics breakingcapacity.

GA drawings shall be got approved fromOwners/Architects/Consultants before fabrication.

MAINS INCOMINGi) 1 nos 800 Amps, 50 kA , 415 volt 4P MCCB .

ii) BUSBARElectrolytic high conductivity aluminium three phaseand neutral busbars rated at 1000 amps having amaximum current density of 1 amp per sq mmsuitable to with stand symmetrical fault level of 50kA at 415 volts. The neutral busbar is to be of100% capacity.

OUTGOINGSa) 4 no 160 amp 600 volts 4P SFU with HRC Fuse.

b) 1 no 125 amp 600 volts 4P SFU with HRC Fuse.

c) 1 no 63 amp 600 volts 4P SFU with HRC Fuse.

Page111

SL NO ITEM QTY UNIT RATE AMOUNT

The panel board should containToggle switch, 3 ph.(R,Y,B) Indicator,Voltmeter (0-500v) & Ammeter (0-1000A) with Selector Switch &800/5 VA CT should be fixed at a suitable place offloor level on a brick structure base /in 100 X 50MM ISMC frame along with other necessaymaterials and labour.

GROUND FLOOR 1 SetRate in FigureRate in Word

Sub-Total =Rate in FigureRate in Word

VIII FOR UNDER FLOOR CABLEMANAGEMENT SYSTEM

D69 Supply & Laying of G.I Trunk with 16 gause offollowing sizes & other necessary materialsGROUND FLOOR

a) 400mm x 40 mm x 1.6mm 21 Mtr.Rate in FigureRate in Word

b) 300mm x 40 mm x 1.6mm 21 Mtr.Rate in FigureRate in Word

c) 200mm x 40 mm x 1.6mm 41 Mtr.Rate in FigureRate in Word

d) 150mm x 40 mm x 1.6mm 19 Mtr.Rate in FigureRate in Word

e) 100mm x 40 mm x 1.6mm 78 Mtr.Rate in FigureRate in Word

f) 50mm x 40 mm x 1.6mm 288 Mtr.Rate in FigureRate in Word

Page112

SL NO ITEM QTY UNIT RATE AMOUNT

FIRST FLOOR

a) 100mm x 40 mm x 1.6mm 5 Mtr.Rate in FigureRate in Word

b) 50mm x 40 mm x 1.6mm 21 Mtr.Rate in FigureRate in Word

D70 Supply & fixing of G.I Pull box of following sizes

GROUND FLOOR a) 600 mm x 600 mm x 51mm 1 No.

Rate in FigureRate in Word

b) 450 mm x 450 mm x 51mm 3 No.Rate in FigureRate in Word

c) 350 mm x3150 mm x 51mm 5 No.Rate in FigureRate in Word

d) 250 mm x 250 mm x 51mm 14 No.Rate in FigureRate in Word

e) 200 mm x 200 mm x 51mm 9 No.Rate in FigureRate in Word

f) 150 mm x 150 mm x 51mm 24 No.Rate in FigureRate in Word

g) 100 mm x 150 mm x 51mm 26 No.Rate in FigureRate in Word

FIRST FLOOR a) 150 mm x 150 mm x 51mm 5 No.

Rate in FigureRate in Word

b) 100 mm x 100 mm x 51mm 5 No.Rate in Figure

Page113

SL NO ITEM QTY UNIT RATE AMOUNT

Rate in Word

D71 Supply and fixing heavy gauge ISI embossed blackenameled MS recessed and/or surface conduitsincluding cost of providing saddles etc for surfaceconduiting and/or cost of cutting and filling chasesfor recessed conduiting complete as perspecifications, as required and as below.

25 mm 16 SWG GROUND FLOOR 353 per mRate in FigureRate in Word

FIRST FLOOR 40 per mRate in FigureRate in Word

Sub-Total =Rate in FigureRate in Word

IX EXTERNAL ELECTRIFICATION :-

D72 Supply, laying, testing and commissioning of600volts grade PVC sheathed flexible FRLS copperconductor wires in 25mm dia. polythene conduitdressing to ensure minimum 1D gap betweenadjacent cables/wires etc. complete as perspecifications, as required and as below.

a) (2 x 1.5 + 1 x 1.0) Sq.mm (From JB to Light Point)835 mtrs.

