Subcontractor Name:_____________________ Proposal #___________ Date:_____________ PROJECT: Evansville Townhouses East & West Sites East Site Existing Building addresses – 120 to 200 S Frederick St & 201 to 209 S Weinbach Av. West Site Existing Building addresses – 1650 to 1664 East Walnut St, & 313 to 319 S Rotherwood Av. Evansville, Indiana BID PACKAGE 03 – Townhouse Buildings TO: Buckingham Construction Company 941 N. Meridian Street Indianapolis, Indiana 46204 Tom Muller, Estimator Phone# (317) 554-6809 Email: [email protected] BID DATE: 9:00 AM, on Thursday, February 28, 2013 Proposal Requests 02-3600 Soil Treatments 03-1100 Building Concrete 03-5000 Gypcrete 04-0000 Masonry 05-1200 Structural & Misc. Steel 06-1100 Building Framing - Material 06-1120 Building Framing - Labor 06-4100 Cabinets 06-4150 Granite Tops 06-4151 Cultured Marble Tops 06-4500 Interior Trim – Material 06-5402 Interior Trim – Labor 07-2100 Insulation 07-3110 Roofing & Gutters 07-4600 Siding & Exterior Trim – Material 07-4601 Siding & Exterior Trim – Labor 07-9220 Caulking 08-1120 Doors & Frames Material 08-5510 Window Material 08-7100 Door Hardware 09-2500 Drywall Material & Labor 09-6000 Flooring 09-9100 Paint 10-0000 Specialties – Bath, Shelving, Mail Boxes 11-4000 Appliances 12-4900 Window Treatment 13-9100 Fire Protection 15-4000 Plumbing 15-7000 HVAC 16-0000 Electrical, Low Voltage & Alarm Contract Exhibits A. EEOC Certification B. Front End Spec – BCC General Conditions C1. MICCS Letter C2. MICCS Reciprocal Programs & Cards D. Insurance Requirements D2. Insurance Forms & Additional Insured E. Purchase Order Terms - Template F. Standard Subcontract (Sample) G. Trade Contractor Prequalification Statement H. Site Phasing Plan I. New Vendor Registration Process J. Drawing Log K. Schedule L. 2013-01-10 Geotechnical Report Quotes must be submitted on the Bid Proposal Sheet that is specific to the work you are quoting. You do not need to return the entire Bid Scope.

Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

PROJECT: Evansville Townhouses East & West Sites East Site Existing Building addresses – 120 to 200 S Frederick St & 201 to 209 S

Weinbach Av. West Site Existing Building addresses – 1650 to 1664 East Walnut St, & 313 to 319 S Rotherwood Av. Evansville, Indiana

BID PACKAGE 03 – Townhouse Buildings TO: Buckingham Construction Company

941 N. Meridian Street Indianapolis, Indiana 46204 Tom Muller, Estimator Phone# (317) 554-6809 Email: [email protected]

BID DATE: 9:00 AM, on Thursday, February 28, 2013

Proposal Requests

02-3600 Soil Treatments

03-1100 Building Concrete

03-5000 Gypcrete

04-0000 Masonry

05-1200 Structural & Misc. Steel

06-1100 Building Framing - Material

06-1120 Building Framing - Labor

06-4100 Cabinets

06-4150 Granite Tops

06-4151 Cultured Marble Tops

06-4500 Interior Trim – Material

06-5402 Interior Trim – Labor

07-2100 Insulation

07-3110 Roofing & Gutters

07-4600 Siding & Exterior Trim – Material

07-4601 Siding & Exterior Trim – Labor

07-9220 Caulking

08-1120 Doors & Frames Material

08-5510 Window Material

08-7100 Door Hardware

09-2500 Drywall Material & Labor

09-6000 Flooring

09-9100 Paint

10-0000 Specialties – Bath, Shelving, Mail Boxes

11-4000 Appliances

12-4900 Window Treatment

13-9100 Fire Protection

15-4000 Plumbing

15-7000 HVAC

16-0000 Electrical, Low Voltage & Alarm

Contract Exhibits A. EEOC Certification B. Front End Spec – BCC General

Conditions C1. MICCS Letter C2. MICCS Reciprocal Programs & Cards D. Insurance Requirements D2. Insurance Forms & Additional Insured E. Purchase Order Terms - Template F. Standard Subcontract (Sample) G. Trade Contractor Prequalification

Statement H. Site Phasing Plan

I. New Vendor Registration Process J. Drawing Log K. Schedule L. 2013-01-10 Geotechnical Report

Quotes must be submitted on the Bid Proposal Sheet that is specific to the work you are quoting. You do not need to

return the entire Bid Scope.

Page 2: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

By submitting the bid, the Subcontractor/Vendor acknowledges that it has read, understands and agrees to execute the

Buckingham Construction Corporation subcontract/Purchase Order without modification.

The descriptions in this Proposal are not intended to limit the scope of work. Instead, the descriptions are intended to

identify the primary areas of work. Therefore, your Proposal is not limited to these descriptions, but it is assumed to

cover the complete scope of work as shown and specified.

Having carefully examined the bidding and construction documents as listed in the drawing log, having reviewed the

schedule, having visited the site and examined all conditions affecting the work, the undersigned agrees to furnish all

labor, materials, tools and equipment required to complete the work associated with the specific bid proposals. NOTE: The undersigned agrees that he will not withdraw this Proposal for a period of sixty (60) days from the date hereof.

CONTRACTOR __________________

ADDRESS __________________

NAME __________________

SIGNATURE __________________

TITLE __________________

Office TELEPHONE ___________________

Mobile TELEPHONE ___________________

E-MAIL __________________

Page 3: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

PROPOSAL – 02-3600 Soil Treatment This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and

miscellaneous items necessary to complete all Soil Treatment.

The scope of work shall include, but is not limited to:

A. All applicable contractor permits, disposal fees and inspection fees to be included. B. Applicable federal, state, and local taxes are to be included. C. Scheduling and coordination of all required inspections associated with this scope of work. D. Provide and install the soil treatment and documentation showing that the work was completed. E. Include environmental controls necessary to complete the work. F. Strict adherence to the on-site safety program shall be included. G. Subcontractor shall include all necessary shift work, overtime, and additional manpower,

supplies and equipment required to meet the project schedule. To be established at time of contract.

H. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and alternates.

Lump Sum Price – Soil Treatment

120 S Fredrick St Bid Amount $ 200 S Fredrick St Bid Amount $ 201 S Weinbach AV Bid Amount $ 209 S Weinbach AV Bid Amount $ 313 & 315 Rotherwood Av Bid Amount $ 317 & 319 Rotherwood Av Bid Amount $ 1650 & 1652 E. Walnut St. Bid Amount $ 1654 & 1656 E. Walnut St. Bid Amount $ 1658 & 1660 E. Walnut St. Bid Amount $ 1662 & 1664 E. Walnut St. Bid Amount $ Tax $ Total Bid Amount $

AADDDDEENNDDAA TThhiiss bbiiddddeerr aacckknnoowwlleeddggeess rreecceeiipptt ooff AAddddeennddaa NNuummbbeerrss ________________________ iissssuueedd dduurriinngg tthhee ttiimmee ooff bbiiddddiinngg,, aanndd iinncclluuddeess tthhee sseevveerraall cchhaannggeess tthheerreeiinn iinn tthhiiss PPrrooppoossaall..

End of PROPOSAL – 02-3600 Soil Treatment

Page 4: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

PROPOSAL 03-1100 Building Concrete This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and miscellaneous items necessary to complete all Building Concrete in compliance with the specifications and as shown on the drawings. The scope of work shall include; but is not necessarily limited to the following:

A. This contractor’s work includes but is not limited to: 1. Permits for this subcontractor’s work 2. Labor, 3. materials, 4. equipment, 5. tools, 6. lifts 7. scaffolds 8. Inspection including

a. calling for inspections, b. inspection fees c. Collection of paperwork d. Documented approvals provided to the

9. Taxes including Applicable: a. federal, b. state, c. local taxes

10. Scheduling 11. Coordination 12. Warranties - Minimum of a One (1) year labor and material. Extended warranties

may apply per the specifications 13. Excavation 14. Concrete 15. Footings - patios & buildings 16. Foundations - patios & buildings 17. vapor barriers 18. Thickened slabs 19. slabs - patios & buildings 20. stoops 21. Concrete Reinforcing

a. Rebar b. Mesh c. Fiber d. Embed anchors & straps

22. Perimeter Insulation 23. backfill for foundations inside and outside 24. 25. granular fill material under slabs 26. 27. Additives 28. Formwork

B. C. Excavation spoils shall be hauled to a location on-site for use as fill by the excavation

contractor D. Post Pier installation to be coordinated with framing contractor E. Wash-out pit shall be provided, maintained, and then removed from the site. F. Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided

dumpster.

Page 5: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

G. Cleanup of all excess, runoff materials, leaving your work area ready for the next subcontractor

H. All trash and clean-up to a roll-off dumpster I. Storage of material will be in a neat and orderly fashion. Location will be as designated by

BCC. J. Receive unload and store materials for this scope of work. K. Relocation of material may be required for coordination with other trades and is included as

a part of this scope of work. L. Strict adherence to the on-site safety program shall be included. M. The following items are supplied by others but used or installed by this contractor

1. Dumpsters 2. Zoning Permits 3. Building Permit 4. Earthen pad graded to + or 1 .1 feet

N. The following work is by others: 1. Sidewalks 2. Curbs 3. Dumpster enclosures 4. Concrete Driveways

O.

NOTE TO SUBCONTRACTORS: Materials, Equipment and assemblies shown or specified are minimum requirements or performance standards. Local jurisdictions may require performance standards beyond those shown or specified; furthermore, local jurisdictions may prevent the use of commonly accepted materials. Subcontractors shall familiarize themselves with all local requirements for licensing, materials, and performance standards, prior to submitting bid. All conflicts between the contract documents and local requirements shall be brought to the owner’s attention and resolved, by mutual agreement, prior to submission of bid or highest priced work. Local requirements versus specified requirements shall be included in the bid.

UTILIZE THIS BID FORM and attach any supplemental information, clarifications and alternates.

BASE BID: BID BREAKDOWN:

Building 1 Building Concrete A) Building Foundation Excavation ......... $________________ _______CY B) Building Foundations .......................... $_________________ _______CY C) Building Foundation Insulation ........... $_________________ _______SF D) Building Foundation backfill ............... $__________________ _______CY E) Building slab granular fill ................... $_________________ _______CY F) Building thickened Slab ...................... $_________________ _______CY G) Building Slab....................................... $_________________ _______SF H) Stoops & Patio .................................. $_________________ _______SF

Building 1 total Building Concrete ............ $_________________

Page 6: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

Building 2 Building Concrete A) Building Foundation Excavation ......... $________________ _______CY B) Building Foundations .......................... $_________________ _______CY C) Building Foundation Insulation ........... $_________________ _______SF D) Building Foundation backfill ............... $__________________ _______CY E) Building slab granular fill ................... $_________________ _______CY F) Building thickened Slab ...................... $_________________ _______CY G) Building Slab....................................... $_________________ _______SF H) Stoops & Patio .................................. $_________________ _______SF

Building 2 total Building Concrete ............ $_________________

Building 3 Building Concrete A) Building Foundation Excavation ......... $________________ _______CY B) Building Foundations .......................... $_________________ _______CY C) Building Foundation Insulation ........... $_________________ _______SF D) Building Foundation backfill ............... $__________________ _______CY E) Building slab granular fill ................... $_________________ _______CY F) Building thickened Slab ...................... $_________________ _______CY G) Building Slab....................................... $_________________ _______SF H) Stoops & Patio .................................. $_________________ _______SF

Building 3 total Building Concrete ............ $_________________

Building 4 Building Concrete

A) Building Foundation Excavation ......... $________________ _______CY B) Building Foundations .......................... $_________________ _______CY C) Building Foundation Insulation ........... $_________________ _______SF D) Building Foundation backfill ............... $__________________ _______CY E) Building slab granular fill ................... $_________________ _______CY F) Building thickened Slab ...................... $_________________ _______CY G) Building Slab....................................... $_________________ _______SF H) Stoops & Patio .................................. $_________________ _______SF

Building 4 total Building Concrete ............ $_________________

Building 5 Building Concrete

A) Building Foundation Excavation ......... $________________ _______CY B) Building Foundations .......................... $_________________ _______CY C) Building Foundation Insulation ........... $_________________ _______SF D) Building Foundation backfill ............... $__________________ _______CY E) Building slab granular fill ................... $_________________ _______CY F) Building thickened Slab ...................... $_________________ _______CY G) Building Slab....................................... $_________________ _______SF H) Stoops & Patio .................................. $_________________ _______SF

Building 5 total Building Concrete ............ $_________________

Page 7: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

Building 6 Building Concrete A) Building Foundation Excavation ......... $________________ _______CY B) Building Foundations .......................... $_________________ _______CY C) Building Foundation Insulation ........... $_________________ _______SF D) Building Foundation backfill ............... $__________________ _______CY E) Building slab granular fill ................... $_________________ _______CY F) Building thickened Slab ...................... $_________________ _______CY G) Building Slab....................................... $_________________ _______SF H) Stoops & Patio .................................. $_________________ _______SF

Building 6 total Building Concrete ............ $_________________ Sales Tax $_________________

Grand Total Building 1 through 6 Building Concrete $_________________

BID ALTERNATE:

Haul spoils to an offsite location………………………………………………. Add $__________________ Alternate foundation design Deduct $__________________

End of Proposal 03-1100 Building Concrete

Page 8: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

PROPOSAL NO. 03-5000 – GYPCRETE This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and miscellaneous items necessary for complete placing and finishing of all Gypcrete flooring underlayment to be placed over all wood floors in all buildings in accordance with the plans and specifications.

