BGR Presentation

Embed Size (px)

Citation preview

  • 7/27/2019 BGR Presentation

    1/37

  • 7/27/2019 BGR Presentation

    2/37

    1

  • 7/27/2019 BGR Presentation

    3/37

    BGR Energy

    A Snapshot Year of Incorporation 1985

    Nature of Company Public Listed Company

    Revenue in 2007-08 Rs.1804.8 Crores

    Order Book as on 1 st April 09 Rs.9522.93 Crores

    Shareholding

    Promoter Mr B.G. Raghupathy 81.3%

    FIs, Public and Employees 18.7%

  • 7/27/2019 BGR Presentation

    4/37

    Product Business

  • 7/27/2019 BGR Presentation

    5/37

    Systems & Products (BGR Group)S/N Systems / Equipment Manufactured Technology Partner

    1 Cooling TowersGEA, Germany

    2 Air Cooled Condensers

    3 Coal Handling Plant4 Deaerators Crane, USA *

    5 Water Treatment Plant Termo Mechanicca, Italy **

    6 Effluent Treatment Plant AES, Saudi Arabia **

    7 Condensate Polishing Unit Termo Mechanicca, Italy

    8 Condenser Tube Cleaning System andDebris Filter GEA, Germany *

    * The technology transfer is completed ** Case by case Co-operation

  • 7/27/2019 BGR Presentation

    6/37

    Systems & Products (BGR Group)

    S/N

    Systems / EquipmentManufactured Technology Partner

    9 Air Cooled Heat Exchanger GEA Btt, France *

    10 Gas Compressor Skid

    11 Gas Metering & Conditioning Skid

    12 Fin Tubes for HRSG GEA Spirogills, UK *

    13 Waste Heat Recovery Module

    14 HP Heater

    15 Super Heater Coil

    16 Pressure Vessels

    * The technology transfer is completed

  • 7/27/2019 BGR Presentation

    7/37

    Manufacturing Facility

    Three Manufacturing Units located near Chennai

    ISO:9001:2000 Certified Units

    ASME U, U2, R and S Code Stamp Qualified Units

    Member of H T R I, USA

    Houses state-of-the-art Finning Machines,Fabrication Yard and Assembly facilities

  • 7/27/2019 BGR Presentation

    8/37

    Manufacturing Facility

    Air Fin Cooler Division GEA BGR Energy System

    Progen Systems and Technologies

  • 7/27/2019 BGR Presentation

    9/37

  • 7/27/2019 BGR Presentation

    10/37

    View of our Finning Process

  • 7/27/2019 BGR Presentation

    11/37

    Prototype Test Facility

  • 7/27/2019 BGR Presentation

    12/37

    Wet Cooling

    Manufactured in Joint Venturewith GEA Energietechnik GmbH,Germany

    Types :

    Natural Draught (NDCT) and

    Induced Draught (IDCT)

    Present supply upto 600 MW

  • 7/27/2019 BGR Presentation

    13/37

    Dry Cooling

    Manufactured in Joint Venturewith GEA Energietechnik GmbH,

    Germany

    Type :

    Air Cooled Condenser (ACC)

    Present supply up to 120 MW

  • 7/27/2019 BGR Presentation

    14/37

    Deaerators

    Supplied Largest Deaerator to Nuclear Power Corporation,Tarapur (2 x 500 MW) and 660 MW NTPC, SIPAT Super Critical TPP

    Supplies till date upto 660 MW

  • 7/27/2019 BGR Presentation

    15/37

    Effluent Recycling Plants

    Technology from A E S

    Implementing 4 Nos. of Common Effluent Recycling Plantsfor Textile Units

  • 7/27/2019 BGR Presentation

    16/37

  • 7/27/2019 BGR Presentation

    17/37

    Gas Compressor

    Complete CNG Gas Booster Compressor Package for TNEBin 95 MW Valuthur CombinedCycle Power Plant, Phase-II,CCPP

  • 7/27/2019 BGR Presentation

    18/37

    Condenser Tube Cleaning System & Debris Filter

    In-house manufacturing & testing

    More than 1200 installations World wide

    ISO:9001 certified Manufacturing Facility

    Present supplies upto 1400 MW

  • 7/27/2019 BGR Presentation

    19/37

    Excellent Manufacturing Centre for Pressure Vessels, HRSG , HeatExchangers, Superheater Coils, Evaporators and Surface Condensers

    ISO:9001 and ASME U & S stamp certified manufacturing facility

    Expertise in High Pressure and Alloy Steel Fabrication

    Heat Recovery Steam Generators Main Air Tank for Hydro Power Plant

    HRSG & Pressure Vessels

  • 7/27/2019 BGR Presentation

    20/37

  • 7/27/2019 BGR Presentation

    21/37

    Air Cooled Heat Exchangers

    Technical Know-how from GEA BTT, France

    ISO:9001 and ASME U stamp certified manufacturing facility

    Turnkey capability to design, engineer, test & supply upto 750 ACHE bundles per annum.