Rate in FigureRate in Word

b) (2 X 2.5 + 1 x 1.5) Sqmm (From BDB to JunctionBox) 600 mtsRate in FigureRate in Word

c) (5 X 4.0) Sqmm (For Motor) 30 mtsRate in FigureRate in Word

e) (4 X 10 + 1 x 6.0) Sqmm (For Sub-main wiringfrom Main Panel to Main External DB) 60 mtsRate in FigureRate in Word

Page114

SL NO ITEM QTY UNIT RATE AMOUNT

D73 Recessed wiring to 3Ph. 5HP motor point

complete with 25A 3ph.industrial plug & socket

with MCB enclouser (IP 42) of approved make and

all other necessary materials and labour. 1 PointRate in FigureRate in Word

D74 Supply & fixing of 3 Ph.6 way, Triple pole andNeutral, sheet steel MCB double door distributionbox complete with tinned copper busbar, neutrallink, earth bar, din rail, detachable gland plateincluding

I/C - 1 no of 40A, 10kA 4P MCI & 1 no. 40A ,10kA TPN MCB.O/G - 6 nos of 32A DP MCB & 2 nos of 25 ATPN MCB.of approved make complete with connections,testing and commissioning including all othermaterials etc. as required. - Branch DistributionBoard 1 No.Rate in FigureRate in Word

D75 Supply & fixing of 8" x 8" MS junction boxcomplete with 2 nos. 200mm x 12mm x 3 mm cu.Bus Bar , 10A / 16A kit-Kat including painting,earthing & 600 mm x 25 mm x 6 mm MS anglecomplete with connections, testing &commissioning etc. as required.

12 No.Rate in FigureRate in Word

D76 SITC of Gate light of size 590 mm x 630 mmsuitable for 70w MH lamp integral translucentsupplied with super imposed ignitor mounted on60mm OD pipe, complete with 1no of70w MHlamp& all other levies etc. as required. (Make : K-Lite, ID 6924 / Philips / Equivalent)

2 No.Rate in FigureRate in Word

Page115

SL NO ITEM QTY UNIT RATE AMOUNT

D77 SITC of Tube bollard - Prince Orna of size 290 mmx 1040mm suitable for single 18w CFLC PrinceOrna integral louver clear complete with ballast & allother levies etc. as required.(Make : K-Lite, ID 5774/ Equivalent)

12 No.Rate in FigureRate in Word

D78 SITC of 8 ft. height Colombia Dual pole suitable formounting Light House Midi luminair, made of 60mm dia. M.S pipe with polyrethane based metaliccolour. The Light House midi luminair with integraltranslucent designed for 4 x 11w CFLC suitable for240V single phase AC, complete with ballast,Control gear box, lamps & all other levies etc. asrequired. (Make : K-Lite, ID 5951/ Equivalent)

19 Nos.Rate in FigureRate in Word

D79 SITC of Garden spike & mini flood luminairsuitable for single PAR 1 X 50W lamp made withblack powder coated die-cast aluminium housingwith spike & collar complete with all other levies etc.as required. (Make : BAJAJ, C.NO.- 110049 / K-Lite / Equivalent)

10 Nos.Rate in FigureRate in Word

D80 Supply , erection , testing and commisoning of flood

light fitting of single 1000w halogen lamp complete

with all other materials & labour. (Make : K-Lite,

ID. - 6103 / Equivalent) 2 nosRate in FigureRate in Word

Page116

SL NO ITEM QTY UNIT RATE AMOUNT

D81 SITC of single piece cast aluminium with full glasscover integral luminair suitable for MH T 150W ofapproved make including with 25mm dia. G.I pipeconforming to IS-1239 part-1990, The pipe is to befixed on the wall vertical / angularly by groutingwith C.C / M.S clamp with all other necessarymaterials & labour. (Make : BAJAJ, C.No. - 180405/ K-Lite / Equivalent) 5 No.Rate in FigureRate in Word

D82 SITC of integral hoarding luminair fitting suitablefor MMH T 400W lamp made with black powdercoated die-cast aluminium housing built in controlgear, aluminium reflector, heat resistant toughenedclear glass cover complete with all other materials &labour. (Make : Bajaj, C.No. - 161476 / K-Lite /Equivalent) 6 nosRate in FigureRate in Word

