28
Sustainability Summary Report 2008

Bhpb Sustainability 2008

Embed Size (px)

Citation preview

Page 1: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 1/28

Sustainability Summary Report 2008

Page 2: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 2/28

Contents

About BHP Billiton 1

From the Chief Executive Officer 2

Sustainability at BHP Billiton 4

Health, Safety, Environment

and Community Targets Scorecard 5Governance 6

People 9

Safety 10

Health 11

Environment 12

Social Responsibility 16

BHP Billiton locations 20

Resourcing the future 22Sustainability Performance Data Summary 23

What others say about BHP Billiton IBC

We support IBC

About this report Report scope and dataThis Summary Report contains information on oursustainability policy and governance, stewardship,health, safety, environment, social responsibilityand economic contributions. It is designed forgeneral readership and is a summary of theFull Sustainability Report available online.The Full Report has been prepared in accordancewith the Global Reporting Initiative (GRI) G3.Ernst & Young has conducted limited assuranceover a selection of disclosures (performancestatements and case studies) in this SustainabilitySummary Report and in the Full SustainabilityReport. Anyone seeking to rely on information inour report or to draw detailed conclusions from

the data should contact us for verificationand assistance.

BHP Billiton Limited, BHP Billiton Plc and theirrespective subsidiaries operate as BHP Billiton.Throughout our Sustainability Reports, unlessotherwise noted ‘BHP Billiton’, the ‘Company’and the ‘Group’ refer to the combined group.

The statistics in this report cover sites owned oroperated wholly by BHP Billiton or operated byBHP Billiton in a joint venture operation duringthe period 1 July 2007 to 30 June 2008. Unlessotherwise stated, data are reported on a100 per cent basis for facilities operated byBHP Billiton, irrespective of our equity share.Joint ventures, where we are not the operator,are excluded; some of our case studies, however,feature initiatives from joint venture operations.All monetary amounts in the report are US dollars,unless otherwise indicated.

Page 3: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 3/28

About BHP BillitonBHP Biito is the wod’s agest divesified esoces compa. We empo some41,000 peope i moe tha 100 opeatios i 25 coties. We have sigificatbsiesses podcig oi ad gas, amia ad amiim, coppe, eeg coa,io oe, icke, magaese ad metagica coa, as we as aim, god, zic,ead ad sive.

O ogaisatio is desiged aod Cstome Secto Gops (CSGs), which aefocsed o cstomes, athe tha opeatios. The CSGs ae Petoem, Amiim,Base Metas, Diamods ad Speciat Podcts, Staiess Stee Mateias, Io Oe,Magaese, Metagica Coa ad Eeg Coa.

The esoces idst has a sigificat socio-ecoomic impact. At atioa,egioa ad oca eves, we shae esposibiit with host govemets,oca sppies, cotactos ad empoees fo esig that weath geeatedfom ata esoces heps to dive sstaiabe ecoomic deveopmetad povet edctio. O aim is to hep povide a safe, ethica, taspaetad fai famewok fo empomet, podctio ad shaig of the ecoomicbeefits that fow fom o pesece.

This document is a summary of our Full Sustainability Report, which can be accessed at www.bhpbilliton.com

BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008 - 1

Page 4: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 4/28

Aog with host govemets, bsiesspates ad empoees, we woktowads hepig o ke stakehodesdaw vae fom o activities adese we cotibte to the og-temsstaiabiit of the commities

whee we opeate.

Ove the past ea, a mbe of emegig ecoomiesexpeieced stog gowth. B sppig the bidig bocksfo that gowth, o idst has cotibted to highe ivigstadads ad geate oppotities fo miios of peope.

Despite ejoig the beefits of gowth, opeatig a gobacompa esposib i a iceasig compex wodpesets s with a age of chaeges.

The apid gowth of the idst has tighteed abo maketsad o fte depeds heavi o o capacit to cotie toattact geat peope.

The Compa’s paticipatio i the cimate chage debate isevovig, as we foow deveopmets i the ecoomics, pbicpoic ad the cabo footpit of o bsiess.

Seios heath pobems, sch as maaia ad HIV/AIDS, emaii some of o host coties ad we ae wokig togethe withothes to fid the most effective wa to hep addess them.

We aim to deveop esoces fo the fte whie espectighma ights ad eavig a positive egac.

Fia, ad most impotat, we fee deep ad pesoa

a oss of ife i o wokpaces ad the impact this has ofamiies, fieds ad coeages.

Shaig

the vae

From the Chief Executive Officer

2  - BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008

Page 5: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 5/28

Fo ma eas, we have made safet o mbe oe pioit.Despite o effots, eeve of o coeages ost thei iveswhie wokig fo s dig Fy2008, five of them i a heicoptecash i Agoa. Eve fatait toches a of s ad I ampesoa committed to eimiatig hazads ad esig

that a o peope go home safe at the ed of each da.Podctio ad fiacia ests ca eve come befoe safet.

no do we take the heath ad we-beig of o peopefo gated. Cet heath pioities icde edctio ofa age of wokpace exposes, pomotio of cosistet seof pesoa potective eqipmet, fatige maagemet admaiteace o impovemet of the geea heath ad fitessof o peope.

O ew five-ea tagets – which we epot o fo the fist timethis ea – efect o itet to fthe edce the eeg adgeehose gas itesit of o bsiess. We ae wokig withothes to fid techoogica sotios to maage o emissios

ad to addess the impact of o podcts i eatio tocimate chage.

We cotie to pa a impotat oe i socia deveopmetthogh empomet ad taiig oppotities, ifastctepovisio, oca bsiess deveopmet ad pamet of taxesad oaties i o host coties.

O commitmet coties to ivest oe pe cet of BHP Biito’spe-tax pofits, o a thee-ea oig aveage, i commit-based pojects. Dig Fy2008, o cotibtio iceased$37.6 miio fom the pevios ea to $141.0 miio withmajo esoces chaeed to impovig access to qaitedcatio ad hepig to tacke majo heath isses, sch asmaaia ad HIV/AIDS.

Thogh o Matched Givig Pogam, a popotio of theCompa’s socia ivestmet was diected to ogaisatiosfo which o empoees ae passioate. Dig Fy2008,the Compa cotibted $4.8 miio to these ogaisatiosb matchig empoee doatios, fdaisig ad pesoavoteeig. This is a sigificat icease fom thepevios ea.

recogisig ad sppotig o empoees’ commit activitiesis oe wa to cotie to attact ad etai skied peope,despite tight empomet coditios acoss the esoces secto.O stadig as a empoe of choice comes fom the boadgeogaphic ad caee oppotities we offe, aog with o

desie to assist peope o thei pesoa deveopmet joead o commitmet as a esposibe empoe.

I wat to ecogise the ogoig effots ad commitmetof o empoees ad cotactos ad thak them fo theicotibtio to the sccesses BHP Biito ecoded digthe ea.

O Compa ca make a ea cotibtio to sstaiabedeveopmet ad povet edctio i the wod ad we eedto wok had to eaise this potetia. We t ae chagedwith esocig the fte – i a esposibe wa.

This docmet is a smma of o F Sstaiabiit repot,which we have pepaed i accodace with the Gobarepotig Iitiative (GrI) G3 Sstaiabiit repotig Gideies.We aso cotie to sppot the un Goba Compact ad wehave icded pdates agaist the picipes i o F repot.yo ca access o F Sstaiabiit repot thogh o website

at www.bhpbilliton.com/sustainabledevelopment 

We cotie to pa a impotat oe isocia deveopmet thogh empometad taiig oppotities, ifastctepovisio, oca bsiess deveopmetad pamet of taxes ad oaties io host coties.

Marius KloppersChief Exective Office

Pilbara | Western Australia

BHP Billiton encourages newstandards for Indigenousdevelopment opportunitiesIn September 2007, Ngarda Civil & Mining Pty Ltd won,on commercial terms, a five-year A$300 million-pluscontract to manage and operate BHP Billiton’s Yarrieiron ore mine in Western Australia. Ngarda is equallyowned by Indigenous-based organisations andLeighton Contractors, and is dedicated to providing

Indigenous people with opportunities to developtheir skills and abilities, and gain experience andemployment. Ngarda began operating the Yarriemine in April 2008.

BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008 - 3

Page 6: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 6/28

CHALLENGESO sstaiabiit chaeges have the potetia to impactmateia o o bsiess ad its ogoig sccess.

I 2003, we detook a majo assessmet of sstaiabiit isksassociated with o bsiess. The assessmet ed s to idetiffive ke sstaiabiit chaeges – chaeges that emaieevat toda. The chaeges ae:

• eliminatingfatalrisks

• occupationalandcommunityhealth

• greenhousegasemissions

• accesstoandmanagementofresources

• sustainablecommunitydevelopmentandclosure.

I eviewig potetia discoses fo this epot ad oF Sstaiabiit repot, we have fod that these categoiescove topics ad idicatos that efect BHP Biito’s sigificatecoomic, eviometa ad socia impacts.

STAKEHOLDERSWe egage with o stakehodes i ma was, fomoe-o-oe meetigs ad mti-stakehode fomsto coss-secto pateships ad idst iitiatives.Most egagemet is at a oca eve, whee we addessspecific isses ad sotios.

We aso seek feedback o o sstaiabiit stateg begagig empoees ad cotactos, ivestos, opiio

eades, govemets, o-govemet ogaisatios,academia ad egatos.

