DISTRICT IRRIGATION PLAN
BILASPUR, HP
2015-120
District Irrigation Plan, 2015-2020
Bilaspur, Himachal Pradesh
NABARD CONSULTANCY SERVICES PVT. LTD.
Corporate Office : 24, Rajendra Place, NABARD Building, New Delhi – 110125
Reg. Office : Plot No. C24, G Block, 3rd Floor, NABARD Building
Bandra Kurla Complex, Bandra East, Mumbai-400051
3 | P a g e
Approval by DLIC
CONTENTS
Executive summary ......................................................................................................................... 9
INTRODUCTION ........................................................................................................................... 13
Background ............................................................................................................................. 13
Vision ........................................................................................................................................ 19
Objective .................................................................................................................................. 19
Strategy/approach ................................................................................................................ 20
Programme Components ................................................................................................... 20
Rationale/ Justification ...................................................................................................... 22
Methodology .......................................................................................................................... 22
Chapter 1 : General Information of the District ............................................................... 24
1.1 District Profile ...................................................................................................................... 24
Administrative setup of Bilaspur .............................................................................................. 25
1.2 Demography ........................................................................................................................ 27
1.3 Biomass and Livestock ........................................................................................................ 29
1.4 Agro-Ecology, Climate, Hydrology and Topography ........................................................... 32
1.5 Soil Profile ............................................................................................................................ 36
1.6 Soil Erosion and Runoff Status ........................................................................................... 37
1.7 Land use Pattern .................................................................................................................. 38
Chapter 2 : District Water Profile ........................................................................................ 42
2.1 Area Wise, Crop-Wise Irrigation Status .............................................................................. 42
2.2 Production and Productivity of Major Crops ...................................................................... 43
2.3 Irrigation Based Classification ............................................................................................ 45
Chapter 3 : District Water Availability ............................................................................... 46
3.1 Status of Water Availability ................................................................................................. 47
5 | P a g e
3.2 Status of Ground Water Availability ................................................................................... 47
3.3 Status of Command Area ..................................................................................................... 51
3.4 Existing Type of Irrigation .................................................................................................. 52
Chapter 4 : Water Requirement/Demand ......................................................................... 55
4.1 Domestic Water Demand .................................................................................................... 55
4.2 Crop Water Requirement .................................................................................................... 56
4.3 Livestock Water Requirement.............................................................................................. 57
4.4 Industrial Water Requirement ............................................................................................ 58
4.5 Water Demand Power Generation ...................................................................................... 59
4.6 Total Water Demand of the district for various sectors ...................................................... 60
4.7 Water budget ....................................................................................................................... 63
Chapter 5 : Strategic Action Plan for Irrigation ............................................................... 64
5.1 Strategic Plan for irrigation in PMKSY. ............................................................................... 64
5.2 Year wise total Plan of the district ....................................................................................... 64
5.3 Component-wise Plan ......................................................................................................... 65
5.4 Action plan based on Member of Parliament Local Area Development Schemes
(MPLAD) ................................................................................................................................... 67
5.5 Block-wise Plan under PMKSY ...................................................................................... 70
5.5.1 Sri Naina Devi Block Plan........................................................................................... 70
5.5.2 Bilaspur Block Plan .................................................................................................... 72
5.5.3 Ghumarwin Block Plan ............................................................................................... 74
5.5.4 Jhandutta Block Plan ................................................................................................. 76
5.5 Suggestions .......................................................................................................................... 78
5.6 Expected Outcome .............................................................................................................. 79
Annexure-I (a) Strategic Action Plan for Irrigation under PMKSY in Bilaspur
District (2016-2020) with respect to I&PH department ............................................. 83
6 | P a g e
Annexure-I (b) Strategic Action Plan for Irrigation under PMKSY in Bilaspur
District (2016-2020) with respect to DRDA ................................................................... 86
Annexure-I (c) Strategic Action Plan for Irrigation under PMKSY in Bilaspur
District (2016-2020) with respect to Agriculture Department, Horticulture
Department and ATMA ....................................................................................................... 88
7 | P a g e
LIST OF TABLES
Table 1.1: General profile of Bilaspur ......................................................................................................... 25 Table 1.2: Administrative setup of Bilaspur ................................................................................................ 26 Table 1.3: Demography of Bilaspur ............................................................................................................. 27 Table 1.4: Category wise distribution of household in the blocks .............................................................. 28 Table 1.5: Category wise distribution of population in Bilaspur ................................................................. 29 Table 1.6: Tehsil wise distribution of small animals ................................................................................... 30 Table 1.7: Tehsil wise distribution of large animals .................................................................................... 30 Table 1.8: Availability of livestock products in Bilaspur .............................................................................. 31 Table 1.9: Extremes of rainfall .................................................................................................................... 34 Table 1.10: Soil classes in Bilaspur .............................................................................................................. 36 Table 1.11: Land use pattern ...................................................................................................................... 39 Table 2.1: Area wise, crop wise irrigation status ........................................................................................ 42 Table 2.2: Irrigation status for horticulture and plantation crop ............................................................... 43 Table 2.3: Area, Production and Yield of major crops ................................................................................ 43 Table 2.4: Irrigation based classification (in hectares) ............................................................................... 45 Table 3.1: Water availability in Bilaspur ..................................................................................................... 47 Table 3.2: Hydrogeology of Bilaspur ........................................................................................................... 48 Table 3.3: Status of ground water availability ............................................................................................ 51 Table 3.4: Villages covered under command area ...................................................................................... 51 Table 3.5: Status of command area ............................................................................................................ 52 Table 3.6: Existing type of surface irrigation sources ................................................................................. 53 Table 3.7: Existing type of ground water irrigation sources ....................................................................... 53 Table 3.8: Existing type of other irrigation sources .................................................................................... 53 Table 4.1: Domestic Water Demand (in MCM) ........................................................................................... 55 Table 4.2: Crop water requirement ............................................................................................................ 56 Table 4.3: Livestock water requirement ..................................................................................................... 57 Table 4.4: Industrial water requirement of Bilaspur .................................................................................. 59 Table 4.5 Water demand for power generation ......................................................................................... 59 Table 4.6(a): Present Water Demand of the district for various sectors .................................................... 60 Table 4.7: Water Budget ............................................................................................................................. 63 Table 5.1: Department-wise yearly plan (Amount in Lakh Rs) ................................................................... 65 Table 5.2: Component-wise plan ................................................................................................................ 66 Table 5.3: Ongoing projects in Bilaspur funded by NABARD under RIDF ................................................... 67 Table 5.4: Details of scheme proposed by local MLAs ................................................................................ 68 Table 5.5: Block wise plan under PMKSY (amount in Lakh Rs.) .................................................................. 70 Table 5.6: Department wise yearly plan (Amount in Lakh Rs) .................................................................... 71 Table 5.7: Component-wise Plan ................................................................................................................ 71 Table 5.8: Department wise yearly plan (Amount in Lakh Rs) .................................................................... 73 Table 5.9: Component-wise Plan ................................................................................................................ 73 Table 5.10: Department wise yearly plan (Amount in Lakh Rs) .................................................................. 75 Table 5.11: Component-wise Plan .............................................................................................................. 75 Table 5.12: Department wise yearly plan (Amount in Lakh Rs) .................................................................. 77 Table 5.13: Component-wise Plan .............................................................................................................. 77 Table 5.14: Strategic Action Plan for Irrigation in District Bilaspur under PMSKY ...................................... 81
8 | P a g e
LIST OF FIGURES & MAPS
Figure 1-1: Administrative Setup of Bilaspur .............................................................................................. 25
Figure 1-2: Demography of Bilaspur ........................................................................................................... 28
Figure 1-3: Category wise distribution of population in the district ........................................................... 29
Figure 1-4: Rainfall in the district ................................................................................................................ 34
Figure 1-5: Relative humidity in the district................................................................................................ 35
Figure 1-6: Wind speed in Bilaspur ............................................................................................................. 35
Figure 1-7: Land use pattern in 2002 .......................................................................................................... 38
Figure 1-8: Land use pattern in 2015 .......................................................................................................... 38
Figure 5-1: Department wise share in proposed plan ................................................................................ 65
Figure 5-2: Component-wise plan ............................................................................................................... 66
Figure 5-3: Block-wise share in plan ........................................................................................................... 70
Figure 5-4: Department wise share in proposed plan ................................................................................ 71
Figure 5-5: Component-wise Plan ............................................................................................................... 72
Figure 5-6: Department wise share in proposed plan ................................................................................ 73
Figure 5-7: Component-wise Plan ............................................................................................................... 74
Figure 5-8: Department wise share in proposed plan ................................................................................ 75
Figure 5-9: Component-wise Plan ............................................................................................................... 76
Figure 5-10: Department wise share in proposed plan .............................................................................. 77
Figure 5-11: Component-wise Plan ............................................................................................................. 78
Map 1.1: Location Map of Bilaspur ............................................................................................................. 24
Map 1.2: Drainage map of Bilaspur (pre monsoon) ................................................................................... 32
Map 1.3: Drainage map of Bilaspur (Post-monsoon).................................................................................. 33
Map 1.4: Soil map of Bilaspur ..................................................................................................................... 37
Map 1.5: Land use map of Bilaspur (2002) ................................................................................................. 40
Map 1.6: Land use map of Bilaspur (2015) ................................................................................................. 41
Map 3.1: Hydrogeology of Bilaspur ............................................................................................................ 50
9 | P a g e
Executive summary
In an agrarian economy like India, agriculture utilizes the major share of country’s exploitable
water resources. Though the sector utilizes the maximum share of exploitable water resources,
availability of the same at different locations to different extent makes it vital to adopt effective
utilization of water through storage, channelizing and judicial use. At some places like Punjab and
Haryana, the environmental and socio-economic rationale for this capture by the sector is now
being questioned. Accordingly, it is needed to challenge and change the fundamentals of the
prevailing view of water resources exploitation. A new and more suitable approach to water
resources allocation is necessary if the population is to be adequately fed, without further
degradation and destruction of the critical ecosystem services. Water productivity needs to be
enhanced considerably, and economic cost-benefit analysis and pricing regimes can play a
significant role in such a process. However, these economic measures will not be sufficient on
their own. They will need to be buttressed by technological innovation and institutional changes
in order to encourage a more equitable distribution of resources and to mitigate potential
international conflicts across 'shared' water basins.
Water has unique characteristics that determine both its allocation and use as a resource by
agriculture. Agricultural use of water for irrigation is itself contingent on land resources. In a
situation of growing water scarcity and rising demands for non-agricultural (household and
industrial) use of water, reassessment of sectoral allocations of water are inevitable. In developing
countries, irrigated agriculture plays a vital role in contributing towards domestic food security
and poverty alleviation. Therefore, achievement of these objectives is dependent on adequate
allocations of water to agriculture. Justification of such allocations requires that irrigated
agriculture be a cost-effective means of achieving stated political or social objectives, such as food
security or poverty alleviation, and that all externalities be taken into account in the pricing
mechanism. Improved allocation of irrigation water is required within the agriculture sectors in
order to achieve greater efficiency in the use of irrigation water and existing irrigation
infrastructure. Reallocation is also required in order to reduce waterlogging and salinization of
irrigated land, to decrease the negative environmental impacts and other externalities of
irrigation (caused by overextraction of groundwater and depletion and pollution of surface water).
Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to address the
constraints in providing assured irrigation as well as increasing efficiency and productivity of
10 | P a g e
current water use to bring more prosperity to the rural areas. Priorities of Government of India
were reflected in the Hon’ble President’s address to the joint Session of the Parliament of 16th
Lok Sabha where he indicated that “Each drop of water is precious. Government is committed to
giving high priority to water security. It will complete the long pending irrigation projects on
priority and launch the ‘Pradhan Mantri Krishi Sinchayee Yojana’ with the motto of ‘Har Khet Ko
Pani’. There is a need for seriously considering all options including linking of rivers, where
feasible; for ensuring optimal use of our water resources to prevent the recurrence of floods and
drought. By harnessing rain water through ‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water
conservation and ground water recharge. Micro irrigation will be popularised to ensure ‘Per drop-
More crop”.
PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five years
from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of Ministry
of Water Resources, River Development and Ganga Rejuvenation, Ministry of Agriculture &
Cooperation and Ministry of Rural Development. The existing schemes AIBP, CADWM, MI,
SWMA, Watershed & Convergence with MGNREGA were brought together under the umbrella
program of PMKSY. Further the scheme seeks convergence with scheme like Mahatma Gandhi
National Rural Employment Guarantee Scheme (MGNRES), Rashtriya Krishi Vikas Yojana
(RKVY), Jawaharlal Nehru National Solar Mission and Rural Electrification programmes
(JLNNSM&REP), Rural Infrastructure Development Fund (RIDF), Members of Parliament Local
Area Development Scheme (MPLAD), Members of Legislative Assembly Local Area Development
Fund (MLALAD), Local Body Funds (LBF), Working Plan of State Forest Department (WPSFD)
etc. The PMKSY will be implemented in an area development mode only by adopting a
decentralized state level planning and projectised execution structure that will allow the state to
draw up their own irrigation development plans based on DIPs and SIPs with a horizon of 5-7
years. The program will be supervised and coordinated utilizing the existing mechanism and
structure available under Rashtriya Krishi Vikas Yojana (RKVY) program with state agriculture
department acting as the State Nodal Agency for implementation of PMKSY. However, the
implementing departments for the four components like AIBP, PMKSY (Har Khet Ko Pani),
PMKSY (Per drop more crop) and PMKSY (watershed development) will be decided by the
respective program ministry/department.
The 05 chapters along with introduction chapter, explains the profile of district, its water
requirement for agriculture and allied sector, water availability, assessment of water requirement
for various sectors and strategic action plan for augmentation and effective management of
11 | P a g e
available water resources.
District Demography: Bilaspur district which forms the north-western portion of the southern
Himachal Pradesh, is located between 310 12’ 30” and 310 35’45” North latitudes and 760 23’ 30”
and 760 55’ 40” East longitudes. The district has a three blocks viz. Bilaspur Sadar, Ghumarwin
and Jhanduta. The total population of the district is 3,81,956, out of which population of female
and male are 1,89,192 and 1,92,764 (census 2011).
Agriculture in Bilaspur: It has been observed from records of Revenue department in the
district that the Gross Cropped Area is 56,901 hectare out of which 14,604 hectare and 13,544
hectare i.e. around 26% and 24% of the area falls in Ghumarwin and Jhandutta Tehsil
respectively. Ghumarwin and Jhandutta Tehsil also records for maximum net sown area of 7354
hectare and 6789 hectares i.e. around 25% and 23% of the net sown area of the district. The
cropping intensity in Jhandutta Tehsil is 199.5% which is highest among other Tehsils in the
district. For rest of the Tehsils, the average cropping intensity is 193%.
As reported by Revenue Department of the district, the total irrigated area in the district is 5,299
hectare which covers only around 10% of the gross cropped area i.e. 51,169 ha. The total cropped
area during Rabi is 31935 ha, of which only 8.4% is irrigated and remaining is under rainfed
cultivation. A total of 6235 hectare is utilized for cultivation of Horticultural and Plantation crops,
out of this irrigated area is to the extent of 20% of the total area covered under this category of
crops.
The major proportion of land in the district is used for cultivation of cereals. Considering all the
blocks, cereals occupy more than 96% of the gross cropped area under agriculture. Wheat, Maize
and Paddy are the three major cereals crops in Bilaspur district. The other food crops which are
grown in the district are Gram, Mash, Sesamum, Mustard and vegetables (Toria, Gobi, Lime and
others). Among the horticulture crops, the most significant ones are Mango, Aonla, Plum and
Litchi.
District Water Profile: As reported by the IPH Bilaspur, only lift irrigation system prevails in
the district. The facility of irrigation through canal is not available in the district. Through LIS, a
total area of 899.98 hectare and 967.5 hectare is being irrigated during Kharif and Rabi season
respectively.
There has been no assessment of availability of ground water in Bilaspur district by Central
Ground Water Board and hence the potential/ availability of ground water in the district cannot
12 | P a g e
be commented upon. Among the ground water sources, 444 Borewells and 135 electricity pumps
are available in the district but these are with individual for personal use (irrigation and other
purpose).
Demand for water sources and the gap: The present water demand of the district has been
assessed at 96.75 MCM annually, with Ghumarwin being the block with maximum requirement
of water. Shri Nainadevi and Bilaspur Sadar blocks stand at 2nd and 3rd position with
approximately 23% and 22% of total water required by district. During 2020, the demand shall
be proportionate to the current water demand and total water requirement has been assessed at
99.2 MCM. The total water gap for the district has been estimated at 66.3 MCM during 2020. The
gap is maximum in case of Ghumarwin with 23.2 MCM followed by Jhandutta (15.7 MCM) and
Bilaspur Sadar (15.3 MCM).
Component wise proposed plan: The plan is prepared component wise also. Table below
shows component wise plan for 4 years starting from 2016-17 to 2019-20. AIBP component has
to be executed mainly by Irrigation and Public Health Department. Per Drop More Crop
components will be executed by Agriculture and Horticulture departments mainly. All the
stakeholders need to have coordination among themselves to have the maximum irrigation
efficiency and to avoid duplicity. It is observed that maximum share of 57.91% is for Har Khet ko
Pani followed by PMKSY Watershed 24.51% and Per Drop More Crop- Supplementary Water
Management activities (5.59%).
Component-wise plan
Component wise Year
Total 2016-17 2017-18 2018-19 2019-20
Accelerated Irrigation Benefitted Programme (AIBP)
76.2 147.4 122.4 0.0 346.0
PMKSY-Har Khet Ko Pani (HKKP) 1265.8 2421.0 2438.9 1404.6 7530.3
i) PDMC-Micro-irrigation 139.0 139.0 139.0 139.0 556.0
ii) PDMC-Supplementary Water Management activities
164.6 177.6 193.6 190.6 726.4
iii) PDMC-Ext. And Trg. Under ATMA
13.3 13.3 13.3 13.3 53.4
PMKSY -Watershed 637.3 796.6 796.6 956.0 3186.6
Convergence with MGNREGS 120.8 151.1 151.1 181.3 604.2
Total 2417.1 3846.0 3855.0 2884.8 13002.9
13 | P a g e
INTRODUCTION
Background
Preparation of decentralized area specific district planning process visualized in various plans
took concrete shape through the years and initiatives like specific guidelines on methodologies
and processes for preparation of district plans; framework for preparation of perspective plan,
medium term and annual plans by then planning commission in 1969 and the 73rd and 74th
constitutional amendments conferring constitutional status to Panchayats at district and sub
district level; local self-government in urban areas; constitution of district planning committee to
consolidate the plans prepared at Panchayats and municipalities and prepare a draft development
plan for the whole district.