D83 SITC of decorative flood light luminair suitable for

MH DE 1 x 150W including ballast, ignitor ,

capacitor, tray & 1 no. 150w MH lamp complete

with all other levies & labour.(Make : Bajaj, C.No. -

110190 / K-Lite / Equivalent) 2 nosRate in FigureRate in Word

D84 Earthing with G.I earth plate electrode of 600 mm

x 600 mm x 3 mm thick including accessories and

providing masonary enclosure with cover plate

having locking arrangement and watering pipe,

including 25 x 3 mm size G.I. flat etc. complete with

charcole / coke and salt etc. as required. 1 No.Rate in FigureRate in Word

D85 Supplying & laying 25 sq.mm single core PVCinsulated Al. flexible cable at 0.5 mm below groundlevel for earth electrode, including soldering /termination etc. with all required materials asrequired. 50 mtr.Rate in FigureRate in Word

Sub-Total =GRAND TOTAL COST =Rate in FigureRate in Word

Page117

SL NO ITEM QTY UNIT RATE AMOUNT

F AIRCONDITIONING

DUCTABLE AIRCONDITIONING

F1 Supply of air cooled ceilling suspended ductableindoor unit with compressor fitted in outdoor unitwith suitable capasity hermetically sealed scrollcompressor and corded remorte control as perdirection of Engineer-in-charge .17 TR 3 NORATE IN FIGURERATE IN WORD

11 TR 4 NOSRATE IN FIGURERATE IN WORD

8.5 TR 3 NOSRATE IN FIGURERATE IN WORD

5.5 TR 1 NORATE IN FIGURERATE IN WORD

F2 Installation , Testing and commissioning af the units

below as per direction of Engineer-in-charge 17 TR 3 NORATE IN FIGURERATE IN WORD

11 TR 4 NOS RATE IN FIGURE RATE IN WORD

8.5 TR 3 NOS RATE IN FIGURE RATE IN WORD

5.5 TR 1 NO RATE IN FIGURE RATE IN WORD

Page118

SL NO ITEM QTY UNIT RATE AMOUNT

F3 Supply and Installation of refrigerant piping for

interconnecting condensing unit and indoor unit for

suction and liquid line with suitable die hard drawn

copper , rubes and duly insulated with 6 mm thick

thermo foam as per direction of Engineer-in-charge 375 rm RATE IN FIGURE RATE IN WORD

F4 Supply and Installation of insulated drain piping

from indoor unit to nearest drain with suitable size

pvc pipe to effectively drain out the aweet water as

desired at site as per direction of Engineer-in-charge. 220 rm RATE IN FIGURE RATE IN WORD

F5 Design , Febrication , supply , Installation of GSS

ducting support , hanger , vones , column dampers ,

control dampers with canvass connection as per

direction of Engineer-in-charge.24 SWG 520 SQMT RATE IN FIGURE RATE IN WORD

22SWG 130 SQMT RATE IN FIGURE RATE IN WORD

F6 Supply and Installation of thermal insulation with 25

mm thick fiber glass covered with aluminium foil as

per direction of Engineer-in-charge 200 SQMT RATE IN FIGURE RATE IN WORD

F7 Supply and Installation of acoustic insulation with12 mm thick fiber glass rigid board covered with36G perforated aluminium sheet as per direction ofEngineer-in-charge. 130 SQMT RATE IN FIGURE RATE IN WORD

F8 Supply and installion of aluminium powder coated

grill as per direction of Engineer-in-charge 25 SQMT RATE IN FIGURE RATE IN WORD

Page119

SL NO ITEM QTY UNIT RATE AMOUNT

F9

Supply and installion of M.S. black paint volumeconrol dampers . 13 SQMT RATE IN FIGURE RATE IN WORD

F10

Interconnectin electrcal cabling as per direction ofEngineer-in-charge

3cor 1.5 sqmm copper cable 430 rm RATE IN FIGURE RATE IN WORD

3cor 2.5 sqmm copper cable 350 rm RATE IN FIGURE RATE IN WORD

4cor 4 sqmm copper cable 65 rm RATE IN FIGURE RATE IN WORD

F11

M.S. stand with VI pad for placing out door unit asper direction of Engineer-in-charge 18 nos RATE IN FIGURE RATE IN WORD

Supply of air cooled ceilling suspended ductableindoor unit with compressor fitted in outdoor unitwith suitable capasity hermetically sealed scrollcompressor and corded remorte control as perdirection of Engineer-in-charge .