Meetigs with o Fom o Copoate resposibiit cotieto povide vaabe advice ad chaege o views o boadsstaiabe deveopmet isses. O paticipatio with seveaextea vota iitiatives, icdig the un Goba Compactad the Goba repotig Iitiative, heps s to fthedestad stakehode views.

Sustainability at BHP Billiton

BUSINESS CASE FOR SUSTAINABLE

DEVELOPMENTO bottom-ie depeds o access toesoces ad o o icece to opeate.Maximisig o bottom-ie aso measecogisig the vae potectio ad vaeadd achieved b ehacig o-fiaciao sstaiabiit dimesios.

Sch sstaiabiit dimesios icdeaspiig to Zeo Ham to peope, hostcommities ad the eviomet; effectivegoveace ad isk maagemet pocesses;beig socia esposibe ad cotibtigto sstaiabe commit deveopmet;

ad to esig the boade ecoomiccotibtios of o opeatios ae ijectedito the egios whee we opeate.

BEYOND THE BUSINESS CASE –SOCIETAL BENEFITSBeod o bsiess case ae ma societabeefits that fow fom itegatigsstaiabiit ito o bsiess. Beefitsicde cotibtig to impoved stadadsof ivig ad sef-sstaiig commities;ehacig ecoomic cotibtios, esocecosevatio ad biodivesit; ad impovigstakehode tst.

Enhanced economiccontributions

Enhancementof biodiversity

Improvedwork/life balance

Company value Societal value

Self-sustainingcommunities

Enhanced resourceconservation

Improvedstakeholder trust

Improved standardsof living

ValueCreation

Reducedbusiness risk

and enhancedbusiness

opportunities

Improvedoperationalperformance

andefficiency

Improvedattraction and

retention of ourworkforce

Maintainedsecurity ofoperations

Enhanced brandrecognition

and reputation

Enhancedability to

strategically planfor the longer

term

Gaining andmaintainingour licenceto operateand grow

Our Sustainability Value Add

4  - BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008

Page 7: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 7/28

Health, Safety, Environment andCommunity Targets ScorecardO 1 J 2007, we itodced ew five-ea Heath, Safet, Eviomet ad Commit tagets. The scoecad, beow, otieso pefomace fo the fiacia ea fom 1 J 2007 to 30 Je 2008 – the fist ea of o ew pogam. A tagets ae basedo a Fy2007 baseie ea, except those eatig to Eeg ad Geehose Gas, which ae based o a Fy2006 baseie ea.

Target Performance Target Date

Zero Harm Result FY2008

Zeo fataities 11 fataities at o cotoed activities Ogoig

Zeo sigificat eviometa icidets ad zeo sigificatcommit icidets (i.e. ated 3 o above o the BHP BiitoCoseqece Seveit Tabe)

no leve 3 eviometa o commit icidetswee epoted

Ogoig

Management Systems

A opeatig sites to achieve ad maitai cofomace agaistBHP Biito HSEC Maagemet Stadads Isse 3 (scoe geatetha 4.0 ot of 5.0) b Je 2008

50 epotig assets (77 pe cet) scoed above 4.0 30 Je 2008

A Gop aveage cofomace of 4.0 ot of 5 agaist BHP BiitoHSEC Maagemet Stadads Isse 3

A aveage cofomace of 4.1 ot of 5.0 hasbee achieved

Ogoig

A opeatig sites to obtai ad maitai ISO 14001 cetificatio 95 pe cet of sites eqiig ISO 14001 ae cetified Ogoig

Health

A opeatig sites to fiaise baseie heath exposeassessmets o occpatioa expose hazads fo:• airbornecontami nantsandnoiseby30June2008,and

• Airbornecontaminantsandnoise–75percent  of sites have competed assessmets

30 Je 2008

• physicalexposuresby30June2010 • Physicalexposures–29percentofsiteshavecompeted assessmets

30 Je 2010

15 pe cet edctio i potetia empoee exposesove the occpatioa expose imit b 30 Je 2012

4 pe cet icease i potetia empoee exposesove the OEl (excdig oise) sice Fy2007

30 Je 2012

30 pe cet edctio i icidece of occpatioa diseaseb 30 Je 2012

26 pe cet edctio i icidece of occpatioadisease sice Fy2007

30 Je 2012

Safety

50 pe cet edctio i Tota recodabe Ij Feqec rateat sites b 30 Je 2012

The TrIFr fo 2008 was 5.9, a impovemetof 20 pe cet o the TrIFr ecoded i Fy2007

30 Je 2012

Environment

Aggegate Gop taget of 6 pe cet edctio i geehosegas emissios pe it of podctio b 30 Je 2012(1)

5 pe cet icease i geehose gas emissiospe it of podctio i Fy2008

30 Je 2012

Aggegate Gop taget of 13 pe cet edctio icabo-based eeg se pe it of podctio b 30 Je 2012

1 pe cet icease i cabo-based eeg sepe it of podctio i Fy2008

30 Je 2012

Aggegate Gop taget of a 10 pe cet impovemet ithe atio of wate ecced/esed to high-qait cosmedb 30 Je 2012

7 pe cet impovemet i the at io of wateecced/esed to high-qait cosmedsice Fy2007

30 Je 2012

Aggegate Gop taget of 10 pe cet edctio i the adavaiabe fo ehabiitat io b 30 Je 2012 The ad avaiabe fo ehabiitatio idexhas emaied chaged sice Fy2007 30 Je 2012

Community

Aggegate Gop taget of 1 pe cet of pe-tax pofitsto be ivested i commit pogams, icdig i-kid sppotad admiistatio, cacated o the aveage of the peviosthee eas’ pe-tax pofit

Expedite totaed uS$141.0 miio, eqivaetto 1 pe cet of pe-tax pofits based o the aveageof the pevios thee eas pe-tax pofit pbicepoted i each of those eas(3)

Ogoig

A opeatig sites ad deveopmet pojects to detakea hma ights sef-assessmet ad impemet a isk-basedhma ights maagemet pa(2) b 30 Je 2008

84 pe cet (54 of 64) of opeatig sites addeveopmet pojects competed hma ightssef-assessmets. 21 of these sites deveoped hmaights maagemet pas; 2 sites that idetifiedhma ights-eated isses had ot competeda maagemet pa

30 Je 2008

A opeatig sites ad deveopmet pojects to have a fomacommit egagemet pogam i pace b 30 Je 2008

95 pe cet (61 of 64) of opeat ig sites addeveopmet pojects have commit egagemetpogams i pace

30 Je 2008

notes:(1) This was pat de to the switchig of fes sed b thid pat eecticit geeatos that seve o opeatios i Chie.(2) Excdes sites havig o hma ights-eated isses idetified i the hma ights sef-assessmet.(3) Icdes BHP Biito compoet of o vota cotibtios to commit pogams at joit vete opeatios, bt does ot icde pamets

to commities that fom pat of madato icesig ageemets.

Overall performance against target:

Taget exceeded Taget achieved (≥ 95%) Taget ot achieved O tack Behid schede

BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008 - 5

Page 8: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 8/28

SUSTAINABILITY SYSTEMS AND DOCUMENTSAt BHP Biito, o covictio is that o bsiess goasca be best attaied thogh hoest, faiess ad itegiti evethig that we do. I additio, theefoe, to thecopoate goveace pocesses that maage the boadeaffais of the Compa, we have a mbe of sstems adsppotig docmets to impemet o commitmet tosstaiabe deveopmet.

The Sstaiabiit Committee of the Boad coties to oveseethe Gop’s sstaiabiit stateg, poic, iitiatives adactivities. Maagemet hods pima esposibiit fo oHeath, Safet, Eviomet ad Commit pefomacead fo divig o commitmet to Zeo Ham.

O Code of Bsiess Codct: Wokig with Itegit appiesto eve membe of o wokfoce, egadess of job o ocatio,ad povides a behavioa famewok fo decisio-makig.It is based o the vaes cotaied i o Chate ad highightsthat we cae as mch abot how ests ae obtaied as wedo abot deiveig good ests.

O Heath, Safet, Eviomet ad Commit (HSEC)Maagemet Stadads (Isse 3) povide the basis fodeveopig ad appig maagemet sstems at a evesof o Compa ad ae a dive of o cotibtio tosstaiabe deveopmet.

The Stadads highight fo ke compoets ofsstaiabe deveopmet:

• Health–promotingandimprovingthehealthofourpeoplead host commities

• Safety–providingaworkplacewherepeoplecanworkwithot beig ijed

• Environment–promotingefficientresourceuse,reducingandpevetig potio ad ehacig biodivesit potectio

• Community–engagingwithemployeesandcontractors  ad with those affected b o opeatios, icdig hostcommities; ad destadig, pomotig ad phodigfdameta hma ights withi o sphee of ifece.

Dig 2008, we ae eviewig o Stadads i accodacewith the Compa’s evised opeatig mode.

AUDIT AND SELF-ASSESSMENTO assets ae bechmaked thogh a tieia peeeview pocess agaist o HSEC Maagemet Stadads.These Stadads ae sppoted b ke pocedes, whichae ega eviewed to ese o assets opeate dea eadig pactice famewok.

Dig Fy2008, seve HSEC adits wee codcted. As ipevios eas, opeatig sites ot adited dig the ea weeeqied to detake sef-assessmets agaist the Stadads.

The ests fom the 68 sef-assessmets have bee combiedwith the adit ests to show a ovea cofomace of4.1 ot of 5 agaist the HSEC Maagemet Stadads, meetigo taget of achievig geate tha 4 ot of 5 b 30 Je 2008.