The scope of work shall include; but is not necessarily limited to the following: A. This contractor’s work includes but is not limited to:

1. Licensing 2. Applicable contractor permits, 3. Inspections for this subcontractor’s work

a. Call for inspections b. Scheduling inspections c. Coordination inspections d. Provide documentation of approvals e. inspection fees

4. Taxes a. federal, b. state, and c. local taxes

5. Gypcrete Gypsum floor underlayment including but not limited to: a. Gypcrete pumping, b. supplies c. Barricades d. Edge forming materials;

I. Seal floor penetrations to avoid Gypcrete “run-off”, II. Blocking for MEP chases

6. Minimum of a One (1) year labor and material warranty. Extended warranties may apply per the specifications

7. Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster. 8. Cleanup of all excess, runoff materials, leaving your work area ready for the next subcontractor. 9. All trash and clean-up to a roll-off dumpster provided by BCC. 10. Storage of material will be in a neat and orderly fashion. Location will be as designated by BCC. 11. Receive unload and store materials for this scope of work. 12. The following items are supplied by others but used or installed by this contractor

a. Dumpsters b. Zoning Permits c. Building Permit

13. The following work is by others: a. Sidewalks b. Curbs c. Dumpster enclosures d. Concrete Driveways

14. Relocation of material may be required for coordination with other trades and is included as a part of this scope of work.

15. Strict adherence to the on-site safety program shall be included. 16. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates.

Page 9: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

Building 1 Bid $_____________________ __________SqFt Building 2 Bid $_____________________ __________SqFt Building 3 Bid $_____________________ __________SqFt Building 4 Bid $_____________________ __________SqFt Building 5 Bid $_____________________ __________SqFt Building 6 Bid $_____________________ __________SqFt Total Bid Amount ...................................................... $_____________________

Alternate

A1- 1 inch Gypcrete floor underlayment - Total Amount: ..................... $______________ / Bld

A2 - acoustic-mat floor underlayment - Total Amount: ............ ............ $______________ / Bld

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $_____________________; said sum not being included in the Base Bid Proposal. ADDENDA The undersigned acknowledges receipt of Addenda Numbers ____________ issued during the time of bidding, and includes the several changes therein in this Proposal.

End of PROPOSAL NO. 03-5000 – GYPCRETE

Page 10: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

PROPOSAL 04-0000 MASONRY

This Proposal includes all labor, equipment, supervision, services, insurance, sales tax, and miscellaneous items necessary Furnish and install all Masonry work as shown on the drawings. The scope of work shall include; but is not necessarily limited to the following:

AA.. Furnish and Install per plans and specifications all: 11.. block, 22.. brick, 33.. mortar 44.. accessories 55.. lintels 66.. Joint Tooling 77.. Expansion joints 88.. temporary formwork 99.. shoring 1100.. BBrriicckk cclleeaanniinngg 1111.. scaffold/lifts including setup and teardown. 1122.. receiving materials 1133.. inventory of materials, 1144.. staging 1155.. storing of materials 16. Accessories include but are not limited to:

a. sand b. ties c. Anchors d. lintels e. weeps f. flashing g. mortar net

17. Brick veneer 18. Cleaning of sand and dirt from brick ledge or footers prior to commencement of work

B. Repairing of any minor Building Wrap (Tyvek) deficiencies prior to installing brick. If the deficiency is major, the subcontractor shall notify the superintendent immediately

C. Cleaning of brick is included per specifications D. Temporary Power with GFCI circuits is included E. Ties and anchors to be installed per Plans and Specifications F. This Subcontractor will leave expansion room at the intersection of all substrates. At door, windows

and thresholds this subcontractor is required to leave a 3/8” gap for expansion G. Minimum of a One (1) year labor and material warranty. Extended warranties may apply per the

specifications. H. Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster. I. Cleanup of all excess, leaving your work area ready for the next subcontractor J. All trash and clean-up to a roll-off dumpster provided by BCC. K. Storage of material will be in a neat and orderly fashion. Location will be as designated by BCC. L. Strict adherence to the on-site safety program shall be included. M. The following items are supplied by others but used or installed by this contractor

a. Dumpsters b. Zoning Permits c. Building Permit

N. The following work is by others: a. Sidewalks b. Curbs c. Dumpster enclosures d. Concrete Driveways

O.

Page 11: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

NOTE TO SUBCONTRACTORS: Materials, Equipment and assemblies shown or specified are minimum requirements or performance standards. Local jurisdictions may require performance standards beyond those shown or specified; furthermore, local jurisdictions may prevent the use of commonly accepted materials. Subcontractors shall familiarize themselves with all local requirements for licensing, materials, and performance standards, prior to submitting bid. All conflicts between the contract documents and local requirements shall be brought to the owner’s attention and resolved, by mutual agreement, prior to submission of bid or highest priced work. Local requirements versus specified requirements shall be included in the bid.

UTILIZE THIS BID FORM and attach any supplemental information, clarifications and alternates.

BASE BID: BID BREAKDOWN: Building 1 Supply and install Brick $________________ ______,000 Qt of brick Building 1 Supply and install Block $________________ _________ Qt of block Building 2 Supply and install Brick $________________ ______,000 Qt of brick Building 2 Supply and install Block $________________ _________ Qt of block Building 3 Supply and install Brick $________________ ______,000 Qt of brick Building 3 Supply and install Block $________________ _________ Qt of block Building 4 Supply and install Brick $________________ ______,000 Qt of brick Building 4 Supply and install Block $________________ _________ Qt of block Building 5 Supply and install Brick $________________ ______,000 Qt of brick Building 5 Supply and install Block $________________ _________ Qt of block Building 6 Supply and install Brick $________________ ______,000 Qt of brick Building 6 Supply and install Block $________________ _________ Qt of block

Sales Tax......... $_________________ Total cost of all masonry work $ _______________ Alternate Foundation design Cost Savings $___________ QTY_______________

End of Proposal 4400 – Masonry

Page 12: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

PROPOSAL NO. 05-1200 – STRUCTURAL & Miscellaneous Steel This Proposal shall include all labor, equipment, supervision, services, insurance, sales tax, and miscellaneous items necessary to complete all Structural Steel in accordance with the plans and specifications.

The scope of work shall include; but is not necessarily limited to the following:

• Complete design with shop drawings

• Include scaffold/lifts, all equipment required to complete this scope of work. • Responsible for receiving materials, inventory of materials, staging and storing of materials • Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster. • Cleanup of all excess, leaving your work area ready for the next subcontractor • All trash and clean-up to a roll-off dumpster provided by BCC, • Storage of material will be in a neat and orderly fashion. Location will be as designated by BCC. • Strict adherence to the on-site safety program shall be included. • UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates. P. The following work is by this subcontractor

1. Steel columns 2. miscellaneous metals 3. bollards 4. beams 5.

Q. The following items are to be fabricated and supplied by this subcontractor but installed by others: 6. None

R. The following items are supplied by others but used or installed by this contractor 1. Dumpsters 2. Zoning Permits 3. Building Permit

S. The following work is not included or by others: 1. Elevator Ladders 2. Fence 3. anchor bolts, 4. steel embeds for shear walls 5. Strap anchors 6. Masonry support angles 7. Porch Railings 8. Sidewalk railings

Page 13: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

BID BREAKDOWN:

Building 1 - Structural Steel & Misc. Metals $____________ ________ pounds Building 2 - Structural Steel & Misc. Metals $____________ ________ pounds BBuuiillddiinngg 33 -- SSttrruuccttuurraall SStteeeell && MMiisscc.. MMeettaallss $$________________________ ________________ ppoouunnddss BBuuiillddiinngg 44 -- SSttrruuccttuurraall SStteeeell && MMiisscc.. MMeettaallss $$________________________ ________________ ppoouunnddss BBuuiillddiinngg 55 -- SSttrruuccttuurraall SStteeeell && MMiisscc.. MMeettaallss $$________________________ ________________ ppoouunnddss BBuuiillddiinngg 66 -- SSttrruuccttuurraall SStteeeell && MMiisscc.. MMeettaallss $$________________________ ________________ ppoouunnddss TToottaall SSttrruuccttuurraall SStteeeell && MMiisscc.. MMeettaallss $$________________________ Alternates

Masonry Support angles $$________________________ ________________ ppoouunnddss

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $_____________________; said sum not being included in the Base Bid Proposal. ADDENDA The undersigned acknowledges receipt of Addenda Numbers ____________ issued during the time of bidding, and includes the several changes therein in this Proposal. End of PROPOSAL NO. 05-1200 – STRUCTURAL & Miscellaneous Steel

Page 14: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

PPRROOPPOOSSAALL NNOO.. 0066--11110000 –– BBuuiillddiinngg FFrraammiinngg MMaatteeiiaall This Proposal shall include all labor, equipment, supervision, services, insurance, sales tax, and miscellaneous items necessary for a complete Building Framing Mateial in accordance with the plans and specifications. The scope of work shall include but is not necessarily limited to the following:

A. Fabricate and deliver to the site all wood framing components including: 1. Floor trusses 2. roof trusses 3. prefabricated wall panels 4. Top plates 5. loose framing lumber as needed to complete the structures; 6. all sheeted panels, 7. PSL or LVL beams 8. wood decks and accessories 9. parapet walls, 10. headers 11. hangers 12. clips 13. Straps 14. bracing – temporary 15. bracing – permanent 16. blocking 17. roof sheathing 18. floor sheathing 19. Truss hangers, 20. Framing hardware 21. draft stops material 22. draft stop doors 23. Building wrap 24. Building wrap tape + 10% to be used to make repairs 25. Wood stairs and 26. stair landing lumber 27. stair landing decking 28. Sill sealer 29. wall and truss bracing 30. miscellaneous blocking 31. Fiber cement panels and/or siding materials 32. exterior trim materials 33. Shear Wall related hardware. 34. Titan brand self tapping anchor bolts 35. Trash enclosure fence 36. Glue & adhesive anchor bolts 37. Steel embeds to tie down the wood framing 38.

B. Deliver, receive, inventory staging and store all materials supplied by this subcontractor. C. Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster. D. Cleanup of all excess, leaving your work area ready for the next subcontractor. E. All trash and clean-up to a roll-off dumpster provided by BCC, F. Storage of material will be in a neat and orderly fashion. Location will be as designated by BCC. A. Strict adherence to the on-site safety program shall be included. B. The following framing materials and fasteners are not supplied by this subcontractor:

1. None C. The following items are supplied by others but used or installed by this contractor

1. Dumpsters 2. Zoning Permits

Page 15: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

3. Building Permit D. The following work is not included or by others:

1. Temporary stair 2. Temporary Fence 3. Masonry support angles 4. Steel columns 5. bollards 6. steel beams 7. Steel joists 8. Decking Screws 9. Nails 10. Trex & Trex accessories

G. H. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates.

Framing Material BID BREAKDOWN: Floor Truss w/bracing Package

Building #1 ................................. $________________ QTY_________ Building #2 ................................. $________________ QTY_________ Building #3 ................................. $________________ QTY_________ Building #4 ................................. $________________ QTY_________ Building #5 ................................. $________________ QTY_________ Building #6 ................................. $________________ QTY_________

Total Floor Truss w/bracing $$________________________________

Roof Truss w/bracing Package

Building #1 ................................. $________________ QTY_________ Building #2 ................................. $________________ QTY_________ Building #3 ................................. $________________ QTY_________ Building #4 ................................. $________________ QTY_________ Building #5 ................................. $________________ QTY_________ Building #6 ................................. $________________ QTY_________

Total Roof Truss w/bracing $$________________________________ Wall Panel Package

Building #1 ................................. $________________ QTY_________ Building #2 ................................. $________________ QTY_________ Building #3 ................................. $________________ QTY_________ Building #4 ................................. $________________ QTY_________ Building #5 ................................. $________________ QTY_________ Building #6 ................................. $________________ QTY_________

Total Wall Panel Package $$________________________________

Page 16: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

LLoooossee FFrraammiinngg LLuummbbeerr PPaacckkaaggee Building #1 ................................. $________________ QTY_________ Building #2 ................................. $________________ QTY_________ Building #3 ................................. $________________ QTY_________ Building #4 ................................. $________________ QTY_________ Building #5 ................................. $________________ QTY_________ Building #6 ................................. $________________ QTY_________

TToottaall LLoooossee FFrraammiinngg LLuummbbeerr PPaacckkaaggee $________________

Prefab. Wood Stairs Pack

Building #1 ................................. $________________ QTY_________ Building #2 ................................. $________________ QTY_________ Building #3 ................................. $________________ QTY_________ Building #4 ................................. $________________ QTY_________ Building #5 ................................. $________________ QTY_________ Building #6 ................................. $________________ QTY_________

TToottaall PPrreeffaabb.. WWoooodd SSttaaiirrss PPaacckkaaggee .... $________________ Decking Material (including PSL’s)

Building #1 ................................. $________________ QTY_________ Building #2 ................................. $________________ QTY_________ Building #3 ................................. $________________ QTY_________ Building #4 ................................. $________________ QTY_________ Building #5 ................................. $________________ QTY_________ Building #6 ................................. $________________ QTY_________

TToottaall DDeecckkiinngg MMaatteerriiaall PPaacckkaaggee ......... $________________ Shearwall Hardware Package

Building #1 ................................. $________________ QTY_________ Building #2 ................................. $________________ QTY_________ Building #3 ................................. $________________ QTY_________ Building #4 ................................. $________________ QTY_________ Building #5 ................................. $________________ QTY_________ Building #6 ................................. $________________ QTY_________

TToottaall SShheeaarrwwaallll HHaarrddwwaarree PPaacckkaaggee .... $________________ Sales Tax......... $_________________

Grand Total of all building material $________________ Alternate – Bottom Cord Bearing Trusses ... Deduct $ ________________________________ Unit Pricing:

1. Floor truss with decking per SF ............................ $________________/SF

2. Roof truss with decking per SF ............................ $________________/SF

3. Wall panel with sheathing per linear foot ............. $________________/LF

ADDENDA The undersigned acknowledges receipt of Addenda Numbers ____________ issued during the time of bidding, and includes the several changes therein in this Proposal.