SPLIT AIRCONDITIONING

F12 Supply of hi-wall split air conditioner fitted with

rotary type compressor with all accessories and

remort etc . The rates shall be inclusive of testing

and commissioning of the machines as per direction

of Engineer-in-charge.1.5 TR 26 Nos RATE IN FIGURE RATE IN WORD

1.0 TR 32 Nos RATE IN FIGURE RATE IN WORD

Page120

SL NO ITEM QTY UNIT RATE AMOUNT

F13 Refrigerant piping inter - connecting respectivecondensing unit and evaporation units withrefrigerant grade copper tubes complete with liquidline strainer , fifter , drier , pipe supports , completewith insulation etc as per direction of Engineer-in-charge . Rate Rs 410/ per rm 30 rm RATE IN FIGURE RATE IN WORD

F14 Supports/suspension of condensing unit andevaporator unit inculding ribbed neoprene VI pads ,flexible connection at blower duflets as per directionof Engineer-in-charge . 48 Nos RATE IN FIGURE RATE IN WORD

F15 Condensore drain piping from indoor unit tonearest drain with suitable size PVC pipe toeffectively drain out the sweet water as desired at siteas per direction of Engineer-in-charge . Rate Rs90/m 50 rm RATE IN FIGURE RATE IN WORD

Page121

SL NO ITEM QTY UNIT RATE AMOUNT

SECTION-E (LANDSCAPING)

E1 Earth work in excavation of foundation in all kindsof soil including rough dressing and levelling the bedand deposition the earth away from work site as perthe direction of Engineer-in-charge.

168.13 cum

RATE IN FIGURERATE IN WORD

E2 Providing and laying plain cement concrete (1:4:8) infoundation and bottom layers of flooring using40mm size black hard crusher broken granite metalof approved quality from approved quarry includingmixing, lowering laying and compacting to properthickness, watering and curing for the requiredperiod as per direction of the Engineer-in-charge,including cost of all materials with all taxes androyalities, loading and unloading conveyance, alllabour, all sundries and T&P etc. complete as perdirection of Engineer-in-charge.

39.77 cum

RATE IN FIGURERATE IN WORD

E3 Providing fly ash brick masonry work in foundationand plinth (250mmx120mmx80mm size) of crushing strength 75Kg/Sqcm in cement mortar (1:6) afterimmersing the bricks for minimum 6 hours in waterbefore use with all necessary projections, splayscutting, circular moulding, corbelling etc as perdrawings. including cost, conveyance, all taxes,royalties, loading and unloading of all materials,including cost of all labour, scaffolding, wateringand curing, sundries, T&P etc. complete as per thedirection of the Engineer-in-charge.(Fly ash brickwill be supplied by the OPGC free of cost at Ashbrick plant).

85.92 cum

RATE IN FIGURERATE IN WORD

Page122

SL NO ITEM QTY UNIT RATE AMOUNT

E4 Providing 12mm thick cement plaster with cementmortar of (1:4) including neat cement punning,finished smooth to proper plumb ,including cost ofall materials,conveyance,loading and unloading, alltaxes and royalties, all labour, watering and curing,sundries and T&P etc.complete as per direction ofthe Engineer-in-charge.

307.21 sqm

RATE IN FIGURERATE IN WORD

E5 Providing & fixing Kota stone using 20mm thickKota stone of approved quality, colour and size inthe internal pathway (area of each kota stone piecenot less than 0.20 sqm) over 20mm thick cementmortar (1:3) and grouting the joints with whitecement slurry and colouring pigment to match thecolour & shade of stone including cutting to shapeand cost of all labour, materials, taxes, royalties,loading and unloading, conveyance, sundries,watering and curing etc. complete as per drawingand direction of the Engineer-in-Charge.

122.54 sqm

RATE IN FIGURERATE IN WORD

E6 Dressing and turfing the good earth soil withspecific contour to form mounds as shown in thedrawing with breaking clods and consolidating thesame by ramming , complete as per the direction ofthe Engineer-in-charge.