Sice the pogam commeced i Septembe 2001, 145 siteadits have bee codcted, ivovig 414 BHP Biito peopead 36 extea aditos. The beadth of the pogam hasbee ivaabe i acceeatig the ate of impovemet i

a aspects of o HSEC maagemet thogh the idetificatioof impovemet oppotities ad commicatio ofeadig pactices.

CLOSURECompehesive cose paig itegated ito the bsiesscotibtes to o visio of sstaiabe deveopmet adZeo Ham. Each of o cotoed assets is esposibefo deveopig cose pas that comp with egisativeeqiemets, imit advese eviometa impacts, adcoside stakehodes’ eeds ad aspiatios, paticawith espect to ed ad se.

The BHP Biito Cose Stadad was oed ot to a ocotoed assets two eas ago. O sites epot agaist this

stadad, docmetig the cet stats of cose pas, iaa cose smma epots.

I the iteest of cotia impovemet, dig the epotigpeiod, we codcted a eview of the Cose Stadad.repesetatives of the mti-fctioa teams ivoved ipepaig o cose pas ad estimatig associated cosecosts detemied thee was a oppotit to bette itegatecose paig thogh o life of Asset paig pocess.

life of Asset paig is a discipied pocede that occsaa acoss the Compa. Icopoatig the CoseStadad eqiemets with life of Asset paig pocedeswi assist cose paig cosideatios beig icopoated

i the life of Asset pa.A detaied potoco fo aditig compiace with Cose Stadadeqiemets was deveoped dig the epotig peiod adtiaed at o Qeesad Coa gop. The adit potoco wibe impemeted b o Gop Adit Sevices fctio, ftheitegatig cose paig as a wa we do bsiess.

BHP Biito is esposibe fo a mbe of egac sites thatae i vaios stages of decommissioig, ehabiitatio opost-cose cae ad maiteace. These sites ae maagedb o Cstome Secto Gops, whee cose is teatedas a poject.

Cose pas povide the basis fo estimatig the fiacia

costs of cose. Ifomatio o o 2008 cose povisiosca be fod i the Fiacia Statemets sectio of the2008 BHP Biito Aa repot.

We ae committed to the highest stadads of copoate goveace,

icdig pocesses to impemet o commitmet to sstaiabe deveopmet.

Governance

6  - BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008

Page 9: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 9/28

Our Charter

Outlining our purpose, plans,values and measures of successOur Charter outlines the actions, values and measuresby which we judge our success in creating long-termvalue through discovering, developing and convertingnatural resources.

Earning the trust of our employees, contractors,customers, suppliers, communities and shareholders isa vital aspect of our success. Our values embrace safetyand the environment, integrity, high performance,win-win relationships, the courage to lead changeand respect for each other.

Link to ‘Our Charter’ atwww.bhpbilliton.com/aboutus/charter

BUSINESS CONDUCTI J 2008, the Code of Bsiess Codct was appoved toepace the Gide to Bsiess Codct. Whie the sbstaceof the ew docmet has ot sigificat chaged, it povidesceae commicatio ad wi be sppoted i Fy2009 btaiig ad commicatio, as we as assace pocesses.

I Fy2008, we eceived 133 eqiies to the Bsiess CodctHepie ad a fthe 32 thogh the Fad Hotie opeated b

Gop Adit Sevices. The most commo isses aised with theHepie eated to eqait i empomet, cofict of iteestad gifts ad hospitait. Fad, theft ad cofict of iteestwee the mai isses aised with the Fad Hotie.

I Fy2009, the Bsiess Codct Hepie ad the FadHotie wi be combied, to be kow as the BsiessCodct Adviso Sevice.

Australia and Asia 60%

Africa 8%

Other 1%

North America 13%South America 15%

Europe 3%

Business Conduct Helpline Enquiriesby Region FY2008

Business Conduct Helpline Enquiriesby Category FY2008

Other 21%

Conflict of Interest 12%

Harassment 9%

Business Travel 6%

Equality in Employment 14%

Gifts and Hospitality 10%

Information Management 8%

Bribery 6%Maintaining SupplierRelationships 5%

Accuracy of Recordsand Reports 4%

Community Relations 5%

BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008 - 7

Page 10: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 10/28

Find out more on www.bhpbilliton.com/casestudies

Bdoze opeatos wokig o oe stockpieswithi the miig idst ae exposedto majo safet chaeges, icdig poovisibiit, stabe god ad mateiafaig fom coveos.

Dig 2006, the goba miig idstexpeieced sevea fata accidets ivovigbdozes opeatig o stockpies. Havigitsef expeieced sevea icidets ivovigbdozes o stockpies, o Escodida mie(i which BHP Biito hods a 57.5 pe cetiteest) soght to addess the safet isks

associated with this activit.

Aasis showed that the o se waof addessig sch isk was to emove thebdoze opeatos fom thei cabs adhave them opeate thei machies foma safe, emote ocatio.

Afte extesive testig, i ea 2007 the miebega istaig state-of-the-at techoog,which had bee adapted fom othe miigpocesses ad that wod aow its bdozesto be opeated emote.

Remote bulldozer operation enhances operator safety

Technology introduced at our Escondida mine in Chileis helping address safety issues associated with operatingbulldozers in stockpiles.

Operator

safet

Atacama Desert | Northern Chile

8  - BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008

Page 11: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 11/28

At BHP Biito, we aspie to be the wod’s best ataesoces compa ad it is o peope who wi make thediffeece. We ae committed to ope, hoest ad podctiveeatioships with o empoees. We aim to be cosistet,fai ad taspaet i o Hma resoces pactices, as weas meetig o commitmet to the un uivesa Decaatioof Hma rights ad eevat egisative eqiemets.

THE BHP BILLITON WAY

To deive o o aspiatio, we eed to act i a cosistetmae accodig to o shaed set of Chate vaes, with ceastategic itet ad accodig to a defied opeatig mode.Togethe, with stog eadeship, these eemets costitteo wa of doig thigs, The BHP Billiton Way .

O opeatig mode is desiged to cea defie o espectiveaccotabiities. Specifica, it aticates the eatioshipbetwee, ad esposibiities of, the Gop fctios, mieasexpoatio, o Cstome Secto Gops ad maketig.

LEADERSHIP AND CULTUREStog eadeship is a coestoe of a ogaisatioasccess, ad o leadeship Mode oties what it takesto be a BHP Biito eade. It is desiged with a mix of the

coe attibtes ad behavios ad eadeship stes thatwe ook to o eades to demostate, idetif ad deveopi othes. The eadeship mode is tied diect to oHma resoces ad HSEC stategies ad stadads.

HUMAN RESOURCES STRATEGYO Hma resoces Stateg coects o vaes adcte (defied i o Chate) ad o bsiess eqiemetsto the wa we maage o peope. Objectives fo each majocompoet of o peope maagemet ae cotaied withio Hma resoces Maagemet Stadads, aog withthe metics we se to gide ad assess o pefomace.

As cotactos fom a sigificat potio of o wokfoce,we wok cose with o cotactig compaies to ese thatthei appoach to hma esoce maagemet is cosistetwith o vaes ad appoach.

TRAINING AND DEVELOPMENTWe ae committed to wokig with a o peope to hepthem each thei f potetia, achieve job satisfactio admaximise thei cotibtio to the Compa. Dig the ea,we cosoidated o appoach to taet maagemet bimpovig o idetificatio ad destadig of o taet,ad stegtheig the taet pipeie thogh eadeshippogams, idivida deveopmet, metoig ad coachig.

I Fy2008, the aveage hos spet taiig pe ampe empoee was 49 fo f-time ad 24 fo pat-time

empoees. refectig the citicait of eadeship deveopmetad taiig to o sccess, dig the ea, moe tha 500peope paticipated i o itesive goba o Cstome SectoGop eadeship deveopmet pogams ad 515 gadatesatteded o Fodatios fo Gadates Pogam.

The fodatio of o bsiess is o peope – both empoees ad cotactos.

O sccess eies o idetifig, ecitig, taiig, deveopig ad etaiiga taeted, divese, mobie ad motivated wokfoce.

People

Employee Share PlanShareplus, introduced in 2007, recognises the contributionof our people to our Company and provides an opportunityfor them to share our future growth and success bybuilding a personal financial stake in the Company.The plan offers employees the opportunity to purchaseBHP Billiton shares, up to a specified limit, and receivea grant of shares from BHP Billiton equal to the numberthey have purchased at the end of three years. The offer isavailable to all BHP Billiton employees regardless of theirrole or location. The only requirement is that the personremains employed by BHP Billiton over the three-year

period. In countries where it is not possible or practicableto operate Shareplus, we have implemented a cash planwith the same terms. By April 2008, some 40 per cent ofeligible employees had elected to join.

EMPLOYEE PROFILEI Fy2008, we empoed some 41,000 peope, as we asegagig some 61,000 cotactos. O tove ate iceasedfom 12 pe cet i Fy2007 to 14 pe cet i Fy2008, efectigboat maket coditios withi the goba esoces secto.

EMPLOYEE RELATIONSWheeve we opeate, we aim to comp with the eevategisative empomet famewok. We ecogise the ight of

feedom of associatio b o empoees. We have a mbeof ocatios whee we have a mix of coective ad idividaegated empomet aagemets, bt this does otaffect the ights of those empoees to choose to beogto tade ios.

Pospective empoees ae made awae of empometaagemets pio to joiig the Compa. O poic isto cost with empoees o majo ogaisatioa chagesad ese pocesses ae i pace at a ocatios to addessa isses. I Fy2008, aod 47 pe cet of o gobawokfoce was coveed b coective ageemet.