End of PROPOSAL NO. 06-1100 – Building Framing Mateial

Page 17: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

PROPOSAL NO. 06-1120 – FRAMING CARPENTRY LABOR This Proposal shall include all labor, equipment, supervision, services, insurance, sales tax, and miscellaneous items necessary to complete all Framing Carpentry in accordance with the plans and specifications. The scope of work shall include; but is not necessarily limited to the following:

A. The following items are supplied by others but received, unloaded, stored, inventoried and used or installed by this subcontractor: 1. Dumpsters 2. Zoning Permits 3. Building Permit 4. prefabricated wall 5. panels 6. sheeted panels 7. floor trusses 8. roof trusses 9. walls 10. headers 11. bracing 12. Loose framing material 13. Shear wall related hardware 14. Anchors 15. decking 16. sub-floor 17. truss hangers 18. hardware 19. clips 20. draft stops 21. OSB, sheathing 22. Building wrap with seam tape 23. Building wrap tape 24. sill sealer 25. stairs 26. landings 27. blocking 28. forming/headers for Gypcrete 29. wood framed walls 30. gypsum fire wall materials 31. drywall nailers 32. Pre-built wood stairs 33. wood stair landing materials 34. Floor and roof systems 35. Wall sheathing 36. Floor sheathing 37. Roof sheathing 38. Smoke wall sheathing 39. fasteners except nails and deck screws 40. tie-downs 41. Framing 42. Floor Truss bracing 43. Wall bracing 44. Roof truss bracing 45. windows, 46. exterior doors 47. adhesives 48. Parapets

Page 18: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

49. Soffits B. Blocking and furring for:

1. millwork, 2. stair rails 3. plumbing fixture 4. toilet accessories 5. shower bases 6. tub units 7. doors/frames 8. Windows

C. Layout for this subcontractor’s work D. Coordination with other trades and material suppliers. E. Sufficient manpower, shift work, overtime, supplies, and equipment to maintain the contracted

project schedule. F. Installation and maintenance of all OSHA required safety items including, but not limited to, safety

guard rails, covering holes, ladders. Roof tie-off is included in this scope of work. G. Removal of bottom plates in doorways as required. . H. The following framing materials and fasteners are supplied by this subcontractor:

1. Nails – framing & firewall 2. Deck screws

I. J. The following work is not included or by others:

1. Temporary Fence 2. Masonry support angles 3. Steel columns 4. bollards 5. steel beams 6. Steel joists 7. Trex & Trex accessories 8. Wood Balcony

a. K. L. Touch-up/repair of areas in this scope of work as required by the owner is included as a part of this

scope. M. Subcontractor shall maintain all required permits and licenses required for this scope of work. N. Storage of material will be in a neat and orderly fashion. Location will be as designated by BCC. O. Relocation of material may be required for coordination with other trades and is included as a part of

this scope of work. P. Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster. Q. Daily Clean-up will be enforced. One (1) 24 hour notice will be give. Future violations will be

cleaned-up by BCC and the costs associated will be deducted from the final contract amount. R. Strict adherence to the on-site safety program shall be included. S. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates.

Page 19: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

BID BREAKDOWN:

Building #1, Framing Labor

a. Walls, Trusses & Decks complete ........... $_________________

b. Wood Stairs Installed .............................. $_________________

c. Shearwall Hardware Installed ................. $_________________

d. Windows Installed ................................... $_________________ QTY_______________

e. Doors Installed ........................................ $_________________ QTY_______________

f. Punchout ................................................. $_________________

g. Building wrap ........................................... $_________________

Total Building #1, Framing Labor $_________________

Building #2, Framing Labor

a. Walls, Trusses & Decks complete ........... $_________________

b. Wood Stairs Installed .............................. $_________________

c. Shearwall Hardware Installed ................. $_________________

d. Windows Installed ................................... $_________________ QTY_______________

e. Doors Installed ........................................ $_________________ QTY_______________

f. Punchout ................................................. $_________________

g. Building wrap ........................................... $_________________

Total Building #2, Framing Labor $_________________

Building #3, Framing Labor

a. Walls, Trusses & Decks complete ........... $_________________

b. Wood Stairs Installed .............................. $_________________

c. Shearwall Hardware Installed ................. $_________________

d. Windows Installed ................................... $_________________ QTY_______________

e. Doors Installed ........................................ $_________________ QTY_______________

f. Punchout ................................................. $_________________

g. Building wrap ........................................... $_________________

Total Building #3, Framing Labor $_________________

Building #4, Framing Labor

a. Walls, Trusses & Decks complete ........... $_________________

b. Wood Stairs Installed .............................. $_________________

c. Shearwall Hardware Installed ................. $_________________

d. Windows Installed ................................... $_________________ QTY_______________

e. Doors Installed ........................................ $_________________ QTY_______________

f. Punchout ................................................. $_________________

g. Building wrap ........................................... $_________________

Total Building #4, Framing Labor $_________________

Page 20: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

Building #5, Framing Labor

a. Walls, Trusses & Decks complete ........... $_________________

b. Wood Stairs Installed .............................. $_________________

c. Shearwall Hardware Installed ................. $_________________

d. Windows Installed ................................... $_________________ QTY_______________

e. Doors Installed ........................................ $_________________ QTY_______________

f. Punchout ................................................. $_________________

g. Building wrap ........................................... $_________________

Total Building #5, Framing Labor $_________________

Building #6, Framing Labor

a. Walls, Trusses & Decks complete ........... $_________________

b. Wood Stairs Installed .............................. $_________________

c. Shearwall Hardware Installed ................. $_________________

d. Windows Installed ................................... $_________________ QTY_______________

e. Doors Installed ........................................ $_________________ QTY_______________

f. Punchout ................................................. $_________________

g. Building wrap ........................................... $_________________

Total Building #6, Framing Labor $_________________

Sales Tax......... $__________________

Grand Total Building Framing Labor $_________________

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $_____________________; said sum not being included in the Base Bid Proposal. ADDENDA The undersigned acknowledges receipt of Addenda Numbers ____________ issued during the time of bidding, and includes the several changes therein in this Proposal.

End of PROPOSAL NO. 06-1120 – FRAMING CARPENTRY LABOR

Page 21: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

PROPOSAL 06-4100 – CABINETS This scope shall include all shop drawings, field dimensioning, trucking, labor, materials and equipment required to furnish completely the cabinets as shown on the drawings or as called for in the specifications.

The scope of work shall include, but is not necessarily limited to the following: A. Cabinets to be equal or similar to Grandview Dover Viscorian;

1. kitchen Color to be “TBD” 2. Bathroom Vanities Color to be “TBD” 3. Cabinet Material to be Maple or equal.

B. Trucking with lift gate for all deliveries C. Shop drawings to be supplied by this vendor D. Field Dimensioning shall be included

E. Adequate supply of scribe molding and toe kick shall be included F. Coordination with appliances shall be included in this scope of work. (Appliances are

provided by others). G. Drawer and door push/pull hardware is included in this contract. H. Material to be shipped in a manner as to avoid damage while in transit, loading, or unloading. I. Vendor will coordinate with BCC field Supervision on delivery. J. The following items are not included but coordinated is required with the suppliers of:

1. Cultured marble vanity tops 2. Granite Kitchen counter tops

K.

Cabinets BID BREAKDOWN:

Building #1, Total Amount $_____________ _________LF

Building #2, Total Amount $_____________ _________LF

Building #3, Total Amount $_____________ _________LF

Building #4, Total Amount $_____________ _________LF

Building #5, Total Amount $_____________ _________LF

Building #6, Total Amount $_____________ _________LF Sales Tax......... $_____________

Total Cabinets Bid (including freight): $

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $ _ ; said sum not being included in the Base Bid Proposal.

ADDENDA The undersigned acknowledges receipt of Addenda Numbers issued during the time of bidding, and includes the several changes therein in this Proposal.

End of PROPOSAL 06-4100 – CABINETS AND GRANITE TOPS

Page 22: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

PROPOSAL 06-4100 –GRANITE kitchen Countertops This scope shall include all shop drawings, field dimensioning, trucking, labor, materials and equipment required to furnish completely the Granite countertops as shown on the drawings or as called for in the specifications.

The scope of work shall include the but is not necessarily limited to the supply and install of the following work:

L. Kitchen countertops shall be 3cm granite; color options to be specified by bidder and samples provided.

M. Back splash included N. End splashes shall be included where a top intersects with a wall or cabinet O. Cutting of the countertops for sinks shall be included in this scope of work. (BCC will provide shop

drawings of the sinks for coordination).

P. Trucking with lift gate for all deliveries Q. Shop drawings to be supplied by this vendor R. Field Dimensioning shall be included S. Coordination with appliances shall be included in this scope of work. (Appliances are

provided by others). T. Drawer and door push/pull hardware is included in this contract.

U. Material to be shipped in a manner as to avoid damage while in transit, loading, or unloading. V. Vendor will coordinate with BCC field Supervision on delivery. W. The following items are not included but coordinated is required with the suppliers of:

3. Cultured marble vanity tops 4. Cabinets

GRANITE kitchen Countertops BID BREAKDOWN:

Building #1, Total Amount $_____________ _________ SF

Building #2, Total Amount $_____________ _________ SF

Building #3, Total Amount $_____________ _________ SF

Building #4, Total Amount $_____________ _________ SF

Building #5, Total Amount $_____________ _________ SF

Building #6, Total Amount $_____________ _________ SF Sales Tax......... $_____________

Total GRANITE kitchen Countertops Bid (including freight):

$ ___________________

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $ _ ; said sum not being included in the Base Bid Proposal.

ADDENDA The undersigned acknowledges receipt of Addenda Numbers issued during the time of bidding, and includes the several changes therein in this Proposal.

End of PROPOSAL 06-4100 –GRANITE kitchen Countertops

Page 23: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

PROPOSAL 06-4100 –Cultured Marble Vanity Tops This scope shall include all shop drawings, field dimensioning, trucking, labor, materials and equipment required to furnish completely the Cultured Marble Vanity Tops as shown on the drawings or as called for in the specifications.

The scope of work shall include, but is not necessarily limited to the following: A. Cultured Marble Vanity Tops shall be from the manufacturers standard color line. Specified by

bidder and samples provided.

B. Back splash included C. End splashes shall be included where a top intersects with a wall or cabinet D. Integral vanity bowl shall be included in this scope of work. E. Trucking with lift gate for all deliveries F. Shop drawings to be supplied by this vendor G. Field Dimensioning shall be included H. Coordination with appliances shall be included in this scope of work. (Appliances are

provided by others). I. Drawer and door push/pull hardware is included in this contract. J. Material to be shipped in a manner as to avoid damage while in transit, loading, or unloading. X. Vendor will coordinate with BCC field Supervision on delivery. Y. The following items are not included but coordinated is required with the suppliers of:

5. Granite Countertops 6. Cabinets

K.

Cultured Marble Vanity Tops BID BREAKDOWN:

Building #1, Total Amount $_____________ _________ SF

Building #2, Total Amount $_____________ _________ SF

Building #3, Total Amount $_____________ _________ SF

Building #4, Total Amount $_____________ _________ SF

Building #5, Total Amount $_____________ _________ SF

Building #6, Total Amount $_____________ _________ SF Sales Tax......... $_____________

Total Cultured Marble Vanity Tops Bid (including freight):

$ ___________________

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $ _ ; said sum not being included in the Base Bid Proposal.

ADDENDA The undersigned acknowledges receipt of Addenda Numbers issued during the time of bidding, and includes the several changes therein in this Proposal.

End of PROPOSAL 06-4100 –Cultured Marble Vanity Tops

Page 24: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

PROPOSAL 06-4500 – INTERIOR TRIM MATERIALS

This Proposal shall include all door casing, baseboard and shoe molding materials necessary to complete all interior wood trim as required by the drawings or as called for in the specifications.

The scope of work shall include; but is not necessarily limited to the following: A. Deliver to site all:

1. base, 2. door casing 3. shoe molding 4. window sill 5. window sill apron

B. 1x material cleat material needed to install cabinets and cabinet tops.

C. Delivery will be tailgate only. D. Trucking, with lift gate, will coordinate with the BCC field Supervision on delivery. E. Material to be shipped in a manner as to avoid damage while in transit, loading F. Replace any units that may be defective or damaged. G. Coordination of deliveries with the field supervision is required.

H. or unloading.

I. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and alternates.

BID BREAKDOWN: Building #1, Total .......... $_ Building #2, Total .........$_ Building #3, Total .........$_ Building #4, Total ......... $_ Building #5, Total ......... $_ Building #6, Total ......... $_ Sales Tax......... $_____________

Total Bid Amount (including sales tax): $___________ Unit Prices: (including sales tax)

a. #430 5-1/4” x 16’ PFJ baseboard......$ /ea or LF (circle one)

b. #685 PFJ door casing x 7’ ................................... $ /pc or LF (circle one)

c. #685 PFJ door casing x 14’ or 16’ (circle one) .... $ /pc or LF (circle one)

d. 1x window sill material ......................................... $ /LF

e. Other .................................................................... $ /pc or LF (circle one)

f. Other .................................................................... $ /pc or LF (circle one)

g. Other .................................................................... $ /pc or LF (circle one)

h. Other .................................................................... $ /pc or LF (circle one)

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $ ; said sum not being included in the Base Bid Proposal.

ADDENDA The undersigned acknowledges receipt of Addenda Numbers issued during the time of bidding, and includes the several changes therein in this Proposal.

End of PROPOSAL 06-4500 – INTERIOR TRIM MATERIALS

Page 25: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

PROPOSAL 3 – INTERIOR TRIM AND MILLWORK LABOR This Scope of work shall include all supervision, labor, consumables, miscellaneous materials, fasteners and equipment required to complete all FINISH CARPENTRY scope of work as shown on the drawings or as called for in the specifications.