The decentralized planning process was further strengthened through emphasis by planning
commission on preparation of district level plans and making it an integral part of the process of
preparation of the states 11th five year plan. The Planning commission issued guidelines in August
2006 for preparation of the district plans. The guidelines define the District Planning as ‘the
process of preparing an integrated plan for the local government sector in a district taking into
account the resources (natural, human and financial) available and covering the sectoral activities
and schemes assigned to the district level and below and those implemented through local
governments in a state. The document that embodies this statement of resources and their
allocation for various purposes is known as the District Plan”.
Government of India through a resolution in National Development Council on 29th May 2007
conceived a special Additional Central Assistance Scheme (ACAS) to address the slow growth of
agriculture and allied sectors by incentivizing states to draw up plans for their agriculture sectors
more comprehensively. The NDC resolution states "GoI will introduce a new Additional Central
Assistance Scheme to incentivize states to draw up plans for their agriculture sector more
comprehensively, taking agro-climatic conditions, natural resource issues and technology into
account, and integrating livestock, poultry and fisheries, etc. This will involve a new scheme for
Additional Central Assistance (ACA) to State Plans, administered by the Union Ministry of
Agriculture over and above its existing Centrally Sponsored Schemes, to supplement the State-
14 | P a g e
specific strategies including special schemes for beneficiaries of land reforms. The newly created
National Rainfed Area Authority will, on request, assist States in planning for rainfed areas".
The NDC in its resolution advised the states to prepare a comprehensive district agriculture plans
(C-DAP) that will fully utilize available resources and will include allied agriculture sectors.
Further, GOI issued a manual on preparation of comprehensive district agriculture plans to help
the states prepare C-DAP. As per these guidelines, the objective of district planning is ‘to design
an integrated and participatory action plan for the development of local area in general and
agriculture and allied sectors in particular’. The objectives of Comprehensive District Agriculture
Plan (C-DAP) are:
To prepare a Comprehensive District Agriculture Plan (C-DAP) through participatory
process involving various organisations and stakeholders.
To enable optimum utilisation of scarce natural, physical & financial resources.
To assess and plan for the infrastructure required to support the agriculture development.
To establish linkages with the required institutional support services, like credit, technology
transfer, ICT, research etc.
To evolve an action plan for achieving sustainable agricultural growth with food security and
cropping system that will improve farmers’ income.
The guidelines required the state/district authorities to (i) ensure that the agricultural plans are
prepared for the district and then integrated into the agricultural plans of the State based on the
agro-climatic conditions, availability of technology, trained manpower and natural resources; (ii)
local needs / crops / feed and fodder / animal husbandry / dairying / fisheries / priorities are
reflected in the plan; (iii) productivity gaps for important crops and livestock and fisheries are
reduced; and (iv) the returns to the farmers from these are maximized.
The latest move in the process of strengthening of decentralized planning process was the
Government of India guidelines issued in 2015 in the form of a template for the preparation of
District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as part of the Pradhan Mantri Krishi
Sinchayee Yojana (PMKSY) program and made the preparation of DIP and SIP mandatory for the
states to receive funds from the program. The present report is a product of these long drawn
efforts of Government of India to strengthen the decentralized planning process in the country
focusing on the vital resource i.e., water.
Water is of vital importance for human & animal life, maintenance of ecological balance and
15 | P a g e
promotion of developmental activities. Considering its vital importance and ever increasing
demand for water, in the face of population growth, urbanization & industrialization and
considerations of climatic change, making water, an increasingly a scarce resource, available to
multiple uses, planning and management of this vital resources, utilization of water economically,
optimally and equitably assumes greater importance.
According to the 12th Five year Plan the water budget estimates of India by Ministry of Water
Resources suggests an availability of 1123 billion cubic meters (BCM) against a current estimated
demand of 710 BCM. The Standing Committee of the Ministry of Water Resources estimates that
this water demand will rise to 1093 BCM by 2025. Though the existing water availability in the
immediate future seems to be adequate, with the near constant supply of water resources in the
face of increasing demand on account of population growth, urbanisation and industrialization
will strain the water supply-demand balance.
The per capita water availability which stood at 5,177 cubic meters in 1951 was reduced to 1820
cubic meters in 2001 while the international prescribed limit is 1800 cubic meters. The projected
per capita availability of water is 1341 cubic meters in 2025 and 1140 cubic meters in 2050
suggesting shortage of water in the medium term1. Further, the all India water balance estimates
does not reflect the variations in water balance across time and space- certain areas having a
positive water balance and the others facing acute shortage. The problem is further accentuated
by water quality related issues.
With the abundant surface and ground water supply in the first five decades since independence,
more than 80 percent of the total available water resources were allocated for irrigation purposes
and the rest meeting the domestic and industrial demands. In a recent study2on the demand for
water from agriculture, domestic and industrial uses in 2000, 2025 and 2050 seems to suggest
that domestic demand (34 BCM in 2000, 66 BCM in 2025 and 101 BCM in 2050) and industrial
demand (42 BCM in 2000, 92 BCM in 2025 and 161 BCM in 2050) for water will utilize the total
balance water available while agriculture demand for water will be (605 BCM in 2000, 675 BCM
in 2025 and 637 BCM in 2050). This change is partly because of the changing sectoral
contributions of India’s GDP and also partly because of dynamics of irrigation development in the
1Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, Government of India, New
Delhi.
2Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007. India’s water future to 2025-
2050:Business-as-usual scenario and deviations. Research Report 123, International Water Management
Institute, Colombo.
16 | P a g e
country where the initial expansion in area under irrigation is propelled by the availability of
abundant water resources and availability of good quality land. This is no longer the case in many
of the states where the availability of land and water are serious constraints for further expansion
of irrigation. Further, as per the erstwhile planning commission up to March 2012 out of 141
million hectares of net sown area in the country 114 (or 81%) million hectares is Irrigation
Potential Created (IPC) and 88 (or 62%) million hectares is Irrigation Potential Utilised (IPU)
leaving almost 20% of irrigated potential unutilized. This leaves 40 percent of the net sown area
in the country dependent on rainfall which makes farming a high risk and less productive.
The competing demands for water resources and the emerging issues and concerns were to be
addressed through certain basic principles and commonality in approaches in dealing with
planning, development and management of water resources3 under an Integrated Water Resource
Management framework. The main objectives of water resource management as delineated in
National Water Policy 2012 are:
(i) Planning, development and management of water resources need to be governed by common
integrated perspective considering local, regional, State and national context, having an
environmentally sound basis, keeping in view the human, social and economic needs.
(ii) Principle of equity and social justice must inform use and allocation of water.
(iii) Good governance through transparent informed decision making is crucial to the objectives
of equity, social justice and sustainability. Meaningful intensive participation, transparency and
accountability should guide decision making and regulation of water resources.
(iv) Water needs to be managed as a common pool community resource held, by the state, under
public trust doctrine to achieve food security, support livelihood, and ensure equitable and
sustainable development for all.
(v) Water is essential for sustenance of eco-system, and therefore, minimum ecological needs
should be given due consideration.
(vi) Safe Water for drinking and sanitation should be considered as pre-emptive needs, followed
by high priority allocation for other basic domestic needs (including needs of animals), achieving
food security, supporting sustenance agriculture and minimum eco-system needs. Available
3Ministry of Water Resources, National Water Policy, 2012, Government of India, New Delhi.
17 | P a g e
water, after meeting the above needs, should be allocated in a manner to promote its conservation
and efficient use.
(vii) All the elements of the water cycle, i.e., evapo-transpiration, precipitation, runoff, river, lakes,
soil moisture, and ground water, sea, etc., are interdependent and the basic hydrological unit is
the river basin, which should be considered as the basic hydrological unit for planning.
(viii) Given the limits on enhancing the availability of utilizable water resources and increased
variability in supplies due to climate change, meeting the future needs will depend more on
demand management, and hence, this needs to be given priority, especially through (a) evolving
an agricultural system which economizes on water use and maximizes value from water, and (b)
bringing in maximum efficiency in use of water and avoiding wastages.
(ix) Water quality and quantity are interlinked and need to be managed in an integrated manner,
consistent with broader environmental management approaches inter-alia including the use of
economic incentives and penalties to reduce pollution and wastage.
(x) The impact of climate change on water resources availability must be factored into water
management related decisions. Water using activities need to be regulated keeping in mind the
local geo climatic and hydrological situation.
Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to address the
constraints in providing assured irrigation as well as increasing efficiency and productivity of
current water use to bring more prosperity to the rural areas. Priorities of Government of India
were reflected in the Hon’ble President’s address to the joint Session of the Parliament of 16th Lok
Sabha where he indicated that “Each drop of water is precious. Government is
committed to giving high priority to water security. It will complete the long
pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi
Sinchayee Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for
seriously considering all options including linking of rivers, where feasible; for
ensuring optimal use of our water resources to prevent the recurrence of floods
and drought. By harnessing rain water through ‘Jal Sanchay’ and ‘Jal Sinchan’,
we will nurture water conservation and ground water recharge. Micro irrigation
will be popularised to ensure ‘Per drop-More crop”.
PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five years
from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of Ministry
18 | P a g e
of Water Resources, River Development and Ganga Rejuvenation, Ministry of Agriculture &
Cooperation and Ministry of Rural Development. The existing schemes AIBP, CADWM, MI,
SWMA, Watershed & Convergence with MGNREGA were brought together under the umbrella
program of PMKSY. Further the scheme seeks convergence with scheme likeMahatma Gandhi
National Rural Employment Guarantee Scheme (MGNRES), Rashtriya Krishi Vikas Yojana
(RKVY), Jawaharlal Nehru National Solar Mission and Rural Electrification programmes
(JLNNSM&REP), Rural Infrastructure Development Fund (RIDF), Members of Parliament Local
Area Development Scheme (MPLAD), Members of Legislative Assembly Local Area Development
Fund (MLALAD), Local Body Funds (LBF), Working Plan of State Forest Department (WPSFD)
etc. The PMKSY will be implemented in an area development mode only by adopting a
decentralized state level planning and projected execution structure that will allow the state to
draw up their own irrigation development plans based on DIPs and SIPs with a horizon of 5-7
years. The program will be supervised and coordinated utilizing the existing mechanism and
structure available under Rashtriya Krishi Vikas Yojana (RKVY) program with state agriculture
department acting as the State Nodal Agency for implementation of PMKSY. However, the
implementing departments for the four components like AIBP, PMKSY (Har Khet Ko Pani),
PMKSY (Per drop more crop) and PMKSY (watershed development) will be decided by the
respective program ministry/department.
The funds under this program would be provided to the states as per the pattern of assistance of
Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance and NITI Aayog. During
2015-16 the existing pattern of assistance of ongoing scheme was continued. An outlay of Rs.
50,000 crore has been approved for 2015-20. The financial assistance provided to the state
governments from this centrally sponsored scheme is subject to fulfillment of certain
conditions.Firstly, a state will become eligible to access PMKSY fund only if it has prepared the
District Irrigation Plans (DIP) and State Irrigation Plan (SIP), excepting for the initial year, and
the expenditure in water resource development for agriculture sector in the year under
consideration is not less than the baseline expenditure, which is defined as the average of the
expenditure in irrigation sector irrespective of the department in the state plan in three years prior
to the year under consideration. Secondly, States will be given additional weightage for levying
charges on water and electricity for irrigation purposes, so as to ensure sustainability of the
programme. Thirdly, interstate allocation of PMKSY fund will be decided based on
19 | P a g e
share of percentage of unirrigated area in the state vis-à-vis national average including
prominence of areas classified under Desert Development Programme (DDP) and Drought
Prone Area Development Programme (DPAP)
increase in percentage share of expenditure on water resource development for agriculture
sector in State Plan expenditure in the previous year over three years prior to it and
improvement in irrigation efficiency in the state.
Vision
The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be to ensure
access to some means of protective irrigation to all agricultural farms in the country, to produce
‘per drop more crop’, thus bringing much desired rural prosperity.
Objective
The objectives of the PMKSY are to :
a) Achieve convergence of investments in irrigation at the field level (preparation of district level
and, if required, sub district level water use plans).
b) Enhance the physical access of water on the farm and expand cultivable area under assured
irrigation (Har Khet ko Pani),
c) Integration of water source, distribution and its efficient use, to make best use of water through
appropriate technologies and practices.
d) Improve on-farm water use efficiency to reduce wastage and increase availability both in
duration and extent,
e) Enhance the adoption of precision-irrigation and other water saving technologies (More crop
per drop).
f) Enhance recharge of aquifers and introduce sustainable water conservation practices
g) Ensure the integrated development of rainfed areas using the watershed approach towards soil
and water conservation, regeneration of ground water, arresting runoff, providing livelihood
options and other NRM activities.
h) Promote extension activities relating to water harvesting, water management and crop
alignment for farmers and grass root level field functionaries.
i) Explore the feasibility of reusing treated municipal waste water for peri-urban agriculture, and
20 | P a g e
j) Attract greater private investments in irrigation.
Strategy/approach
To achieve these objectives PMKSY adopted strategies that include
a) Creation of new water sources; repair, restoration and renovation of defunct water sources;
construction of water harvesting structures, secondary & micro storage, groundwater
development, enhancing potentials of traditional water bodies at village level like Jal Mandir
(Gujarat); Khatri, Kuhl (H.P.); Zabo (Nagaland); Eri, Ooranis (T.N.); Dongs (Assam); Katas,
Bandhas (Odisha and M.P.) etc.
b) Developing/augmenting distribution network where irrigation sources (both assured and
protective) are available or created;
c) Promotion of scientific moisture conservation and run off control measures to improve ground
water recharge so as to create opportunities for farmers to access recharged water through shallow
tube/dug wells;
d) Promoting efficient water conveyance and field application devices within the farm viz,
underground piping system, Drip & Sprinklers, pivots, rain-guns and other application devices
etc.;
e) Encouraging community irrigation through registered user groups/farmer producers’
organisations/NGOs; and
f) Farmer oriented activities like capacity building, training and exposure visits, demonstrations,
farm schools, skill development in efficient water and crop management practices (crop
alignment) including large scale awareness on more crop per drop of water through mass media
campaign, exhibitions, field days, and extension activities through short animation films etc.
Programme Components
PMKSY has following four components:
Accelerated Irrigation Benefit Programme(AIBP) a) To focus on faster completion of
ongoing Major and Medium Irrigation including National Projects.
PMKSY (Har Khet ko Pani) a) Creation of new water sources through Minor Irrigation (both
surface and ground water) b) Repair, restoration and renovation of water bodies; strengthening
carrying capacity of traditional water sources, construction rain water harvesting structures (Jal
Sanchay); c) Command area development, strengthening and creation of distribution network
21 | P a g e
from source to the farm; d) Ground water development in the areas where it is abundant, so that
sink is created to store runoff/ flood water during peak rainy season. e) Improvement in water
management and distribution system for water bodies to take advantage of the available source
which is not tapped to its fullest capacity (deriving benefits from low hanging fruits). At least 10%
of the command area to be covered under micro/precision irrigation. f) Diversion of water from
source of different location where it is plenty to nearby water scarce areas, lift irrigation from
water bodies/rivers at lower elevation to supplement requirements beyond IWMP and
MGNREGS irrespective of irrigation command. g) Creating and rejuvenating traditional water
storage systems like Khatri, Kuhl etc. at feasible locations.
PMKSY (Per Drop More Crop) a) Programme management, preparation of State/District
Irrigation Plan, approval of annual action plan, Monitoring etc. b) Promoting efficient water
conveyance and precision water application devices like drips, sprinklers, pivots, rain-guns in the
farm (Jal Sinchan); c) Topping up of input cost particularly under civil construction beyond
permissible limit (40%), under MGNREGS for activities like lining inlet, outlet, silt traps,
distribution system etc. d) Construction of micro irrigation structures to supplement source
creation activities including tube wells and dug wells (in areas where ground water is available
and not under semi critical /critical /over exploited category of development) which are not
supported under AIBP, PMKSY (Har Khet ko Pani), PMKSY (Watershed) and MGNREGS as per
block/district irrigation plan. e) Secondary storage structures at tail end of canal system to store
water when available in abundance (rainy season) or from perennial sources like streams for use
during dry periods through effective on-farm water management; f) Water lifting devices like
diesel/ electric/ solar pumpsets including water carriage pipes, underground piping system. g)
Extension activities for promotion of scientific moisture conservation and agronomic measures
including cropping alignment to maximise use of available water including rainfall and minimise
irrigation requirement (Jal Sarankchan); h) Capacity building, training and awareness campaign
including low cost publications, use of pico projectors and low cost films for encouraging potential
use water source through technological, agronomic and management practices including
community irrigation. i) The extension workers will be empowered to disseminate relevant
technologies under PMKSY only after requisite training is provided to them especially in the area
of promotion of scientific moisture conservation and agronomic measures, improved/ innovative
distribution system like pipe and box outlet system, etc. Appropriate Domain Experts will act as
Master Trainers. j) Information Communication Technology (ICT) interventions through NeGP-
A to be made use in the field of water use efficiency, precision irrigation technologies, on farm
water management, crop alignment etc. and also to do intensive monitoring of the Scheme.
22 | P a g e
PMKSY (Watershed Development)
a) Effective management of runoff water and improved soil & moisture conservation activities
such as ridge area treatment, drainage line treatment, rain water harvesting, in-situ moisture
conservation and other allied activities on watershed basis. b) Converging with MGNREGS for
creation of water source to full potential in identified backward rainfed blocks including
renovation of traditional water bodies
Rationale/ Justification
In reference to the status and need of irrigation, the water resource management including
irrigation related priorities was identified for Bilaspur district by the peoples’ representatives of
district with support from administration and technical experts. For instance the reports of
Strategic Research and Extension Plan (SREP) prepared under ATMA program, Comprehensive
District Agriculture Plan (C-DAP) prepared as part of Rashtriya Krishi Vikas Yojana (RKVY),
Potential Linked Credit Plans (PLP) of NABARD and the Integrated District Development Plan
etc. identified number of irrigation related issues for Bilaspur district including (i) promoting
water use efficiency through sprinkler and drip irrigation; (iii) promoting protected polyhouse
cultivation to minimize risk factors and enhance quality and productivity; (iv) Improvement of
on-farm water delivery and efficiency of existing irrigation systems; (v) promotion of soil
conservation of arable & non-arable land through engineering measures; (vi) creation of new
water harvesting structures, check dams, ponds, tanks, etc (vii) increase the forest cover in the
district and (viii) land improvement measures.
Methodology
During the course of preparation of District Irrigation Plan (DIP) the team visited Bilaspur district
to collect data and have interaction with all the stakeholders. Methodology adopted to prepare
DIP is outlined in brief as under:
Collection of primary and secondary data from field from various sources including
published documents and websites.