Employees by Region FY2008

Australia and Asia 37%

South America 22%South Africa 27%

Europe (incl UK) 1%

North America (incl Canada) 7%Rest of world 6%

Contractors by Region FY2008

Australia and Asia 41%

Europe, Africa andMiddle East 25%

South America 28%

North America 6%

BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008 - 9

Page 12: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 12/28

SAFETY PERFORMANCEWe expeieced eeve fataities i seve sepaate icidetsdig the ea to 30 Je 2008. I expessig o deepestsmpath to the famiies, fieds ad wok coeagesof those who died, we emai detemied to do ai o powe to eimiate fataities fom o opeatios.

As pat of o stateg to ese that safet emais atthe foefot of the mid of eve empoee ad cotacto,

we hed o iaga Safet Week dig Jaa 2008.reifocig that good safet stats with good eadeship,a feate of the week was that a exective maagemetpesoa ed a thee-ho discssio with thei spevisosad maages.

Whie ow ij feqec ates do ot mea ow fatait ates,we ae peased to epot that, dig Fy2008, we impoved oij pefomace ate. O Tota recodabe Ij Feqecrate deceased b 20 pe cet, fom 7.4 fo Fy2007 to 5.9.O taget is a 50 pe cet edctio betwee 1 J 2007 ad30 Je 2012. We beieve achievig this eve of impovemetwi deive a wod-cass eve of pefomace.

O ij seveit aso edced b some 20 pe cet i Fy2008

whe compaed to Fy2007.FATAL RISK CONTROL PROTOCOLSBHP Biito’s Fata risk Coto Potocos (FrCPs) estabishmiimm pefomace expectatios fo maagig potetiafata isks associated with activities commo codcted at oopeatios. The addess ight vehices, mobie eqipmet abovead beow god, maagig hazados ad mote mateias,degod god coto, safegadig ad isoatigeqipmet, iftig ad wokig at heights.

A sites ae eqied to codct sef-assessmets agaistthe FrCPs eqiemets ad to impemet impovemet pas.

SIGNIFICANT INCIDENT AND NEAR MISS REPORTING

We cotie to ecoage epotig of ea miss ad sigificaticidets, as o abiit to ea fom these evets ad appcoective itevetios befoe the same deig casesmaifest as moe seios icidets is a ke to sppotigo effots to eimiate ijies ad fataities.

O aasis of these evets assists s to geeateCompa-wide aets that idetif teds i commo casesfo simia icidets, siga whee a pevetive baieswee beached, ad icdes what is to be eat, withiks to fthe ifomatio.

Aasis of sigificat icidets agaist o FrCPs categoiesidicates that the ke aeas fo impovemet emai sfacemobie eqipmet, isoatio ad wokig at heights.

LIGHT VEHICLE SAFETYTo assist i addessig safet isks associated with ightvehices, we wi eqie that a ight vehices ae fitted withi vehice moitoig sstems (IVMS). IVMS tasmits data ovehice sage, speed ad dive behavio to a ceta ocatiofo aasis ad feedback to both maagemet ad dives.This is expected to take appoximate two eas to impemet.

CATASTROPHIC RISK MANAGEMENTCatastophic isk maagemet seeks to idetif, assess admaage potetia isks that cod est i mtipe fataitiesad/o popet, ifastcte o fixed-pat damage thatcod case sigificat disptio to, o stop, o opeatios,

ad which cod theate o icece to opeate. DigFy2008, fo sites tested a evised method fo catastophicmaagemet that, oce fiaised ad impoved, wi beicopoated ito o Compa-wide docmetatio addive a cosistet appoach to maagig catastophic isk.

The oveidig impotace we pace o the safet of o empoees, cotactos

ad host commities is efected i o Zeo Ham goa ad o beief that aij-fee wokpace is possibe.

Safety

Kalgoorlie | Western Australia

Applying technology to makehandling molten metal saferand more efficientOur Kalgoorlie Nickel Smelter in Western Australia

produces granulated nickel matte. We move potscontaining some 10 tonnes of molten metal – usinggantry cranes – to tilting stations where nickel matteis poured through jets of water to produce granulatednickel matte.

While being craned, the metal begins to cool and acrust forms across its surface. During pouring, partsof the crust can break away, interrupting the metalflow and, potentially, leading to a steam explosionthat could result in severe injury and damage to theplant. Traditionally, our personnel used long paddlesto control the crust during pouring and to preventan explosion. The task required operators to wearlayers of protective clothing and to work in an

‘extreme’ environment.

By applying technology from the automotive industryto enable our personnel to control the crust froma remote position, we have removed them froman extreme environment and potential dangerfrom steam explosions.

10  - BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008

Page 13: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 13/28

Newman | Western Australia

Cutting-edge technology towarn of approaching drowsinessDrowsiness or fatigue contributes to a large number

of our significant incidents. In response, the Australian-developed Optalert™ technology that uses infraredtechnology to continuously monitor the wearer’s eyelidand eye movement is being introduced at our Iron OreMt Whaleback mine, Western Australia. When impendingdrowsiness is detected the system delivers an audioalert. While not the solution to drowsiness or fatigue,Optalert™ provides another level of protection forour drivers.

HEALTHY PEOPLEThe heath of o peope is ceta to o bsiess sccess.If we ae to scceed i o joe towads Zeo Ham,we eed to destad the potetia fo heath isksad estabish sitabe mitigatio meases.

REDUCING OCCUPATIONAL EXPOSUREO pbic taget fo each opeatig site to cose ot itsbaseie occpatioa hgiee expose sve fo aiboe

cotamiats ad oise cocded 30 Je 2008. This tagetwas ot met, with 75 pe cet of sites, epesetig 88 pe cetof empoees, competig thei sve.

This was a impotat miestoe as it aows each espectivesite to deveop a compehesive destadig of whichwokes ae exposed to aiboe cotamiats, sch as dst,fme, mist, gas ad vapo, ad to oise at a eve i excessof Compa occpatioa expose imits. Sch exposescet ecessitate the stict se of pesoa potectiveeqipmet to avoid advese heath effects.

Pogams to eimiate expose at the soce ae based othe ests of the baseie sve. Exampes of sch pogamsicde those desiged to addess diese exhast fmes i

degod opeatios ad acid mist i some of o metapocessig pats.

O taget is fo a 15 pe cet edctio b 2012 fo potetiaempoee exposes ove the occpatioa expose imit.

Dig Fy2008, 48 pe cet of o wokfoce acoss theCompa was potetia exposed to oise, if ot fo the seof pesoa potective eqipmet, a edctio of oe pe ceto Fy2007 ests. Othe exposes emaied at 17 pe cet,as epoted i the pevios epotig peiod.

Thee wee 207 ew cases of occpatioa iess epotedCompa-wide i Fy2008. This epesets a 26 pe cetedctio i the ate of iesses pe 10,000 empoees

agaist o taget of a 30 pe cet edctio i the icideceof occpatioa iess b Je 2012.

FIT FOR WORKO safet pefomace ca be impacted b both wok-eatedad geea heath isses. A patica aea of attetiodig Fy2008 was the compex isse of fatige maagemet.Oe of o iitiatives i this aea is otied i the sto beow.

COMMUNITY HEALTHMaaia ad HIV/AIDS emai a sigificat heath isse fo maof o opeatios, icdig those i sothe Mozambiqe,othe Bazi, Pakista, ad aeas whee we have deveopmetactivities sch as Giea ad Agoa. We cotie to wokto fid the most effective was to hep addess the isse,

icdig offeig vota HIV/AIDS testig ad coseigad cotiig to sppot the mosqito spaig pogam isothe Afica. We ae aso sig o Afica expeiece toassist the Asia-Pacific Coaitio o HIV/AIDS as the deveoppogams i Papa new Giea, laos, Thaiad ad Cambodia.

O goa is a wok eviomet whee o empoees ad cotactos

ca wok fee fom the isk of occpatioa iess, thogh shaed esposibiitbetwee maagemet ad empoees, cotactos ad thei famiies.

Health

Percentage of Employees in Potential Exposures* FY2008

* In other words, would beexposed if not wearing PPE.

† Action Level is 50% of theOccupational Exposure Limit.

Between Action Levels†

and Occupational Exposure Limit Greater than Occupational Exposure Limit Greater than Noise Exposure Limit

   B   H   P   B   i    l    l   i   t   o   n

   P   e   t   r   o    l   e   u   m

   E   n   e   r   g   y   C   o   a    l

   C   o   r   p   o   r   a   t   e

   a   n    d   O   t    h   e   r

   S   t   a   i   n    l   e   s   s   S   t   e   e    l

   M   a   t   e   r   i   a    l   s

   I   r   o   n   O   r   e

   M   a   n   g   a   n   e   s   e

   M   e   t   a    l    l   u   r   g   i   c   a    l

   C   o   a    l

   B   a   s   e   M   e   t   a    l   s

   A    l   u   m   i   n   i   u   m

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

   D   i   a   m   o   n    d   s

   a   n    d   S   p   e   c   i   a    l   t   y

   P   r   o    d   u   c   t   s

BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008 - 11

Page 14: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 14/28

Find out more on www.bhpbilliton.com/casestudies

Excavatig coa eeases methae, whichis exposive i sigificat cocetatios.Vetiatio ai is sed i degodcoa mies to dite the methae to safeeves, eadig to age vomes of aiwith ow methae cotet beig eeasedto the atmosphee.

