Bilan and Objectives SU
Dominique Missiaen
Departures-Arrivals
19.06.2013ABP group meeting D. Missiaen2
Departures : Joanna Hulboj (FE) Sylvain Griffet (FE) Juha Kemppinen (FE) Sylvain Mico (FSU) Yann Bailly (VIA) Mohamed Khamfir
(TL) Montse Montero (FE) Christophe Podevin
(end of August) Bernard Noël (TL)
Arrivals Francis Klumb (ST) Philippe Dewitte (ST) Christophe Podevin Sebastian Waniorek
(FE) Mathieu Duquenne
(FE) Petre Radut (VIA) Michael Udzik (FSU) Mehdi Belhay (FE) Ales Hrabe (TECH) Olivier Ggouabre Seri
(TL) Bruno Perret (TL) 13 persons from the
contract c201
Before LS1 Alignment of K12 and Na62 :
1st beam in November 2012 Linac4 :
Fiducialisation of Components : RFQ, CCDTL, DTL, etc
3MEV test stand : RFQ, diagnostic line Tunnel : marking on the floor, alignment of the
source and LEBT LHC
Fiducialisation of 15 dipoles and 3 SSS Levelling tests in sector 67 to prepair LS1
19.06.2013ABP group meeting D. Missiaen3
NA62 LA
V, STR
AW, MUV
Before LS1 low beta quads
Load sensors under Installation at PT 5 (100 %) and 2
(80%) Visualisation under PVSS Irradiation tests performed with
success Design of remote validation units
for the HLS and WPS alignment systems Prototypes validated (mechanics,
electronics, acquisition and control)
19.06.2013ABP group meeting D. Missiaen4
Experiments
19.06.2013ABP group meeting D. Missiaen5
ATLAS IBL / New beam pipe:Mock-up scale1 (H180)
CMS :YE4 assembly
ALICE DCAL :Load test
LEB : Preparation of beam pipe changes (ATLAS, CMS, LHCb LS1, ALICE LS2)
LHCb Magnet :PhotogrammetryWith and without B
COMPASS: New RPD,
RICH, Liquid H target …
Non-LHC Experiments
11.12.2012Réunion annuelle 2012 D. Missiaen6
NA62 – COMPASS – ALPHA – CAST – NA61 – ISOLDE – Others
Survey in multiple areasAll along the year
ISOLDE Surve
y of a
ll lines
HIE-ISOLDE Intégration 3D Scan
CAST Grid, Dynamic survey
ALPHA Full installation
LS1- accelerators
19.06.2013ABP group meeting D. Missiaen7
LHC :-Fast levelling- Network machine-exp. for Atlas and CMS
PSB :Vertical shape
SPS :Vertical realignment of the «hole» of sextant 6
TI2:V and H realignment
LS1 – accelerators (coming next) LHC :
LSSs and alignment of new components Smoothing of the arcs from Summer next year Maintenance of the permanent monitoring system of
low beta quads Installation of load sensors and of validation systems for
HLS and WPS in PT1 and 5 SPS :
H and V realignment of all components TI8 : H and V realignment of all components TT10
PS : Measurement/re-alignment of the PSR Linac 4 :
alignment of the components 3 MEV test stand in the L4 tunnel
During assembly checks of CDDTL and DTL19.06.2013ABP group meeting D. Missiaen8
LS1 -Experiments Main survey done
Geodetic networks Stabilities ATLAS – CMS Experiment Opening surveys ATLAS EE Muon alignment
completed CMS Pixel / bulkhead-YE1 3D
scanning
19.06.2013ABP group meeting D. Missiaen9
Some tasks for the next future ATLAS: Muon Barrel / Install. Muon
Sector 13 / Start of Open Close Monitoring installation
CMS: MABs Calib. / YE4 assembly start / Upgrade BCAM / Prepa insertion beam pipe and Pixel CT
ALICE: Installation DCAL and new TRD mod.
LHCb: Installation of new Beam Pipe (Full length)
And many others operations foreseen in 2014
ATLAS: Muon Barrel
CMS Pixel Survey
CMS Bulkhead/YE1 3D Scan
Projects CLIC
LAMBDA : validation of solution on short range Development and validation of cam movers
Compact Standard
Validation of the alignment strategy on the TBTM mock-up Comparison of movement measured with CMM, WPS and AT401within 10 microns
Fiducialisation and active alignment : important progress
Absolute measurements with cWPS and oWPS within a few microns
19.06.2013ABP group meeting D. Missiaen10
Projects HIE-Isolde
Bcam monitoring system Open/Close monitoring system for Atlas CLIC
Development of cam movers: Standard and compact to be tested under 5 DOF Compatibility with stabilization solution to be checked
Lambda project: Validation of the concept on short range using a very
accurate displacement table Dimensional control, fiducialisation and alignment on
test setups: On the TBTM (including control of alignment during thermal
and transport tests) 19.06.2013ABP group meeting D. Missiaen11
Projects HIE-Isolde
Bcam monitoring system Open/Close monitoring system for Atlas
19.06.2013ABP group meeting D. Missiaen12
Projects (future) CLIC
Development of cam movers: Lambda project:
Validation of the concept on short range using a very accurate displacement table
Dimensional control, fiducialisation and alignment on test setups: On the TBTM (including control of alignment during thermal
and transport tests) Collaboration with NIKHEF:
Inter-comparison between alignment systems on short & long range
Follow-up of the spoke design in MDI area PACMAN project (Particle Accelerator Components’
Metrology and Alignment up to the Nanometre level) Marie Curie Initial Training Network, Innovative Doctoral
Programme
19.06.2013 ABP group meeting D. Missiaen13
Software and Database The development of the APEX interface has
been continued Calculation menu Measurements menu
Several versions of Post-processing : LGC++, CHaBa++, Data acquisition : SFB, PFB, carnet, Pctopo32
Some developments will be continued during LS1
19.06.2013ABP group meeting D. Missiaen14
Conclusions A huge LS1 ahead of us
A good start for the first 4 months Motivation will be very the most difficult thing to
maintain all along the 20 months
But not only LS1 LC and HIE-Isolde studies still continue Software and database developments as well
19.06.2013ABP group meeting D. Missiaen15