2631.57 sqm

RATE IN FIGURERATE IN WORD

E7 Providing & fixing of concrete floor tile of 20mmthick or above in the internal pathway, over cementmortar of ( 1:3 ) in proper slope and filling the gapswith cement mixed with oxide matching colour inrequired proportion , including cost of materials,labour, conveyance, watering, curing, taxes ,T&Pand complete as per the direction of Engineer-in-charge.

230.34 sqm

RATE IN FIGURERATE IN WORD

Page123

SL NO ITEM QTY UNIT RATE AMOUNT

E8 Providing and laying 75mm thick interlocking PaverBlocks of approved quality, colour and shade over75mm thick bed of coarse river sand, jointed withcement slurry mixed with colouring pigments tomatch the colour and shade of Paver Blocksincluding cost of all materials, labour for the worketc complete in all respect as per the direction of theEngineer-in-charge.

1768.83 sqm

RATE IN FIGURERATE IN WORD

E9 Procurement of Baramunda Grass , preparation ofthe ground upto a depth of 0.45m, disposal ofrejected soil if any within a lead of 50m and refillingwith fresh garden earth to proper level ,finaldressing & levelling for adequate drainage ,spreading of organic manure like sterameal &chemical fertilizer, dibbling the lawn grass & turfingfor preparation of lawn ,watering & maintenance forone year as per direction of the Engineer-in-charge.

2631.57 sqm

RATE IN FIGURERATE IN WORD

E10 Proving and fixing water body with sculpture as perenclosed detail design and specifications forspecified location and as per direction of theEngineer-in-charge.

L.S

RATE IN FIGURERATE IN WORD

E11 Digging and preparation of beds of depth 0.3m andof desired shape for ground cover and hedgesaplings including disposal of rejected soil of anywithin a lead of 50m and refilling with fresh gardenearth to proper level as per technical specificationand as per direction of the Engineer-in-chargecomplete.

193.70 cum

RATE IN FIGURERATE IN WORD

Page124

SL NO ITEM QTY UNIT RATE AMOUNT

E12 Procurement and planting of ground cover,including filling the pits with good garden earth &manure , pocketing , watering & irrigation,deweeding , controlling plant diseases & pests,transplanting of new plants and initial maintenancefor one year as per technical specifications anddirection of the Engineer-in-charge.

a) Golden duranta 371.61 sqmRATE IN FIGURERATE IN WORDb) Alternanthera red 74.32 sqmRATE IN FIGURERATE IN WORDc) Iresine 55.74 sqmRATE IN FIGURERATE IN WORDd) Alternanthera tricolour 106.84 sqmRATE IN FIGURERATE IN WORDe) Flower bed 37.16 sqmRATE IN FIGURERATE IN WORD

E13 Digging and preparation of pits of size (0.6m x 0.6mx 0.75m) for saplings , including disposal of rejectedsoil ( if any) within a lead of 50m and supply offresh earth and when required as per technicalspecifications and as per instructions of Engineer-in-charge

389.00 nos

RATE IN FIGURERATE IN WORD

E14 Procurement and planting of shrubs and includingfilling the pits with good garden earth & manure ,pocketing , watering & irrigation , deweeding ,controlling plant diseases & pests, transplanting ofnew plants and initial maintenance for one year asper technical specifications and direction of theEngineer-in-charge.

a) Jewel of India 121.00 nosRATE IN FIGURERATE IN WORD

b) Tecoma capensis 12.00 nosRATE IN FIGURERATE IN WORD

Page125

SL NO ITEM QTY UNIT RATE AMOUNT

c) Vinica Rosea 76.00 nosRATE IN FIGURERATE IN WORD

d) Song of India 170.00 nosRATE IN FIGURERATE IN WORD

e) Cycus revoluta 6.00 nosRATE IN FIGURERATE IN WORD

f) Bouganvillea topiary 4.00 nosRATE IN FIGURERATE IN WORD

E15 Digging and preparation of pits for trees of size:(1.0m x 1.0m x1.0m) including disposal of rejectedsoil within a lead of 50m and refilling with freshearth as per technical specifications and as perinstructions of Engineer-in-charge.