At BHP Biito Iawaa Coa’s West Ciff Mie,i new Soth Waes, Astaia, vetiatio aicotaiig dite methae is beig sed togeeate eecticit commecia.

A wod-fist deveopmet b BHP Biito

ad its techoog povide MEGTEC Sstems,

the A$30 miio pat geeates somesix megawatts of eecticit pe ho whieedcig geehose gas emissios.

Methae has 21 times the goba wamigeffect of cabo dioxide. This pat wi edceBHP Biito’s geehose gas emissios b250,000 toes of cabo dioxide eqivaetpe ea.

The potetia fo this techoog wasecogised b the uited States EviometPotectio Agec with a awad i Ma 2008.

World’s first power plant fuelled by coal mine ventilation air

Our challenge is to meet the growing global demandfor mineral resources while addressing the challengesof climate change, achieving sustainable supply andenvironmental protection.

Environmental

resposibiit

Illawarra Region | Australia

12  - BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008

Page 15: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 15/28

CLIMATE CHANGE AND ENERGYWe beieve that the isks of cimate chage associated withiceasig geehose gas cocetatios i the atmospheeeed to be addessed thogh acceeated actio. Behavioachage, iovatio ad techoogica pogess ae ecessato achieve stabiisatio i a mae cosistet with meetigata esoce ad eeg eeds.

We ae wokig withi o bsiesses ad with govemets,

idst ad othe stakehodes to addess this goba chaegead fid astig sotios that ae cosistet with o goaof Zeo Ham.

O five-ea tagets icde a six pe cet edctio igeehose gas emissios pe it of podctio ad a13 pe cet edctio i cabo-based eeg se pe itof podctio, both b 30 Je 2012. I Fy2008, ocabo-based eeg itesit iceased b oe pe cet.

The Astaia Govemet passed the Eeg EfficiecOppotities (EEO) Act i 2006 to impove the idetificatioad evaatio of eeg efficiec oppotities b ageeeg ses. The ests of this pogam wi be avaiabepbic o the BHP Biito website i Decembe 2008.

It is expected that appig what we have eaed fom theAstaia EEO pogam wi cotibte to o stateg fomeetig o eeg itesit taget o a goba basis.

I Fy2008, we expeieced a five pe cet icease i thegeehose gas emissios itesit idex fo BHP Biito’sgoba sites. This was de, i age pat, to the switchig offes sed b thid pat eecticit geeatos that seve oopeatios i Chie. O stateg to achieve o geehoseitesit tagets icdes impovig o eeg efficiecad ivestigatig cost effective ateative eeg soces.

O Eeg Maketig Gop is bidig kowedge i gobacabo makets thogh tadig i the Koto Potoco’s

Cea Deveopmet Mechaism (CDM) cedits to sppoto opeatios ad cstomes i Eope. This expeiecewi hep pepae s fo othe atioa o egioa cabotadig schemes.

We ae sig o techica capacit ad expeiece to assistgovemets ad othe stakehodes i the desig of effectivead eqitabe cimate chage poicies. I 2007, we paticipatedi the pbic commet pocess o the natioa Geehosead Eeg repotig egatios ad the natioa EmissiosTadig Scheme i Astaia.

We ae cotibtig to the deveopmet of ow caboateative eeg soces thogh pateships sch asAstaia’s COAl21, Coopeative reseach Cete fo Geehose

Gas Techoogies ad the Coopeative reseach Cete fo Coai Sstaiabe Deveopmet. These pojects cove techoogiessch as coa gasificatio, oxfe, ad cabo captead seqestatio.

I ie with o aspiatioa Zeo Ham goa we pogams to impove

o pefomace, set specific tagets, sch as fo eeg se ad ai emissios,ad tack o pogess agaist o tagets.

Environment

The itesit idices have bee deveoped as a Compa-widepefomace idicato fo GHG ad Eeg meases. The ‘idex’cocept aows pefomace fom diffeet bsiess gops o sites,a of which ma have diffeet opeatig coditios ad podct mixes,to be added togethe to fom a ovea idicato pe it of podctio.The base ea fo the itesit idices is Fy2006 ad has a vae of1 fo that ea (1 = 100%). Beow 1 idicates bette tha baseie.(1) Baseie (Fy2006) = 1; beow 1 idicates bette tha baseie.(2) Fy2008–2012 Taget = 6% edctio beow Fy2006 base ea.(3) Fy2008–2012 Taget = 13% edctio beow Fy2006 base ea.

   B   a   s   e

   Y   e   a   r

   F   Y   2   0   0   8

0

0.2

0.4

0.6

0.8

1

1.2

Greenhouse GasIntensity Index FY2008(1)(2)

Target94%

Energy Use by TypeFY2008 Petajoules (PJ)

Electricity 40%

Fuel and Process Oil 3%

Distillate 21%

Natural Gas 14%

Other 2%

Coal and Coke 20%

   B   a   s   e

   Y   e   a   r

   F   Y   2   0   0   8

0

0.2

0.4

0.6

0.8

1

1.2

Energy IntensityIndex FY2008(1)(3)

Target87%

Total Energy Use by CustomerSector Group FY2008

Petroleum 5%

Iron Ore 4%

Aluminium 45%

Diamonds andSpecialty Products 1%Stainless Steel Materials 15%

Base Metals 11%

Manganese 9%Metallurgical Coal 6%Energy Coal 4%

BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008 - 13

Page 16: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 16/28

BIODIVERSITY AND LANDWe ow, maage o ease i excess of 5.7 miio hectaesof ad (excdig data fom expoatio ad deveopmetpojects), of which appoximate two pe cet is sed fomiig, pocessig pats ad ifastcte. Focsig opioitisig o ehabiitatio effots, we have a five-eataget of a 10 pe cet edctio i the ad avaiabe foehabiitatio b 30 Je 2012, which we mease as a atioof ad ehabiitated compaed to ad distbed. I Fy2008,

the atio of 0.28 emaied chaged de to the iceaseddeveopmet of o coppe opeatios i Chie, coa opeatiosi Astaia ad nicke opeatios i Astaia ad Chie.

As a esoces compa opeatig i divese ocatios,o activities have the potetia fo sigificat impact obiodivesit. This ea, i costatio with stakehodes,icdig o Fom o Copoate resposibiit, we haveevised ad fomaised o biodivesit positio whichca be fod i this ea’s F Sstaiabiit repot.

WATERWe se wate i miig, smetig, efiig ad petoempocesses. To bette destad o maagemet of wategoba, we coect data o wate sed i o pocess i thefoowig thee categoies: high-qait o fesh wate schas wate of a qait sitabe fo dikig, ow-qait watesch as wate soced fom a waste wate teatmet pat,ad ecced o esed wate.

We have set a taget to impove o se of ecced wateeative to o se of high-qait wate fom the eviomet.O aggegate taget is to see a 10 pe cet impovemetb 2012 i the atio of wate ecced to high-qait watecosmed. With a impovemet of seve pe cet, we madegood pogess towads achievig o taget. We ae cetwokig to destad whee o best oppotities ie fomeetig this impotat taget.

WASTEO miig opeatios podce age qatities of miea wastesch as waste ock, taiigs ad sag. Geea, this mieawaste is maaged o-site i disposa faciities desiged adopeated to we-estabished egieeig stadads. Mieawastes ae categoised as hazados o o-hazados, ad

we podced a tota of 215 miio toes of miea wastedig the epotig peiod.

no-miea waste is aso categoised as eithe hazadoso o-hazados (geea) waste. Hazados o-mieawaste icdes oi, mateias cotamiated with hdocabos,chemica waste ad spet pot iigs. These hazados wastesae ecced o disposed of i appoved faciities.

We have geea deceased o hazados waste iecet eas; howeve, this epotig peiod we podced192,000 toes of hazados o-miea waste, appoximateseve pe cet moe tha i Fy2007.

Geea waste icdes domestic waste, tes, pape, cadboad,ad bidig ad costctio mateia. O opeatios

geeated 304,000 toes of geea waste ad 45 pe cetof this was ecced, esed o composted.

ENVIRONMENTAL INCIDENTSno acta sigificat eviometa icidets wee epotedi Fy2008, as defied b o Coseqece Seveit Matix;thee wee, howeve, 40 icidets that had the potetiato case sigificat eviometa ham.

The icidets wee eated to evets icdig cotoeddischages fom taiigs ad sedimet coto dams deto high aifa evets, hdocabo ad chemica spisvia boke pipeies, tak faies o taspot icidetsad beaches of itea ad ceaig pocedes.

De to cotos that wee i pace ad mitigatio actios

take, oe of these icidets wee cassified as havig casedsigificat eviometa ham. Ivestigatios wee codctedto ese the factos that cotibted to each icidet weeidetified so that additioa cotos cod be impemetedto pevet a ecece.

Environment

Louisiana | United States of America

Reducing waste and providing

sustainable employmentopportunitiesAs part of the ongoing pursuit of Zero Harm, BHP BillitonPetroleum drilling teams identified recycling as a wayto reduce waste from the rigs that went to licensedcontractors for disposal in landfill. After our peopleimplemented the segregation system, we contractedAccess Real Choices (ARC), a non-profit organisationdedicated to the welfare of individuals with learningand development disabilities in New Iberia, Louisiana,US. This organisation separates and repackages thewaste for resale to local recycling plants. BetweenJune 2006 and December 2007, more than 68 tonnes

of material was diverted from landfills and recycled.The initiative has reduced our disposal costs, raisedrevenue for ARC, and provided employment for40 people within ARC.