The scope of work shall include, but is not limited to the following:

A. Layout for this contractors work B. Coordination with other trades and material suppliers. C. Sufficient manpower, shift work, overtime, supplies, and equipment to maintain the

contracted project schedule D. Receiving, inventory, unloading, handling, and proper storage of the materials provided by the

general contractor under this scope of work. E. Installation and maintenance of all OSHA required safety procedures including, but not limited

to, safety rails, covering holes, ladders, and tie-off is included in this scope of work. F. Installation in all apartment units and common areas shall include;

1. Interior door frames 2. Interior doors 3. cabinet pulls, 4. Cabinet fillers 5. Cabinet hardware

6. Cabinets & trim 7. Casing around all interior doors 8. Wood baseboard

9. Shoe molding 10. Window sills and casing underneath sills. 11. Fire extinguishers and cabinets 12. Vanity Tops

13. Attic access panels G. Storage of material will be in a neat and orderly fashion. Location will be as designated by BCC. H. Relocation of material may be required for coordination with other trades and is included as a part

of this scope of work. I. Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster J. The following work is by others but coordinated with this contractor

a. granite countertops

Interior Carpentry Labor BID BREAKDOWN:

Building #1, A. Install all base and casing .......... $__________________ B. Install all Interior Doors .............. $__________________ C. Install all Cabinets ...................... $__________________ D. Install all Vanity Tops ............... $__________________ E. Install all Door Hardware............ $__________________ F. Fire Extinguishers............ $__________________

Building 1 Total ............................ $__________________

Building #2, A. Install all base and casing .......... $__________________ B. Install all Interior Doors .............. $__________________ C. Install all Cabinets ...................... $__________________ D. Install all Vanity Tops ............... $__________________ E. Install all Door Hardware............ $__________________ F. Fire Extinguishers............ $__________________

Building 2 Total ............................ $

Page 26: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_____________________ Proposal #___________ Date:_____________

Building #3,

A. Install all base and casing .......... $__________________ B. Install all Interior Doors .............. $__________________ C. Install all Cabinets ...................... $__________________ D. Install all Vanity Tops ............... $__________________ E. Install all Door Hardware............ $__________________ F. Fire Extinguishers............ $__________________

Building 3 Total ............................ $

Building #4,

A. Install all base and casing .......... $__________________ B. Install all Interior Doors .............. $__________________ C. Install all Cabinets ...................... $__________________ D. Install all Vanity Tops ............... $__________________ E. Install all Door Hardware............ $__________________ F. Fire Extinguishers............ $__________________

Building 4 Total ............................ $

Building #5, A. Install all base and casing .......... $__________________ B. Install all Interior Doors .............. $__________________ C. Install all Cabinets ...................... $__________________ D. Install all Vanity Tops ............... $__________________ E. Install all Door Hardware............ $__________________ F. Fire Extinguishers............ $__________________

Building 5 Total ............................ $

Building #6, A. Install all base and casing .......... $__________________ B. Install all Interior Doors .............. $__________________ C. Install all Cabinets ...................... $__________________ D. Install all Vanity Tops ............... $__________________ E. Install all Door Hardware............ $__________________ F. Fire Extinguishers............ $__________________

Building 6 Total ............................ $ Sales Tax............................ $

Grand Total Bid Amount: .................... $_______________

Alternate Install Granite Counter tops $____________ / Apartment

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $ ; said sum not being included in the Base Bid Proposal.

ADDENDA The undersigned acknowledges receipt of Addenda Numbers issued during the time of bidding, and includes the several changes therein in this Prop

End of PROPOSAL 3 – INTERIOR TRIM AND MILLWORK LABOR

Page 27: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 07-2100 – INSULATION This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and miscellaneous items necessary to complete all Insulation work in accordance with the plans and specifications. The scope of work shall include, but is not limited to the following:

A. Permits and licensing for this contractors work B. Layout own work C. Supply and install the flowing work:

1. fiberglass kraft faced batt insulation 2. Blown in insulation 3. Soffit baffles 4. Batt insulation in walls & ceilings and tenant separation walls as per plans. 5. fiberglass kraft face batt insulation 6. sound” batts 7. fire caulking 8. acoustical caulk 9. Draft stop caulking

D. Remove all scrap and trash from units to onsite dumpster provided by General Contractor and broom clean daily

E. Daily Clean-up will be enforced. One 24 hour notice will be given. Future violations will be cleaned-up by BCC and the costs associated will be deducted from the final contract amount.

F. Strict adherence to the on-site safety program shall be included. G. The following items are not supplied or installed by this contractor

2. Perimeter Insulation 3. Caulking between:

a. siding and brick b. Siding and windows c. Siding and doors d. Around toilets e. Around kitchen counters

H. The following items supplied by others but used or installed by this contractor 1. Dumpsters

I. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and alternates.

BID BREAKDOWN: Building #1 Insulation, Fire Caulk, Acoustical caulk, & Draft stop caulking

A. IInnssuullaattiioonn $$________________________________ B. FFiirree ccaauullkk $$________________________________ C. fire caulking $$________________________________ D. acoustical caulk $$________________________________ E. Draft stop caulking $$________________________________

Building 1 Total $$________________________________ Building #1, Total Amount $________________

Page 28: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Building #2 Insulation, Fire Caulk, Acoustical caulk, & Draft stop caulking

A. IInnssuullaattiioonn $$________________________________ B. FFiirree ccaauullkk $$________________________________ C. fire caulking $$________________________________ D. acoustical caulk $$________________________________ E. Draft stop caulking $$________________________________

Building 1 Total $$________________________________ Building #2, Total Amount $________________ Building #3 Insulation, Fire Caulk, Acoustical caulk, & Draft stop caulking

A. IInnssuullaattiioonn $$________________________________ B. FFiirree ccaauullkk $$________________________________ C. fire caulking $$________________________________ D. acoustical caulk $$________________________________ E. Draft stop caulking $$________________________________

Building 1 Total $$________________________________ Building #3, Total Amount $________________ Building #4 Insulation, Fire Caulk, Acoustical caulk, & Draft stop caulking

A. IInnssuullaattiioonn $$________________________________ B. FFiirree ccaauullkk $$________________________________ C. fire caulking $$________________________________ D. acoustical caulk $$________________________________ E. Draft stop caulking $$________________________________

Building 1 Total $$________________________________ Building #4, Total Amount $________________ Building #5 Insulation, Fire Caulk, Acoustical caulk, & Draft stop caulking

A. IInnssuullaattiioonn $$________________________________ B. FFiirree ccaauullkk $$________________________________ C. fire caulking $$________________________________ D. acoustical caulk $$________________________________ E. Draft stop caulking $$________________________________

Building 1 Total $$________________________________ Building #5, Total Amount $________________ Building #6 Insulation, Fire Caulk, Acoustical caulk, & Draft stop caulking

A. IInnssuullaattiioonn $$________________________________ B. FFiirree ccaauullkk $$________________________________ C. fire caulking $$________________________________ D. acoustical caulk $$________________________________ E. Draft stop caulking $$________________________________

Building 1 Total $$________________________________ Building #6, Total Amount $________________ Tax $________________

Grand Total Bid Amount ........................................... $_____________________

Page 29: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Unit Prices (installed):

1. R-13 FG Kraft faced batts per SF ............................... $__________________

2. R-15 FG Kraft faced batts per SF ............................... $__________________

3. R-19 FG Kraft faced batts per SF ............................... $__________________

4. R-21 FG Kraft faced batts per SF ............................... $__________________

5. R-19 FG Kraft faced batts pinned to deck per SF ...... $__________________

6. R-30 FG Kraft faced batts pinned to deck per SF ...... $__________________

7. R-38 FG Kraft faced batts pinned to deck per SF ...... $__________________ FFiirree ccaauullkk

8. fire caulking ................................................................ $$________________________________ /LF

9. acoustical caulk .......................................................... $$________________________________ /LF

10. Draft stop caulking ...................................................... $$________________________________ /LF

11.

ADDENDA The undersigned acknowledges receipt of Addenda Numbers ____________ issued during the time of bidding, and includes the several changes therein in this Proposal.

End of PROPOSAL NO. 07-2100 – INSULATION

Page 30: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL 07-3110 ROOFING & GUTTERING This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and

miscellaneous items necessary to furnish and install all Roofing & Guttering in compliance with the

specifications and as shown on the drawings.

The scope of work shall include, but is not limited to the following: A. Provide all licensing and permits for this scope of work B. Strict adherence to the on-site safety program shall be included. Provide all safety measures as

required by code and also reasonable precautions. C. Call for, schedule, coordinate, gather paperwork and approval documents for all required

inspections associated with your scope of work. Provide copies of approvals to BCC. D. Furnish and Install the following work including fasteners

1. Ice and water shield at eaves & Valeys 2. felt on all roof surfaces not covered with ice and water shield 3. shingle starter at complete perimeter. 4. shingles 5. aluminum step flashing and head flashing at all wall transitions 6. sheet metal flashing and trims 7. pipe boots at all pipe penetrations. 8. ridge hip and ridge shingles at all hips and ridges. 9. roof venting per drawings and specs – color to match shingles 10. metal drip edge per specifications – color to match shingles 11. Gutter and downspouts – color selected by owner 12. concrete splash blocks at termination of all downspouts

E. Seal all exposed nail heads with color-matched polyurethanes caulking. F. Clean up all job related debris and dispose of in GC provided dumpster. G. Register shingles with manufacturer to ensure full warranty coverage. H. Place. I. Clean up all job related debris. NOTE TO SUBCONTRACTORS: Materials, Equipment and assemblies shown or specified are minimum requirements or performance standards. Local jurisdictions may require performance standards beyond those shown or specified; furthermore, local jurisdictions may prevent the use of commonly accepted materials. Subcontractors shall familiarize themselves with all local requirements for licensing, materials, and performance standards, prior to submitting bid. All conflicts between the contract documents and local requirements shall be brought to the owner’s attention and resolved, by mutual agreement, prior to submission of bid or highest priced work. Local requirements versus specified requirements shall be included in the bid.

UTILIZE THIS BID FORM and attach any supplemental information, clarifications and alternates.

PROPOSAL 07-3110 ROOFING & GUTTERING BID BREAKDOWN: Builidng # 1 BID BREAKDOWN: Dimensional Shingle Roofing ........................................... $_________________ ______ SF Gutters and Downspouts .................................................. $_________________ ______ LF Splash Blocks .................................................................... $_________________ ______ LF Building #1 Total Cost............................................................. $_________________

Page 31: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Builidng # 2 BID BREAKDOWN: Dimensional Shingle Roofing ........................................... $_________________ ______ SF Gutters and Downspouts .................................................. $_________________ ______ LF Splash Blocks .................................................................... $_________________ ______ LF Building #2 Total Cost............................................................. $_________________ Builidng #3 BID BREAKDOWN: Dimensional Shingle Roofing ........................................... $_________________ ______ SF Gutters and Downspouts .................................................. $_________________ ______ LF Splash Blocks .................................................................... $_________________ ______ LF Building #3 Total Cost............................................................. $_________________

Builidng # 4 BID BREAKDOWN: Dimensional Shingle Roofing ........................................... $_________________ ______ SF Gutters and Downspouts .................................................. $_________________ ______ LF Splash Blocks .................................................................... $_________________ ______ LF Building #4 Total Cost............................................................. $_________________

Builidng # 5 BID BREAKDOWN: Dimensional Shingle Roofing ........................................... $_________________ ______ SF Gutters and Downspouts .................................................. $_________________ ______ LF Splash Blocks .................................................................... $_________________ ______ LF Building #5 Total Cost............................................................. $_________________

Builidng # 6 BID BREAKDOWN: Dimensional Shingle Roofing ........................................... $_________________ ______ SF Gutters and Downspouts .................................................. $_________________ ______ LF Splash Blocks .................................................................... $_________________ ______ LF Building #6 Total Cost............................................................. $_________________

Sales Tax ............. ............................................................ $__________________

Grand Total BASE BID: ................................................... $ _____________________

Unit Costs: (For Bid Verification only) a) Gutters & Downspouts supplied/installed per LF of gutter ........... $______________/LF b) Ice & Water Shield ........................................................................ $______________/SF

c) Black paper $______________/SF d) Dimensional Shingles supplied and installed per SF ................... $______________/SF e) Splash Blocks supplied and installed per SF ............................... $______________/SF

End of Proposal 07-3110 ROOFING & GUTTERING

Page 32: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 07-4600 – EXTERIOR SIDING & TRIM MATERIALS This Proposal shall include all materials, equipment, supervision, services, insurance, sales tax, and miscellaneous items necessary to complete all Exterior Siding and Trim Materials in accordance with the plans and specifications. The scope of work shall include; but is not necessarily limited to the following:

A. Supply all materials required to complete the Exterior Siding and Trim work including but not limited to:

1. Shop drawings 2. Exterior trim 3. Fiber cement siding 4. Gutter Boards 5. Rake Boards 6. Soffit 7. Metal trims and flashings 8. Shutters 9. Architectural gable vents 10. Architectural Panels below windows

B. Trucking, with lift gate for deliveries, will coordinate with BCC field Supervision on delivery. C. Material to be shipped in a manner as to avoid damage while in transit, loading, or unloading. D. Trucking with lift gate for deliveries. E. Unload and store materials. Location will be as designated by BCC. F. Replace any units that may be defective or damaged. G. Coordination of deliveries with the field supervision is required. H. Storage of material will be in a neat and orderly fashion. I. Relocation of material may be required for coordination with other trades and is included as a part of

this scope of work. J. Strict adherence to the on-site safety program shall be included. K. Material not included in this bid package but coordinated by this supplier:

1. Building wrap 2. Building warp Tape

L. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and alternates.