68.00 nos

RATE IN FIGURERATE IN WORD

E16 Procurement and planting of approved treessaplings with minimum height 1.0m to 1.5mincluding filling the pits with good garden earth &manure , pocketing , watering & irrigation ,deweeding , controlling plant diseases & pests ,transplanting of new plants and initial maintenancefor one year as per technical specifications anddirection of the Engineer-in-charge.

a) Ficus benjamina 37.00 nosRATE IN FIGURERATE IN WORD

b) Lagestromia indica 11.00 nosRATE IN FIGURERATE IN WORD

c) Plumeria alba 4.00 nosRATE IN FIGURERATE IN WORD

d) Pheonix palm 12.00 nosRATE IN FIGURERATE IN WORD

Page126

SL NO ITEM QTY UNIT RATE AMOUNT

e) Coconut tree 4.00 nosRATE IN FIGURERATE IN WORD

E17 Providing water cascade as per enclosedArchitectural design and drawing and including costof all materials, labour for the work etc complete inall respect as per the direction of the Engineer-in-charge.

L.S

RATE IN FIGURERATE IN WORD

SECTION G -FIRE DETECTION

G1 Supply Instalation Testing & Commissioning ofmicroprocessor based addressable fire alarm controlpanel with 127 addressable point capcity , LCDdisplay inbuilt annunciator , smfbatteries withcharger , complete in all respect , ullisted & design asper NEPA 72 ( C- Tek) and as per direction of EIC. No. 1

Rate in Figure

Rate in Word

G2 Supply Instalation Testing & Commissioning of

Addressible photo electric smoke detector with base

& accessories , ullisted ( compatible with control

panel ) and as per direction of EIC . No. 88

Rate in Figure

Rate in Word

G3 Supply Instalation Testing & Commissioning ofaudio visual annunciation devices , ullisted ( gentex/compatible with control panel ) and as perdirection of EIC . No. 6

Rate in Figure

Rate in Word

Page127

SL NO ITEM QTY UNIT RATE AMOUNT

G4 Supply Instalation Testing & Commissioning ofaddressable manual call points with all acessories ,complete in all respect : monitor module UL/PCBlisted ( compatible with control panel ) and as perdirection of EIC . No 4

Rate in Figure

Rate in Word

G5 SUPPLY INSTALATION,TESTING &COMMISSIONING OF INTERCONNECTINGCABLES WITH FITTINGS & ACCESORIES:ForNotification Appliance Circuits (NAC) for theAudio Visual Annunciation Devices - 2 Core X 2.5sq. mm armoured cupper cable.For SLC,detectors,MCP & IF devices 2 core X 1.5 sq mmarmoured cupper cable.(NIPPO/UNIFLEX-with IS1554/1/1988) AND AS PER DIRECTION OFEIC.

Mtr. 3000

Rate in Figure

Rate in Word

TOTAL COST =

Rate in Figure

Rate in Word

Page128

SL NO ITEM QTY UNIT RATE AMOUNT

H1 Supply, Installation, Testing & Commissioning of 4 doorcontroller complete with battery back-up, LCD displaywith backlight, Speaker etc. including all other accessoriesas required. (Make: - SYRIS / Equivalent)

1 No.

Rate in Figure

Rate in Word

H2 Supply, Installation, Testing & Commissioning ofproximity reader built in beep, temper switch completewith all other accessories as required. (Make: - SYRIS/ Equivalent) 8 No.

Rate in Figure

Rate in Word

H3 Supply, Installation, Testing & Commissioning of ElectroMagnetic Lock complete with all other accessories asrequired. (300 LBS) (Make: - SYRIS / Equivalent)

4 No.

Rate in Figure

Rate in Word

H4 Supply, Installation, Testing & Commissioning of PCLink Converter with USB built in beep & originalSoftware omplete with all other accessories as required.(Make: - SYRIS / Equivalent) 1 No.

Rate in Figure

Rate in Word

H5 Ssupply & laying of 6c x 2.5 sq.mm PVC insulated un-sheathed unarmoured Cu. Cable in PVC conduit ofapproved make complete with with all other requiredmaterials. Make : Chetan /Equivalent 200 Mtr.

Rate in Figure

Rate in Word

H6 Supply & providing Proxy Card. 85 No.

Rate in Figure

Rate in Word

TOTAL COST =

Rate in Figure

Rate in Word

SECTION H - ACCESS CONTROL

Page129