  • 7/27/2019 BGR Presentation

    22/37

    Coal Handling Plant

    In-house Design, Engineering, Testing and Commissioning facility for Complete Coal Handling Plant for Thermal Power Plants

    Complete design and fabrication done in-house

    Presently executing CHPs for 6 Nos. 500 MW and 3 Nos. 600 MW ThermalPower Plants

  • 7/27/2019 BGR Presentation

    23/37

    Turnkey Contracts

  • 7/27/2019 BGR Presentation

    24/37

    Scope of Turnkey Contracts

    S/N Service Offered Max Unit rating for which Offered

    1Engineering, Procurement and Construction (EPC) for Balance of Plant of Thermal Power Plants and CombinedCycle Plants (except Power Island)

    800 MW

    2Engineering, Procurement and Construction (EPC) of complete Thermal Power Plants and Combined CyclePlants including Power Island

    660 MW

    3 Engineering, Procurement and Construction (EPC) of 400KV Substations and Gas Insulated Switchgear Substations 400 KV

    4Building integrated network for Electric Utilities for usingOPGW in live line conditions

    5 Engineering, Procurement, Construction (EPC) of GasTransmission Systems from Well-head to User 220 mm scft / day

    6 Sea Water Desalination Plant

  • 7/27/2019 BGR Presentation

    25/37

    E P C / Turnkey B O P Experience

    Projects Completed

    S/N Project Customer / LocationValue

    (Rs. InCrores)

    Scope Commissionedin

    1 95 MW CCPP T N E B, Valuthur (Phase-I),Tamil Nadu 72.48 B O P December 02

    2 23 MW TPP Grasim Industries,Chittorgarh, Rajasthan 54.24 B O P February 03

    3 120 MW CCPP Aban Power, Karuppur,Tamil Nadu 329.28 E P C July 05

    4 330 MW CCPPRRVUNL, Dholpur,Rajasthan 255.84 B O P December 07

    5 92.2 MW CCPP TNEB, Valuthur (Phase-II),Tamil Nadu 433.92 E P C May 08

    6 25 MW IPP MALCO, Mettur, Tamil Nadu 91.44 E P C March 09

    7 500 MW TPP APGENCO, Vijayawada,

    Andhra Pradesh706.56 B O P April 09

  • 7/27/2019 BGR Presentation

    26/37

  • 7/27/2019 BGR Presentation

    27/37

  • 7/27/2019 BGR Presentation

    28/37

  • 7/27/2019 BGR Presentation

    29/37

    330 MW CCPP RRVUNL, Dholpur, Rajasthan

  • 7/27/2019 BGR Presentation

    30/37

    330 MW CCPP RRVUNL, Dholpur, Rajasthan

  • 7/27/2019 BGR Presentation

    31/37

    25 MW IPP - MALCO, Mettur, Tamil Nadu

  • 7/27/2019 BGR Presentation

    32/37

    500 MW TPP APGENCO, Vijayawada, Andhra Pradesh

  • 7/27/2019 BGR Presentation

    33/37

    E P C / B O P Experience Projects Under Execution

    S/N Project Customer / LocationValue(Rs. In

    Crores)Scope

    1 500 MW TPP APGENCO, Bhoopalapalli, Andhra Pradesh 848.16 B O P

    2 500 MW TPP MAHAGENCO, Khapherkheda,Maharashtra 1218.24 B O P

    3 500 MW TPP APGENCO, Kothagudem, Andhra Pradesh 950.4 B O P

    4 820 MW CCPP Konaseema Gas Power

    Company, Andhra Pradesh792 EPC

    5 600 MW TPP TNEB, Mettur, Tamil Nadu 3720 E P C

    6 2 x 600 MW TPP RRVUNL, Kalisindh, Rajasthan 6125 E P C

    7 2 x 500 MW TPP MAHAGENCO, Chandrapur,Maharashtra 1622.4 B O P

  • 7/27/2019 BGR Presentation

    34/37

    Highlights of Turnkey Projects under execution500 MW TPP MAHAGENCO, Khapherkheda

  • 7/27/2019 BGR Presentation

    35/37

    500 MW TPP MAHAGENCO, Khapherkheda

  • 7/27/2019 BGR Presentation

    36/37

    Highlights of Turnkey Projects under execution

    500 MW TPP APGENCO, KTPP

  • 7/27/2019 BGR Presentation

    37/37

    Key DifferentiatorsEstablished in Product and Turnkey contract segmentsAn Engineering Company dedicated to Power, Oil & Gas and EnvironmentExecuted over 131 contracts in 42 overseas countries as of November 8, 2007Undertakes turnkey projects

    Diverse Design & Engineering capabilities

    Ability to Design & Manufacture customised products and projectsIn-house Design & Engineering gives control over costs, design and scheduling

    Diverse range of product and services

    Products well accepted by clients for their qualityManufacturing capability is an added advantage in EPC projects

    Cost Competitiveness

    Control costs by optimising product features and designGlobal sourcing

    Technology tie-ups

    Successfully tied up with several international companies to obtain technology know-

    h