PROPOSAL NO. 07-4600 – EXTERIOR SIDING & TRIM MATERIALS BID BREAKDOWN:

Siding ................................... $_________________

Trim ...................................... $_________________

Vents, Shutters & Panels ..... $_________________

Total Building #1, Siding & Trim Material Amount ................... $_________________

Siding ................................... $_________________

Trim ...................................... $_________________

Vents, Shutters & Panels ..... $_________________

Page 33: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Total Building #2 Siding & Trim, Material Amount ................... $_________________

Siding ................................... $_________________

Trim ...................................... $_________________

Vents, Shutters & Panels ..... $_________________

Total Building #3 Siding & Trim, Material Amount ................... $_________________

Siding ................................... $_________________

Trim ...................................... $_________________

Vents, Shutters & Panels ..... $_________________

Total Building #4 Siding & Trim, Material Amount ................... $_________________

Siding ................................... $_________________

Trim ...................................... $_________________

Vents, Shutters & Panels ..... $_________________

Total Building #5, Siding & Trim, Material Amount .................. $__________________

Siding ................................... $_________________

Trim ...................................... $_________________

Vents, Shutters & Panels ..... $_________________

Total Building #6, Siding & Trim, Material Amount .................. $__________________

Sales Tax ............. ......................................................................... $__________________

Grand Total Siding & Trim Material Bid Amount ..................... $_____________________

Unit Price:

a. Cement Board siding material ........................................... $_________________ / SF

b. Trim ................................................................................... $_________________ / LF

c. Gable Vents ....................................................................... $_________________ / Ea

d. Shutters ............................................................................. $_________________ / Ea

e. Billing rate for carpenter per HR ........................................ $_________________

f. Billing rate for laborer per HR ............................................ $_________________

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $_____________________; said sum not being included in the Base Bid Proposal. ADDENDA The undersigned acknowledges receipt of Addenda Numbers ____________ issued during the time of bidding, and includes the several changes therein in this Proposal. End of PROPOSAL NO. 07-4600 – EXTERIOR SIDING & TRIM MATERIALS

Page 34: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 07-4601 – EXTERIOR SIDING & TRIM Labor This Proposal shall include all materials, equipment, supervision, services, insurance, sales tax, and miscellaneous items necessary to complete all Exterior Siding and Trim Labor in accordance with the plans and specifications. The scope of work shall include; but is not necessarily limited to the following:

A. Supply and install all materials required to complete the Exterior Siding and Trim work including but not limited to:

1. Shop drawings 2. Exterior trim 3. Fiber cement siding 4. Gutter Boards 5. Rake Boards 6. Soffit 7. Metal trims and flashings 8. Shutters 9. Architectural gable vents 10. Architectural Panels below windows

B. Trucking, with lift gate for deliveries, will coordinate with BCC field Supervision on delivery. C. Material to be shipped in a manner to avoid damage while in transit, loading, or unloading. D. Unload material from a Truck with lift gate E. Unload and store materials. Location will be as designated by BCC. F. Notify BCC of any defective or damaged materials G. Coordinate deliveries with the field supervision. H. Storage of material will be in a neat and orderly fashion. I. Relocation of material may be required for coordination with other trades and is included as a part of

this scope of work. J. Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster. K. Daily Clean-up will be enforced. One (1) 24 hour notice will be give. Future violations will be

cleaned-up by BCC and the costs associated will be deducted from the final contract amount. L. Strict adherence to the on-site safety program shall be included. M. Repair tears and seams in building wrap. If there are major areas of building wrap damage contract

the superintendent. N. Items supplied by others but used by this contractor

1. Dumpsters O. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates.

PROPOSAL NO. 07-4601 – EXTERIOR SIDING & TRIM Labor BID BREAKDOWN:

Siding ................................... $_________________

Trim ...................................... $_________________

Vents, Shutters & Panels ..... $_________________

Total Building #1, Siding & Trim Labor Amount ....................... $_________________

Siding ................................... $_________________

Trim ...................................... $_________________

Vents, Shutters & Panels ..... $_________________

Total Building #2 Siding & Trim, Labor Amount ....................... $________________

Page 35: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Siding ................................... $_________________

Trim ...................................... $_________________

Vents, Shutters & Panels ..... $_________________

Total Building #3 Siding & Trim, Labor Amount ....................... $_________________

Siding ................................... $_________________

Trim ...................................... $_________________

Vents, Shutters & Panels ..... $_________________

Total Building #4 Siding & Trim, Labor Amount ....................... $_________________

Siding ................................... $_________________

Trim ...................................... $_________________

Vents, Shutters & Panels ..... $_________________

Total Building #5, Siding & Trim, Labor Amount ...................... $__________________

Siding ................................... $_________________

Trim ...................................... $_________________

Vents, Shutters & Panels ..... $_________________

Total Building #6, Siding & Trim, Labor Amount ...................... $__________________

Sales Tax ............. ............ ............ $__________________ Grand Total Siding & Trim Labor Bid Amount ......................... $_____________________

Unit Price:

g. Cememt Board siding labor & material, installed .............. $_________________ / SF

h. Trim ................................................................................... $_________________ / LF

i. Gable Vents ....................................................................... $_________________ / LF

j. Shutters ............................................................................. $_________________ / LF

k. Billing rate for carpenter per HR ........................................ $_________________

l. Billing rate for laborer per HR ............................................ $_________________

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $_____________________; said sum not being included in the Base Bid Proposal. ADDENDA The undersigned acknowledges receipt of Addenda Numbers ____________ issued during the time of bidding, and includes the several changes therein in this Proposal. End of PROPOSAL NO. 07-4601 – EXTERIOR SIDING & TRIM LABOR

Page 36: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 07-9220 – CAULKING This Proposal shall include all materials, equipment, supervision, services, insurance, sales tax, and miscellaneous items necessary to complete all Caulking in accordance with the plans and specifications.

The scope of work shall include, but is not limited to the following:

Supply and install all materials required to complete the caulking. A. Minimum of a One (1) year labor and material warranty. Extended warranties may apply per the

specifications. B. Unload and store materials. Location will be as designated by BCC. C. Coordination of deliveries with the field supervision is required. D. Storage of material will be in a neat and orderly fashion. E. Relocation of material may be required for coordination with other trades and is included as a part

of this scope of work. F. Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster. G. Daily Clean-up will be enforced. One (1) 24 hour notice will be given. Future violations will be

cleaned-up by BCC and the costs associated will be deducted from the final contract amount. H. Strict adherence to the on-site safety program shall be included. I. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates.

Building #1, Caulking, Total Amount .................... $ LF

Building #2, Caulking, Total Amount .................... $ LF

Building #3, Caulking, Total Amount .................... $ LF

Building #4, Caulking, Total Amount .................... $ LF

Building #5, Caulking, Total Amount .................... $ LF

Building #6, Caulking, Total Amount .................... $ LF Sales Tax ............. $__________________

Grand Total Caulking Bid Amount .........$________________

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $ ; said sum not being included in the Base Bid Proposal.

ADDENDA The undersigned acknowledges receipt of Addenda Numbers issued during the time of bidding, and includes the several changes therein in this Proposal.

End of PROPOSAL NO. 07-9220 – CAULKING

Page 37: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 08-1120 – Doors & Frames This Proposal shall include all labor, material, equipment,

supervision, services, insurance, sales tax, and miscellaneous items necessary to Furnish and Deliver all

Interior and Exterior Doors in compliance with the specifications and as shown on the drawings:

The scope of work shall include; but is not necessarily limited to the following:

A. Provide door schedule for review

B. Mark each package with the building and door number

C. Entry Doors & Frames

D. Pre-hung Interior Doors

E. Building Entry doors

F. Rear Mechanical area door & Frame

G. Doors shall be prepped for appropriate hardware

H. Delivery will be tailgate only and by building.

I. Each door and box of hardware to be labeled appropriately

J. Trucking, with lift gate, will coordinate with the BCC field Supervision on delivery.

K. Material to be shipped in a manner to avoid damage while in transit, loading, or unloading

L. All glazing to be included with grids per drawings and specifications.

M. Damage to material noted on delivery to be replaced at No cost to BCC.

N. Coordination of deliveries with the field supervision is required.

O. The following items are supplied by others but there will be some coordination

1. Interior Door Casing

2. Temporary Hardware

PP.. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates.

Bld# 1 Doors & Frames $_____________________ _______ QT BBlldd## 22 DDoooorrss && FFrraammeess .................................................. $$__________________________________________ ______________ QQTT Bld# 3 Doors & Frames $_____________________ _______ QT Bld# 4 Doors & Frames $_____________________ _______ QT Bld# 5 Doors & Frames $_____________________ _______ QT Bld# 6 Doors & Frames $_____________________ _______ QT Sales Tax $_____________________ Total Doors & Frames $_____________________

Page 38: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Unit Prices:

1. Unit entry Door frame $__________EA Include Tax & Shipping

2. Pre-hung Interior Swing Door Frame Size __________ $__________EA

3. Pre-hung Interior Swing Door Frame Size __________ $__________EA

4. Pre-hung Interior Swing Door Frame Size __________ $__________EA

5. Pre-hung Interior Swing Door Frame Size __________ $__________EA

6. Mechanical Room Door Frame Size __________ $__________EA

7. Mechanical Room Door Size __________ $__________EA

End of PROPOSAL NO. 08-1120 – DOORS & HARDWARE

Page 39: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 08-5510 – WINDOWS This Proposal shall include all materials, equipment, supervision, services, insurance, sales tax, and miscellaneous items necessary to supply all Windows in accordance with the plans and specifications.

The scope of work shall include; but is not necessarily limited to the following:

A. Provide Shop drawings. B. Mark each window package with the building number C. Fabricate and deliver to the site all Windows including all related hardware, weather stripping,

screens, accessories etc. D. Glass shall be tempered where required by code. E. All glass shall meet the specified requirements F. Trucking, with lift gate, will coordinate with the BCC field Supervision on delivery. G. Material to be shipped in a manner as to avoid damage while in transit, loading, or unloading. H. Trucking with lift gate for deliveries. I. Unload and store materials. Location will be as designated by BCC. J. Replace any units that may be defective or damaged. K. Coordinate deliveries with the field supervision. L. Storage of material will be in a neat and orderly fashion. M. Relocation of material may be required for coordination with other trades and is included as a part of

this scope of work. N. Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster. O. Daily Clean-up will be enforced. One (1) 24 hour notice will be given. Future violations will be

cleaned-up by BCC and the costs associated will be deducted from the final contract amount. P. Strict adherence to the on-site safety program shall be included. Q. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates.

Window Cost BID BREAKDOWN:

Type A QTY ............. _________________ Type B QTY ............. _________________ Type C QTY ............. _________________

Building #1, Total ........ $_________________ Type A QTY ............. _________________ Type B QTY ............. _________________ Type C QTY ............. _________________

Building #2, Total ........ $_________________ Type A QTY ............. _________________ Type B QTY ............. _________________ Type C QTY ............. _________________

Building #3, Total $_________________

Type A QTY ............. _________________ Type B QTY ............. _________________ Type C QTY ............. _________________

Building #4, Total ........ $_________________ Type A QTY ............. _________________ Type B QTY ............. _________________ Type C QTY ............. _________________

Building #5, Total ........ $_________________

Page 40: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Type A QTY ............. _________________ Type B QTY ............. _________________ Type C QTY ............. _________________

Building #6, Total ........ $_________________ Tax $$__________________________________

Total Bid Amount (including Freight, & tax) ................... $_____________________ Unit Prices:

window sizes (list): a. ____________________ ........... $_______________ea. Including tax and freight b. ____________________ ........... $_______________ea. c. ____________________ ........... $_______________ea. d. ____________________ ........... $_______________ea. e. ____________________ ........... $_______________ea. f.

ADDENDA The undersigned acknowledges receipt of Addenda Numbers ____________ issued during the time of bidding, and includes the several changes therein in this Proposal.

End of PROPOSAL NO. 08-5510 – WINDOWS

Page 41: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 08-7100 – DOOR HARDWARE This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and

miscellaneous items necessary to Furnish and Deliver all Interior and Exterior Door hardware in

compliance with the specifications and as shown on the drawings:

The scope of work shall includes but is not limited to the following:

A. Provide door hardware schedule for review

B. Label each package with the building, unit and door number in addition to the manufacturers info

C. Entry Door hardware

D. Pre-hung Interior Doors

E. Building Entry doors

F. Rear Mechanical area door hardware

G. Door Hardware including but not limited to:

a. Hinges for doors that are not pre-hung

b. Entry Door lock sets

c. Closet door latch sets

d. Bathroom door lock sets

e. All specified door hardware

H. All Door Hardware to be finished as specified

I. Provide templates so doors can be prepped for appropriate hardware

J. Delivery will be tailgate only and by building.

K. Trucking, with lift gate, will coordinate with the BCC field Supervision on delivery.

L. Material to be shipped in a manner to avoid damage while in transit, loading, or unloading

M. All glazing to be included with grids per drawings and specifications.

N. Damage to material noted on delivery to be replaced at No cost to BCC.

O. Coordination of deliveries with the field supervision is required.

P. The following items are supplied by others but there will be some coordination

1. Temporary Hardware

QQ.. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates.

Bld# 1 Doors & Frames $_____________________ _______ QT BBlldd## 22 DDoooorrss && FFrraammeess .................................................. $$__________________________________________ ______________ QQTT Bld# 3 Doors & Frames $_____________________ _______ QT Bld# 4 Doors & Frames $_____________________ _______ QT Bld# 5 Doors & Frames $_____________________ _______ QT Bld# 6 Doors & Frames $_____________________ _______ QT Sales Tax $_____________________ Total Hollow Metal Doors & Frames $_____________________

Page 42: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Unit Prices:

1. Unit Entry door lock set $__________EA Include Tax & Shipping

2. Bathroom door lock set $__________EA

3. Closet Door Lock set $__________EA

4. Entry Door Hinges $__________EA Dr

5. Interior Door Hinges $__________EA Dr

End of PROPOSAL NO. 08-7100 – DOOR HARDWARE

Page 43: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 09-2500 – DRYWALL (ON WOOD FRAMING) This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and miscellaneous items necessary to complete all Drywall on wood framing work in accordance with the plans and specifications.

The scope of work shall include, but is not limited to the following:

A. Layout for own work B. Furnish and install all drywall for all the buildings including, but not limited to;

1. Mechanical/Electrical Rooms 2. Townhouses

C. Drywall ceiling assemblies shall be per the plans. D. All one (1) and Two (2) hour fire rated walls are included in this scope of work. E. Moisture resistant drywall as required on wet walls. F. Provide the specified finish Level on all drywall walls and ceilings. G. Furnish all gypsum panels, clips, screws and all miscellaneous materials required for all drywall

work including: fire Walls, smoke walls etc. required by the plans and specifications. H. Ceiling systems shall be per the plans and specs.

1. Include drywall on the ceilings and walls as per plans. I. All load bearing walls to receive the specified drywall on each side. J. All non-load bearing walls shall receive the specified drywall on each side. K. When stocking buildings, subcontractor shall be aware of directional runs of floor trusses and shall

not stack sheet rock in excess of 16” in height to avoid causing deflection in floor trusses. L. The storage of joint compound and other material in buildings is prohibited. The mixing of sheetrock

mud in units and breezeways or balconies is prohibited. Drywall compound shall be mixed on scrap OSB on the ground, or in an approved location by Contractors Project Superintendent.