14  - BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008

Page 17: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 17/28

(1) Baseie (Fy2007) = 1; beow 1 idicates wose tha base ea (1 = 100%).(2) Fy2007–2012 Taget = 10% impovemet fom Fy2007 base ea.(3) Aggegate Gop Taget of a 10% impovemet i the at io

of wate ecced/esed to fesh wate cosmed b 30 Je 2012.(4) Fy2008–2012 Taget = 10% impovemet fom Fy2007 base ea.

Kalimantan province | Indonesia

Managing our impact in IndonesiaBHP Billiton’s wholly-owned Maruwai Coal Project isseeking to develop a high-quality coking coal resourcein an area that is world-renowned for its biodiversity.Our strategy is to minimise our operational footprint

and to support broad-based conservation outside ourarea of interest. We engaged with several internationalconservation Non-Government Organisations (NGOs)to contribute to our biodiversity strategy, including indeveloping goals, identifying challenges and priorities.

Comprehensive, practical actions to minimise ourimpact on the forest include redesigning our explorationprogram to eliminate unnecessary clearing by havinga single exploration camp rather than satellite campsand using helicopters to transport people andequipment rather than constructing roads. We alsohave a comprehensive program for rehabilitatingand revegetating all our abandoned drill sites.

Water Use byClassification FY2008

High-Quality Water 43%Recycled Water 44%

Low-Quality Water 13%

0

50

100

150

200

250

Total Mineral Processing WasteDisposed FY2004 to FY2008

Non-Hazardous Mineral Processing Waste

Hazardous Mineral Processing Waste

   m   i    l    l

   i   o   n   t   o   n   n   e   s

   F   Y   2   0   0   4

   F   Y   2   0   0   5

   F   Y   2   0   0   6

   F   Y   2   0   0   7

   F   Y   2   0   0   8

        B      a      s      e

        Y      e      a      r

        F        Y        2        0        0        8

0

0.2

0.4

0.6

0.8

1

1.2

Recycled Water Index FY2008(1)(2)(3)

High-Quality Water from theEnvironment/Recycled Waste

Target110%

        F        Y        2        0        0        7

        F        Y        2        0        0        8

0

0.2

0.4

0.6

0.8

1

1.2

Land Available forRehabilitation IndexFY2008(1)(4)

Target110%

General Waste DisposalMethods FY2008

Landfill 54.8%Re-use or Recycle 45%Incineration 0.2%

Recycled Water Use FY2008Megalitres (ML)

Iron Ore 3%

Aluminium 3%

Diamonds andSpecialty Products 3%Stainless Steel Materials 39%

Base Metals 21%

Manganese 11%Metallurgical Coal 12%Energy Coal 8%

BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008 - 15

Page 18: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 18/28

Find out more on www.bhpbilliton.com/casestudies

I Septembe 2006, BHP Biito ad MitsbishiCopoatio siged a ageemet with theroa Govemet of Cambodia that aowsfo baxite expoatio ad evaatio of thepotetia fo a amia efie i Cambodia.

Costatio with host commities,govemet, ad o-govemetogaisatios idetified fo aeas wheeBHP Biito cod assist oca commities.These icded sppotig speciaist teamsto emove exposive emats of wa ad

edcate commities abot the associatedisks; stegtheig oca heathcae seviceaccess fo impoveished commities; adsppotig o-govemet ogaisatiosthat povide edcatio ad taiig iheathcae, sstaiabe agicte adata esoce maagemet.

To date we have sppoted the emovaad destctio of moe tha 437 exposivehazads ad ae sppotig a seectio ofoca heath ad edcatio pojects.

Assisting local communities

Relationships and partnerships are at the core of ourbusiness. We can do very little on our own. Our abilityto work collaboratively and transparently with othersis critical to our long-term success.

Community

resposibiit

Mondulkiri Province | Cambodia

16  - BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008

Page 19: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 19/28

O icece to opeate depeds o o abiit to opeate a aspects of

o bsiess esposib, icdig o abiit to wok effective witho host commities.

Social Responsibility

COMMUNITY ENGAGEMENTrega, ope ad hoest diaoge is the ke to bidigstog eatioships. O commit eatios pofessioasae chaged with deveopig ad tig eatioshipswith peope impacted b, ad iteested i, o opeatiosso we ca destad thei coces, hopes ad aspiatios.

Whie o bsiesses taio thei commit eatios pogamsto sit the oca cotext, o Heath, Safet, Eviomet ad

Commit Maagemet Stadads povide diectio as to thecitica activities that mst be impemeted b a o opeatios.

Fo exampe, o sites ae eqied to have commit eatiospas i pace ad to ega eview the effectiveess ofcommicatio, costatio ad paticipatio pocessesi coaboatio with stakehodes.

I Fy2008, we itodced a taget fo a opeatig sitesad deveopmet pojects to impemet foma commitegagemet pogams. We met the taget, with 95 pe cet(61 of 64 sites) of o sites compiat.

We aso eqie a o sites to have commit compaitegistes that ecod ad tack the maagemet of commit

coces. Dig the epotig peiod, o sites eceived536 compaits, simia to 543 eceived i Fy2007.Simia to the pevios epotig ea, the most commotpe of commit compait was oise-eated.

COMMUNITY DEVELOPMENT TRAININGThe goa of o commit eatios pogams is tobig og-tem beefits to peope i o host commities.Taditioa, we have focsed o sevice deive mechaisms,sch as povidig edcatioa faciities o heath sevices.Whie the povisio of essetia sevices emais a impotatstateg to impove peope’s iveihoods, eaise hmapotetia ad pomote the qait of ife of famiies, we aeiceasig ookig to sppemet these pogams with

paticipato pojects, whee we wok aogside peopeto assist them i thei ow deveopmet pocess.

We ae bidig the capacit of o pactitioes to esef commit egagemet i sevice deive ad to assistcommit paticipatio ad coto of empoweigdeveopmet pojects.

I 2005, we eteed ito a eatioship with Oxfam Astaiato deive commit deveopmet taiig pogams. Thepactice-based taiig cose coves commit diaoge,paticipato stctes ad peope-ceted commitdeveopmet pocesses.

I Fy2008, we a 10 coses i Chie, Pe, Soth Afica

ad Coombia. Othe esoce compaies ae ow expessiga iteest i this diaoge methodoog taiig.

Ancash provinces | Peru

Antamina Mining FundIn December 2006, the Peruvian Government andthe mining industry established a five-year general

contribution program to support social programs inthe country’s poorest areas. Our 33.75 per cent ownedAntamina Mine was the first to sign an agreement withthe government, under which companies contributethree per cent of their pre-tax profits.

With an initial contribution of $64.3 million, weestablished the Antamina Mining Fund, which accountsfor 40 per cent of the mining industry contributionfor the program’s first year. During its first 10 monthsof operation, to December 2007, the Fund approved178 projects – worth a total of $42.7 million – in fourfields: health and nutrition, education, developingproductive skills and strengthening institutions.

Community Contributions byGeographic Region FY2008

South America 46%Australia/Asia 39%

North America 2%Europe (incl UK) 1%

Africa 12%

Community Contributions byProgram Category FY2008

Community Development 53%

Environment 4%

Education 17%

Other 7%Arts/Culture 6%

Health 9%

Sport/Recreation 4%

BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008 - 17

Page 20: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 20/28

Social Responsibility

FORUM ON CORPORATE RESPONSIBILITYThe Fom o Copoate resposibiit compises omost seio maagemet ad eadeship fom iteatioao-govemet ogaisatios (nGOs). The Fom povidesnGOs with a oppotit to ifece the Compa’sappoach to ke sstaiabe deveopmet isses.

The ope ad fak discssio povides paticipats with aisight ito the compexit of diemmas ad chaeges facig

the Compa ad a destadig of the impotace pacedo o vaes ad stadads whe makig bsiess decisios;it aso eabes o exectives to appeciate isses foma diffeet viewpoit.

The Fom is scheded to meet twice each ea ad is chaiedb o Chief Exective Office. I Fy2008, the Fom povidedfeedback o o deveopmet of positio statemets fo cimatechage, biodivesit ad bsiess codct.

COMMUNITY INVESTMENTWe cotie to ivest oe pe cet of o pe-tax pofits(based o the aveage of the pevios thee eas’ pe-taxpofit pbic epoted i each of those eas) i commitpogams to ese o host commities shae i o

sccess. Dig Fy2008, this vota ivestmet totaed$141.0 miio, compisig cash, i-kid sppot adadmiistatio costs.

We take cae to sppot commit ivestmet pojectsthat wi cotibte to og-tem sstaiabe deveopmetad ot ceate depedec.

We have aso cotied to map o commit ivestmetsped agaist the un Mieim Deveopmet Goas (MDGs),ecogisig that the itet of the MDGs aigs with osstaiabiit picipes.

I Fy2008, o sites epoted spedig $40.7 miio opogams to hep achieve the MDGs, which is abot oe-thid ofthe Compa’s tota commit ivestmet. Of this amot, the

goas that eceived most focs wee MDG 1: Eadicate extemepovet ad hge (29 pe cet of the tota) ad MDG 2:Achieve ivesa pima edcatio (21 pe cet of the tota).

ENSURING TRANSPARENCYPojects ae seected accodig to pbic avaiabe gideiesthat cea descibe the Compa’s pioit aeas ad thedecisio-makig pocess. Sites ae ecoaged to icdecommit membes i the costatio whe makig decisiosabot socia pogams the Compa wi sppot.