Various meetings were held to obtain ground level realities and data from key
personnel/stakeholders through structured, unstructured interviews, focused group
discussions etc.
Meetings with various State Government departments and related institutions were held
Meeting through VC was also held with State Level authorities.
23 | P a g e
GIS maps of the area’s/clusters were studied to understand the land morphology,
topography of the district.
Focused group discussions and interaction with of agriculture officers, horticulture officers,
soil conservation officers, extension officers, rural development department, animal
husbandry department, irrigation officers both at blocks and district level for identifying
the key issues and focus areas of the region.
Discussion with NABARD officer of Bilaspur district was also held during the visit.
Team members also participated in the State Level workshop and held active discussions with
GoI officers, State Level officers and scientists of various institutions
On the basis of detailed discussion and analysis of data, the team arrived at the projections of
various components of PMKSY and Department wise plan for four years from 2016-17 to 2019-20
as detailed in the plan.
24 | P a g e
Chapter 1 : General Information of the District
1.1 District Profile
Bilaspur district which forms the north-western portion of the southern Himachal Pradesh, is
located between 310 12’ 30” and 310 35’45” North latitudes and 760 23’ 30” and760 55’ 40” East
longitudes. District of Bilaspur lies on the north and north-western side of Bilaspur and district
of Una is situated on the north-eastern sidewith district of Mandi on the eastern side. This district
is bounded by Solan district from south and south-east and by state of Punjab from the western
portion of the district. The district is predominantly located on the lower basin of the Satluj River.
The district is 47 km length-wise (from east to west) and 42 km breadth-wise (from north to
south). Map 1.1 represents the location of district in state of Himachal and also indicates all the
blocks of district.
Map 1.1: Location Map of Bilaspur
25 | P a g e
Bilaspur had been a town in 1891 and 1901 Censuses but was declassified thereafter in the year
1911. In 1931 Census, it was again classified as town and has been continuing as such since then.
Naina Devi a place of religious importance was declared as town for the first time in 1953. A small
town committee was setup to look after the affairs of this place till 1960. In the year 1961 it was
notified as municipal committee. After 1981 Census, one more place Shah Talai has been
classified as notified area committee.
Table 1.1: General profile of Bilaspur
Name of the District
District Code Latitude Longitude
Bilaspur 030 310 12’ 30” and 310 35’45” North 760 23’ 30” and760 55’ 40” East
Source: Census of India
Administrative setup of Bilaspur
For administrative purposes, the district is divided into two Sub-divisions namely Bilaspur and
Ghumarwin. Bilaspur Sub-division comprises of tehsil Bilaspur Sadar, tehsil Naina Devi, sub-
tehsil Namhol and Ghumarwin Sub-Division comprises of Tehsil Ghumarwin, Jhanduta and sub-
tehsil Bharari. There are three Municipal Committees i.e. Bilaspur, Ghumarwin and Naina Devi
and one Nagar Panchayat i.e. Talai. For the development activities, the district is divided into
three Community Development Blocks namely Bilaspur Sadar, Ghumarwin and Jhanduta.
The administrative head of the district is Deputy Commissioner who is assisted by one Additional
Deputy Commissioner and an Assistant Commissioner in discharging the administrative and
Deputy Commissioner
Additional Deputy Commissioner
AC to DC SDM Sadar
Tehsildar
Naib Tehsildar
SDM Ghumarwin
Tehsildar
Naib-tehsildar
Figure 1-1: Administrative Setup of Bilaspur
26 | P a g e
other executive functions. At sub-divisional level, Sub-Divisional Officer (Civil) is in-charge of
sub-division while at tehsil/sub-tehsil level, Tehsildar and Naib-Tehsildar is responsible for
discharging executive and revenue related functions respectively. Block Development Officer is
posted in each CD Block to co-ordinate and supervises the developmental activities assigned to
Gram Panchayats in their areas.
The district has judicial officers in the rank of District & Session Judge, a Sr. Sub-Judge-cum CJM
and a Sub-Judge- cum- JM. The head of the district police force is Superintendent of Police and
is assisted by one Additional Superintendent of Police (ASP) and a Deputy Superintendent of
Police (Hqrs.) in maintaining the law and order in the district.
The Public Works Department of the district is looked after by Superintending Engineer,
Irrigation & Public Health by Executive Engineer and State Electricity Board is having one SE
(Operation) and another SE (M&T). Every department maintains its senior officers and staff at
district level to implement the developmental schemes pertaining to it. The forest in the district
is managed by one Conservator of Forests, two Divisional Forest Officers and Range Officer.
Education Department is having one Deputy Director for Secondary and another Deputy Director
for Primary Education in the district.
Table 1.2: Administrative setup of Bilaspur No of Sub-Division 2 (Sadar and Ghumarwin) No. of Tehsils 4 (Sadar, Ghumarwin, Jhandutta, Sri Naina Devi Ji at Swarghat] No. of Sub-tehsil 2 (Namhol, Bharari) No. of Development Blocks 4 (Sadar, Ghumarwin, Jhandutta, Sri Naina Devi Ji at Swarghat) No. of Panchayats 151 No. of Villages 1080
Local Urban Bodies Nagar Parishad: Bilaspur, Ghumarwin and Sri Naina Devi Ji Nagar Panchayat: Talai
Source: www.hpbilaspur.nic.in
Zila Parishad & Panchayat Samities
The Zila Parishad elects its President, Vice President and Chairman of its committees from
amongst the elected members. The terms of these elected members is five years. A senior I.A.S.
Officer is assigned the functions of the Chief Executive Officer of the Zila Parishad who happens
to be the Deputy Commissioner of the district. The Parishad is also assisted by various
departments of the district. At the Block level, the Panchayat Samities have an elected Chairman
and Deputy Chairman. The Block Development Officer works as Secretary to the Panchayat
Samiti. The Deputy Chief Executive Officer works as a Secretary of the General Body of the Zila
27 | P a g e
Parishad. Normally, the functions of Secretary are performed by either Additional Deputy
Commissioner or Additional District Magistrate.
Urban Local Bodies
The statutory Urban Local Bodies are Cantonments, Municipal Corporations, Municipal Councils
and Nagar Panchayats. The urban local bodies elect a councilor from each of the wards whose
term is five years. From among these elected councilor, Mayor and Deputy Mayor of the Municipal
Councils/ Nagar Panchayats are elected for a term of for five years. Apart from this, the Chairman
of various committees are also elected from amongst the elected councilors with a term of five
years. For day to day administration, the Executive Officer is responsible in a Municipal Council
and Nagar Panchayat. He works under the administrative control of the President of the
Municipal Council and Nagar Panchayat. In the Corporations, an I.A.S. or a senior H.A.S. officer
is deputed by the State Government as Municipal Commissioner who is responsible for day to day
administration and the executive authority lies in him.
1.2 Demography
As per 2011 census, the total population of the district was 3,81,956, out of which population of
female and male are 1,89,192 and 1,92,764. The district ranks 10th in population at state level and
constitutes 5.56 per cent of state population. When compared with data as per 2001 census, the
decadal growth in population of Bilaspur has been 12%, i.e. 1.2% growth per annum. Bilaspur
occupies fifth position in the state in terms of high sex ratio of 981 females per thousand males as
against state’s average of 972 females per 1000 male. With a literacy rate of 84.59%, Bilaspur
stands at 4th position, slightly above to the state literacy rate of 82.8%. For male population, the
literacy rate is 91.16% while it is comparatively low for females at 77.97%. Also, worth mentioning
is the increase of 6.83% in the literacy rate of Bilaspur from 2001 to 2011.
Table 1.3: Demography of Bilaspur Block Male Female Children Total Ghumarwin 50048 51975 10355 102023 Jhandutta 57464 57033 12738 114497 Bilaspur Sadar 72141 68166 16408 140307 Ghumarwin (U) 4175 3724 815 7899 Talai (U) 1251 1121 233 2372 Sri Naina Devi (U) 645 559 151 1204 Bilaspur (U) 7040 6614 1256 13654 Total 192764 189192 41956 381956
Source: Census of India
28 | P a g e
Figure 1-2: Demography of Bilaspur
The population density of Bilaspur district as recorded by 2011 census is 327 people per sq. km.
which is 12% increase in density as compared to 292 people per sq. km as per 2001 census.
Compared to the population density of the state (123 person per sqkm), the current population
density of Bilaspur is on higher side.
Table 1.4: Category wise distribution of household in the blocks Block SC Household ST Household General Household
Ghumarwin 5192 252 17054 Jhandutta 6902 521 16991 Bilaspur Sadar 7187 1210 19403 Ghumarwin (U) 354 19 1423 Talai (U) 134 23 327 Sri Naina Devi (U) 24 243 Bilaspur (U) 651 37 2538 Total 20444 2062 57979 Source: Census of India
Total number of household in the district is 80,485, out of which 35% are in Bilaspur Sadar block,
30% in Jhandutta block and 21% are in Ghumarwin block. Bilaspur Sadar block is residence for
37% of the population of the district. The total number of SC and ST families in the district are
20,444 and 2062 respectively. In Jhandutta block, the number of SC household is 6902 which is
28% of total household in the block. The percentage of SC is 23% in Ghumarwin block and 26%
in Bilaspur Sadar block. In case of ST families, the percentage of ST household is maximum (4.4%
of the total household residing in the block) in Bilaspur Sadar block followed by 2.1% in Jhandutta
and 1.1% in Ghumarwin block. The number of ST families in Bilaspur Sadar is 1210 which is 59%
102023114497
140307
7899 2372 120413654
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
Ghumarwin Jhandutta Bilaspur Sadar Ghumarwin (U) Talai (U) Sri Naina Devi(U)
Bilaspur (U)
Male Female Children Total
29 | P a g e
of the total ST household in the district. In case of Jhandutta, the number of ST household is 521
which is 25% of the total ST household in the district.
Table 1.5: Category wise distribution of population in Bilaspur Block ST Population SC Population General Population Ghumarwin 1204 24177 76642 Jhandutta 2691 32617 79189 Bilaspur Sadar 6439 36864 96734 Ghumarwin (U) 72 1654 6173 Talai (U) 151 614 1607 Sri Naina Devi (U) 127 1077 Bilaspur (U) 36 2916 10702 Total 10593 98969 272124
Figure 1-3: Category wise distribution of population in the district
Source: Census of India
Out of the total population in the district (as per 2011 census), merely 6.57 % lives in urban areas
of district with a total of 25,129 people. Remaining 93.43% population i.e. 3,56,827 belong to rural
areas.
1.3 Biomass and Livestock
Livestock Population
Livestock rearing is an integral part of farming systems in the district. As per Livestock census
2012, a total of 3,06,062 livestock was recorded in the district. The district has seen a decrease of
approximately 3% in the total livestock population which was recorded as 3,15,434 during
Livestock census 2003. Compared to the data recorded during 2003 census, significant changes
haveoccurred in the population of Cows, Sheep, Goat and Poultry. The population of Poultry has
1204 2691 6439 72151 36
24177 32617 36864 1654 614 127 2916
7664279189
96734
61731607
1077
10702
0
20000
40000
60000
80000
100000
120000
140000
160000
Ghumarwin Jhandutta Bilaspur Sadar Ghumarwin (U) Talai (U) Sri Naina Devi(U)
Bilaspur (U)
ST Population SC Population General Population
30 | P a g e
shown decreaseof 10%, 52% decrease in Sheep and 12% decrease in number of Cows. In case of
Buffaloes and Goats, the population has increased by 3% and 12% respectively.
Table 1.6: Tehsil wise distribution of small animals Name of the Tehsil
Poultry Pigs Goats Sheep Total
Jhandutta 8458 58 15215 213 23944 Ghumarwin 43389 54 16164 471 60078 Bilaspur Sadar 4042 55 20211 708 25016 Naina Devi 39934 67 7654 31 47686 Total 95823 234 59244 1423 156724
Source: Livestock census
Regarding population of large animal, table 1.7 below may be referred. As depicted in the table,
Buffalo rearing has been observed as the most preferred choice by rural folks in this district.
Buffalo population accounts for 33% of the total animals followed by Poultry (31% ) and Goats
(19%). Presently, out of 3,06,062 animals in Bilaspur district, 35% of the livestock population is
reared in Ghumarwin Tehsil, 23% inNaina Devi Tehsil and 21% eachinJhandutta and Bilaspur
Sadar Tehsils.
Table 1.7: Tehsil wise distribution of large animals
Name of the Tehsil
Indigenous Cow Hybrid Cow
Hybrid Buffalo
Draft Animal
Total
Jhandutta 3742 6077 30020 197 40036 Ghumarwin 4295 4653 37402 378 46728 Bilaspur Sadar 9686 13049 16436 279 39450 Naina Devi 3999 2191 16728 206 23124 Total 21722 25970 100586 1060 149338
23944
60078
25016
47686
Jhandutta Ghumarwin Bilaspur Sadar Naina Devi
31 | P a g e
Source: Livestock census
Livestock Products
According to the record of Animal Husbandry department, milk production in the district has
increased from 68000 tonnes in 2010-11 to 69000 tonnes in 2013-14. The milk production at the
state level has also increased from 11 lakh to 11.5 lakh tonnes during the same period. Due to
increased production of milk in district and the state, the per capita availability of milk has
increased in district as well as state. During 2010-11, per capita availability of milk in the district
and the state was 489 gm and 441 gram respectively which has increased to 495 gm and 460 gm
in 2013-14.
In case of eggs, in 2010-11, total production in the district was 150 lakh which has increased to
165 lakh during 2013-14. During the same period, the changes in egg production in the state has
changed from 1021 lakh to 1057 lakh. Per capita availability of eggs in the district and state has
changed from 39 to 43 and 15 to 16 respectively.
Table 1.8: Availability of livestock products in Bilaspur
Item 2010-2011 2011-2012 2012-2013 2013-14 HP Dist HP Dist HP Dist HP Dist
Milk Production ('000 Tonnes)
1102 68 1120 67 1139 70 1151 69
Per Capita Availability of milk per day (gm)
441 489 447 480 455 501 460 495
Eggs Production (lakh No.) 1021 150 1050 159 1069 162 1075 165 Per capita Availability of eggs per year (number)
15 39 15 42 16 42 16 43
Meat Production (Tonnes) 3610 84 3966 87 3997 101 3986 110 Wool Production (Tonnes) 1639 10 1648 10 1650 10 1657 10
As depicted above, the production of meat in Bilaspur has seen a net growth during recent years.
In 2010-11, the total production of meat in the district was 84 tonnes which increased to 110
197
378
279
206
Jhandutta Ghumarwin Bilaspur Sadar Naina Devi
32 | P a g e
tonnes during 2013-14. The production of wool in the district has remained unchanged
throughout the period.
1.4 Agro-Ecology, Climate, Hydrology and Topography
Bilaspur district is located in Shivalik ranges and forms part of the lesser Himalayas. It has a
diverse landscape of hills, valleys with piedmont zone. There are seven main hill ranges i.e. Naina
Devi, Kot, jhanjiar, Tiun, Bandla, Bahaurpur and Ratanpur constituting the hill system. The
elevation of the lowest point is about 290 m amsl and of the highest peak i.e. Bhadurpur hill is
1980 m amsl.
The major river that passes through the middle of the district from east to west is Sutlej. It enters
the district near a place known as Kasol in the north-west and after traversing a course of 90 km,
it leaves near Naila and enters the territory of Punjab in the south-west. The Sutlej is joined by
several tributaries from both sides. The main three tributaries are Ali Khad, Gamrola Khad and
Seer Khad. The length of Ali Khad is about 26 km. It arises in Shimla district and after passing
through Bahadurpur Dhar joins the river Sutlej at Bilaspur. Gamrola Khad also arises in Shimla
district and after draining the RattanpurDhar joins the river about 5 km downwards from Bilaspur
Map 1.2: Drainage map of Bilaspur (pre monsoon)
33 | P a g e
town. Seer Khad which is the third tributary of Sutlej originates at Wah Devi which is 10 km from
Sarkaghat in Mandi district. After draining Kot-Ki-Dhar and a greater portion of Ghumarwin
tehsil, it joins Sutlej River at village Serimatla which is about 15 kms downwards from Bilaspur
town.
The drainage maps of district as given below indicates the flow of water bodies, streams and river
in Bilaspur. Map 1.2 depicts the amount of water before onset of monsoon and Map 1.3 illustrates
the presence of water post- monsoon. It can be clearly seen that during summer season, the
districts primarily is dry except the western and south western part where water body is situated.
However, after monsoon, all the tributaries and sub-tributaries throughout the district are
recharged. Due to high elevation, these tributaries join the main river.
Climate and Rainfall
The climate of this district is generally temperate. The terrain is mountainous, particularly in the portion of
the district to the southwest of Sutlej. The portion to the north and west of Sutlej is slightly hilly with
elevations generally between 500 and 700 m with some well-defined ridges going upto higher elevations.
Map 1.3: Drainage map of Bilaspur (Post-monsoon)
34 | P a g e
Table 1.9: Extremes of rainfall Month Normal Rainfall (mm) Number of rainy days January 64.9 3.8 February 65.4 3.8 March 59.8 3.7 April 28.5 2 May 44.4 3 Jun 110.9 5.6 July 333.8 13.9 August 310.5 13.8 September 158.3 7.1 October 30.2 1.6 November 15.4 1 December 34.6 2.1 Annual 1256.7 61.4
Source: Climatological Summaries of State, Series No. 15, GOI
As per District Agriculture plan, the records of rainfall in the district are available for three
stations, namely Bilaspur (Obsy), Bilaspur (Sadar) and Ghumarwinfor period ranging from 32 to 39
years. It has been observed that the monsoon rainfall occurs mainly during July to September,
with July being the month receiving maximum rainfall. The average annual rainfall in the district
is 1256.7 mm [refer table 1.9].
Temperature
There is only one observatory in the district located at Bilaspur. Climatic conditions prevailed at
Bilaspur may be taken to be broadly representative of the whole district, except for regions at
higher elevations where the temperatures would generally be less than those at Bilaspur. From
beginning of March, temperatures begin to rise steadily till June, which is usually the hottest
month of the year with the mean daily maximum temperature of 36.7 0C and the mean daily
0
2
4
6
8
10
12
14
16
0
50
100
150
200
250
300
350
400
Nu
mb
er o
f ra
iny
day
s
No
rmal
Rai
nfa
ll
Normal Rainfall (mm) Number of rainy days
Figure 1-4: Rainfall in the district
35 | P a g e
minimum temperature of 23.1 0C. With the advance of the southwest monsoon over the district
by about the beginning of July, the day temperature drops appreciably while the night
temperatures continue to be as warm as in June. After about the middle of September,
temperatures begin to decrease, the fall in night temperature being more rapid than that of day
temperature. January is the coldest month of the year with the mean daily minimum temperature
of 4.9 0C. In the cold season from December to February, the cold waves affect the district in wake
of passing western disturbances and at times minimum temperature may drop down to about
freezing point of water and frosts may occur.
