1
OPPOURTUNITIES AND RISK FACTORS IN CONSTRUCTION OF SOLAR PHOTOVOLTAIC PLANT WITH VENTURE OF PUBLIC PRIVATE PARTNERSHIP.CASE STUDY OF PV P LANT Bilal Anwar, PHD scholar, Xi’an jiao tong university, China Phone +008615664889412, Email: [email protected] Dr.ZhongDong Xiao, Xi’an Jiaotong university, Xi’an, China, [email protected] Solar is the fastest developing renewable energy technology which can be divided into two types solar Photovoltaic(PV) and solar thermal. Solar PV system converts directly sun light into electricity. This study delineate a 1000 Mega watt (MW) very large scale PV system is designed in three phases,from which 100 MW has started working and the remaining two phases of 300MW and 600 MW has yet to be functional at Quaid-e-Azam soalr park(QSP) in Cholistan desert near Bahawalpur city of Pakistan This study describes the opportunities and risks in the construction of one of the largest solar PV plant (QSP), which is constructed through public private partnership (3P).3P used for the purpose that variety of risks including financial, legal, social, political, regulatory, commercial, skills inefficiencies have been shared. This study uses the mixed methodology in which case study is part of the survey, which is conducted by interviews, questionnaire responses from the respondents working at the project. This study find outs the main opportunities especially in Pakistani context are, bench mark practices through largest solar PV plant based on 3P,adoption of barren land, pro poor development, new markets, green growth and play role in supply balances. Furthermore this study also find out main risk factors in the construction of QSP PV Plant are related to design, site, contractor performance, delay risk, cost overruns, environmental risks and safety risk. Technical risks during project development are resource estimation, component specifications, system design, testing,, installation ,transportation .technical risks during operation phases mainly related to operation and maintenance. Non technical risks are mainly policy environment ,political engagement in adopting solar technology, and macroeconomic factors. Construction risks, transmission/distribution line risks .Power purchase agreement pricing risks,insurability, site controls safety The findings of this study is for all those nations who are adopting PV renewable technologies in situation particularly for Pakistan.Firstly the results techniques,risk mitigation strategies used in this study can be followed as benchmark practices for other developing plants,like adoption of barren land in desert.Furthermore,suggestions for policy makers to develop pro poor community with the growth of new markets.New oppourtunities for private sector investments with public support. Both ways can be used for electrification for poor community i.e.on Grid o r off Grid. 1-Sorin Cebotari * and Jozsef Benedek. Renewable Energy Project as a Source of Innovation in Rural Communities: Lessons from the Periphery . journal of Sustainability 2-Solangi KH, Islam MR, Saidur R, Rahim NA, Fayaz H. A review on global solar energy policy. Renewable Sustainable Energy Rev 2011;15:2149–63. 3-Hernandez RR, Easter SB, Murphy-Mariscal ML, Maestre FT, Tavassoli M, Allen EB, Barrows CW, Belnap J, Ochoa-Hueso R, Ravi S, Allen MF. Environmental impacts of utility-scale solar energy. Renewable Sustainable Energy Rev 2014;29:76679. Motivation and back ground of Renewable energy sector worldwide Abstract Abstract Methodology Result Conclusion References Investment in renewable energy(Billion $) by sector ,2016 Risk Factors What is PPP? why their need? Benefits and various arrangements of PPP 0 20 40 60 80 100 120 solar wind biomass small hydro geo thermal bio fuels marine PPP QSP PV PLANT Technical risks Non technical risks during Project development,proj ect operation Risk mitigating strategies for both types technical & non technical risks On/off grid urban market scenario Community development New markets Green growth Supply balances balancesbalancesAL ANCES Off Grid rural electrification program Defining of PPP HM Treasury GOV.UK 2000 3P depict the opportunities associated with variety of partnership arrangements and signify how 3P will deliver real improvements to public services, for mutual benefits of both parties. Canadian Council for the Public- Private Partnership , 3P as a joint venture between the public and the private sectors depend on the expertise of each partner that best meets clearly defined public needs through the adequate allocation of resources, risks and rewards (CC3P, 2010). Asian Development Bank, ‘’The term “public–private partnership” describes a range of possible relationships among public and private entities in the context of infrastructure and other services. Other terms used for this type of activity include private sector participation and privatization’’ (ADB, 2016). Economic Coordination Committee “Public Private Partnerships (3P) engage the financing, development, operation and maintenance of infrastructure In this study we used Mixed methodology approach ,in which case study of ongoing project of Quaid-e-Azam Solar park is a part of survey .So questionnaire based on Meta Literature review for construction related risk factors , interviews with technical managers working in solar PV field EaUnremitting source of energy Human planet needs just 90 minutes to fulfill 1 year energy requirements China is leading in PV technology COP21-FRANCE(150 State Heads from the world) (www.cop21.gouv.fr/en/) PV system price declines of around 75% in less than 10 years (www.iea.com) Crying need of hour to develop sustainable infrastructure What is solution?????? PPP accepted as brand ch year around 6.5 million premature deaths caused to air pollution

bilal poster presentation Anwar p… · 233285781,7,(6 $1' 5,6. )$&7256 ,1 &216758&7,21 2) 62/$5 3+27292/7$,& 3/$17 :,7+ 9(1785( 2) 38%/,& 35,9$7( 3$571(56+,3 &$6( 678'< 2) 39 3 /$17

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: bilal poster presentation Anwar p… · 233285781,7,(6 $1' 5,6. )$&7256 ,1 &216758&7,21 2) 62/$5 3+27292/7$,& 3/$17 :,7+ 9(1785( 2) 38%/,& 35,9$7( 3$571(56+,3 &$6( 678'< 2) 39 3 /$17