We aim to impemet pojects i a taspaet, ethicamae ad to wok effective with o commit pates.I Fy2008, we itodced a set of madato eqiemetsfo commit ivestmet to stegthe goveace i this

aea. I additio, aa, o Gop Adit Sevices aditsthe fiacia ad maagemet cotos eated to commitivestmet pogams at a seectio of o opeatios.

INVOLVING OUR EMPLOYEESOe of the most sigificat was we sppot the effotsof o empoees egaged i commit activities isthogh o goba Matched Givig Pogam. This pogamaims to stegthe oca commities b sppotigad ecoagig empoees who votee, fdaiseo doate to ot-fo-pofit ogaisatios.

Dig Fy2008, the Compa matched cotibtios totaig

$4.8 miio, which was distibted to ove 1,150 ot-fo-pofitogaisatios. This is a sigificat icease fom $2.4 miioi Fy2007 ad icded matchig fo some 115,000 hosof voteeig b empoees i thei ow pesoa time.

PEOPLE’S RIGHTSToda, compaies face heighteed pbic scti; ad,iceasig, copoate obigatios ae beig shaped bstakehodes’ expectatios. At the same time, aws adegatios ae chagig to efect ad foow societa vaes.

As the wod’s agest divesified esoces compa, wehave potetia expose to hma ights-eated isses,expose that ma peset s with chaeges. nevetheess,phodig peope’s fdameta ights i o da-to-da

bsiess is paamot.I Fy2008, we itodced a taget fo a o opeatig sitesad deveopmet pojects to detake a hma ightssef-assessmet ad, if eeded, to impemet a isk-basedhma ights maagemet pa. Eight-fo pe cet of osites epoted that the have competed thei sef-assessmetad 21 of these sites have deveoped hma ights maagemetpas i espose to the assessmet. Two sites that idetifiedmodeate expose to hma ights isses did ot competea maagemet pa b the cose of the epotig ea; howeve,these pas ae i pogess.

no sigificat hma ights-eated isses wee idetifiedi this epotig peiod. Thee wee two epoted votaesettemets – both i Soth Afica – ivovig five famiies.

INDIGENOUS RECONCILIATIONWe ecogise ad espect the impotace of Idigeospeopes’ cte, heitage ad taditioa ights.

We have opeatios o the taditioa ads of Idigeospeopes, makig it o esposibiit ad obigatio to esewe espect thei ights. O aim is to bid espectf og-temeatioships with Idigeos peopes.

BHP Biito is recociiatio Astaia’s fodig natioa leadei recociiatio ad we ae pod to be oe of the fist compaiesi Astaia to compete a recociiatio Actio Pa (rAP).

O 2007 rAP oties o visio to hep Idigeos peopepaticipate i f, ad ejo eqa, the beefits povided

to a Astaias. It oties o appoach to ecociiatio,detaied actios, timeies ad pefomace idicatos aodke aeas of edcatio, taiig ad empomet, Idigeosbsiess oppotities ad capacit bidig.

We aim to eview o pefomace agaist the 2007 rAPad deveop a pa fo the comig ea.

18  - BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008

Page 21: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 21/28

Stewardship

It is o aim that o podcts do ot caseham to peope o the eviomet dig

podctio, cosmptio, disposa o whiebeig ecced. We shae this esposibiitwith a ivoved i o podcts’ ife cce.

STEWARDSHIP PROGRAMSWhile we control extraction, and in some instancesprocessing, of our products, we are also concerned thatlife cycle aspects we don’t control, such as transport,some processing, manufacturing, use and disposal,are undertaken safely and responsibly.

In bringing together stakeholders in the life cycleof our products, we can determine concerns andresponsibilities and work cooperatively so thatour products do not cause harm at any point in

their life cycle.During FY2008, we continued our involvementin several industry initiatives, where we work withother resources companies, industry and commodityassociations and governments to develop standardsand verification systems to ensure compliance by themining sector with environmental, human rights andsocial standards.

Our customers represent the next stage in the life cycleof our commodities; and, through workshops with ourmarketing personnel, we are working collaborativelywith them to reduce the impact of minerals productionon the community and the environment.

We are also continuing to support the use by our

customers of the GreenLead self-assessment tools.Initiated by our Cannington silver, lead and zincoperations (Australia), the GreenLead program isa product stewardship program based on the soundmanagement of materials and products in the leadlife cycle.

An example of our work with customers is our programto introduce stewardship concepts to a range ofChinese organisations, including state agencies,national commodity associations, lead smeltersand battery exporters.

In March 2008, the inaugural meeting of theGreenLead China Working Group occurred and,as a result, Yangzhou Apollo Battery (China’s largest

battery exporter) has become the first Chinese leadfacility to complete the GreenLead assessment toolsthat are currently being trialled globally.

We remain a member of the World Nuclear Associationand chair their Uranium Stewardship Working Group.In Australia, we chair the Board of the AustralianUranium Association and its Uranium StewardshipWorking Group. Our uranium product is only sold tocountries approved and monitored under bilateralagreements with the Australian Government andthat are signatories to the international NuclearNon-Proliferation Treaty. All transport of our uraniumproduct during FY2008 was conducted safely.

KwaZulu-Natal province | South Africa

Trees for LifeIn Zululand, South Africa, where BHP Bill iton’sHillside and Bayside aluminium smelters operate,rural communities are often characterised by their pooreducation, health and social infrastructure. BHP Billitonand Wildlands Conservation Trust’s Indigenous Treesfor Life initiative aims to address disillusionmentand despondency by creating a framework foryoung unskilled community members to participateas ‘Tree-preneurs’.

The Tree-preneurs are trained in indigenous treepropagation techniques, provided with propagationstarter packs, mentored through the propagationprocess and provided with a market for the trees thatthey propagate. Participants generate much neededcash while improving their basic communication andnumeracy skills and, possibly most importantly,nurturing self-confidence and hope. Tree plantingactivities occur in the afternoon, after school.

Employee Matched Givingby Category FY2008

Community Services 35%

Overseas Aid 8%

Sport 15%

Welfare 13%Formal Education 11%

Health 14%

Arts and Culture 2%Environment 2%

Employee Matched Givingby Activity FY2008

Cash Donations 44%Fundraising 35%Volunteering 21%

BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008 - 19

Page 22: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 22/28

Page 23: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 23/28

Page 24: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 24/28

Cstome SectoEnergy

Cstome SectoConstruction

Cstome SectoIndustry

Cstome SectoHousehold Appliances

Cstome SectoPersonal Use

Petroleum

Oil and Natural GasFe, heatig, eecticitgeeatio

Oil and Natural GasCapets, paits, pastics

Oil and Natural GasEecticit geeatio,taspot, face fe

Oil and Natural GasPastic compoets,packagig, pastichomewaes

Oil and Natural GasEecticit, fe fo vehices,fe fo cookig adheatig, cothig fabic,pastic tos, pes

Aluminium

Aluminium High-tesiopowe ies, wiesad cabes

Aluminium Doo adwidow fames, wacaddig, oofig,awigs

Aluminium Popees,bod sheet (fo ships,aeopaes, vehices),geaboxes, moto pats,wies, cabes, packagig

Aluminium Compoetsfo TV sets, adios,efigeatos adaicoditioes

Aluminium Beveage cas,botte tops, foi wap,foi semi-igid cotaies,kettes ad sacepas, cte,teis acqets, softba bats,idoo ad otdoo fite,bicces, vehices

Base Metals

Copper Wie ad cabes,eectica wiig i bidigs,eectica geeatosad motosLead lead-acid stoagebatteies (ca batteies),emote aea powe stoageUranium* Eecticitgeeatio, sive batteies,soa cesZinc Zic cabo batteies

Copper Eectica wiig,pmbig pipes adtaks, oofig, ight fixtes,teated timbesGold God eaf fodecoatioLead roofig, pmbig,sodpoofig, staiedgass widowsSilver Sode, dobe paethema widowsZinc roofig, feces,doos, hades, paits,pmbig, ts ad bots

Copper Wies ad cabes,eectica wiig i bidigsad vehices, obotics,aicoditioig adefigeatio its,scietific istmetsGold Eectoics focomptes, idstiaeqipmet, aeospacetechoog, tited-gasswidowsLead lead foi, adiatioshieds, toxic waste stoagecotaies, des, sodeSilver Photogaphic papead fim, medicies, specodctosUranium* Eecticit

geeatioZinc Gavaisig adcoosio potectio, cabodies, cabettos, tes

Copper Eecticaappiaces, teephoecabes, micowaveeqipmet, adioad TV setsGold Eectoic techoogLead Eectoic adeectica appiacessch as adios ad TV sets(sodeed coectios)Zinc Doo hadesad othe hosehodcompoets, bass fittigs

Copper Oamets,teephoes, cookig tesis,home heatig sstems,decoative appicatios, coisGold Jewee, watches,cec, detist,decoatio fo diewaead oametsLead Comptes, eadightwidows, gass i TVad compte sceesfo adiatio potectioSilver Jewee, watches,watch batteies, bad-aids,diewae ad oamets,mios, cte, cec,medaios, wate pificatioUranium* Eecticit

Zinc Medicatios, zic ceam,TV sets, compte pats, tos

Diamonds and Specialty Products

Diamonds Diamod gitad powde impegatedock diig bits, masodiig, machie too tipsad cttig discsTitanium Pigmetfo paits, fabic,pastics, pape

Diamonds Poishigcompods fo fie opticasfaces, jewe beaigs,wie dawig diesTitanium Titaim metafo aeospace eqipmet,egies, abasives,ceamics, obotics