Humidity
In the southwest monsoon season the values of relative humidity are high. The values of relative
humidity in the early mornings are generally high during throughout the year except in the latter
part of summer. In the summer, particularly in afternoons, the values of relative humidity are low
about 40 percent.
Cloudiness and Winds
As mentioned in District Agriculture plan, skies are usually clear or lightly clouded in the post
monsoon and winter season. Heavily clouded to overcast skies prevail in the southwest monsoon
season.
Figure 1-6: Wind speed in Bilaspur
90 8680
6453
66
87 90 89 85 87 89
6053 48
38 3547
6975
66
51 53 58
0
20
40
60
80
100
Relative Humidity (%) at 0830 IST Relative Humidity (%) at 1730 ISTFigure 1-5: Relative humidity in the district
36 | P a g e
1.5 Soil Profile
Bilaspur district is dominated with Brown Earths (Eutrochrepts and Hapludalfs) in gently sloping
lands of Shivaliks. The soils of side slope of Shiwalik hills are shallow to medium, excessively
drained, loamy skeletal (gravelly), coarse to fine loamy in texture with moderate to severe erosion.
These are slightly acidic to slightly alkaline with low to medium AWC. The soils are classified as
Ustorthents and Eutrochrepts.
Table 1.10: Soil classes in Bilaspur Major Soil Classes Area (Ha) Shallow to medium deep, loamy soils 1700 Medium deep to deep loamy soils 3100 Medium deep to deep, loamy-skeletal soils 95700 Medium deep, loamy, calcareous soils 4600 Shallow, sandy soils 4200 Deep, loamy soils 1350 Medium deep, loamy soils 1500
As indicated in Table 1.10, the soils on ridge tops are medium to deep, well to excessively drained,
loamy skeletal with severe to very severe erosion. The soils are slightly acidic to slightly alkaline
soils with low AWC. These have also been classified as Ustorthents and Eutrochrepts. The soils of
very gently to gently sloping piedmont plains are medium to deep, well drained, coarse loamy to
fine loamy with slight to moderate erosion. They are non-calcareous to calcareous and neutral to
moderately alkaline with medium to high AWC. These soils are mostly classified as Eutrochrepts
and Udifluvents. The nearly level to very gently active flood plains have deep, well to excessively
drained, mostly stratified, coarse loamy to fine loamy soils with slight erosion and stoniness.
These soils are mostly prone to slight to moderate flooding. The soils have been classified as
Ustifluvents and Psamments. The soils of district Bilaspur are low to medium in available N, P
and K. In Jukhala area of Sadar Block, deficiency of Zn has been observed. The soils of the district
are prone to water erosion. The soils are having low to medium status of organic carbon. With
some variation in valley areas where soils are deep fertile having good water holding capacity.
Contrarily, soils in Changar areas are shallow and stony. A few pockets in these situations are well
0
1
2
3
4
5
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual
37 | P a g e
drained and rich in organic matter. Whereas, a peculiar situation exists in the basin of
GovindSagar reservoir where soils are sandy, low in organic matter, neutral to alkaline having
poor water holding capacity [Map 4 depicts the soil map of the district]
Map 1.4: Soil map of Bilaspur
1.6 Soil Erosion and Runoff Status
Physiography of the area is dominated by irregular, undulating topography, shallow depth, steep
slopes, coarse texture, poor soil structure, scanty vegetative cover and erratic rainfall. Thus, the
soils are subjected to severe soil erosion during rainy season. During dry spell, the soil dries up
quickly due to evaporation and transpiration. The crops experience drought conditions and
consequently the crop yields are affected adversely. At times the extent of damage is alarming.
Undulating topography makes the development of irrigation facilities difficult.
38 | P a g e
Slope and aspect of an area are vital parameters in deciding suitable land use for the area, as the
degree and direction of the slope decide the land use that the area can support. Slope is also very
important while determining the land irritability and capability classification and has direct
bearing on the runoff. Slope and aspects are also helpful in prioritizing area for development
measures and in deciding sites for irrigation projects, afforestation programmes etc.
Due to topographical factors, the soil is subject to splash, sheet and Gully erosion resulting into
degradation of the soil. Besides this, there is biotic pressure on the lands to the curb this menace
particularly on the agricultural lands.
1.7 Land use Pattern
The total geographical area (TGA) of Bilaspur is 1,11,776 hectare. The largest Tehsil of the district
is Jhandutta which comprises of a TGA of 31,041 hectare i.e. about 28% of the TGA of the district.
The Figures 1.8& 1.9 indicate the change in land use pattern in the district. Notable attributes are
decrease of 12% in area under forest and slight increase of 1% in area under agriculture. Significant
increase of approximately 10 % has been observed in spread of Barren land over the period of 13
years.
It has been observed from records of Revenue department in the district that the Gross Cropped
Area of the district is 56,901 hectare out of which 14,604 hectare and 13,544 hectare i.e. around
26% and 24% of the area falls in Ghumarwin and Jhandutta Tehsil respectively. Ghumarwin and
Jhandutta Tehsil also records for maximum net sown area of 7354 hectare and 6789 hectares i.e.
0%17%
0%
73%
1%
9%
Landuse/Landcover Area in 2002 (%)
Builtup Land
Agricultural Land
River
Forest
Barren Land
Water Bodies
0%
18%
1%
61%
11%
9%
Landuse/Landcover Area in 2015 (%)
Builtup Land
Agricultural Land
River
Forest
Barren Land
Water Bodies
Figure 1-7: Land use pattern in 2002 Figure 1-8: Land use pattern in 2015
39 | P a g e
around 25% and 23% of the net sown area of the district. The cropping intensity in Jhandutta
Tehsil is 199.5% which is highest among other Tehsils in the district. For rest of the Tehsils, the
average cropping intensity is 193%.
Table 1.11: Land use pattern Name of the Tehsil TGA Area under Agriculture Area
under forest
Area under
wasteland
Area under other uses
GCA (1)
NSA (2)
AST (1-2)
Cropping intensity
(%) Bilaspur Sadar 17782 7383 3743 3640 197.2 1304 1134 11601 Ghumarwin 19082 14604 7354 7250 198.5 2535 1006 8187 Jhandutta 31041 13544 6789 6755 199.5 5173 1982 17077 ShNaina Devi 24594 6749 3524 3225 191.5 3766 1347 15957 Sub Tehsil Namhol 10061 6378 3306 3072 192.9 398 371 5986 Sub Tehsil Bharari 9216 8243 4471 3772 184.4 837 196 3712
Source: Patwari record TGA- Total Geographical Area, GCA- Gross Cropped Area, NSA- Net Sown Area, AST- Area Sown more than once
As per National Forest Policy, 66% of the area in the hilly regions of the state and 33% in plains is
to be brought under forest cover. However, keeping in view that about 20% of the area is
inaccessible and beyond the tree limit, the State Government aims to bring 50% of the
geographical area under forest cover.
The development of forestry sector assumes greater significance as it not only provides direct
benefits in terms of production of timber, sandal wood, fodder etc. but also intangible benefits on
the fragile eco-system. There is scope for improving the density of trees in the forest areas as also
afforestation on problematic / wasteland available in the district and through diversification of
agriculture to agro forestry. Depending upon the site, some of the fast growing species that can be
selected are Khair, Eucalyptus, Poplar and Bamboo.
Within Bilaspur, Jhandutta Tehsil contributes for maximum forest area i.e. 37% (5173 hectare) of
the total forest area of the district followed by Sh Naina Devi Tehsil (27%, 3766 hectare) and
Ghumarwin (18%, 2535 hectare).
In Jhandutta and Bilaspur Sadar Tehsil, the area under wasteland is to the tune of 6.4% of the
total geographical area of the Tehsil. Similarly, the area under wasteland in Shri Naina Devi is
1347 hectares i.e. 5.5% of the TGA of the Tehsil. In other Tehsils, the area under wasteland is
approximately 3-5% of total area of the tehsil.
40 | P a g e
The satellite imagery map depicting the shift in land use pattern has been provided in Maps 5 &
Map 6.
Map 1.5: Land use map of Bilaspur (2002)
41 | P a g e
Map 1.6: Land use map of Bilaspur (2015)
42 | P a g e
Chapter 2 : District Water Profile
2.1 Area Wise, Crop-Wise Irrigation Status
Irrigation and drinking water supply facility are the basic needs of the rural agricultural economy
of Bilaspur. Despite heavy precipitation, the soils of district remain thirsty to a larger extent
because of its undulating topography, shallow depth and coarse texture. As reported by Revenue
Department of the district, the total irrigated area in the district is 5,299 hectare which covers
only around 10% of the gross cropped area i.e. 51,169 ha. The total cropped area during Rabi is
31935 ha, of which only 8.4% is irrigated and remaining is under rainfed cultivation. A total of
6235 hectare is utilized for cultivation of Horticultural and Plantation crops, out of this irrigated
area is to the extent of 20% of the total area covered under this category of crops.
Table 2.1: Area wise, crop wise irrigation status Crop Type Kharif (Area in ha) Rabi (Area in ha) Total (Area in ha)
Irrigated Rainfed
Total Irrigated
Rainfed
Total Irrigated
Rainfed
Total
Sadar 874 7162 8289 23 333 7009 897 7495 14757 Shri Naina Devi
182 2754 2936 780 4404 5184 962 7157 8120
Ghumarwin 1306 6863 8169 1311 11204 12515 2617 18067 20684 Jhandutta 268 6479 6747 555 6671 7226 823 13150 13973 Total 2630 23257 2614
1 2669 22612 3193
5 5299 45870 51169
Source: Department of Agriculture, Bilaspur
The total irrigated area under agricultural crops is maximum in Ghumarwin block. During Kharif
season, a total of 1306 hectare of area is cultivated under irrigated conditions, which is only 5% of
the total cultivated land in the district during the season. In case of Rabi season also, the total
irrigated area is maximum in Ghumarwin block, which constitutes 4% of the total cultivated area
in the district during this season.
In Jhandutta block, only 823 hectare is under irrigation and most of the crops are cultivated under
rainfed conditions. In remaining blocks, the extent of irrigation facility is significantly low.
The major proportion of land in the district is used for cultivation of cereals. Considering all the
blocks, cereals occupy more than 96% of the gross cropped area under agriculture.
In case of horticulture and plantation crops the area under rainfed is almost four times more than
that of irrigated. In case of Bilaspur Sadar, Ghumarwin and Jhandutta block, the irrigated land
under Horticulture and Plantation is 20% of the total cropped are under Horticulture and
Plantation.
43 | P a g e
Table 2.2: Irrigation status for horticulture and plantation crop
Block Horticulture & Plantation Crops (Area in ha)
Irrigated Rain-fed Total Sadar 440 1761 2201 Shri Naina Devi 0 0 0 Ghumarwin 349 1397 1746 Jhandutta 458 1830 2288 Total 1247 4988 6235
Source: Department of Horticulture, Bilaspur
2.2 Production and Productivity of Major Crops
Wheat, Maize and Paddy are the three major cereals crops in Bilaspur district. The other food
crops which are grown in the district are Gram, Mash, Sesamum, Mustard and vegetables (Toria,
Gobi, Lime and others). Among the horticulture crops, the most significant ones are Mango,
Aonla, Plum and Litchi.
Table 2.3: Area, Production and Yield of major crops Crop Bilaspur Sadar Ghumarwin Jhandutta Naina Devi
Wheat A 6672 12454 6463 4975 P 119364 223471 114711 91553 Y 18 18 18 18
Paddy A 202 627 0 0 P 5210 13733 0 0 Y 26 22 - -
Maize A 7732 7407 6413 2839 P 147124 143157 119967 53683 Y 19 19 19 19
Gram A 8 1 2 94 P 49 10 10 567 Y 6 7 6 6
Mash A 15 4 13 4 P 83 20 77 22 Y 6 6 6 6
Mustard A 151 37 736 112 P 631 155 2976 460 Y 4 4 4 4
Sesamum A 9 1 61 14.4 P 26 3 191 43.1 Y 3 3 3 3
Mango A 3.49 0.38 1238 804 P 31.5 3.60 2500 4500 Y 9.0 9.47 2.02 5.6
Source: Department of Agriculture, Bilaspur A-Area in Hectare, P- production in quintals and Y- Yield in qt/ha
44 | P a g e
It is apparent from the table above that wheat is the major Rabi crop which is cultivated on an
area of around 25.6 thousand hectares. The productivity of wheat in the district is 18 qt. per
hectare and the total production is to the tune of 45.7 thousand MT. This is significantly high
when compared to average productivity of wheat in the state of Himachal Pradesh (1671 kg per
ha). As per Department of Agriculture of the district, it has been observed that while Ghumarwin
block has recorded maximum area of 12454 ha under cultivation of wheat. The production has
also been highest in Ghumarwin district with average yield of 18 quintal per hectare.
Similarly, in case of Maize, the area under cultivation was reported to be 21.5 thousand hectare,
with a total production of 41 thousand MT. The productivity of maize has been observed to be
1900kg/ha, which is much lower than the state average of 2233 kg/ha. As per Department of
Agriculture of the district, it has been observed that Bilaspur Sadar block has recorded maximum
area of 7732 ha under cultivation of maize against the district total of 21.5 thousand ha. The
production has been maximum in Bilaspur Sadar with average yield of 19 quintal per hectare. In
terms of area and production, Bilaspur Sadar is followed by Ghumarwin and Jhandutta blocks.
In case of Paddy, it is observed that that the total area under cultivation was 829 hectare. The
productivity of paddy in the district is 24 qt. per hectare and the total production is 1.9 thousand
MT. This is significantly higher than the state average 1546 kg per ha. As per the data recorded by
Department of Agriculture in the district, Ghumarwin block has maximum area (627 ha) under
paddy cultivation which is 75.6% of total area of paddy in the district.
Mustard and Sesamum are the major oil seed cultivated in the district. Mustard is cultivated on
approximately 924 hectare of land and contributes to the production of 3762 MT with an average
yield of 400 kg per hectare. As per Department, Sesamum is cultivated on a total of 71 ha area
with Jhandutta having maximum area of 61 ha, followed by Bilaspur Sadar block with 9 ha area.
The production has been observed to be proportionate to the area under cultivation and the
productivity of around 3.3 qt. per hectare has been constant in all the blocks of district.
Among the fruit crops, the major crop is Mango which is produced in the district in an area of
1242 hectares and the total production is 253 MT. The yield of Mango in the district is 683 kg per
hectare. As per Department, Jhandutta has recorded maximum area (1238 ha) under cultivation
of Mango as compared to remaining blocks. It is followed by Bilaspur Sadar and Ghumarwin
blocks with 3.49 ha and 0.38 ha respectively. Though Jhandutta bock records for maximum area
under cultivation of Mango, the yield of mango in this block is mere 2.02 qt. per hectare which is
far below the average yield of the district (6.83) and the highest yield achieved in Ghumarwin
block (10.5 qt per hectare).
45 | P a g e
2.3 Irrigation Based Classification
As discussed earlier in table 2.1, the district is primarily rainfed. Out of the gross cropped area of
51,169 ha, the extent of irrigated land is only 5299 ha, i.e. mere 10% of total cropped area.
Considering the block-wise data, percentage of gross irrigated land to gross cropped area is
maximum in Ghumarwin block, followed by Shri Naina Devi block, i.e 13% and 12% respectively.
A total of 50858 ha of area is under rainfed cultivation. While comparing the ratio of area under
rainfed cultivation to gross cropped area in each block, Jhandutta block comes at the top position
with 94% (gross cropped area of 13973 ha) under rainfed irrigation, followed by Bilaspur Sadar
block with 89% area under rainfed cultivation (gross cropped area of 8392 ha).
The area under partial irrigation has been reported to be zero across all the blocks the district.
Table 2.4: Irrigation based classification (in hectares) Block Gross Irrigated
Area Net Irrigated
Area Partially Irrigated/Protective
Irrigation Un-Irrigated or Totally
Rainfed Sadar 1337 463 - 9256 Shri Naina Devi 962 182 - 7157 Ghumarwin 2966 1655 - 19464 Jhandutta 1281 726 - 14980 Total 6546 3877 - 50858
Source: Department of Agriculture, Bilaspur
0%
20%
40%
60%
80%
100%
Sadar Shri Naina Devi Ghumarwin Jhandutta
20% 15% 45% 20%
12% 5% 43%19%
18% 14%38%
29%
Irrigation based classification (in hectares)
Gross Irrigated Area Net Irrigated Area
Partially Irrigated/Protective Irrigation Un-Irrigated or Totally Rainfed
46 | P a g e
Chapter 3 : District Water Availability
The water situation in the district in terms of surface and underground water is discussed below:
Sutlej: It is the only river that passes through the district and enters the district at village Kasol
located in north east of the district. It is deep and rapidly flowing river which runs at the rate of
about eight kilometres per hour. The river divides the district in almost two equal parts. It flow
ninety kilometres within the district leaving it at a village Neila in the south west and enters the
Punjab territory. The gigantic multipurpose dam is located over this river. The tremendous
increase in the volume of water during the rainy season causes floods.
Ali Stream: Ali is one of the notable streams of the district which rises in Arki tehsil of district
Solan. It enters district Bilaspur at village KothiHarrar and Manothi. It is perennial stream but as
its source lies in snowless mountains, the volume of water is very small during summers. After
flowing for about thirty five kilometres in the district, it joins Sutlej river in between villages
Kherian and Talwar. During its course, its water is utilised for irrigation purpose in low lying areas
and also for running water mills.
GhamberKhad: This Khad originates in Shimla hills and enters the district territory at Village
Neri of Ratanpur finally joining Sutlej at village Dagran and Nerli at a distance of about 13
kilometers. Its bed is very deep and hence a small area is only irrigated by its water.
Seer Khad: It is large stream and a largest tributary of Sutlej. It originates in district Mandi and
drains a large part of Ghumarwin and Jhandutta blocks. Two other khads, Suka and Saryali which
rise in Hamirpur district join this khad at village Balgar after draining the western portion of the
district. Few water mills are run by the water of this Khad. This is a rich source of perennial water
which could be utilised for augmenting irrigation facilities in the district.
Lakes, Tanks, Springs and Spring Heads:There are no natural lakes though the district has
one of the biggest lakes in the country, GobindSagar. The lake has huge importance for the
agricultural economy of the district in terms of availability of water for irrigation and potential for
fish production. The district has six large water tanks at JagatKhana, Swarghat, Naina Devi,
Jamthal, Kasol and Snghwana. In addition, there are about 40 small tanks. There are two springs,
namely, Luhund Spring and Bassi Spring.
