Departures-Arrivals

19.06.2013ABP group meeting D. Missiaen2

Departures : Joanna Hulboj (FE) Sylvain Griffet (FE) Juha Kemppinen (FE) Sylvain Mico (FSU) Yann Bailly (VIA) Mohamed Khamfir

(TL) Montse Montero (FE) Christophe Podevin

(end of August) Bernard Noël (TL)

Arrivals Francis Klumb (ST) Philippe Dewitte (ST) Christophe Podevin Sebastian Waniorek

(FE) Mathieu Duquenne

(FE) Petre Radut (VIA) Michael Udzik (FSU) Mehdi Belhay (FE) Ales Hrabe (TECH) Olivier Ggouabre Seri

(TL) Bruno Perret (TL) 13 persons from the

contract c201

Page 3: Bilan and Objectives SU

Before LS1 Alignment of K12 and Na62 :

1st beam in November 2012 Linac4 :

Fiducialisation of Components : RFQ, CCDTL, DTL, etc

3MEV test stand : RFQ, diagnostic line Tunnel : marking on the floor, alignment of the

source and LEBT LHC

Fiducialisation of 15 dipoles and 3 SSS Levelling tests in sector 67 to prepair LS1

19.06.2013ABP group meeting D. Missiaen3

NA62 LA

V, STR

AW, MUV

Page 4: Bilan and Objectives SU

Before LS1 low beta quads

Load sensors under Installation at PT 5 (100 %) and 2

(80%) Visualisation under PVSS Irradiation tests performed with

success Design of remote validation units

for the HLS and WPS alignment systems Prototypes validated (mechanics,

electronics, acquisition and control)

19.06.2013ABP group meeting D. Missiaen4

Page 5: Bilan and Objectives SU

Experiments

19.06.2013ABP group meeting D. Missiaen5

ATLAS IBL / New beam pipe:Mock-up scale1 (H180)

CMS :YE4 assembly

ALICE DCAL :Load test

LEB : Preparation of beam pipe changes (ATLAS, CMS, LHCb LS1, ALICE LS2)

LHCb Magnet :PhotogrammetryWith and without B

Page 6: Bilan and Objectives SU

COMPASS: New RPD,

RICH, Liquid H target …

Non-LHC Experiments

11.12.2012Réunion annuelle 2012 D. Missiaen6

NA62 – COMPASS – ALPHA – CAST – NA61 – ISOLDE – Others

Survey in multiple areasAll along the year

ISOLDE Surve

y of a

ll lines

HIE-ISOLDE Intégration 3D Scan

CAST Grid, Dynamic survey

ALPHA Full installation

Page 7: Bilan and Objectives SU

LS1- accelerators

19.06.2013ABP group meeting D. Missiaen7

LHC :-Fast levelling- Network machine-exp. for Atlas and CMS

PSB :Vertical shape

SPS :Vertical realignment of the «hole» of sextant 6

TI2:V and H realignment

Page 8: Bilan and Objectives SU

LS1 – accelerators (coming next) LHC :

LSSs and alignment of new components Smoothing of the arcs from Summer next year Maintenance of the permanent monitoring system of

low beta quads Installation of load sensors and of validation systems for

HLS and WPS in PT1 and 5 SPS :

H and V realignment of all components TI8 : H and V realignment of all components TT10

PS : Measurement/re-alignment of the PSR Linac 4 :

alignment of the components 3 MEV test stand in the L4 tunnel

During assembly checks of CDDTL and DTL19.06.2013ABP group meeting D. Missiaen8

Page 9: Bilan and Objectives SU

LS1 -Experiments Main survey done

Geodetic networks Stabilities ATLAS – CMS Experiment Opening surveys ATLAS EE Muon alignment

completed CMS Pixel / bulkhead-YE1 3D

scanning

19.06.2013ABP group meeting D. Missiaen9

Some tasks for the next future ATLAS: Muon Barrel / Install. Muon

Sector 13 / Start of Open Close Monitoring installation

CMS: MABs Calib. / YE4 assembly start / Upgrade BCAM / Prepa insertion beam pipe and Pixel CT

ALICE: Installation DCAL and new TRD mod.

LHCb: Installation of new Beam Pipe (Full length)

And many others operations foreseen in 2014

ATLAS: Muon Barrel

CMS Pixel Survey

CMS Bulkhead/YE1 3D Scan

Page 10: Bilan and Objectives SU

Projects CLIC

LAMBDA : validation of solution on short range Development and validation of cam movers

Compact Standard

Validation of the alignment strategy on the TBTM mock-up Comparison of movement measured with CMM, WPS and AT401within 10 microns

Fiducialisation and active alignment : important progress

Absolute measurements with cWPS and oWPS within a few microns

19.06.2013ABP group meeting D. Missiaen10

Page 11: Bilan and Objectives SU

Projects HIE-Isolde

Bcam monitoring system Open/Close monitoring system for Atlas CLIC

Development of cam movers: Standard and compact to be tested under 5 DOF Compatibility with stabilization solution to be checked

Lambda project: Validation of the concept on short range using a very

accurate displacement table Dimensional control, fiducialisation and alignment on

test setups: On the TBTM (including control of alignment during thermal

and transport tests) 19.06.2013ABP group meeting D. Missiaen11

Page 12: Bilan and Objectives SU

Projects HIE-Isolde

Bcam monitoring system Open/Close monitoring system for Atlas

19.06.2013ABP group meeting D. Missiaen12

Page 13: Bilan and Objectives SU

Projects (future) CLIC

Development of cam movers: Lambda project:

Validation of the concept on short range using a very accurate displacement table

Dimensional control, fiducialisation and alignment on test setups: On the TBTM (including control of alignment during thermal

and transport tests) Collaboration with NIKHEF:

Inter-comparison between alignment systems on short & long range

Follow-up of the spoke design in MDI area PACMAN project (Particle Accelerator Components’

Metrology and Alignment up to the Nanometre level) Marie Curie Initial Training Network, Innovative Doctoral

Programme

19.06.2013 ABP group meeting D. Missiaen13

Page 14: Bilan and Objectives SU

Software and Database The development of the APEX interface has

been continued Calculation menu Measurements menu

Several versions of Post-processing : LGC++, CHaBa++, Data acquisition : SFB, PFB, carnet, Pctopo32

Some developments will be continued during LS1

19.06.2013ABP group meeting D. Missiaen14

Page 15: Bilan and Objectives SU

Conclusions A huge LS1 ahead of us

A good start for the first 4 months Motivation will be very the most difficult thing to

maintain all along the 20 months

But not only LS1 LC and HIE-Isolde studies still continue Software and database developments as well

19.06.2013ABP group meeting D. Missiaen15