M. Coordinate delivery schedule with Project Superintendent. N. All drywall is to be screwed and nailed.

1. Screws – in drywall field as noted in the plans and specifications. 2. Nails – corner bead and perimeter of drywall.

O. Resilient Channel as per plans and U.L. U356, U336, U311, U341, and P522. P. Attic draft stops to be OSB / Thermo-Ply; fire stopping and shaft assemblies per plans Q. All drywall materials including but not limited to:

1. fasteners 2. Metal channel 3. Standard Drywall 4. Type X Drywall 5. Type C (if called for on the contract documents) 6. Water Board 7. corner bead 8. Finishing 9. Zip Strip around windows – remove before caulking and painting

R. Subcontractor shall be responsible for stocking and unloading all materials required for his work. S. Coordinate delivery schedule with Project Construction Superintendent. T. Install all drywall required to do pre-drywall work, behind tubs, in furnace rooms, above drops,

between joist on two hour walls, behind bulkheads, etc., so that other trades can complete their rough-in work.

U. Sand and wash down all finish wall board, so as to give a smooth surface ready for paint and/or wall decoration.

V. No board shall be hung until the building inspector has posted the close-in approval sticker.

Page 44: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

W. Subcontractor will repair or report all surfaces and supports which would jeopardize satisfactory finish walls. Subcontractor is responsible for correction of defects in finish work, due to faulty sub-surface preparation. Subcontractor shall report any bowed walls, studs, or out of square conditions.

X. The Subcontractor agrees to do minor touch-up and repairs due to damage by other contractors, at no cost to the General Contractor. In the event of major or excessive costs and repairs, Subcontractor and Project Superintendent will present an estimate of the costs to the party responsible for the damage.

Y. All corridors, breezeways, garage areas, lobbies, storage rooms, electrical rooms, etc., to be included in subcontractor’s work scope.

Z. Wallboard to be held 3/8” above bath tubs/showers with factory edge down, or as directed by the Project Superintendent.

AA. All windows, tubs, HVAC units, piping, doors, etc will be covered before finishing starts. All drywall compound will be cleaned immediately from any contacts not intended to have drywall mud. No overspray on anything will be tolerated. At time of punch out, all accessories will be covered from damage and overspray. Do not spray electrical panels or boxes.

BB. Subcontractor is to ensure proper conditions exist for finishing operation. Low temperature will not be an acceptable reason for failure to meet project schedule.

CC. Immediately after hanging operation, the subcontractor shall completely scrap out and broom sweep all work areas. This process will be repeated after sanding operation. This directive does not excuse the subcontractor from his daily cleaning obligation. Subcontractor is to clean all work areas thoroughly upon completion of all work. No nails, screws or any fasteners will be left behind to rust or damage property. Subcontractor shall scrape all floors removing drywall compound, tape, nails, etc. as required to the satisfaction of the Project Superintendent. Subcontractor will not clean out mud pans, boxes and/or equipment in sinks, commodes, tubs, windows, disposals and/or any other location causing extra work to cleaners or laborers. No clean out will result in materials being discharged in any manner on any exterior building products. All excessive cleaning performed by cleaners resulting in a charge to contractor will be back-charged to drywall subcontractor.

DD. Drywall hang & finish for residential areas including equipment, trim accessories, sealants and adhesives.

EE. Remove all scrap and trash from units to onsite dumpster provided by General Contractor and broom clean daily.

FF. Leave all finished surfaces ready for paint. GG. Strict adherence to the on-site safety program shall be included. HH. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates.

BID BREAKDOWN: Drywall Labor and Materials:

Building #1, Total ........... $_________________ _____________ SF

Building #2, Total ........... $_________________ _____________ SF

Building #3, Total ........... $_________________ _____________ SF

Building #4, Total ........... $_________________ _____________ SF

Building #5, Total ........... $_________________ _____________ SF

Building #6, Total ........... $_________________ _____________ SF

Sales Tax ...................... $_________________

Total Bid Amount ...................................................... $_____________________

Page 45: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $_____________________; said sum not being included in the Base Bid Proposal. ADDENDA The undersigned acknowledges receipt of Addenda Numbers ____________ issued during the time of bidding, and includes the several changes therein in this Proposal.

End of PROPOSAL NO. 09-2500 – DRYWALL (ON WOOD FRAMING)

Page 46: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PPRROOPPOOSSAALL NNOO.. 09-6000 Flooring

This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and miscellaneous items required to complete all Flooring work as shown on the drawings or as called for in the specifications.

The scope of work shall include, but is not limited to the following:

Flooring scope shall include, but not limited to the following: • All floor prep is to be included such as but not limited to the following;

Latex leveling of building slab control joints. Cleaning of slab floors prior to application of adhesives

Supply and install all floor covering and accessories including but not limited to: Carpet pad gglluueess ggrroouuttss fflloooorr ttrraannssiittiioonnss mmaatteerriiaallss Vinyl Flooring

• Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster. • Cleanup of all excess, runoff materials, leaving your work area ready for the next subcontractor. • All trash and clean-up to a roll-off dumpster provided by BCC unless HAZMAT obligations require

hauling from the project site. If the material is to be hauled from the site, then it is this subcontractor’s responsibility to do so under this scope of work.

• Subcontractor shall maintain all required permits and licenses required for this scope of work. • Strict adherence to the on-site safety program shall be included. • UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates.

Flooring BID BREAKDOWN:

Unit Carpet, Total Amount ................ $______________ ____ SY

Unit Vinyl Plank Floors, Total............ $______________ ____ SF

Total Building #1, Flooring ................................ $______________

Unit Carpet, Total Amount ................ $______________ ____ SY

Unit Vinyl Plank Floors, Total............ $______________ ____ SF

Total Building #2, Flooring .......................................................... $______________

Unit Carpet, Total Amount ................ $______________ ____ SY

Unit Vinyl Plank Floors, Total............ $______________ ____ SF

Total Building #3, Flooring .......................................................... $______________

Unit Carpet, Total Amount ................ $______________ ____ SY

Unit Vinyl Plank Floors, Total............ $______________ ____ SF

Total Building #4, Flooring .......................................................... $______________

Unit Carpet, Total Amount ................ $______________ ____ SY

Unit Vinyl Plank Floors, Total............ $______________ ____ SF

Total Building #5, Flooring .......................................................... $______________

Page 47: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Unit Carpet, Total Amount ................ $______________ ____ SY

Unit Vinyl Plank Floors, Total............ $______________ ____ SF

Total Building #6, Flooring $______________ Tax $______________

Grand Total Flooring Bid $____________________ Unit Prices:

a. Carpet/pad installed,. ........................................... $______________ / Sq. Yd

b. Vinyl plank installed, ............................................. $______________ /SF

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $_____________________; said sum not being included in the Base Bid Proposal. ADDENDA The undersigned acknowledges receipt of Addenda Numbers ____________ issued during the time of bidding, and includes the several changes therein in this Proposal.

End of PPRROOPPOOSSAALL NNOO.. 09-6000 Flooring

Page 48: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 09 - 9100 - PAINTING This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and miscellaneous items required to complete all Painting work in accordance with the plans and specifications. The scope of work shall include, but is not limited to the following:

A. Applicable contractor permits, tap fees and inspection fees to be included. B. Scheduling and coordination of all required inspections associated with your scope of work. C. Painting scope includes, but not limited to:

1. Trash Enclosure fences 2. Exterior Siding & Trim 3. Soffits and gutter boards 4. Columns 5. Shutters 6. Exterior wall panels 7. Patio Railings 8. Exterior & Interior Doors 9. Walls & Ceilings 10. Painting/sealing the stairway walls shall be included. 11. Stair Handrails 12.

D. Patch, repair, and appropriate preparation of trim and all other painted surfaces shall be included. E. Provide and install all paint materials and labor. F. Caulk

1. wood trim 2. door frames 3. wood base 4. Zip strip around windows 5. kitchen 6. bath countertops

G. Draping, covering and protection of all other materials shall be included in order to avoid overspray

and/or splatter from paint. H. Include minor interior wall touchup prior to paint. I. Include touch up after punch list is completed. J. Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster. K. Cleanup of all excess, runoff materials, leaving your work area ready for the next subcontractor. L. All trash and clean-up to a roll-off dumpster provided by BCC unless HAZMAT obligations require

hauling from the project site. If the material is to be hauled from the site, then it is this subcontractor’s responsibility to do so under this scope of work.

M. Subcontractor shall maintain all required permits and licenses required for this scope of work. N. The following items are provided by others but used or installed by this contractor

1. Dumpsters O. The following work is not included in this scope of work:

1. Parking marking 2. Parking striping

P. Strict adherence to the on-site safety program shall be included. Q. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates.

Page 49: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Painting BID BREAKDOWN:

Trash Enclosures Painting ................... $______________ _______ SF Other Site amenities ................................ $______________ _______ SF

Site Total Amount ............................................... $___________________

Interior Walls, Ceilings & Trim ................. $______________ _______ SF Interior/Exterior Steel Doors .................... $______________ _______ QT Exterior Siding/Trim Painting ................... $______________ _______ SF Patio Railings .......................................... $______________ _______ LF Patio Columns ......................................... $______________ _______ EA

Building #1, Total Amount ................................. $___________________

Interior Walls, Ceilings & Trim ................. $______________ _______ SF Interior/Exterior Steel Doors .................... $______________ _______ QT Exterior Siding/Trim Painting ................... $______________ _______ SF Patio Railings .......................................... $______________ _______ LF Patio Columns ......................................... $______________ _______ EA

Building #2, Total Amount ................................. $___________________

Interior Walls, Ceilings & Trim ................. $______________ _______ SF Interior/Exterior Steel Doors .................... $______________ _______ QT Exterior Siding/Trim Painting ................... $______________ _______ SF Patio Railings .......................................... $______________ _______ LF Patio Columns ......................................... $______________ _______ EA

Building #3, Total Amount ................................. $___________________ Interior Walls, Ceilings & Trim ................. $______________ _______ SF Interior/Exterior Steel Doors .................... $______________ _______ QT Exterior Siding/Trim Painting ................... $______________ _______ SF Patio Railings .......................................... $______________ _______ LF Patio Columns ......................................... $______________ _______ EA

Building #4, Total Amount ................................. $___________________

Interior Walls, Ceilings & Trim ................. $______________ _______ SF Interior/Exterior Steel Doors .................... $______________ _______ QT Exterior Siding/Trim Painting ................... $______________ _______ SF Patio Railings .......................................... $______________ _______ LF Patio Columns ......................................... $______________ _______ EA

Building #5, Total Amount ................................. $___________________ Interior Walls, Ceilings & Trim ................. $______________ _______ SF Interior/Exterior Steel Doors .................... $______________ _______ QT Exterior Siding/Trim Painting ................... $______________ _______ SF Patio Railings .......................................... $______________ _______ LF Patio Columns ......................................... $______________ _______ EA

Building #6, Total Amount ................................. $___________________ TAX .......................................................................................................................................... $$__________________________________________ GGrraanndd TToottaall BBiidd .................................................................................................... $$__________________________________________

Page 50: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Unit Prices:

a. Interior painting walls, .......................................... $______________ /SF b. Interior painting ceilings, ...................................... $______________ /SF c. Interior painting doors,.......................................... $______________/EA d. Interior painting trim,............................................. $______________/LF e. Exterior painting, .................................................. $______________ /SF f. Exterior Doors ...................................................... $______________/EA g. Trash Enclosure Fence ........................................ $______________ /SF h. Patio Railing ......................................................... $______________ /LF i.

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $_____________________; said sum not being included in the Base Bid Proposal. ADDENDA The undersigned acknowledges receipt of Addenda Numbers ____________ issued during the time of bidding, and includes the several changes therein in this Proposal.

End of PROPOSAL NO. 09 - 9100 - PAINTING

Page 51: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 10-0000 - ACCESSORIES This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and miscellaneous items required to complete all Accessories work in accordance with the plans and specifications. The scope of work shall include, but is not limited to the following;

A. Applicable contractor permits, tap fees and inspection fees to be included. B. Scheduling and coordination of all required inspections associated with your scope of work. C. Minimum of a One (1) year labor and material warranty. Extended warranties may apply per the

specifications. D. Accessories scope includes, but not limited to Provide and Install:

1. Towel Bars 2. Toilet Paper holders 3. Shower Rods 4. Bath Mirrors 5. vinyl coated wire shelving in all linen, pantry and clothes closets 6. Unit numbers 7. Post mounted - exterior mail boxes

E. Include all screws, nails, glues and clips for proper attachment. F. Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster. G. All trash and clean-up to a roll-off dumpster provided by BCC unless HAZMAT obligations require

hauling from the project site. If the material is to be hauled from the site, then it is this subcontractor’s responsibility to do so under this scope of work.

H. Subcontractor shall maintain all required permits and licenses required for this scope of work. I. Strict adherence to the on-site safety program shall be included. J. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates.