47 | P a g e
3.1 Status of Water Availability
As reported by the IPH Bilaspur, only lift irrigation system prevails in the district. The facility of
irrigation through canal is not available in the district. Through LIS, a total area of 899.98 hectare
and 967.5 hectare is being irrigated during Kharif and Rabi season respectively.
Table 3.1: Water availability in Bilaspur Sl. Sources Kharif Season Rabi Total
Area (Ha) Volume of water (cusec)
Area (Ha)
Volume of water (cusec)
Summer
Area (Ha)
Volume of water (cusec)
1 Surface Irrigation i) Canal (Major & Medium
irrigation)
ii) Minor Irrigation tanks iii) Lift Irrigation/ Diversion 899.98 10.36 967.46 16.51 0 1867.44 26.87 iv) Various water bodies including
Rain Water Harvesting.
v) Treated Effluent Received form STP.
.
vi) Untreated Effluent. vii) Perenial sources of water
2 Ground Water * (i) Open Well - - - - - - -
(ii) Deep Well - - - - - - - (iii) Medium Tube Well. - - - - - - - (iv) Shallow Tube Wells - - - - - - -
Source: I&PH department, Bilaspur,
*Ground water availability is abysmally low in the district and the exact quantum of consumable ground
water resources and stage of groundwater resources in the district has not been estimated yet.
There has been no assessment of availability of ground water in Bilaspur district by Central
Ground Water Board and hence the potential/ availability of ground water in the district cannot
be commented upon. Among the ground water sources, 444 Borewells and 135 electricity pumps
are available in the district but these are with individual for personal use (irrigation and other
purpose). Block-wise detail of these ground water sources is mentioned in para 3.4.
3.2 Status of Ground Water Availability
Ground water availability is abysmally low in the district and all the blocks have been classified
under critical zone (as per IPH Bilaspur). The exact quantum of consumable ground water
resources and stage of groundwater resources in the district has yet not been estimated. The soft
rock aquifers which exist underground, indicated feasibility of tube-well and dug-well and areas
with hard rock aquifers indicated places where bore well, dug well and spring development are
possible. As already mentioned, the regional geology is characterized by alluvium, Shivaliks and
metamorphous rocks.
48 | P a g e
Hydrogeology
The rock formations occupying the district range in age from pre-Cambrian toQuaternary period.
The generalized geological succession in the district is given below:-
Table 3.2: Hydrogeology of Bilaspur
EON Era Period Group Formation
Description
Phanerozoic Cenozoic Quaternary (Recent to sub-recent)
Alluvium; fluvial, terrace, piedmont
Sand silt, clay, gravel, pebble and cobble etc.
Undifferentiated Sand, clay, gravel, pebble, cobble and boulders
Teriary Pliocene to mid Miocene
Upper Shivalik
Soft sandstone, brownish clay, shale, poorly sorted and crudely bedded conglomerate. Boulder beds.
Middle Shivalik Grey sandstone and brownish clay/ shale
Lower Shivalik Red and purple sandstone and shale
Oligocene lower Miocene
Subathu Group Grey sandstone, shale, clay
Kasauli Formation Greenish to grayish hard sandstones
Dagshai Formation Dark-red and purple coloured shale
Subathu Formation Dark nodular clays
Proterozoic
Upper Proterozoic III
Proterozoic II
Krol formation Greyish massive dolomites and limestine
Shali formation Cherty Dolomite, Quartzite and lime stone
Source: CGWB
Hydrogeologically, both the unconsolidated valley fill and alluvial formation are occurring in the
valley area and semi-consolidated sediments belonging to Shivalik Group form aquifer system in
the district. Porous alluvial formation forms the most prolific aquifer system in the valley area
where as the sedimentary semi-consolidated formation forms the aquifer of low yield prospect.
The ground water in the Siwalik group of rocks occur under unconfined to semi confined
conditions mainly in the arenaceous rocks viz., sandstone, siltstone, gravel & boulder beds etc.
The occurrence and movement of ground water is controlled by inter-granular pore spaces and
also the secondary fracture porosity. Siwalik sediments underlying hilly/undulating areas where
springs (mostly gravity/contact type) and bowries are the main ground water structures apart
from the hand pumps. The discharges of the springs, varies from seepages to 0.50 lps. Bowries
49 | P a g e
are dug well type structures constructed on the hill slopes for tapping the seepages. In the low
lying areas underlain by Siwalik rocks, dug wells and hand pumps are the main ground water
structures that range in depth from 3.00 to 25.00 m bgl, where in depth to water level ranges from
2.50 to 15.00 m bgl. In upland/plateau areas the water level is generally deep. In Beet area, water
level more than 60 m below land surface is observed.
50 | P a g e
Map 3.1: Hydrogeology of Bilaspur
In valley areas, the ground water occurs in porous unconsolidated / alluvial formations (valley
fills) comprising sand, silt, gravel, cobbles / pebbles etc., and forms prolific aquifers. Ground
water occurs both under phreatic and confined artesian conditions. Water logging areas are
observed in northern part of Jukhola valley. Ground water is being extensively developed in the
51 | P a g e
area by medium tube wells and dug wells, and also by hand pumps. Depth of dug wells ranges
from 4.00 to 15.00 m bgl whereas depth to water level ranges from near surface to 6 m bgl in pre
monsoon. Yield of shallow aquifer is moderate with well discharges up to 10 lps.
Ground water quality is assessed to be good and check dams, check dam cum ground water dam
and recharge shaft have been reported to be suitable recharge structure. Further, it has been found
that the depth of bore-well and dug-well feasible in the soft rock aquifers varies between 100-150
meters and 10-20 meters with discharge of 1200-2500 litres per minute in case of the former type
of wells and 300-500 litres per minute in respect of the latter. Likewise, in hard rock aquifers, the
depth of bore well, dug well has been estimated between 100 to 200 metres and 10 to 20 meters
respectively.
Table 3.3: Status of ground water availability Status of Block as per Central Ground Water Board Notification
Ground Water (BCM)
Critical Semi-Critical Safe Draft Recharge Gap All blocks under critical zone
- - -
Source: IPH department, Bilaspur
3.3 Status of Command Area
As per IPH Bilaspur, a total of 102 villages across all the blocks fall under the command area
irrigated by Lift system. Block-wise names of villages are as under:
Table 3.4: Villages covered under command area
Block No. of villages
Name of villages
Swarghat 28
Under Changer Area Medium Irrigation Project Bassi: Dabat, Bassi, Guru-Ka -Lahour, Ghatewal, Kanguwali, Kheri, Bassa, Neelan, Jhira, KotKhas, Jhra, NandBehal, Toba Sangawan, Lakhnoo, Dharot, Dollan, Behrda, Kudini, Raur, Jaman, Jandauri, BarotanDabla, Dehini, Lehri, PalsedDuletTarsooil, Illewal, Changar, Tarsooh Under Bilaspur division: FIS Changer
Sadar 22
LIS Nog, LIS NeriJamli, LIS Chilla, LIS RopaBagoun, LIS DharJerkh, LIS BaggiPhagalwatta, LIS Lower Kothipura, LIS Jukhala, LIS MalothiSamog, LIS Sikrohachandpur, LIS MiyanBandla, LIS GassourDamthalJukhala, LIS NaiSarli from Gambhrollakhad, LIS MangrotSandholi, FIS Toba Karot, FIS NiharkhanBasla, FIS KasolKuhl, FIS Smog Kuhl, FIS KothiMajher, FIS LuhardaSmardi, FIS DeothVao Humber, FIS Rani Kotla.
Ghumarwin
25
Bilaspur division: BLIS Nanwan, LIS Parnal, LIS NuinPaliyan, LIS MehriKathla, LIS Nalti, LIS Kulwari, LIS Kasol, LIS BachhriMasdan, LIS Talwara Ghumarwin Division:
52 | P a g e
Block No. of villages
Name of villages
LIS Daghiar, LIS Dehra, LIS Lanjta, LIS Damehra, LIS Bhadrog, LIS Patta, LIS Dabla, LIS KalsiMuchwan, LIS Bari Karngora, LIS Ghumarwin, LIS GaharPadhyan, LIS Chhat, LIS BadduGalasin, LIS BaniPanditan, LIS Ghumarwin
Jhandutta 27
LIS Jhabolla, LIS Goacher, LIS Dashlera, LIS HawaniKhuban, LIS Kujail, LIS Gujrehra, FIS Koshrian, FIS TalaiDuslehraKuhal, LIS Malari, LIS BharoliKallan, LIS Jhabola, LIS Sunhani, LIS Sunhani, LIS Bhallu, old LIS Bhallu, New LIS BalraSunhani, LIS Nihan, LIS Bard Upper Har, LIS Amroa, LIS SerBaroha, LIS DhararPrahoo, LIS ReeRandoh, FIS RukamaniBadoaKuhal, LIS Lag Bakain, LIS JohadMalangan, LIS Tihri
Table 3.5 which follows summarizes the status of command area in the district for each block. As
depicted therein, whole command area in the district is irrigated through lift system. Whole of the
command area (6919 ha) has been reported as being undeveloped.
Table 3.5: Status of command area Name of the Block
Information of canal command
Information on the other services command*
Total Area
Total Area
Developed
Area
Undeveloped Area
Total Area
Developed
Area
Undeveloped Area
Developed
Command
Undeveloped
Command
Swarghat
N.A. N.A. N.A. 2516.00
2406.88 109.12 2406.88 109.12
Sadar N.A. N.A. N.A. 1334.65
894.8 439.85 894.8 439.85
Ghumarwin
N.A. N.A. N.A. 2074.45
1130.37 944.08 1130.37 944.08
Jhandutta
N.A. N.A. N.A. 993.45
321.11 672.34 321.11 672.34
TOTAL N.A. N.A. N.A. 6918.55
4753.16 2165.39 4753.16 2165.39
Source: I&PH, Bilaspur *Only lift irrigation applicable for the district
3.4 Existing Type of Irrigation
As informed by District Agriculture Department, a total of 765 irrigation sources are operating in
the district. As indicated in table 3.6, 3.7& 3.8, Jhandutta block has maximum number of sources
of irrigation, i.e. 263 out of 765 sources of irrigation in the district. After Jhandutta, Ghumarwin
and Bilaspur Sadar are equipped with comparatively more number of sources of irrigation. In
Ghumarwin, there are 250 irrigation sources while in Bilaspur Sadar, 174 irrigation sources are
available. Shri Naina Devi is the block with least number of irrigation sources. In Shri Naina Devi,
only 68 irrigation sources are available. There are no canals in Bilaspur district.
53 | P a g e
As depicted in Table 3.6, under surface irrigation, a total of 124 Individual ponds and 53 water
reservoirs exist. A total of 53lift irrigation structures are operating in the district, with Ghumarwin
block having the maximum number of LIS (Lift irrigation schemes) in the district.
Table 3.6: Existing type of surface irrigation sources Block Source of
irrigation (Nos.)
Surface irrigation (1) Canal based Tanks/Ponds/ Reservoir
Govt. canal
Community/ Pvt. Canal
Community Ponds
Individual/ Pvt. Pond
Govt. Reservoir / Dams/ Spring Source/Khad
1 2 3 4 5 6 Bilaspur Sadar - - - 33 22 ShNaina Devi 1 - - 10 1 Ghumarwin - - - 41 21 Jhandutta - - - 40 9 Total 1 - - 124 53
As already mentioned, the ground water availability has not been assessed in the district.
However, as Department of Horticulture, Bilaspur has provided information on Number of bore
wells in the district (Table 3.7).
Table 3.7: Existing type of ground water irrigation sources Block Ground Water (2)
Tube well Open well Bore well Govt. Pvt. Community/
Govt. Pvt. Govt. Pvt.
7 8 9 10 11 12 Bilaspur Sadar - - - - - 100 ShNaina Devi - - - - - 48 Ghumarwin - - - - - 133 Jhandutta - - - - - 163 Total - - - - - 444
Out of total 444 bore wells, which are all privately owned, 163 are in Jhandutta Block followed by
133 in Ghumarwin and 100 in Bilaspur Sadar block. Shri Naina Devi, being an urban block has
recorded 48 Bore wells.
Table 3.8: Existing type of other irrigation sources Block Other sources
including Traditional WHS (3)
Treated effluent discharged from
STP
Water extraction devices/ Lift
Electricity Pump (4)
Diesel Pump (5)
Others (6)
13 14 15 16 17 Bilaspur Sadar - - 21 - 8 ShNaina Devi - - 8 - 1 Ghumarwin - - 55 - - Jhandutta - - 51 - - Total - - 135 - 9
54 | P a g e
As informed by IPH department, Bilaspur, there are 144 water extraction devices/ lifts operating
in district. Out of these, 135 are electricity pumps and 9 are other sources. Out of 135 electricity
pumps, 55 are available in Ghumarwin block only. Jhandutta block has 51 electricity pumps.
55 | P a g e
Chapter 4 : Water Requirement/Demand
The earlier chapters dealt with the general profile, water profile and water availability of Bilaspur
district. The present chapter deals with the current and projected (2020) demand of water for
various sectors. The demand for water has been assessed on the basis of data obtained from
different departments.
4.1 Domestic Water Demand
Data of Census 2011 and 2001 has been considered to arrive at the growth rate of population of
the district. As per Census 2011, the district has shown an annual growth rate of 1.205%. Table 4.1
below indicates the block-wise population of the district. Current and Projected population have
been estimated using the growth rate of 1.205% per annum.
It has been assumed that per capita daily water requirement of people residing in urban areas of
the district is 150 Liters and for population in rural areas, the daily per capita daily water
requirement is 70 Liters. Using the same norms domestic water supply demand has been worked
out and given in table 4.1 below.
Table 4.1: Domestic Water Demand (in MCM)
Blocks 2011 CP Existing
Population Present Water Requirement
Projected Population
in 2020
Annual Water Requirement
in 2020
Bilaspur Sadar 140307 147,070 3.758 155931 3.984
Ghumarwin 102023 106,941 2.732 113384 2.897
Jhandutta 114497 120,016 3.066 127247 3.251
Swarghat/ Shri Naina Devi Ji (U)
1204 1,262 0.069 1338 0.073
Ghumarwin (U) 7899 8,280 0.453 8779 0.481
Talai (U) 2372 2,486 0.136 2636 0.144
Bilaspur (U) 13654 14,312 0.784 15174 0.831
Total 420253 400,366 10.998 424488 11.661
56 | P a g e
It can be inferred from the table that considering the growth rate of population of the district, the
quantity of water required in 2020 for domestic consumption shall be approximately 16 MCM
which is 0.9 MCM more than the present water requirement.
4.2 Crop Water Requirement
As discussed in Chapter 2, cereals are cultivated on major part of the gross cropped area in the
district. Hence, the crop water requirement for major cereals viz. Maize, Paddy, Wheat as assumed
by State Agricultural University has been taken. The assumptions are as under:
For paddy: 0.6 m per ha,
for Maize: 0.06 m per ha,
for wheat: 0.15mper ha,
Vegetables: 0.18 m per ha and
for Horticulture crops: 0.06 m/ha
The small portion of area under other crops has been taken in category of vegetables and
same assumption has been made.
Table 4.2: Crop water requirement Block Area
sown (Ha)
Irrigated area (ha)
Crop Water Demand (MCM)
Water Potential Required (MCM)
Existing Water Potential (MCM)
Water Potential to be created (MCM)
Bilaspur Sadar 17499 2230 18.43 15.01 3.417 11.59 Ghumarwin 22430 3056 28.29 22.99 5.300 17.69 Jhandutta 16261 1281 16.84 15.52 1.311 14.21 Naina Devi 8120 962 9.72 8.42 1.300 7.12 Total 64310 7529 73.26 61.94 11.328 50.60
0.0000.5001.0001.5002.0002.5003.0003.5004.000
BilaspurSadar
Ghumarwin Jhandutta Swarghat/Shri NainaDevi Ji (U)
Ghumarwin(U)
Talai (U) Bilaspur (U)
3.758
2.7323.066
0.0690.453
0.136
0.784
3.984
2.897 3.251
0.073 0.481 0.1440.831
Present and Projected water demand of district in MCM
Present Water Requirement Projected Water Requirement (2020)
57 | P a g e
Water potential required has been derived from water required by crops cultivated under rainfed
conditions. Therefore, the existing water potential represents the water requirement of crops
cultivated in irrigated areas.
It can be concluded from the table that a total water potential of 50.60 MCM is to be created in
the district to fulfill the requirement of crops.
4.3 Livestock Water Requirement
The requirement of water by livestock in the district has been derived from two livestock census
(2003 & 20012), as discussed in second chapter. The table below represents the animal wise water
requirement as well as total water requirement of the district for livestock.
Table 4.3: Livestock water requirement (in MCM) Block Total
number of livestock
Present water demand
Water Demand in 2020
Existing water potential
Water potential to be created
Jhandutta 63980 0.985 1.005 0.985 0.021 Ghumarwin 106806 1.149 1.174 1.149 0.025 Bilaspur Sadar 64466 0.982 0.997 0.982 0.014 Shri Naina Devi 70810 0.569 0.581 0.569 0.011 Total(Rounded off)
306062 3.685 3.757 3.685 0.072
0.00
5.00
10.00
15.00
20.00
25.00
30.00
BILASPUR SADAR GHUMARWIN JHANDUTTA SHRI NAINA DEVI
18.43
28.29
16.84
9.72
3.42 5.30
1.31 1.30
11.59
17.6914.21
7.12
De
man
d in
MC
MCrop water demand
Crop Water Demand Existing Water Potential Water Potential to be created
58 | P a g e
Based on the projected water requirement for livestock in 2020, the gap has been assessed. The
total potential which has to be created for livestock in 2020 is 0.072 MCM. This has been assessed
on the terms of the following:
Per capital daily water requirement for cows/buffaloes 65 litres, sheep/goats/pigs 6 litres
and Poultry 0.25 liters.
For projecting the water demand of livestock, growth rate as deduced from census has
been considered during calculations. In case of livestock with decreasing growth rate of
population, the present population has been considered. It is assumed that present water
requirement of livestock is met from existing water usage and hence existing potential is
equal to existing demand.
As observed above, the potential to be created for meeting the water demand for livestock is
slightly more than existing potential.
4.4 Industrial Water Requirement
The requirement of industries has been calculated from data given by District department of
Industries. Only two industrial areas exist in the district, namely, Industrial area Bilaspur and
Gwalthai Industrial area. The industrial department has their own water supply system and they
supply water as per actual requirement at present. As majority of industrial units in the district
are small, the consumption of water is quite nominal. The Department has informed that
presently the water supply to industries is much more than their actual consumption.