OPPOURTUNITIES AND RISK FACTORS IN CONSTRUCTION OF SOLAR PHOTOVOLTAICPLANT WITH VENTURE OF PUBLIC PRIVATE PARTNERSHIP.CASE STUDY OF PV P LANT

Bilal Anwar, PHD scholar, Xi’an jiao tong university, China Phone +008615664889412, Email: [email protected] Dr.ZhongDong Xiao, Xi’an Jiaotong university, Xi’an, China, [email protected]

Solar is the fastest developing renewable energy technology whichcan be divided into two types solar Photovoltaic(PV) and solarthermal. Solar PV system converts directly sun light into electricity.This study delineate a 1000 Mega watt (MW) very large scale PVsystem is designed in three phases,from which 100 MW has startedworking and the remaining two phases of 300MW and 600 MW hasyet to be functional at Quaid-e-Azam soalr park(QSP) in Cholistandesert near Bahawalpur city of Pakistan This study describes theopportunities and risks in the construction of one of the largest solarPV plant (QSP), which is constructed through public privatepartnership (3P).3P used for the purpose that variety of risksincluding financial, legal, social, political, regulatory, commercial,skills inefficiencies have been shared. This study uses the mixedmethodology in which case study is part of the survey, which isconducted by interviews, questionnaire responses from therespondents working at the project. This study find outs the mainopportunities especially in Pakistani context are, bench markpractices through largest solar PV plant based on 3P,adoption ofbarren land, pro poor development, new markets, green growth andplay role in supply balances. Furthermore this study also find outmain risk factors in the construction of QSP PV Plant are related todesign, site, contractor performance, delay risk, cost overruns,environmental risks and safety risk.

Technical risks during project development areresource estimation, component specifications,system design, testing,, installation ,transportation.technical risks during operation phases mainlyrelated to operation and maintenance.Non technical risks are mainly policy environment,political engagement in adopting solar technology,and macroeconomic factors.Construction risks, transmission/distribution linerisks .Power purchase agreement pricingrisks,insurability, site controls safety

The findings of this study is for all those nations who areadopting PV renewable technologies in situationparticularly for Pakistan.Firstly the resultstechniques,risk mitigation strategies used in thisstudy can be followed as benchmark practices forother developing plants,like adoption of barren landin desert.Furthermore,suggestions for policy makersto develop pro poor community with the growth ofnew markets.New oppourtunities for private sectorinvestments with public support. Both ways can beused for electrification for poor community i.e.onGrid o r off Grid.1-Sorin Cebotari * and Jozsef Benedek. Renewable Energy

Project as a Source of Innovation in Rural Communities: Lessons from the Periphery . journal of Sustainability2-Solangi KH, Islam MR, Saidur R, Rahim NA, Fayaz H. A review on global solarenergy policy. Renewable Sustainable Energy Rev 2011;15:2149–63.3-Hernandez RR, Easter SB, Murphy-Mariscal ML, MaestreFT, Tavassoli M, AllenEB, Barrows CW, Belnap J, Ochoa-Hueso R, Ravi S, Allen MF. Environmentalimpacts of utility-scale solar energy. Renewable Sustainable Energy Rev2014;29:766–79.

Motivation and back ground of Motivation and back ground of Renewable energy sector worldwide

AbstractAbstract MethodologyMethodology ResultResult

ConclusionConclusion

References

Investment in renewable energy(Billion Investment in renewable energy(Billion $) by sector ,2016

Risk FactorsRisk Factors

What is PPP? why their need? Benefits What is PPP? why their need? Benefits and various arrangements of PPP

0

20

40

60

80

100

120

solar wind biomass small hydro geo thermal bio fuels marine

PPP QSP PV PLANT

Technical risks

Non technical risks during Project development,project operation

Risk mitigating strategies for both types technical & non technical risks

On/off grid urban market scenario

Community development

New markets

Green growth

Supply balances balancesbalancesAL

ANCES

Off Grid rural electrification

program

Defining of PPP

HM Treasury GOV.UK 2000

3P depict the opportunities associated with variety of partnership arrangements

and signify how 3P will deliver real improvements to public services, for

mutual benefits of both parties.

Canadian Council for the Public-

Private Partnership

, 3P as a joint venture between the public and the private sectors depend on the

expertise of each partner that best meets clearly defined public needs through the adequate allocation of resources, risks

and rewards (CC3P, 2010).

Asian Development

Bank,

‘’The term “public–private partnership”describes a range of possible relationshipsamong public and private entities in thecontext of infrastructure and otherservices. Other terms used for this type ofactivity include private sectorparticipation and privatization’’ (ADB,2016).

Economic Coordination Committee

“Public Private Partnerships (3P) engagethe financing, development, operationand maintenance of infrastructure

In this study we used Mixed methodology approach ,in which case study of ongoing project of Quaid-e-Azam Solar park is a part of survey .So questionnairebased on Meta Literature review for construction related risk factors ,interviews with technical managers working in solar PV field

EaUnremitting source of energy

Human planet needs just 90 minutes to fulfill 1 year energy requirements

China is leading in PV technology

COP21-FRANCE(150 State Heads from the world) (www.cop21.gouv.fr/en/)

PV system price declines of around 75% in less than 10 years

(www.iea.com)

Crying need of hour to develop sustainable infrastructure

What is solution?????? PPP accepted as brand

ch year around 6.5 million premature deaths caused to air pollution