Accessory BID BREAKDOWN:

Pedestal Mounted Mail Boxes $_________________ Site Accessories Total Amount .................................................. $________________

Mirrors ........................................ $_________________ Toilet Paper Holders................... $_________________ Towel Bars ................................. $_________________ Shower Rods ............................. $_________________ Wire Shelving ............................. $_________________ Unit numbers .............................. $_________________

Building# 1 Total Amount ............................................................ $________________

Mirrors ........................................ $_________________ Toilet Paper Holders................... $_________________ Towel Bars ................................. $_________________ Shower Rods ............................. $_________________ Wire Shelving ............................. $_________________ Unit numbers .............................. $_________________

Building# 2 Total Amount ............................................................ $________________

Page 52: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Mirrors ........................................ $_________________ Toilet Paper Holders................... $_________________ Towel Bars ................................. $_________________ Shower Rods ............................. $_________________ Wire Shelving ............................. $_________________ Unit numbers .............................. $_________________

Building# 3 Total Amount ............................................................ $________________

Mirrors ........................................ $_________________ Toilet Paper Holders................... $_________________ Towel Bars ................................. $_________________ Shower Rods ............................. $_________________ Wire Shelving ............................. $_________________ Unit numbers .............................. $_________________

Building# 4 Total Amount ............................................................ $________________ Mirrors ........................................ $_________________ Toilet Paper Holders................... $_________________ Towel Bars ................................. $_________________ Shower Rods ............................. $_________________ Wire Shelving ............................. $_________________ Unit numbers .............................. $_________________

Building# 5 Total Amount ............................................................ $________________ Mirrors ........................................ $_________________ Toilet Paper Holders................... $_________________ Towel Bars ................................. $_________________ Shower Rods ............................. $_________________ Wire Shelving ............................. $_________________ Unit numbers .............................. $_________________

Building# 6 Total Amount ............................................................ $________________

Tax $_________________

Grand Total Bid Amount $_____________________

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $_____________________; said sum not being included in the Base Bid Proposal. ADDENDA The undersigned acknowledges receipt of Addenda Numbers ____________ issued during the time of bidding, and includes the several changes therein in this Proposal. End of PROPOSAL NO. 10-0000 - ACCESSORIES

Page 53: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 11- 4000 - Appliances This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and miscellaneous items required to complete all Appliances work in accordance with the plans and specifications. The scope of work shall include, but is not limited to the following;

A. Applicable contractor permits, fees and inspection fees to be included. B. Scheduling and coordination of all required inspections associated with your scope of work. C. Minimum of a One (1) year labor and material warranty. Extended warranties may apply per the

specifications. D. Unpack, and set in place all appliances, remove packing from inside appliances E. Appliances scope includes, but not limited to provide, install and hook up:

1. Refrigerator – with corded plug in (Pig Tail) 2. Range – with corded plug in (Pig Tail) 3. Dish Washer – with corded plug in (Pig Tail) 4. MMiiccrroowwaavvee oovveerr OOvveenn –– wwiitthh ((PPiigg TTaaiill)) 5. MMiiccrroowwaavvee oonn ccoouunntteerr –– wwiitthh ((PPiigg TTaaiill)) 6. RRaannggee HHoooodd –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) 7. Washing machine – with hoses and corded plug in (Pig Tail) 8. Dryer – with vent pipe, corded plug in (Pig Tail)

F. Include all screws, clips and adjustments for proper set up and attachment G. The following items are provided by this Subcontractor but installed by others:

1. Garbage disposal – with corded plug in (Pig Tail) H. Ship each building of appliances separately. I. Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster. J. All trash and clean-up to a roll-off dumpster provided by BCC unless HAZMAT obligations require

hauling from the project site. If the material is to be hauled from the site, then it is this subcontractor’s responsibility to do so under this scope of work.

K. Subcontractor shall maintain all required permits and licenses required for this scope of work. L. Strict adherence to the on-site safety program shall be included. M. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates.

Appliances BID BREAKDOWN:

RReeffrriiggeerraattoorr –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT RRaannggee –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT DDiisshh WWaasshheerr –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT Microwave over Oven –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Microwave on counter –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Range Hood –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT Garbage Disposals –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Washing machine – with hoses and (Pig Tail) $$__________________________________ ____________QQTT Dryer – with vent pipe, corded plug in (Pig Tail) $_________________ ______QT

Building# 1 Total Amount ............................................................ $________________

Page 54: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

RReeffrriiggeerraattoorr –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT RRaannggee –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT DDiisshh WWaasshheerr –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT Microwave over Oven –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Microwave on counter –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Range Hood –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT Garbage Disposals –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Washing machine – with hoses and (Pig Tail) $$__________________________________ ____________QQTT Dryer – with vent pipe, corded plug in (Pig Tail) $_________________ ______QT

Building# 2 Total Amount ............................................................ $________________

RReeffrriiggeerraattoorr –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT RRaannggee –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT DDiisshh WWaasshheerr –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT Microwave over Oven –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Microwave on counter –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Range Hood –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT Garbage Disposals –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Washing machine – with hoses and (Pig Tail) $$__________________________________ ____________QQTT Dryer – with vent pipe, corded plug in (Pig Tail) $_________________ ______QT

Building# 3 Total Amount ............................................................ $________________ RReeffrriiggeerraattoorr –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT RRaannggee –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT DDiisshh WWaasshheerr –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT Microwave over Oven –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Microwave on counter –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Range Hood –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT Garbage Disposals –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Washing machine – with hoses and (Pig Tail) $$__________________________________ ____________QQTT Dryer – with vent pipe, corded plug in (Pig Tail) $_________________ ______QT

Building# 4 Total Amount ............................................................ $________________ RReeffrriiggeerraattoorr –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT RRaannggee –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT DDiisshh WWaasshheerr –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT Microwave over Oven –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Microwave on counter –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Range Hood –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT GGaarrbbaaggee DDiissppoossaallss – with (Pig Tail) $$__________________________________ ____________QQTT Washing machine – with hoses and (Pig Tail) $$__________________________________ ____________QQTT Dryer – with vent pipe, corded plug in (Pig Tail) $_________________ ______QT

Building# 5 Total Amount ............................................................ $________________ RReeffrriiggeerraattoorr –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT RRaannggee –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT DDiisshh WWaasshheerr –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT Microwave over Oven –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Microwave on counter –– wwiitthh ((PPiigg TTaaiill)) $_________________ ______QT Range Hood –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ ______QT GGaarrbbaaggee DDiissppoossaallss – with (Pig Tail) $$__________________________________ ____________QQTT Washing machine – with hoses and (Pig Tail) $$__________________________________ ____________QQTT Dryer – with vent pipe, corded plug in (Pig Tail) $_________________ ______QT

Building# 6 Total Amount ............................................................ $________________

Sales Tax $_________________

Grand Total Bid Amount $_____________________

Page 55: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Unit Prices- Including Tax, delivery, uncrated and hook up:

RReeffrriiggeerraattoorr –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ Each RRaannggee –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ Each DDiisshh WWaasshheerr –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ Each Microwave over Oven –– wwiitthh ((PPiigg TTaaiill)) $_________________ Each Microwave on counter –– wwiitthh ((PPiigg TTaaiill)) $_________________ Each Range Hood –– wwiitthh ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ Each Garbage Disposals –– wwiitthh ((PPiigg TTaaiill)) $_________________ Each WWaasshhiinngg mmaacchhiinnee –– wwiitthh hhoosseess aanndd ((PPiigg TTaaiill)) $_________________ Each DDrryyeerr –– wwiitthh vveenntt ppiippee,, ccoorrddeedd pplluugg iinn ((PPiigg TTaaiill)) $_________________ Each

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $_____________________; said sum not being included in the Base Bid Proposal. ADDENDA The undersigned acknowledges receipt of Addenda Numbers ____________ issued during the time of bidding, and includes the several changes therein in this Proposal. End of PROPOSAL NO. 11- 4000 - Appliances

Page 56: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 12 - 4900 – WINDOW Treatment This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and miscellaneous items required to complete all Window Blinds work in accordance with the plans and specifications. The scope of work shall include, but is not limited to the following:

• Subcontractor shall maintain all required permits and licenses required for this scope of work. • Scheduling and coordination of all required inspections associated with your scope of work. • Minimum of a One (1) year labor and material warranty. Extended warranties may apply per the

specifications. • Window blinds shall be 1” wide PVC flexible vinyl mini blinds, white, with metal head rails. • Supply and install blinds on all windows • Include all fasteners required for proper attachment. • Buckingham Construction will not be responsible for theft or vandalism of partially installed material

or equipment that is roughed in and but not complete or functional. • Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster. • Cleanup of all excess, runoff materials, leaving your work area ready for the next subcontractor. • All trash and clean-up to a roll-off dumpster provided by BCC unless HAZMAT obligations require

hauling from the project site. If the material is to be hauled from the site, then it is this subcontractor’s responsibility to do so under this scope of work.

• The following windows are not included as part of this work: o Dormer windows o Full view doors o Sliding glass doors.

• Strict adherence to the on-site safety program shall be included. • UTILIZE THIS BID FORM and attach any supplemental information, clarifications and

alternates.

Total Bid Amount ...................................................... $_____________________

BID BREAKDOWN:

Building #1, Total ........... $_________________

Building #2, Total ........... $_________________

Building #3, Total ........... $_________________

Building #4, Total ........... $_________________

Building #5, Total ........... $_________________

Building #6, Total ........... $_________________

Sales Tax ...................... $_________________

Window Blinds, Total Amount .................................................... $________________

Page 57: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Units Cost – Size ____________ $_________ea

Units Cost – Size ____________ $_________ea

Units Cost – Size ____________ $_________ea

Units Cost – Size ____________ $_________ea

Units Cost – Size ____________ $_________ea

PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS Should Owner require Contractor to furnish Performance Bond and Labor and Material Payment Bond, Bonds shall be furnished by the Contractor for total value of the contracted work for which the Contractor will charge the sum of $_____________________; said sum not being included in the Base Bid Proposal. ADDENDA The undersigned acknowledges receipt of Addenda Numbers ____________ issued during the time of bidding, and includes the several changes therein in this Proposal. End of 12- 4900 Window Treatment

Page 58: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 13-9100 - FIRE PROTECTION This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and miscellaneous items required to complete all Fire Protection as shown on the drawings and specifications. The scope of work includes but is not limited to the following;

A. Buildings shall be completely protected by an automatic fire sprinkler system including all: 1. permits 2. licenses 3. ddiissppoossaall ffeeeess 4. IInnssppeeccttiioonn ffeeeess 5. governmental approvals and fire district agencies 6. piping 7. valves 8. risers 9. fittings 10. SSpprriinnkklleerr hheeaaddss iinn uunniittss -- sseemmii--rreecceesssseedd wwiitthh wwhhiittee eessccuuttcchheeoonn rriinnggss 11. valves 12. check valves 13. fire department connections 14. compressor (if required) 15. fire pumps (if required) 16. contacts for fire protection 17. monitoring and flow switches 18. supports 19. anchors 20. hangers 21. sprinkler heads 22. accessories 23. standpipes 24. hose valve connections 25. hoses, 26. test connections, 27. drains, 28. system testing, 29. inspections, 30. permits 31. fees, 32. ttaammppeerr sswwiittcchheess 33. ffllooww sswwiittcchheess 34. aallaarrmm BBeellllss 35. wet and dry pipe systems 36. flange in riser room 37. Backflow preventers 38. Siamese or Stortz fire department connection per fire department’s request

B. Scheduling and coordination of all required inspections associated with your scope of work. C. Minimum of a One (1) year labor and material warranty. Extended warranties may apply per the

specifications D. Subcontractor’s work starts 5’ outside the building E. All areas of the building, including support and storage rooms shall be protected F. This subcontractor shall supply and install a connection (Determined by local Fire Marshall) with

lockable FDC plugs on the outside of the riser room or as indicated on the drawings. Should local building authorities require a standalone connection, in lieu of building mounted connections, they shall be supplied and installed by this subcontractor.

G. All control switches, including PIV’s to be electronically supervised (by others)

Page 59: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

H. Fire Stopping & Fire Caulking of all penetrations made by this subcontractor, including those penetrating through draft stops.

I. Seal floor penetrations to avoid Gypcrete “run-off”. J. All materials and devices are to be in accordance with NFPA 13R. K. Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster. L. Cleanup of all excess, runoff materials, leaving your work area ready for the next subcontractor M. All trash and clean-up to a roll-off dumpster provided by BCC unless HAZMAT obligations

require hauling from the project site. If the material is to be hauled from the site, then it is this subcontractor’s responsibility to do so under this scope of work.

N. Strict adherence to the on-site safety program shall be included. O. Sprinkler heads shall be ceiling or high side-wall mounted where applicable and meet all local

building and fire code requirements P. Exposed sprinklers located under 7’-0” AFF to be installed with head guards Q. Design shall include extra sprinkler head for the unit mechanical closets for a total of (2) heads

in each mechanical closet. R. Work or items provided by others but used by this contractor:

1. SSaanniittaarryy aanndd wwaatteerr tteerrmmiinnaatteedd 55’’ oouuttssiiddee eeaacchh bbuuiillddiinngg 2. DDuummppsstteerr

S. Fire Sprinkler BID BREAKDOWN:

Building Type 1, Total.... $_________________ ________ Heads Building Type 2, Total.... $_________________ ________ Heads Building Type 3, Total.... $_________________ ________ Heads Building Type 4, Total.... $_________________ ________ Heads Building Type 5, Total.... $_________________ ________ Heads Building Type 6, Total.... $_________________ ________ Heads Sales Tax Included ........ $_________________

Grand Total BASE Bid ............. $__________________

Unit Cost: Foreman ___________/HR

Laborer ___________/HR Journeyman ___________/HR End of PROPOSAL NO. 13-9100 - FIRE PROTECTION

Page 60: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL 15-4000 PLUMBING This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and miscellaneous items required to complete all Plumbing work as shown on the drawings or as called for in the specifications. This scope of work includes but is not limited to the following in accordance with all applicable codes and ordinances:

1. Specific trade permits will be the responsibility of each trade subcontractor. 2. Furnish and install a complete plumbing system including: 3. Layout 4. Supply starting 5’ outside the building including final connection 5. Waste starting 5’ outside the building including final connection 6. Vent piping 7. Fixtures including ADA fixtures

• Fiberglass bathtubs/shower unit with walls and faucets, spicket & Spray head Tub, tub walls and tub protector Shower & shower walls • Kitchen sink and faucet with spray • Toilets • Vanity Faucet • Washer box • Ice-maker supply box (final connection to be by others). • Water heater and plastic water heater pan with drain fitting.

8. Drains including floor and hub drains 9. Equipment 10. Frost free hose bib 11. Pipe Insulation 12. Fire stopping 13. Testing and Certification 14. Scheduling and coordination of all required inspections associated with your scope of work. 15. Minimum of a One (1) year labor and material warranty. Extended warranties may apply per the

specifications. 16. This scope includes cutting and patching as required 17. Excavation spoils hauled off site by this subcontractor 18. Backfill under slab plumbing trenches with compactable fill per the Geotechnical report 19. Plumbing system testing and certifications as is required. 20. Provide Professionally Stamped CAD drawings for submittal of intended design changes for

approval by the engineer of record prior to the start of the work. 21. Plumbing piping installation shall be coordinated with the duct and other mechanical and electrical

services in the ceiling cavities by the subcontractor, to provide clearances for light fixtures as required.

22. Toilet Flanges and other associated plumbing shall be installed at finished floor elevation in all areas that receive Gypcrete overlay.

23. Proper seal of floor penetrations to avoid Gypcrete “run-off”. 24. At project completion provide three (3) sets of as-built drawings, one (1) vellum and one (1) CAD

disk and three (3) operation/maintenance manuals with an equipment training orientation to Property Management staff.