0
0.2
0.4
0.6
0.8
1
1.2
JHANDUTTA GHUMARWIN BILASPUR SADAR SHRI NAINA DEVI
1.005
1.174
0.997
0.581
0.9851.149
0.982
0.569
0.021 0.025 0.014 0.011De
man
d in
MC
MLivestock water demand
Projected water demand in 2020 Existing water potential Water potential to be created
59 | P a g e
Industry at a glance
The brief industrial profile of Bilaspur is as under
Particulars Number of units Employment
Registered Industrial Units 2315 8342
Functional Industrial Units 1829 4302
Registered Medium and Large Scale Units 3 1167
Table 4.4: Industrial water requirement of Bilaspur (in MCM)
Block Name of the Industry
Water Demand
Water Demand in 2020
Existing Water Potential
Water Potential to be created
Shri Naina Devi (U)
I.A. Gwalthai 7 8.4 7 1.4
Bilaspur (U) I.A. Bilaspur 1.8 2.16 1.8 0.36 Total 8.8 10.56 8.8 1.76
The current water demand has been estimated to be 7 MCM for Gwalthai Industrial area and 1.8
MCM for Bilaspur Industrial area. Considering annual growth rate of 5%, the water demand of
10.56 MCM in year 2020 has been indicated by the department. Accordingly, the water potential
which has to be created to meet industrial water demand in 2020 is 1.76 MCM.
4.5 Water Demand Power Generation
Table 4.5 Water demand for power generation
Block/Electrical
Divisions
Power
Requirement
(MW)
Water
Demand
(BCM)
Water
Demand in
2020 (BCM)
Existing
Water
Potential
(BCM)
Water
Potential to
be created
(BCM)
Ghumarwin 23.265 Nil 29.081 Nil Nil
Bilaspur 16.756 Nil 20.945 Nil Nil
Power is not generated in the district and hence, water requirement has been indicated to be zero.
The power requirement of district is met through common grid system of the state. There are two
electrical divisions mainly concerned with the power distribution in this district, namely
Ghumarwin and Bilaspur. The power requirement in the year 2015 as per the actual consumption
on record is 23.265 MW and 16.756 MW, respectively.
60 | P a g e
4.6 Total Water Demand of the district for various sectors
This sections presents the total water demand of the district and has been calculated by summing
up all major sectors consuming water. The current water demand has been indicated in Table
4.6(a) and the projected water demand has been depicted in Table 4.6 (b).
Table 4.6(a): Present Water Demand of the district for various sectors
Blocks
Demand from components (MCM)
Total Domestic Crop Livestock Industrial
Power Generation
Bilaspur Sadar 3.76 18.43 0.98 0.00 0.00 23.17
Ghumarwin 2.73 28.29 1.15 0.00 0.00 32.17
Jhandutta 3.07 16.84 0.98 0.00 0.00 20.88
Shri Naina Devi (U) 0.07 9.72 0.57 7.00 0.00 17.36
Ghumarwin (U) 0.45 0.00 0.00 0.00 0.00 0.45
Talai (U) 0.14 0.00 0.00 0.00 0.00 0.14
Bilaspur (U) 0.78 0.00 0.00 1.80 0.00 2.58
Total 11.00 73.27 3.69 8.80 0.00 96.75
12%
84%
4%
Bilaspur Sadar- Water Demand from components (MCM)
Domestic
Crop
Livestock
Industrial
8%
88%
4%
Ghumarwin- Water Demand from components (MCM)
Domestic
Crop
Livestock
Industrial
61 | P a g e
The present water demand of the district has been assessed at 96.5 MCM annually, with
Ghumarwin being the block with maximum requirement of water. Shri Nainadevi and Bilaspur
Sadar blocks stand at 2nd and 3rd position with approximately 23% and 22% of total water required
by district.
12%
83%
5%
Jhandutta- Water Demand from components (MCM)
Domestic
Crop
Livestock
Industrial
25%
42%
3%
30%
Shri Naina Devi (U)- Water Demand from components (MCM)
Domestic
Crop
Livestock
Industrial
22%
32%20%
23%
3%
Present Water Demand of the district for various sectors
Bilaspur Sadar
Ghumarwin
Jhandutta
Shri Naina Devi (U)
Ghumarwin (U)
Talai (U)
Bilaspur (U)
62 | P a g e
Table 4.6(b): Water Demand of the district for various sectors (Projected for 2020)
Blocks Demand from components (MCM)
Domestic Crop Livestock Industrial Power
Generation Total
Bilaspur Sadar 4.0 18.43 1.0 0 0 23.4 Ghumarwin 2.9 28.29 1.2 0 0 32.4 Jhandutta 3.3 16.84 1.0 0 0 21.1 Shri Naina Devi (U) 0.1 9.72 0.6 8.4 0 18.8 Ghumarwin (U) 0.5 0.00 0.0 0 0 0.5 Talai (U) 0.1 0.00 0.0 0 0 0.1 Bilaspur (U) 0.8 0.00 0.0 2.16 0 3.0 Total 11.7 73.3 3.8 10.6 0.0 99.2
13%
83%
4%
Bilaspur Sadar- Water Demand from components (MCM)
Domestic
Crop
Livestock
Industrial
9%
87%
4%
Ghumarwin- Water Demand from components (MCM)
Domestic
Crop
Livestock
Industrial
13%
82%
5%
Jhandutta- Water Demand from components (MCM)
Domestic
Crop
Livestock
Industrial
25%
39%2%
34%
Shri Naina Devi (U)- Water Demand from components
(MCM)
Domestic
Crop
Livestock
Industrial
63 | P a g e
During 2020, the demand shall be proportionate to the current water demand and total water
requirement has been assessed at 99.2 MCM.
4.7 Water budget
As discussed in chapter 3, there are no ground water sources in Bilaspur. Hence, surface water is
being used to fulfill the requirement of existing water consumption.
Table 4.7: Water Budget Name of Blocks
Existing water availability
Total (MCM)
Water Demand (MCM)
Water Gap (MCM)
Surface Water
Ground Water
Present
Projected (2020)
Present
Projected (2020)
Bilaspur Sadar 8.16 0 8.16 23.2 23.4 15.0 15.3 Ghumarwin 9.18 0 9.18 32.2 32.4 23.0 23.2 Jhandutta 5.36 0 5.36 20.9 21.1 15.5 15.7 Shri Naina Devi (U)
7.1 0 7.1 17.4 18.8 10.3 11.7
Ghumarwin (U) 0.45 0 0.45 0.5 0.5 0.0 0.0 Talai (U) 0.14 0 0.14 0.1 0.1 0.0 0.0 Bilaspur (U) 2.58 0 2.58 2.6 3.0 0.0 0.4 Total 32.94 0 32.94 96.7 99.2 63.8 66.3
The total water gap for the district has been estimated at 66.3 MCM during 2020. The gap is
maximum in case of Ghumarwin with 23.2 MCM followed by Jhandutta (15.7 MCM) and Bilaspur
Sadar (15.3 MCM).
22%
31%20%
24%
3%
Water Demand of the district for various sectors (Projected for 2020)
Bilaspur Sadar
Ghumarwin
Jhandutta
Shri Naina Devi (U)
Ghumarwin (U)
Talai (U)
Bilaspur (U)
64 | P a g e
Chapter 5 : Strategic Action Plan for Irrigation
The vision of the scheme PMKSY is to ensure access to some means of protective irrigation to all
agricultural farms in the country, to increase water use efficiency by its ‘per drop more crop’
subcomponent, thus bringing much desired rural prosperity. The need of the hour is to have well
managed watershed resources which not only enhances the ecological resource base of a rural
economy but will also create sustainable livelihood opportunity.
5.1 Strategic Plan for irrigation in PMKSY.
At present, the schemes implemented by all the departments are broadly based and are required
to be specific and location/ problem based. A systematic integrated approach having full
participation of the users in the planning process is the need of the hour and extension facilitation
should be inter-disciplinary. On the basis of methodology described above, a strategic plan for
four years has been prepared starting from 2016-17 to 2019-20.
The schemes have been prepared by the proper consultation with the actual beneficiaries. The
ground water recharge structures were also prepared after the proper study of the availability of
the water from the local boulies, jhorhas and khattries, etc. The water from these sources was
otherwise going waste. Hence, the schemes seem to be justified.
The plan in brief is detailed below.
5.2 Year wise total Plan of the district
Estimated plan for whole district under the scheme for four years works out to be Rs.13002.9
lakhs. Irrigation and Public Health Department accounts for the maximum share of about Rs.
7876.3 lakhs (60. 57%) and is followed by RDD with a budget of Rs. 3790.83 lakhs (29.15%).
Agriculture and Horticulture Departments have a share of around 5% each. While working out
the plan, phasing of ongoing irrigation projects has been considered. However, from the proposal
of departments, eligible activities under RIDF will be covered as per the funds requirement of the
State. Project sanctioned under RIDF XXI for micro irrigation has been shown separately as it
will be implemented by I&PH Department and covered under the plan of the Department.
Capacity building, extension and training are important components for successful execution of
the plan. Therefore, a budget of Rs. 53.4 lakhs has been proposed in the plan from 2016-17 to
2019-20. Year-wise plan with respect to all departments for 2016-17, 2017-18, 2018-19 and 2019-
20 has been proposed to be Rs. 2417.1 lakhs, Rs. 3846 lakhs, Rs. 3855 lakhs and Rs. 2884.8 lakhs
respectively. Details of the plan are given in Annexure V.
65 | P a g e
Table 5.1: Department-wise yearly plan (Amount in Lakh Rs)
Department Year
Total 2016-17 2017-18 2018-19 2019-20
Irrigation & Public Health Department
1342.0 2568.4 2561.3 1404.6 7876.3
Agriculture Department 152.3 165.3 181.3 178.3 677.4
Horticulture Department 164.6 164.6 164.6 164.6 658.4
Rural Development Department 758.2 947.7 947.7 1137.2 3790.8
Total: 2417.1 3846.0 3855.0 2884.8 13002.9
NABARD* 1060
* On-going and Proposed projects under RIDF, have been included in respective departments’ outlay.
Figure 5-1: Department wise share in proposed plan
Fig5.1 shows the graphical representation of various stake holders of PMKSY, and clearly indicates
I&PH department as the key player for implementation of this scheme.
5.3 Component-wise Plan
The plan is prepared component wise also. Table below shows component wise plan for 4 years
starting from 2016-17 to 2019-20. AIBP component has to be executed mainly by Irrigation and
Public Health Department. Per Drop More Crop components will be executed by Agriculture and
Horticulture departments mainly. All the stakeholders need to have coordination among
themselves to have the maximum irrigation efficiency and to avoid duplicity. It is observed that
I&PH, 60.57%
Agri, 5.21%
Horti, 5.06%
DRDA, 29.15%
66 | P a g e
maximum share of 57.91% is for Har Khet ko Pani followed by PMKSY Watershed 24.51% and Per
Drop More Crop- Supplementary Water Management activities (5.59%).
Table 5.2: Component-wise plan
Component wise Year
Total 2016-17 2017-18 2018-19 2019-20
Accelerated Irrigation Benefitted Programme (AIBP)
76.2 147.4 122.4 0.0 346.0
PMKSY-Har Khet Ko Pani (HKKP) 1265.8 2421.0 2438.9 1404.6 7530.3
i) PDMC-Micro-irrigation 139.0 139.0 139.0 139.0 556.0
ii) PDMC-Supplementary Water Management activities
164.6 177.6 193.6 190.6 726.4
iii) PDMC-Ext. And Trg. Under ATMA
13.3 13.3 13.3 13.3 53.4
PMKSY -Watershed 637.3 796.6 796.6 956.0 3186.6
Convergence with MGNREGS 120.8 151.1 151.1 181.3 604.2
Total 2417.1 3846.0 3855.0 2884.8 13002.9
Figure 5-2: Component-wise plan
AIBP, 2.66%
HKKP, 57.91%
PDMC- MI, 4.28%
PDMC SWM, 5.59%
PDMC ATMA, 0.41%
Watershed, 24.51%
Convergence, 4.65%
67 | P a g e
Table 5.3: Ongoing projects in Bilaspur funded by NABARD under RIDF
Type
Name of Project
Block
Command Area(ha)
RIDF loan phasing RIDF loan Total
2016-17 2017-18 2018-19
LIS Imp. & Ext. of LIS Ser Baroha up to village Gallian in Tehsil Jhandutta
Ghumarwin 96.04 43.45 108.63
RWH C/o RWH over Seer Khad at Ghumarwin (near STP)
Ghumarwin 292.70 172.17 430.42
RWH C/o RWH over Seer Khad at Damla (ODI)
Ghumarwin 199.06 76.78 191.95
LIS Imp. Of LIS Amroa in Tehsil Jhanduta
Jhanduta 40.00 33.17 82.94
RWH cum LIS
C/o Check Dam at Souli Khad/ Mand khad in Tehsil Ghumarwin
Bilaspur 179.33 35.45 70.91 70.91 177.27
5.4 Action plan based on Member of Parliament Local Area Development Schemes
(MPLAD)
The outlay proposed by Irrigation & Public Health Department includes the schemes which have
been proposed by Local MLAs. It has been observed that all the schemes which have been
proposed by I&PH department pertains to one or other MLA of various constituencies of Bilaspur.
Table below presents the scheme, name of MLA proposed the schemes and constituency where
the scheme will be implemented.
Table 5.4: Details of scheme proposed by local MLAs Sr. NO.
Name of Divison
Name of scheme CCA in Hect.
Estimated Cost
Constituency Priority (years wise)
Period of implementation and requirement of funds (In Lakh)
Remarks
2016-17 2017-18 2018-19 2019-20
1 CAMIP Bassi
DPR for providing Micro Irrigation, Mechanixed land leveling, Correction of System Deficiencies of Changer area Medium Irrigation Project from Anandpur Hydel Channel (Under CAD W&M Programme in The. Shri Naina Devi Ji Distt. Bilaspur (H.P)
2350 117119500 Sh. Naina Devi
Ji - 23423900 46847800 46847800 -
Scheme completed. Provision for CAD gap and automation is proposed.
2 Bilaspur
DPR for providing CAD of Lift Irrigation Scheme Tanbol Zagatkhana (Under CAD W&M Programme) in Distt. Bilaspur.
292.44 30600000 Sh. Naina Devi
Ji - 6120000 12240000 12240000 -
Work in progress. CAD works proposed.
3 Bilaspur Construction of Lift Irrigation Scheme Jamthal Harnoda in Distt. Bilaspur.
59 15000000 Sadar 2013-14
P-I 14000000 1000000 - -
Scheme approved under shelf of 39 irrigation schemes under AIBP.
4 Bilaspur
DPR for providing CAD of Lift Irrigation Scheme Jamthal Harnoda (Under CAD W&M Programme) in Distt. Bilaspur.
59 4000000 Sadar - 1500000 2500000 - -
Work in progress. CAD works proposed.
5 Bilaspur
Providing CAD works in Cluster of 21 Nos. Minor Irrigation Scheme under IPH Division Bilaspur (H.P)
1383 166876500 Sadar - 33375300 66750600 66750600 -
Schemes completed. Provision for CAD works proposed.
6 Bilaspur LIS Parnal 52
13000000 Sadar 2015-16
P-1 1300000 3900000 3900000 3900000
These are newly
proposed schemes to be brought
under Irrigation
and schemes are appearing
under Hon'ble
MLA Priorites
during last financial
years.
7 Bilaspur LIS Mehri Kathla 38
9500000 Sadar 2015-16
P-1 950000 2850000 2850000 2850000
8 Bilaspur LIS Bachhrin Masdhan 115
28750000 Sadar 2015-16
P-1 2875000 8625000 8625000 8625000
9 Bilaspur LIS Ladder 73
18250000 Sadar 2015-16
P-1 1825000 5475000 5475000 5475000
10 Bilaspur LIS Jukhala 435
108750000 Sh. Naina Devi
Ji 2015-16
P-2 10875000 32625000 32625000 32625000
11 Bilaspur LIS sikroha 54
13500000 -do- 2013-14
P-2 1350000 4050000 4050000 4050000
12 Bilaspur LIS Kothi Chandpur and Kandrour
585 146250000 Sadar
2014-15 P-2
14625000 43875000 43875000 43875000
13 Bilaspur FIS Ladda Bhagwani 90
22500000 -do- 2015-16
P-2 2250000 6750000 6750000 6750000
69 | P a g e
14 Ghumarwin
Providing CAD works in Cluster of 12 Nos. Minor Irrigation Scheme under IPH Division Ghuamrwin (H.P)
702 6000000 Ghumarwin - 600000 1800000 1800000 1800000
Schemes completed. Provision for CAD works proposed.
15 Ghuamrwin
LIS Auhar Palthin Sepra Bakroa, Paleh, Bhajwani etc. in Tehsil Ghumarwin Distt. Bilaspur (HP)
105
26250000 -do- 2014-15
P-I 2625000 7875000 7875000 7875000
These are newly proposed schemes to be brought under Irrigation and schemes are appearing under Hon'ble MLA Priorites during last financial years.
16 Ghuamrwin
LIS Peherwin Majhasu by tapping River water etc in Tehsil Ghumarwin Distt. Bilaspur (HP)
130
32500000 -do- 2014-15
P-II 3250000 9750000 9750000 9750000
17 Ghuamrwin
Providing Irrigation facilities to Village Badoa Hirapur from Rukmani Nalla Distt. Billaspur
42
10500000 Jhandutta 2014-15
P-I 1050000 3150000 3150000 3150000
18 Ghuamrwin LIS for village Seo and ket in Ghumarwin in Distt. Bilaspur.
35 15000000 Ghumarwin
2013-14 P-I
6000000 7500000 1500000 -
19 Ghuamrwin LIS Dharad Parho in Distt. Bilaspur
58 9500000 Jhandutta
2013-14 P-II
950000 2850000 2850000 2850000
20 Ghumarwin LIS Daslerha Goacher in Jhandutta Constituency Distt. Bilaspur.
87 19000000 -do-
2014-15 P-I
1900000 5700000 5700000 5700000
21 Ghumarwin CAD to LIS Kalshi Machuan
15 2000000 Ghumarwin CAD 200000 600000 600000 600000
22 Ghumarwin CAD to LIS Jaman Tikker 13 1964700 -do- CAD 196470 589410 589410 589410 Total 6713.44 816810700 131240670 277302810 267802810 140464410
Sr. NO.
Name of Divison
Name of scheme Estimated Cost Constituency Priority Period of implementation and requirement of funds (In Lakh)
2016-17 2017-18 2018-19
1 Bilaspur C/O rain water harvesting structure over Ali Khad near Kuddi in Tehsil Sadar Distt. Bilaspur.
9093000 Sadar 2009-10 P-
I 2727900 2727900 3637200
2 Bilaspur
C/O rain water harvesting structure over Ali Khad near Thoru (Down stream Jabble bridge) in Tehsil Sadar Distt. Bilaspur.