Diamonds Kife‘shapees’, egavesTitanium Pape podcts,compte ad TV scees

Diamonds JeweeTitanium Cosmeticsad sscees, fabic,cothig, jewee,heat pacemakes, hipepacemets, food cooig

Stainless Steel Materials

Nickel Eecticit geeatiotbies, batteiesCobalt rechageabeithim batteies fomobie teephoesad aptop comptes, jet egie tbies

Nickel Steet fite,bidig caddig,staiess steeCobalt Te adhesives,magets, cabidecttig toos

Nickel Compte haddisks, sgica impemetsad impats, jet egies,food ad beveageeqipmet, phamaceticaeqipmet, vehices,meta hadeigCobalt Paits, eames,gazes

Nickel Coo TV tbes,kitche siks, white goodsCobalt Videotape coatigs,heatig eemets oeectic stoves

Nickel Kitche tesis, cois,mobie teephoes, bathoomad kitche fittigs adfixtes, jewee

Iron Ore

Iron Ore Steemakig,bidigs, bidges,toos, caes

Iron Ore Steemakig,taspot eqipmet, motovehices, fam machie

Iron Ore refigeatos,washig machies, oves

Iron Ore Food cas,vehices, toos, cte, jewee, watches

Manganese

Manganese D cebatteies

Manganese Steemakig Manganese Stee aos,wedig ods

Manganese eectoics(e.g. TV cicit boads)

Manganese Gass, ceamics,d ce batteies

Metallurgical Coal

Coking Coal Steemakig

Energy Coal

Thermal Coal Eecticitgeeatio, heatig

Thermal Coal Eecticitgeeatio, heatig, cemet

Thermal Coal Eecticit,fe fo cookig ad heatig

* Safegads ae i pace to ese that aim podced b o Ompic Dam opeatio is sed o fo powe geeatio i coties that have biateasafegad ageemets with the Astaia Govemet.

22  - BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008

Page 25: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 25/28

Sustainability Performance Data Summary

HEALTHY PEOPLE

Fo a smma of the aims adpefomace of this aea iFy2008, pease see page 11.

Health FY2004 FY2005 FY2006 FY2007 FY2008

new cases of occpatioa iesses nmbe 197 152 124 264 207

Employees in potential exposuresgreater than the:

Occpatioa expose imitnoise expose imit

%%

2355

2853

1847 

1751

1748

SAFE WORKPLACESFo a smma of the aims adpefomace of this aea iFy2008, pease see page 10.

Safety FY2004 FY2005 FY2006 FY2007 FY2008

nmbe of fataities ato cotoed opeatios 17 3 3 8 11

Tota recodabe Ij Feqec rate 11.1 8.6 8.8 7.4 5.9

ENVIRONMENTALCOMMITMENT 

Fo a smma of the aimsad pefomace of thisaea i Fy2008 aditesit-based data,pease see pages 12–15.

Environment(1) FY2004 FY2005 FY2006 FY2007 FY2008

Land Use

lad ew distbedlad ehabiitatedlad to be ehabiitated(2)

hectaes 5,6202,060

156,040

4,9401,850

127,970

4,9302,410

121,200

5,120 3,340 

106,410 

5,7401,590

112,780

Water

High-qait watecosmptiolow-qait watecosmptiorecced wate cosmptio

 megaites 

153,000 

nA172,700

 153,200

 nA

166,760

 160,230

 33,800

168,660

 162,080 

 25,600

161,130

 162,490

 48,320

171,130

Waste(3)

Geea wastedisposed to adfiHazados wastedisposed to adfi

toes 

124,990 

59,100

 154,830

 68,100

 158,970

 43,850

 132,520 

 55,490 

 168,570

 63,650

Energy and Emissions

Eeg sedGeehose gases Oxides of sphOxides of itogeFoide

petajoes’000 toes(C02-eqivaet)toestoestoes

328 

51,14048,24054,600

900

311 

52,27050,54057,130

950

306 

51,82093,390

165,3501,360

303 

52,00076,82063,790

1,090

305 

53,80075,99070,210

990

Accideta dischageof hdocabos

 

117,500 

132,035 

17,286 

20,163 

126,763

SOCIAL RESPONSIBILITYFo a smma of the aimsad pefomace of thisaea i Fy2008, peasesee pages 17–19.

Social Responsibility andSocio-Economic contributions FY2004 FY2005 FY2006 FY2007 FY2008

Tota vae add(4) uS$ miio 14,085 15,927 10,931 15,679 17,154

Commit cotibtios(5) uS$ miio 46.5 57.4 81.3 103.4 141.0

Pecetage of Compa pe-tax pofit % 1.6 1.6 1.4 1.1 1.0

Commit compaits 511 509 603 543 536

Empoees ad cotactospaticipatig i hma ights taiig nA 12,679 15,570 20,886 23,876

note: The se of itaics idicates that the fige has bee adjsted sice it was oigia epoted.(1) Figes estated to faciitate ea-to-ea compaiso of pefomace withot BHP Stee, which was demeged i J 2002.(2) Assmes immediate cose of a opeatios.(3) Excdes ecced mateias ad miig eated mateias, sch as waste ock, taiigs, coa eject ad sag. Hazados waste icdes waste oi.(4) The defiitio of vae add is povided b the 2006 Goba repotig Iitiative Gideies.(5) % pe-tax pofits cacated o a thee-ea oig aveage.

BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008 - 23

Page 26: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 26/28

Sustainability Performance Data Summary

OUR PEOPLE

Fo a smma of theaims ad pefomaceof this aea i Fy2008,pease see page 9.

People FY2004 FY2005 FY2006 FY2007 FY2008

F time empoees nmbe 35,070 34,201 40,002 39,947 41,732

Cotactos nmbe 38,000 50,000 66,000 59,000 61,000

F time femae empoees % 9 12 13 14 17

FINANCIALFinancial FY2004(6) FY2005(6) FY2006(6)(7) FY2007(6)(7) FY2008(6)(7)

revee uS$ miio 24,943 31,150 39,099 47,473 59,473

udeig eaigsbefoe iteest ad tax(8) uS$ miio 5,488 9,921 15,277 20,067 24,282

(6) Ifomatio fo the eas 2008 to 2005 is stated de IFrS. 2004 is pepaed i accodace with uKGAAP ad has ot bee estated.(7) O 1 J 2007, the Gop adopted the poic of ecogisig its popotioate iteest i the assets, iabiities, evees ad expeses of joit

cotoed etities withi each appicabe ie item of the fiacia statemets. A sch iteests wee pevios ecogised sig the eqit method.

Compaative figes fo the eas 2007 ad 2006 have bee estated.(8) udeig EBIT is eaigs befoe et fiace costs ad taxatio ad a exceptioa items.

Contact us

Sustainable DevelopmentBHP BillitonBHP Billiton CentreLonsdale StreetMelbourne Victoria 3000 Australia

Phone +61 1300 554 757

Fax +61 3 9609 3015Email [email protected] www.bhpbilliton.com

Pited o 250gsm PhoeixMotio Xeo FSC ad 130gsmMoza Sati recced FSC.

PhoeiXmotio is a FSC mixed soce cetified pape, whicheses that a vigi pp is deived fom we maaged foests.It cotais a mix of eemeta ad tota choie fee beachedpp ad has the nodic Swa eviometa abe.

Moza Sati is podced with 55% ecced fibe (25% postcosme 30% pe cosme) ad 45% FSC Cetified Pp,which eses a vigi pp is deived fom we maagedfoests ad mafacted at a ISO14001 cetified Mi.

Cert no. SCS-COC-00858

 

Employees byAge Group FY2008

30–39 years 31%

Over 50 years 22%40–49 years 31%

Under 30 years 16%

Turnover byAge Group FY2008

30–39 years 35%

Over 50 years 17%40–49 years 25%

Under 30 years 23%

Employees byGender FY2008

Female 17%Male 83%

Turnover byGender FY2008

Female 30%Male 70%

24  - BHP BIllITOn SuSTAInABIlITy SuMMAry rEPOrT 2008

Page 27: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 27/28

Awards Business in the Community Awards (UK)Awarded a ‘Big Tick’ in the Impact on Society categoryand short listed for Company of the Year in 2008

ACCA Australia and New ZealandAwarded Best Report for our 2007 Sustainability Report

Sustainability Ratings

Dow Jones Sustainability IndexesA member of the global index since 2002

FTSE4Good Index SeriesIncluded in the international ethical index FTSE4Goodsince 2003

The Australian SAM Sustainability IndexMining sector leader, fourth year in a row

JSE SRI IndexIncluded in the South African index since 2004

Business in the CommunityPlatinum-band Company

Corporate Responsibility IndexMember of the CRI Leaders Network

StorebrandBest in class status for leading environmental and socialperformance in the metals and mining industry 2007

A+ GRI Application Level

Our 2008 Full Sustainability Report has been written in accordancewith the Global Reporting Initiative (GRI) G3 Sustainability ReportingGuidelines. The report has been checked by GRI and meets therequirements for the A+ GRI Application Level

We support

We support a range of voluntary initiatives, including:

International Council on Mining and Metals

United Nations Global Compact

Global Reporting Initiative (we are an Organisational Stakeholder)

World Business Council for Sustainable Development

Carbon Disclosure Project

What others say about BHP Billiton

Page 28: Bhpb Sustainability 2008

8/8/2019 Bhpb Sustainability 2008

http://slidepdf.com/reader/full/bhpb-sustainability-2008 28/28

www.bhpbilliton.com