25. for penetrations for this scope of work shall be included. 26. Touch-up/repair of areas in this scope of work as required by the owner is included in this scope. 27. This subcontractor shall coordinate via pinpoint hole placement drawings, provided under this

scope, within the building structure to avoid interference with structural elements of the building 28. Subcontractor shall maintain all required permits and licenses required for this scope of work. 29. Receive unload and store materials for this scope of work. 30. Storage of material will be in a neat and orderly fashion. Location will be as designated by BCC. 31. Relocation of material may be required for coordination with other trades and is included as a part of

this scope of work. 32. Subcontractor is responsible for daily clean-up (Broom Clean) to the BCC provided dumpster.

Page 61: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

33. Clean-up to a roll-off dumpster provided by BCC. 34. Strict adherence to the on-site safety program shall be included. 35. Work or items provided by others but used or installed by this contractor:

A. SSaanniittaarryy aanndd wwaatteerr tteerrmmiinnaatteedd 55’’ oouuttssiiddee eeaacchh bbuuiillddiinngg B. DDuummppsstteerrss C. Building permits D. Garbage Disposal with pig tail E. Sub-meters F. Dishwasher G. Vanity top with pre-molded sink

NOTE TO SUBCONTRACTORS: Materials, Equipment and assemblies shown or specified are minimum requirements or performance standards. Local jurisdictions may require performance standards beyond those shown or specified; furthermore, local jurisdictions may prevent the use of commonly accepted materials. Subcontractors shall familiarize themselves with all local requirements for licensing, materials, and performance standards, prior to submitting bid. All conflicts between the contract documents and local requirements shall be brought to the owner’s attention and resolved, by mutual agreement, prior to submission of bid or highest priced work. Local requirements versus specified requirements shall be included in the bid.

UTILIZE THIS BID FORM and attach any supplemental information, clarifications and alternates Plumbing BID BREAKDOWN:

Residential fixtures and other materials ........................................ $_________________ Labor ............................................................................................. $_________________

Building Type 1 Total Amount: ................................................................... $__________________ Residential fixtures and other materials ........................................ $_________________ Labor ............................................................................................. $_________________

Building Type 2 Total Amount: ................................................................... $__________________

Residential fixtures and other materials ........................................ $_________________ Labor ............................................................................................. $_________________

Building Type 3 Total Amount: ................................................................... $__________________ Residential fixtures and other materials ........................................ $_________________ Labor ............................................................................................. $_________________

Building Type 4 Total Amount: ................................................................... $__________________ Residential fixtures and other materials ........................................ $_________________ Labor ............................................................................................. $_________________

Building Type 5 Total Amount: ................................................................... $__________________

Residential fixtures and other materials ........................................ $_________________ Labor ............................................................................................. $_________________

Building Type 6 Total Amount: ................................................................... $__________________

Sales Tax $_________________ Grand Total BASE BID ................................................................................. $__________________

Page 62: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Unit Prices (with tax and OHP) a) Water Closet: ..................................................................................... $______EA b) Lavatory ............................................................................................ $______EA c) Lavatory Faucet ................................................................................ $______EA d) Bathtub & Shower Surround ............................................................. $______EA e) Shower with Fiberglass Surround ..................................................... $______EA f) Kitchen sink w/ faucet........................................................................ $______EA

Water Heater ..................................................................................... $______EA g) Wall Hydrant ...................................................................................... $______EA h) Washer Box ....................................................................................... $______EA i) Floor Drain ......................................................................................... $______EA

Unit Cost: Laborer ___________/HR Journeyman ___________/HR Foreman ___________/HR

ALTERNATES: 1. PEX domestic water system Total Credit $_____________ 2. Fire caulking if performed by others: Total Credit $_____________

3. Spoils stocked onsite rather than haul away Deduct $_____________

4. Install sub meters Total Amount $_____________ Each

End of Proposal 15400 – Plumbing

Page 63: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 15-7000 - HVAC This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and miscellaneous items required to complete all HVAC work as shown on the drawings or as called for in the specifications The scope of work shall include, but is not limited to the following:

AA.. Specific trade permits will be the responsibility of each trade subcontractor. B. Layout required for the complete installation of your scope of work. C. Receive unload and store materials for this scope of work D. Coordination with electrical contractor for hook-up of HVAC. E. Coordination of HVAC System placement with building structural and architectural elements,

electrical, plumbing and fire protection systems. F. Scheduling and coordination of all required inspections associated with your scope of work. G. The HVAC System also includes the Furnish and install of the following work:

1. permits and licenses for this scope of work 2. Furnace and Fan Coil 3. Auxiliary drain pan on shelf/partition below unit to protect against wet damage 4. AC Condensing Unit. 5. Thermostat/sensor 6. Diffuser and 7. return air grills 8. Ductwork and distribution with insulation for the HVAC System. 9. Temperature controls, 10. fire dampers at fire rated penetrations 11. Fire stopping 12. low voltage wiring for this contactors work 13. Bath exhaust including exterior vent caps. 14. DDrryyeerr ccoonnnneeccttiioonn bbooxxeess & Dryer exhaust including exterior vent caps. 15. Exhaust fans 16. One (1) year labor and material warranty as required by the documents. 17. Start, check, test and comfort balance system. 18. metal/plastic metal ID tags (to be approved by owner). 19. Access Panels for this scope

H. Exterior Louvers and vents for this contractors work I. Vent covers to be paintable J. This scope includes 1 filter at the time of installation and a filter change at the time of finish

before the units are walked with property management K. Furnish and install stand alone electric heaters in corridors and riser rooms per drawings

(Electric Connections by others) L. Furnish and install all bath exhaust fans and all ducting (electrical connection by others) M. Furnish and install pads for condenser units on exterior of building N. Provide Operating and Maintenance manuals with an equipment training orientation to Property

Maintenance staff including three (3) sets of as-built drawings, and CAD disk. O. This scope includes cutting and patching as required. P. This scope includes one filter at the time of installation and a filter change at the time of

turnover. Q. Touch-up/repair of areas in this scope of work as required by the owner is included as a part of

this scope. R. SSeeaall fflloooorr ppeenneettrraattiioonnss ttoo aavvooiidd GGyyppccrreettee ““rruunn--ooffff””.. S. Receive unload and store materials for this scope of work. T. Storage of material will be in a neat and orderly fashion. Location will be as designated by BCC. U. Strict adherence to the on-site safety program shall be included. V. The following items are supplied by other but used, connected or installed by this contractor

1. Building Permit 2. Dumpsters

Page 64: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

W. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and alternates.

HVAC BID BREAKDOWN: Residential Unit Materials........................................... $________________ Residential Unit Labor ................................................................................................ $$________________________________ Building #1, HVAC, Total Amount: ............................................. $__________________ Residential Unit Materials........................................... $________________ Residential Unit Labor ................................................................................................ $$________________________________ Building #2, HVAC, Total Amount: ............................................. $__________________ Residential Unit Materials........................................... $________________ Residential Unit Labor ................................................................................................ $$________________________________ Building #3, HVAC, Total Amount: ............................................. $__________________ Residential Unit Materials........................................... $________________ Residential Unit Labor ................................................................................................ $$________________________________ Building #4, HVAC, Total Amount: ............................................. $__________________ Residential Unit Materials........................................... $________________ Residential Unit Labor ................................................................................................ $$________________________________ Building #5, HVAC, Total Amount: ............................................. $__________________ Residential Unit Materials........................................... $________________ Residential Unit Labor ................................................................................................ $$________________________________ Building #6, HVAC, Total Amount: ............................................. $__________________

Sales Tax ...................................................................... $________________ Total HVAC Bid Amount: $_____________________

Unit Pricing (includes OH&P)

Filters per.................................................................................................. $________________/EA

_______ ton fan coil w/ heat kit ............................................................... $________________/EA

_______ ton condenser............................................................................ $________________/EA

__________ Stand Alone Electric Heater…………………………………$________________/EA

FFuurrnniisshh aanndd iinnssttaallll ddrryyeerr ccoonnnneeccttiioonn bbooxxeess……………………………………………….... $$____________________________________

Unit Cost: Laborer ___________/HR Journeyman ___________/HR Foreman ___________/HR

Bid Alternate - None

End of PROPOSAL NO. 15-7000 - HVAC

Page 65: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

PROPOSAL NO. 16-0000 – ELECTRICAL, FIRE ALARM & LOW VOLTAGE This Proposal shall include all labor, material, equipment, supervision, services, insurance, sales tax, and miscellaneous items required to complete all Electrical work as shown on the drawings or as called for in the specifications.

The Scope of Work shall include, but is not necessarily limited to the following: A. Trade permits B. Layout C. Install and maintain temporary power (per code, w/GFCI circuits) in the building structure

consisting of the equivalent of 100 amps of electrical service per floor and access with a 50’-0” extension cord to all points in each building.

D. Install & maintain temporary lighting (per code) for building construction, utility charges shall be by BCC, includes re-locating temporary lighting as interior walls are installed to provide a safe working environment per OSHA Standards.

E. Secondary Service Conduit is included. F. Furnishing and installing a complete electrical service system commencing at the

transformer,including but not limited to: 1. ...Conduit, 2. ...Wire 3. ...Light fixtures

4. ...Lamps/bulbs 5. ...Outlets 6. ...Fire stopping for this subcontractor’s work 7. ...Meter bases 8. ...Panel boards 9. ...Battery back-up exit signage ( if shown) 10. .Cable TV distribution 11. .Alarm system 12. .Fire Alarm and monitoring system 13. .House panels

G. Seal floor penetrations to avoid Gypcrete “run-off”. H. Scheduling and coordination of all required inspections associated with your scope of work. I. One (1) year labor and material warranty shall be included. J. Provide and install panel boards for patch down blocks in mechanical rooms (typically fire rated

plywood) K. Install conduit for tamper switches on PIV’s back to the mechanical room L. Furnish and install sleeves for incoming service to meter bank and house panel M. All electrical work will be coordinated with other trades and shall comply with all applicable codes. N. All fire caulking/fire stopping, fire rated electrical boxes, putty packs, cutting and patching as

required for this contractor’s work. O. Provide disconnects for all equipment as required by code or as shown on the drawings. P. Provide hook-up, including disconnects to:

1. water heaters

2. air handlers 2. electric heaters 3. condensing units

4. AC/Heating units 5. restroom exhaust fans 6. Water Heater

Page 66: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_______________________ Proposal #_____

Provide Outlets for: 1. Refrigerators

2. Garbage disposals 3. Microwaves 4. Ranges/ovens 5. Dishwasher 6. outlets for water sub-meter signal

Q. Furnish and install a complete Fire Alarm and monitoring system in accordance with drawings and specs and as required by code (Monitoring by others) including but not limited to, monitoring of sprinkler flow and tamper switches, system auto-dialer, audio and visual alarms per the drawings and specifications.

R. Furnish and install all site electrical, including light poles, conduit, pole bases, wiring, contactors and photocells per drawings

S. At project completion, provide three (3) sets of as-built drawings, one PDF disk and CAD disk. T. Strict adherence to the on-site safety program shall be included. U. The following items are supplied by others but used, installed, or connected by this contractor.

1. Building permits 2. Dumpster

V. UTILIZE THIS BID FORM and attach any supplemental information, clarifications and alternates.

Electrical BID BREAKDOWN:

Site Lighting Work - Total Amount: $__________________ (Includes fixture, pole, conduit, feeder and bases) Site Underground Service Conduit for cable provider $_________________ East Site Underground Conduit for fiber optics $_________________ West Site Underground Conduit for fiber optics $_________________ Unit Electrical Building #1, Total ....................... $_____________ Building #2, Total ....................... $_____________ Building #3, Total ....................... $_____________ Building #4, Total ....................... $_____________ Building #5, Total ....................... $_____________ Building #6, Total ....................... $_____________ Unit Electrical - Total Amount: $__________________ Building Service Building #1, Total ....................... $_____________ Building #2, Total ....................... $_____________ Building #3, Total ....................... $_____________ Building #4, Total ....................... $_____________ Building #5, Total ....................... $_____________ Building #6, Total ....................... $_____________ Building Service - Total Amount: $__________________ Lighting Fixtures $__________________ Building #1, Total ....................... $_____________ Building #2, Total ....................... $_____________ Building #3, Total ....................... $_____________ Building #4, Total ....................... $_____________ Building #5, Total ....................... $_____________ Building #6, Total ....................... $_____________ Lighting Fixtures, Total Amount: $__________________

Page 67: Bid Pac 03 Evansville Townhouses - Buildings · Subcontractor Name:_____ Proposal #_____ Date:_____ By submitting the bid, the Subcontractor/Vendor acknowledges that it has read,

Subcontractor Name:_______________________ Proposal #_____

Low Voltage Wiring, Building #1, Total ....................... $_____________ Building #2, Total ....................... $_____________ Building #3, Total ....................... $_____________ Building #4, Total ....................... $_____________ Building #5, Total ....................... $_____________ Building #6, Total ....................... $_____________ Low Voltage Wiring, Total Amount: $__________________ Fire Alarm System, Building #1, Total ....................... $_____________ Building #2, Total ....................... $_____________ Building #3, Total ....................... $_____________ Building #4, Total ....................... $_____________ Building #5, Total ....................... $_____________ Building #6, Total ....................... $_____________ Fire Alarm System, Total Amount: $__________________ Grand Total Electrical Bid Amount: $_____________________ Unit Cost (Installed, including OH&P):

Light Fixtures:

Kitchen .................................................... $____________/EA

Entry/Hall ................................................. $____________/EA

Bath Vanity .............................................. $____________/EA

Closet ...................................................... $____________/EA

Patio ........................................................ $____________/EA

Bedroom .................................................. $____________/EA

Laundry ................................................... $____________/EA

Kitchen Island .......................................... $____________/EA

Common Corridor .................................... $____________/EA

Entry Coachlight ...................................... $____________/EA

EM - Emergency ..................................... $____________/EA

EX – Exit ................................................. $____________/EA

Alternates ............................................................

Fiber and conduit from North Hall to East site Property line Add $_________________ East Site fiber optic cable from property line to buildings Add $_________________ Fiber and conduit from Schroeder Hall to West site Property line Add $_________________ West Site fiber optic cable from property line to buildings Add $_________________

Unit Cost:

Laborer ___________/HR Journeyman ___________/HR Foreman ___________/HR

End of PROPOSAL NO. 16-0000 – ELECTRICAL, FIRE ALARM & LOW VOLTAGE