13147000 Sh. Naina Devi Ji 2009-10 P-
I 3944100 3944100 5258800
3 Ghumarwin C/O Rain Water Harvesting Structure Over Seer Khad at Ghuamrwin near STP in Distt. Bilaspur.
19700000 Ghumarwin 2014-15 P-II 5910000 5910000 7880000
4 Ghumarwin C/O Rain Water Harvesting Structure Over Seer Khad at Damla (Odi) in Distt. Bilaspur.
46000000 Ghumarwin 2015-16 P-1 13800000 13800000 18400000
Total 87940000 26382000 26382000 35176000 G. Total (A&B) 904750700 157622670 303684810 302978810
5.5 Block-wise Plan under PMKSY
Out of the total plan of 13002.9 lakh, 53.70% is pertaining to Bilaspur Sadar while Ghumarwin
and Jhandutta each has a share of 20.60% and 20.32% respectively. The share of Naina Devi is to
the tune of 5.38% in total plan. Table below describes block and department wise share in plan.
Table 5.5: Block wise plan under PMKSY (amount in Lakh Rs.)
Block Year
Total 2016-17 2017-18 2018-19 2019-20
Sri Naina Devi 151.1 218.9 222.9 106.1 699.0
Bilaspur Sadar 1280.2 2127.9 2119.1 1455.6 6982.9
Ghumarwin 542.2 790.8 800.5 545.3 2678.7
Jhandutta 443.6 708.4 712.4 777.8 2642.3
Total 2417.1 3846.0 3855.0 2884.8 13002.9
Figure 5-3: Block-wise share in plan
5.5.1 Sri Naina Devi Block Plan
Estimated plan for whole block under the scheme for four years works out to be Rs.698.97 lakhs.
Irrigation and Public Health Department accounts for the maximum share of about Rs. 306 lakhs
(43.78%) and is followed by Horticulture Department with a budget of Rs. 164.6 lakhs (23.55%).
Agriculture department and RDD have a share of 19.51% and 13.17% respectively. Year-wise plan
with respect to all departments for 2016-17, 2017-18, 2018-19 and 2019-20 has been proposed to
be Rs. 151.085 lakhs, Rs. 218.895 lakhs, Rs. 222.895 lakhs and Rs. 106.095 lakhs respectively.
Sri Naina Devi, 5.38%
Bilaspur Sadar, 53.70%
Ghumarwin, 20.60%
Jhandutta, 20.32%
71 | P a g e
Table 5.6: Department wise yearly plan (Amount in Lakh Rs)
Department Year
Total 2016-17 2017-18 2018-19 2019-20
Irrigation & Public Health Department
61.2 122.4 122.4 0 306
Agriculture Department 30.335 32.335 36.335 37.335 136.34
Horticulture Department 41.15 41.15 41.15 41.15 164.6
Rural Development Department 18.4 23.01 23.01 27.61 92.03
Total: 151.085 218.895 222.895 106.095 698.97
Figure 5-4: Department wise share in proposed plan
The plan is prepared component wise also. Table 5.7 shows component wise plan for 4 years
starting from 2016-17 to 2019-20. Fig. 5.5 is the graphical representation of various components
of PMKSY. It is observed that maximum share of 43.78% is for AIBP followed by Per Drop More
Crop- Supplementary Water Management activities (21.26%) and Per Drop More Crop- Micro-
irrigation (19.89%).
Table 5.7: Component-wise Plan
Component wise Year
Total 2016-17 2017-18 2018-19 2019-20
Accelerated Irrigation Benefitted Programme (AIBP)
61.2 122.4 122.4 0 306
Irrigation & Public Health Department,
43.78%
Agriculture Department, 19.51%
Horticulture Department, 23.55%
Rural Development Department,
13.17%
72 | P a g e
PMKSY-Har Khet Ko Pani (HKKP) 0 0 0 0 0
i) Micro-irrigation 34.75 34.75 34.75 34.75 139
ii) Supplementary Water Management activities
33.4 35.4 39.4 40.4 144.6
iii) Ext. And Trg. Under ATMA 3.335 3.335 3.335 3.335 13.34
PMKSY -Watershed 0 0 0 0 0
Convergence with MGNREGS 18.4 23.01 23.01 27.61 92.03
Total 151.09 218.895 222.9 106.095 698.97
Figure 5-5: Component-wise Plan
5.5.2 Bilaspur Block Plan
Estimated plan for whole block under the scheme for four years works out to be Rs.6982.87 lakhs.
Irrigation and Public Health Department accounts for the maximum share of about Rs. 4766.17
lakhs (68.26%) and is followed by RDD with a budget of Rs. 1878.77 lakhs (26.91%). Agriculture
department and Horticulture Department have a share of 2.48% and 2.36% respectively. Year-
wise plan with respect to all departments for 2016-17, 2017-18, 2018-19 and 2019-20 has been
proposed to be Rs. 1280.21 lakhs, Rs. 2127.90 lakhs, Rs. 2119.14 lakhs and Rs. 1455.62 lakhs
respectively.
AIBP, 43.78%
PDMC- MI, 19.89%
PDMC SWM, 21.26%
PDMC ATMA, 1.91%
Convergence, 13.17%
73 | P a g e
Table 5.8: Department wise yearly plan (Amount in Lakh Rs)
Department Year
Total 2016-17 2017-18 2018-19 2019-20
Irrigation & Public Health Department
823.97 1574.73 1561.97 805.50 4766.17
Agriculture Department 39.34 42.34 46.34 45.34 173.34
Horticulture Department 41.15 41.15 41.15 41.15 164.60
Rural Development Department 375.75 469.69 469.69 563.63 1878.77
Total 1280.21 2127.90 2119.14 1455.62 6982.87
Figure 5-6: Department wise share in proposed plan
The plan is prepared component wise also. Table 5.9 shows component wise plan for 4 years
starting from 2016-17 to 2019-20. Fig. 5.7 is the graphical representation of various components
of PMKSY. It is observed that maximum share of 67.68% is for Har Khet Ko Pani followed by
Watershed (24.62%).
Table 5.9: Component-wise Plan
Component wise Year
Total 2016-17 2017-18 2018-19 2019-20
Accelerated Irrigation Benefitted Programme (AIBP)
15.00 25.00 0.00 0.00 40.00
Irrigation & Public Health Department,
68.26%
Agriculture Department, 2.48%
Horticulture Department, 2.36%
Rural Development Department, 26.91%
74 | P a g e
PMKSY-Har Khet Ko Pani (HKKP) 808.97 1549.73 1561.97 805.50 4726.17
i) Micro-irrigation 34.75 34.75 34.75 34.75 139.00
ii) Supplementary Water Management activities
42.40 45.40 49.40 48.40 185.60
iii) Ext. And Trg. Under ATMA 3.34 3.34 3.34 3.34 13.34
PMKSY -Watershed 343.84 429.80 429.80 515.76 1719.21
Convergence with MGNREGS 31.91 39.89 39.89 47.87 159.56
Total 1280.21 2127.90 2119.14 1455.62 6982.87
Figure 5-7: Component-wise Plan
5.5.3 Ghumarwin Block Plan
Estimated plan for whole block under the scheme for four years works out to be Rs.2678.75 lakhs.
Irrigation and Public Health Department accounts for the maximum share of about Rs. 1826.65
lakhs (68.19%) and is followed by RDD Department with a budget of Rs. 493.16 lakhs (18.41%).
Agriculture and Horticulture departments have a share of 7.25% and 6.14% respectively. Year-
wise plan with respect to all departments for 2016-17, 2017-18, 2018-19 and 2019-20 has been
AIBP, 0.57%
HKKP, 67.68%
PDMC- MI, 1.99%
PDMC SWM, 2.66%
PDMC ATMA, 0.19%
Watershed, 24.62%
Convergence, 2.29%
75 | P a g e
proposed to be Rs. 542.19 lakhs, Rs. 790.97 lakhs, Rs. 800.47 lakhs and Rs. 545.32 lakhs
respectively.
Table 5.10: Department wise yearly plan (Amount in Lakh Rs)
Department Year
Total 2016-17 2017-18 2018-19 2019-20
Irrigation & Public Health Department
359.06 577.99 583.69 305.89 1826.65
Agriculture Department 43.34 48.34 52.34 50.34 194.34
Horticulture Department 41.15 41.15 41.15 41.15 164.60
Rural Development Department 98.64 123.29 123.29 147.94 493.16
Total 542.19 790.77 800.47 545.32 2678.75
Figure 5-8: Department wise share in proposed plan
The plan is prepared component wise also. Table 5.11 shows component wise plan for 4 years
starting from 2016-17 to 2019-20. Fig. 5.9 is the graphical representation of various components
of PMKSY. It is observed that maximum share of 68.19% is for Har Khet Ko Pani followed by
Watershed (11.20%).
Table 5.11: Component-wise Plan
Component wise Year Total
Irrigation & Public Health Department,
68.19%Agriculture
Department, 7.25%
Horticulture Department, 6.14%
Rural Development Department, 18.41%
76 | P a g e
2016-17 2017-18 2018-19 2019-20
Accelerated Irrigation Benefitted Programme (AIBP)
0.00 0.00 0.00 0.00 0.00
PMKSY-Har Khet Ko Pani (HKKP) 359.06 577.99 583.69 305.89 1826.65
i) Micro-irrigation 34.75 34.75 34.75 34.75 139.00
ii) Supplementary Water Management activities
46.40 51.40 55.40 53.40 206.60
iii) Ext. And Trg. Under ATMA 3.34 3.34 3.34 3.34 13.34
PMKSY -Watershed 60.02 75.02 75.02 90.02 300.08
Convergence with MGNREGS 38.62 48.27 48.27 57.92 193.08
Total 542.19 790.77 800.47 545.32 2678.75
Figure 5-9: Component-wise Plan
5.5.4 Jhandutta Block Plan
Estimated plan for whole block under the scheme for four years works out to be Rs.2642.30 lakhs.
RDD accounts for the maximum share of about Rs. 1326.86 lakhs (50.22%) and is followed
Irrigation and Public Health Department with a budget of Rs. 977.50 lakhs (36.99%). Agriculture
department and Horticulture Department have a share of 6.56% and 6.23% respectively. Year-
HKKP, 68.19%
PDMC- MI, 5.19%
PDMC SWM, 7.71%
PDMC ATMA, 0.50%
Watershed, 11.20%
Convergence, 7.21%
77 | P a g e
wise plan with respect to all departments for 2016-17, 2017-18, 2018-19 and 2019-20 has been
proposed to be Rs. 443.61 lakhs, Rs. 708.45 lakhs, Rs. 712.45 lakhs and Rs. 777.8 lakhs
respectively.
Table 5.12: Department wise yearly plan (Amount in Lakh Rs)
Department Year
Total 2016-17 2017-18 2018-19 2019-20
Irrigation & Public Health Department
97.75 293.25 293.25 293.25 977.50
Agriculture Department 39.34 42.34 46.34 45.34 173.34
Horticulture Department 41.15 41.15 41.15 41.15 164.60
Rural Development Department 265.37 331.71 331.71 398.06 1326.86
Total 443.61 708.45 712.45 777.80 2642.30
Figure 5-10: Department wise share in proposed plan
The plan is prepared component wise also. Table 5.13 shows component wise plan for 4 years
starting from 2016-17 to 2019-20. Fig. 5.11 is the graphical representation of various components
of PMKSY. It is observed that maximum share of 44.18% is for Watershed followed by Har Khet
Ko Pani (36.99%).
Table 5.13: Component-wise Plan
Component wise Year Total
Irrigation & Public Health Department,
36.99%
Agriculture Department, 6.56%
Horticulture Department, 6.23%
Rural Development Department, 50.22%
78 | P a g e
2016-17 2017-18 2018-19 2019-20
Accelerated Irrigation Benefitted Programme (AIBP)
0.00 0.00 0.00 0.00 0.00
PMKSY-Har Khet Ko Pani (HKKP) 97.75 293.25 293.25 293.25 977.50
i) Micro-irrigation 34.75 34.75 34.75 34.75 139.00
ii) Supplementary Water Management activities
42.40 45.40 45.40 48.40 185.60
iii) Ext. And Trg. Under ATMA 3.34 3.34 3.34 3.34 13.34
PMKSY -Watershed 233.46 291.82 291.82 350.19 1167.30
Convergence with MGNREGS 31.91 39.89 39.89 47.87 159.56
Total 443.61 708.45 712.45 777.80 2642.30
Figure 5-11: Component-wise Plan
5.5 Suggestions
For successful implementation of PMKSY plan it is suggested that:
All the stakeholders should convene meeting of Panchayat Samities and then finalize the
village plan and prepare DPR.
HKKP, 36.99%
PDMC- MI, 5.26%PDMC SWM, 7.02%
PDMC ATMA, 0.50%
Watershed, 44.18%
Convergence, 6.05%
79 | P a g e
There should not be any duplicity of project.
The Department should supplement each other so that the maximum irrigation efficiency
is achieved.
Agriculture and Horticulture Department should take micro irrigation projects in the
command of minor irrigation projects which are either completed or likely to be completed
in near future.
All the irrigation projects should have a component of water conveyance so that the each
drop of water is judiciously utilized.
Where ever feasible, Solar pumpsets should be installed.
All the structures planned should be geo tagged and marked on map, so that social
monitoring of the projects can be conducted. This will also avoid the duplicity.
Priority should be given to projects to minimize the gap in potential created and potential
utilized.
Wherever sites with low head LIS have already been exhausted, higher per hectare norms
should be allowed.
Execution of the scheme should be expeditiously completed.
There should be smooth fund flow for timely completion of the project and to avoid cost
escalation.
5.6 Expected Outcome
As stated above in earlier chapters gross sown area of the district is 51169 hectare of which 5299
hectare is irrigated. Thus there is a gap of 45870 hectare which can be converted from rainfed to
area under assured irrigation. As the water requirement of crops for the existing cropping pattern
works out to be 73.26 MCM and if the gross cropped area is to be brought under irrigated area,
50.60 MCM water is required. Though the water (surface and ground water) is available in the
district yet it will not be feasible to create irrigation potential to the extent of 100% as the
construction of irrigation project may not be economically viable even if it is technically feasible.
In hilly area due to tough terrain, high head, small and fragmented land holdings, per hectare cost
may be very high. Moreover it may not be feasible to develop all the sources within a short spell
of four years for which the plan is being prepared.
Keeping in view the above constraints a plan to develop irrigation potential of 16021.44 ha has
been proposed. It is proposed to create an irrigation potential by installing new lift irrigation ad
Flow irrigation schemes tapping surface water and installation of tube wells and bore wells where
80 | P a g e
ground water is available. Besides, water Harvesting structures have also been proposed which
will harvest rainwater as also spring water.
The average productivity of land in Rainfed area is 2394 kg/ha while the same is 3049 kg/ha.
Hence, with extended irrigation facility to 16021 hectare, the incremental yield would be 10500
MT approximately. Considering an income of Rs. 100000/- from one hectare, the additional
income which farmers would derive on account of increased productivity will be around Rs. 40
crores per season.
Potential of 4422.44 hectare which is around 28% of the total potential proposed to be created is
proposed I&PH department. Horticulture and Agriculture Departments have proposed to create
and irrigation potential of 840 hectare. Sprinkler and drip irrigation schemes have been proposed
by the department. On completion of these projects, it is expected that an additional irrigation
potential will be created due to saving of water through adoption of water saving methods of
irrigation. It is proposed to create 2177 Water Harvesting Structures which will augment the water
potential by around 122436 cum. This will result into extending irrigation facility to around 163.25
hectare.
Under Per Drop More Crop (Supplementary Water Management Activities), a total of 399
structures will be created which will create a pondage capacity of 189500 cubic meters. This will
result in to creating an irrigation potential of 330 hectares. Maximum potential will be created in
Ghumarwin Block (100 Ha) followed by Jhandutta (80 ha), Sadar (80 ha) and Swarghat Block
(70 Ha).
Last but not the least, as the scheme envisages, the plan includes convergence with MGNREGS
for creation of water sources to full potential in identified backward rainfed blocks including
renovation of traditional water bodies. This can be observed from the fact that DRDA has
proposed around Rs. 604.2 for the period of 4 years under the head of convergence with
MGNGRES. This involves creation of new water conservation, water harvesting structures,
irrigation canals and drains, land development, etc. It also involved renovation of water bodies
including desiltation, maintenance of canals and drains, etc.
Considering 20% of the TFO will be used for labour component, around 12 lakh mandays of job
will be created in the district.
Table 5.14: Strategic Action Plan for Irrigation in District Bilaspur under PMSKY
S.
No.
Name of the blocks/ Sub
district
Concerned Ministry/
Department
Component Activity Total Number/Capacity
(cum)
Command Area/
Irrigation Potential (Ha.)
Peroid of Implementation
(years)
Estimated Cost
(in Rs. lakh)
1
MoWR
AIBP
Major 1 292.44 4 306
Irrigation
2 MoWR Medium
1 59 4 40 Irrigation
3 MoWR Surface Minor Irrigation
4 MoWR
HAR Khet Ko Pani
Lift Irrigation 1 59 2 150
5 MoWR Minor irrigation 49 4012 4 6500.917
6 MoWR C/O RWHS 10 20 3 879.4
7 MoWR Construction of field channels
7.1 MoWR Lined Field Channels
7.2 MoWR Unlined Field Channels
8 MoWR Micro-Irrigation
9
MOA & FW-DAC & FW
DPAP Drip
10 MOA & FW-DAC
& FW
Per drop more crop (Micro
Irrigation) DPAP Sprinkler
11 MOA & FW-DAC & FW
Non- DPAP Drip 10 10 4 4
12 MOA & FW-DAC
& FW Non- DPAP Sprinkler 100 100 4 80
13
MOA & FW-DAC & FW
Per drop more crop ATMA 6324 4 59.76
Creation of water sources 350 300 4 472
Repair of existing dugwells 30 30 4 24
Command area development 70 70 4 56
Water lifting devices 50 4 16
14 MOA & FW-DAC
& FW
Per drop more crop Drought
99 250 4 404
(Supplementar y water
management activities) Proofing
through
check
Dams/Water
Harvesting
Structures
15 MOA & FW-DAC
& FW
Secondary
100 48 4 140 Storage
Structure
16 MOA & FW-DAC
& FW
On Farm Development
(distribution pipe /lift device etc.) 200 32 4 80
82 | P a g e
17
DoLR-MoRD
PMKSY Watershed
Newly created WHS
17.1
DoLR-MoRD Farm Ponds 177 813 4 122.098
17.
2 DoLR-MoRD Check Dams 149 1478 4 220.919
17.
3 DoLR-MoRD Nallah Bunds 99 854 4 128.31
17.
4 DoLR-MoRD Percolation Tank 224 1143 4 173.59
17.
5 DoLR-MoRD
Other Ground Water Recharge
structure 217 266 4 40.173
17.
6 DoLR-MoRD Fishery Ponds/cattle Ponds 745 2473 4 370.132
18 DoLR-MoRD Renovated WHS
18.
1 DoLR-MoRD Farm Ponds 2 22 4 3.525
18.2
DoLR-MoRD Check Dams 1 27 4 4.134
18.
3 DoLR-MoRD Nallah Bunds 0 0 4 0
18.4
DoLR-MoRD Percolation Tank 0 11 4 1.718
18.
5 DoLR-MoRD
Other Ground Water Recharge
structure 0 0 4 0
18.6
DoLR-MoRD Fishery Ponds/cattle Ponds 10 44 4 37.591
18.
7 DoLR-MoRD PMKSY Watershed 30953 3608 4 2084.4
19
DoRD-MoRD
Convergence with
MGNREGA
Newly Created
19.1
DoRD-MoRD Water Conservation 20/2130 52/27 4 36
19.
2 DoRD-MoRD Water Harvesting 92/3540 69/33 4 116.5
19.3
DoRD-MoRD Creation of Irrigation canals & Drains
67 281/217 4 117
19.
4 DoRD-MoRD
Providing Infrastructure for
Irrigation 132/8902 4598/584 4 291
19.5
DoRD-MoRD Land Development 100 0 4 10
20 DoRD-MoRD Renovation
20.
1 DoRD-MoRD
Renovation of water bodies
including desilting: 29/660 231/2 4 22.5
20.2
DoRD-MoRD Renovation & Maintenance of Irrigation Canals & Drains
16 4 11.2
Total 13002.9
Annexure-I (a) Strategic Action Plan for Irrigation under PMKSY in Bilaspur District (2016-2020) with respect to
I&PH department
Proposed IRRIGATION SCHEMES UNDER (PMKSY) PROGRAMME IN IPH CIRCLE BILASPUR (H.P) Sl Name of
Davison Name of scheme CCA in
Hect. Estimate
d Cost Constitue
ncy Name of Hon'ble
MLA
Priority
(years wise)
Period of implementation and requirement of funds (In Lakh)
2016-17 2017-18 2018-19
2019-20
1 Bilaspur
DPR for providing CAD of Lift Irrigation Scheme Tanbol Zagatkhana (Under CAD W&M Programme) in Distt. Bilaspur.
292.44 306 Sh. Naina
Devi Ji
Sh. Randhir Sharma
- 61.2 122.4 122.4 -
2 Bilaspur Construction of Lift Irrigation Scheme Jamthal Harnoda in Distt. Bilaspur.
59 150
Sadar
Sh. Bumber Thakur
2013-14 P-I
140 10 - -
3 Bilaspur
DPR for providing CAD of Lift Irrigation Scheme Jamthal Harnoda (Under CAD W&M Programme) in Distt. Bilaspur.
59 40 - 15 25 - -
4 Bilaspur
Providing CAD works in Cluster of 21 Nos. Minor Irrigation Scheme under IPH Division Bilaspur (H.P)
1383 1668.765 - 333.753 667.506 667.506 -
5 Bilaspur LIS Parnal 52
130 2015-16
P-1 13 39 39 39
6 Bilaspur LIS Mehri Kathla 38
95 2015-16
P-1 9.5 28.5 28.5 28.5
7 Bilaspur LIS Bachhrin Masdhan 115
287.5 2015-16
P-1 28.75 86.25 86.25 86.25
8 Bilaspur LIS Ladder 73
182.5 2015-16
P-1 18.25 54.75 54.75 54.75
9 Bilaspur LIS Jukhala 435
1087.5 Sh. Naina
Devi Ji
Sh. Randhir Sharma
2015-16 P-2
108.75 326.25 326.25 326.25
10 Bilaspur LIS sikroha 54
135 2013-14
P-2 13.5 40.5 40.5 40.5
11 Bilaspur LIS Kothi Chandpur and Kandrour
585 1462.5
Sadar Sh.
Bumber Thakur
2014-15 P-2
146.25 438.75 438.75 438.75
12 Bilaspur FIS Ladda Bhagwani 90
225 2015-16
P-2 22.5 67.5 67.5 67.5
13 Ghumarwi
n
Providing CAD works in Cluster of 12 Nos. Minor Irrigation Scheme under IPH Division Ghuamrwin (H.P)
702 60 Ghumarwi
n
Sh. Rajesh Dharmani
- 6 18 18 18
84 | P a g e
14 Ghuamrwi
n
LIS Auhar Palthin Sepra Bakroa, Paleh, Bhajwani etc. in Tehsil Ghumarwin Distt. Bilaspur (HP)
105
262.5 2014-15
P-I 26.25 78.75 78.75 78.75
15 Ghuamrwi
n
LIS Peherwin Majhasu by tapping River water etc in Tehsil Ghumarwin Distt. Bilaspur (HP)
130
325 2014-15
P-II 32.5 97.5 97.5 97.5
16 Ghuamrwi
n
Providing Irrigation facilities to Village Badoa Hirapur from Rukmani Nalla Distt. Billaspur
42
105 Jhandutta Sh. Rikhi
Ram Kaundal
2014-15 P-I
10.5 31.5 31.5 31.5
17 Ghuamrwi
n
LIS for village Seo and ket in Ghumarwin in Distt. Bilaspur.
35 150
Ghumarwin
Sh. Rajesh Dharmani
2013-14 P-I
60 75 15 -
18 Ghuamrwi
n
LIS Dharad Parho in Distt. Bilaspur
58 95 Jhandutta
Sh. Rikhi Ram
Kaundal
2013-14 P-II
9.5 28.5 28.5 28.5
19 Ghumarwi
n
LIS Daslerha Goacher in Jhandutta Constituency Distt. Bilaspur.
87 190 -do- -do-
2014-15 P-I
19 57 57 57
20 Ghumarwi
n CAD to LIS Kalshi Machuan 15
20 Ghumarwi
n Sh. Rajesh Dharmani
CAD 2 6 6 6
21 Ghumarwi
n CAD to LIS Jaman Tikker 13
19.647 -do- -do- CAD 1.9647 5.8941 5.8941 5.8941
22 Bilaspur C/O RWH structure over Ali Khad near Kuddi in Tehsil Sadar Distt. Bilaspur.
90.93 Sadar Sh. J.P. Nadda
2009-10 P-I
27.279 27.279 36.372 0
23 Bilaspur
C/O RWH structure over Ali Khad near Thoru (Downstream Jabble bridge) in Tehsil Sadar Distt. Bilaspur.
131.47 Sh. Naina
Devi Ji
Sh. Randhir Sharma
2009-10 P-I
39.441 39.441 52.588 0
24 Ghumarwi
n
C/O RWH Structure Over Seer Khad at Ghuamrwin near STP in Distt. Bilaspur.
197 Ghumarwin
Sh. R Dharmani
2014-15 P-II 59.1 59.1 78.8 0
25 Ghumarwi
n
C/O RWH Structure Over Seer Khad at Damla (Odi) in Distt. Bilaspur.
460 Ghumarwin
Sh. Rajesh Dharmani
2015-16 P-1 138 138 184 0
Total
7876.312 1341.98
8 2568.3
7 2561.3
1 1404.64
4
85 | P a g e
86 | P a g e
Annexure-I (b) Strategic Action Plan for Irrigation under PMKSY in Bilaspur District (2016-2020) with respect to
DRDA
Sr. No.
Component Activity-wise Block No. Capacity
(cum)
Command Area /
Irrigation Potential
(Ha)
Period of Implementation
Year-wise Estimated Cost in Rs. in Lac
17
Water Harvesting Structures (newly
to be created)
1st yr 2nd yr 3rd yr 4th yr Total 17.1 Farm Ponds 177 32260 813 4 year 24.42 30.525 30.525 36.629 122.098 17.2 Check Dams 149 35490 1478 4 year 44.184 55.23 55.23 66.276 220.919 17.3 NallaBandhs 99 5740 854 4 year 25.662 32.078 32.078 38.493 128.31
17.4 Percolation
Tanks 224 8050 1143 4 year 34.718 43.398 43.398 52.077 173.59
17.5 ground water
Recharge Structure
217 2254 266 4 year 8.0346 10.043 10.043 12.052 40.173
17.6 Others 745 12290 2473 4 year 74.026 92.533 92.533 111.04 370.132 TOTAL 17 1611 96084 7027 0 211.0446 263.807 263.807 316.567 1055.222
18
Water Harvesting
Structures to be Renovated
18.1 Farm Ponds 2 150 22 4 years 0.705 0.8813 0.8813 1.0575 3.525 18.2 Check Dams 1 4000 27 4 years 0.8268 1.0335 1.0335 1.2402 4.134 18.3 NallaBandhs 0 0 0 4 years 0 0 0 0 0
18.4 Percolation
Tanks 0 0 11 4 years 0.3436 0.4295 0.4295 0.5154 1.718
18.5
Ground Water
Recharge Structure
0 0 0 4 years 0 0 0 0 0
18.6 Other Fishry
Ponds / Cattle Ponds
10 1170 44 4 years 7.5182 9.3978 9.3978 11.277 37.591
Total 18.1-18.6
13 5320 104 0 9.3936 11.7421 11.7421 14.0901 46.968
18.7 (A)
Land Development
2140.9 0 1300 4 Year 28.9808 36.226 36.226 43.471 144.904
18.7 (B)
Soil and Moisture Conservation
923 0 264 54Year 23.64 29.55 29.55 35.46 118.2
18.7 (C)
Entry Point Activities
35 158 69 4 Year 5.4048 6.756 6.756 8.1072 27.024
18.7 (D)
DPR 0 0 0 4 Year 2.4509 3.0636 3.0636 3.6764 12.2545
87 | P a g e
18.7 (E)
I & CB 175 6905 4 Year 30.0151 37.519 37.519 45.023 150.0755
18.7 (F)
Livelihood 386 1271 0 5 Year 67.5 84.4 84.4 101.3 337.5155
18.7 (G)
Production & Micro Enterprises
21366 2863 0 5 Year 71.97 89.96 89.96 107.96 359.851
18.7 (H)
Monitoring 0 0 0 4 Year 5.0377 6.2971 6.2971 7.5566 25.1885
18.7 (I)
Evaluation 0 0 0 4 Year 5.037 6.296 6.296 7.555 25.1825
18.7 (J)
Consolidation 0 0 0 4 Year 23.4503 29.313 29.313 35.175 117.2515
18.7 (K)
Veg. &Engg. Structures
5927 1802 1975 4 Year 89.8928 112.37 112.37 134.84 449.464
Admin. 0 0 0 4 Year 63.49674 79.371 79.371 95.245 317.4837 Total 18.7 416.88 521.1 521.1 625.32 2084.395
19 Convergence with MGNREGA
19.1
Newly created
Water conservation
20/2130 52/27 4 year 7.2 9 9 10.8 36
19.2 Water harvesting
92/3540 69/33 4 year 23.3 29.125 29.125 34.95 116.5
19.3
Creation of irrigation canals and Drains
67 281/217 4 year 23.4 29.25 29.25 35.1 117
19.4 Providing infrastructure for irrigation
132/8902 4598/584 4 year 58.2 72.75 72.75 87.3 291
19.5 Land Development
100 0 4 year 2 2.5 2.5 3 10
Total 19 114.1 142.625 142.625 171.15 570.5
20.1
Renovation
Renovation of water bodies including desilting
29/660 231/2 4 year 4.5 5.625 5.625 6.75 22.5
20.2
Renovation & Maintanance cannals & Drains
16 2/1 4 year 2.24 2.8 2.8 3.36 11.2
Totall 20 6.74 8.425 8.425 10.11 33.7
GRAND TOTAL 758.2 947.7 947.7 1137.2 3790.78
88 | P a g e
Annexure-I (c) Strategic Action Plan for Irrigation under PMKSY in Bilaspur District (2016-2020) with respect to
Agriculture Department, Horticulture Department and ATMA
Sl Name of the Blocks/
Sub Districts
Component Activity Total Number
Pondage Capacity
Command Area/
Irrigation Potential
(Ha)
Period of Implementa
tion (yrs)
Estimated cost (Rs. in lacs)
2016-17 2017-18 2018-19 2019-20 Total 1 Ghumarwin PDMC
Supplementary Water Management Activities
Topping up of MGNREGA 0 0 0 0 0 0 0 0 0 Drought Proofing through Check Dam/ WHS 30 Nos.
60000 80 Hect. 5 29.00 33.00 33.00 31.00 126.00
Secondary storage structure 25 Nos. 500 12 Hect. 5 7.00 8.00 10.00 10.00 35.00 On farm development. Distribution of pipes. Raised beds & furrow systems 50 Nos.
8 Hect. 5 4.00 4.00 6.00 6.00 20.00 Total 105 60500 100 40.0 45.0 49.0 47.0 181.00 2 Jhandutta PDMC
Supplementary Water Management Activities
Topping up of MGNREGA 0 0 0 5 0 0 0 0 0 Drought Proofing through Check Dam/ WHS 26 Nos.
45000 60 Hect. 5 25.00 27.00 27.00 26.00 105.00
Secondary storage structure 25 Nos. 500 12 Hect. 5 7.00 8.00 10.00 10.00 35.00 On farm development. Distribution of pipes. Raised beds & furrow systems 50 Nos.
8 Hect. 5 4.00 4.00 6.00 6.00 20.00 Total 11 45500 80 36.0 39.0 43.0 42.0 160.0 3 Bilaspur
Sadar PDMC Supplementary Water Management Activities
Topping up of MGNREGA 0 0 0 5 0 0 0 0 0 Drought Proofing through Check Dam/ WHS
26 45000 60 5 25.00 27.00 27.00 26.00 105.00
Secondary storage structure 25 500 12 5 7.00 8.00 10.00 10.00 35.00 On farm development. Distribution of pipes. Raised beds & furrow systems
50 0 8 5
4.00 4.00 6.00 6.00 20.00 Total 101 45500 80 36.0 39.0 43.0 42.0 160.0 4 Swarghat PDMC
Supplementary Water Management Activities
Topping up of MGNREGA 0 0 0 5 0 0 0 0 0 Drought Proofing through Check Dam/ WHS 17
37500 50 5 16.00 17.00 17.00 18.00 68.00
Secondary storage structure 25 500 12 5 7.00 8.00 10.00 10.00 35.00 On farm development. Distribution of pipes. Raised beds & furrow systems
50 0 8 5
4.00 4.00 6.00 6.00 20.00 Total 92 38000 70 27.0 29.0 33.0 34.0 123.0 Sub Total Agriculture 139.0 152.0 168.0 165.0 624.0 Proposal from ATMA 1 Bilaspur Moisture
conservation & cropping alignment
Training of farmers @250 for one day 1600
4 1.00 1.00 1.00 1.00 4.00
2 Training of officers @500 per day for Two days 160
4 0.40 0.40 0.40 0.40 1.60
3 Demonstration @ 4000 480 4 4.80 4.80 4.80 4.80 19.20 4 Efficient use of
water Training of farmers @250 for one day 1600
4 1.00 1.00 1.00 1.00 4.00
89 | P a g e
5 Water requirement
based cropping
Training of officers @500 per day for Two days 80
4 0.20 0.20 0.20 0.20 0.80
6 Demonstration @ 4000 256 4 2.56 2.56 2.56 2.56 10.24 7 Training of farmers @250
for one day 1440
4 0.90 0.90 0.90 0.90 3.60 8 Per Drop more
crop (On Farm Development )
Farm school Sub Total
ATMA
Training of officers @500 per day for Two days 80
4 0.20 0.20 0.20 0.20 0.80
9 Demonstration @ 4000 112 4 1.12 1.12 1.12 1.12 4.48 10 Farm school 16 4 1.16 1.16 1.16 1.16 4.64
5824
13.34 13.34 13.34 13.34 53.36
Total of Agriculture + ATMA 152.34 165.34 181.34 178.34 677.36
Details of PMKSY programme to be implemented by Horticulture Department 1 Bilaspur Ministry of
Agriculture & Farmer Welfare
Per Drop more crop (Efficient use of Water)
i) Drip@ Rs. 0.50 Lakh per Ha 10 Nos.
10 Ha 4 1.00 1.00 1.00 1.00 4.00
2 ii) Portable Sprinkler @ Rs. 1.0 Lakh per Ha 100
100 Ha 4 20.00 20.00 20.00 20.00 80.00
3 Per Drop more crop (Creation of water sources )
Water storage tanks RCC structure @ Rs. 2800 per cum
100 No’s
50 Ha 4 28.00 28.00 28.00 28.00 112.00 4 Borewell @ Rs.1.80 lac
per unit 250 No’s
250 Ha 4 90.00 90.00 90.00 90.00 360.00
5 PDMC (Repair of existing dugwells )
Dug well @ 1 Lakh
30 Nos.
30 4 6.00 6.00 6.00 6.00 24.00 6 Per Drop more
crop (Command Area Development )
Distribution of Water from source to tank
7 i) GI Pipe/ HDPE Pipe @ Rs. 1 Lakh per Ha 50 No's
50 ha 4 10.00 10.00 10.00 10.00 40.00 8 ii) Kuhls @ Rs. 1 Lakh
per Ha 20
20 Ha 4 4.00 4.00 4.00 4.00 16.00 9 Per Drop more
crop (Water Lifting Devices )
Water Lifing pump/Diesel engine/ Electrical engine @ Rs. 0.40 Lakh Per Ha 50 Nos.
4 4.00 4.00 4.00 4.00 16.00 10 Per Drop more
crop (Capacity Building )
Training Camps 200 Nos. Farmers @1000/- day
200 Nos.
4 0.40 0.40 0.40 0.40 1.60 11 Exposure visit outside
state 300 Nos. @ 2000/- farmer
300 Nos.
4 1.20 1.20 1.20 1.20 4.80 Sub Total of Horticulture : 1110 510H. 164.60 164.60 164.60 164.60 658.40
Total of PMKSY( Per Drop More Crop -Micro-Irrigation Component
110 4 21.00 21.00 21.00 21.00 84.00
Total of PMKSY( Per Drop More Crop -Other Interventions
Component 1000
770 4 139.00 152.00 168.00 165.00 624.00 Total of PMKSY (Training Component ) ATMA 4 13.34 13.34 13.34 13.34 53.36 G.Total:- 173.34 186.34 202.34 199.34 761.36
90 | P a g e