BGR Energy
A Snapshot Year of Incorporation 1985
Nature of Company Public Listed Company
Revenue in 2007-08 Rs.1804.8 Crores
Order Book as on 1 st April 09 Rs.9522.93 Crores
Shareholding
Promoter Mr B.G. Raghupathy 81.3%
FIs, Public and Employees 18.7%
7/27/2019 BGR Presentation
4/37
Product Business
7/27/2019 BGR Presentation
5/37
Systems & Products (BGR Group)S/N Systems / Equipment Manufactured Technology Partner
1 Cooling TowersGEA, Germany
2 Air Cooled Condensers
3 Coal Handling Plant4 Deaerators Crane, USA *
5 Water Treatment Plant Termo Mechanicca, Italy **
6 Effluent Treatment Plant AES, Saudi Arabia **
7 Condensate Polishing Unit Termo Mechanicca, Italy
8 Condenser Tube Cleaning System andDebris Filter GEA, Germany *
* The technology transfer is completed ** Case by case Co-operation
7/27/2019 BGR Presentation
6/37
Systems & Products (BGR Group)
S/N
Systems / EquipmentManufactured Technology Partner
9 Air Cooled Heat Exchanger GEA Btt, France *
10 Gas Compressor Skid
11 Gas Metering & Conditioning Skid
12 Fin Tubes for HRSG GEA Spirogills, UK *
13 Waste Heat Recovery Module
14 HP Heater
15 Super Heater Coil
16 Pressure Vessels
* The technology transfer is completed
7/27/2019 BGR Presentation
7/37
Manufacturing Facility
Three Manufacturing Units located near Chennai
ISO:9001:2000 Certified Units
ASME U, U2, R and S Code Stamp Qualified Units
Member of H T R I, USA
Houses state-of-the-art Finning Machines,Fabrication Yard and Assembly facilities
7/27/2019 BGR Presentation
8/37
Manufacturing Facility
Air Fin Cooler Division GEA BGR Energy System
Progen Systems and Technologies
7/27/2019 BGR Presentation
9/37
7/27/2019 BGR Presentation
10/37
View of our Finning Process
7/27/2019 BGR Presentation
11/37
Prototype Test Facility
7/27/2019 BGR Presentation
12/37
Wet Cooling
Manufactured in Joint Venturewith GEA Energietechnik GmbH,Germany
Types :
Natural Draught (NDCT) and
Induced Draught (IDCT)
Present supply upto 600 MW
7/27/2019 BGR Presentation
13/37
Dry Cooling
Manufactured in Joint Venturewith GEA Energietechnik GmbH,
Germany
Type :
Air Cooled Condenser (ACC)
Present supply up to 120 MW
7/27/2019 BGR Presentation
14/37
Deaerators
Supplied Largest Deaerator to Nuclear Power Corporation,Tarapur (2 x 500 MW) and 660 MW NTPC, SIPAT Super Critical TPP
Supplies till date upto 660 MW
7/27/2019 BGR Presentation
15/37
Effluent Recycling Plants
Technology from A E S
Implementing 4 Nos. of Common Effluent Recycling Plantsfor Textile Units
7/27/2019 BGR Presentation
16/37
7/27/2019 BGR Presentation
17/37
Gas Compressor
Complete CNG Gas Booster Compressor Package for TNEBin 95 MW Valuthur CombinedCycle Power Plant, Phase-II,CCPP
7/27/2019 BGR Presentation
18/37
Condenser Tube Cleaning System & Debris Filter
In-house manufacturing & testing
More than 1200 installations World wide
ISO:9001 certified Manufacturing Facility
Present supplies upto 1400 MW
7/27/2019 BGR Presentation
19/37
Excellent Manufacturing Centre for Pressure Vessels, HRSG , HeatExchangers, Superheater Coils, Evaporators and Surface Condensers
ISO:9001 and ASME U & S stamp certified manufacturing facility
Expertise in High Pressure and Alloy Steel Fabrication
Heat Recovery Steam Generators Main Air Tank for Hydro Power Plant
HRSG & Pressure Vessels
7/27/2019 BGR Presentation
20/37
7/27/2019 BGR Presentation
21/37
Air Cooled Heat Exchangers
Technical Know-how from GEA BTT, France
ISO:9001 and ASME U stamp certified manufacturing facility
Turnkey capability to design, engineer, test & supply upto 750 ACHE bundles per annum.
7/27/2019 BGR Presentation
22/37
Coal Handling Plant
In-house Design, Engineering, Testing and Commissioning facility for Complete Coal Handling Plant for Thermal Power Plants
Complete design and fabrication done in-house
Presently executing CHPs for 6 Nos. 500 MW and 3 Nos. 600 MW ThermalPower Plants
7/27/2019 BGR Presentation
23/37
Turnkey Contracts
7/27/2019 BGR Presentation
24/37
Scope of Turnkey Contracts
S/N Service Offered Max Unit rating for which Offered
1Engineering, Procurement and Construction (EPC) for Balance of Plant of Thermal Power Plants and CombinedCycle Plants (except Power Island)
800 MW
2Engineering, Procurement and Construction (EPC) of complete Thermal Power Plants and Combined CyclePlants including Power Island
660 MW
3 Engineering, Procurement and Construction (EPC) of 400KV Substations and Gas Insulated Switchgear Substations 400 KV
4Building integrated network for Electric Utilities for usingOPGW in live line conditions
5 Engineering, Procurement, Construction (EPC) of GasTransmission Systems from Well-head to User 220 mm scft / day
6 Sea Water Desalination Plant
7/27/2019 BGR Presentation
25/37
E P C / Turnkey B O P Experience
Projects Completed
S/N Project Customer / LocationValue
(Rs. InCrores)
Scope Commissionedin
1 95 MW CCPP T N E B, Valuthur (Phase-I),Tamil Nadu 72.48 B O P December 02
2 23 MW TPP Grasim Industries,Chittorgarh, Rajasthan 54.24 B O P February 03
3 120 MW CCPP Aban Power, Karuppur,Tamil Nadu 329.28 E P C July 05
4 330 MW CCPPRRVUNL, Dholpur,Rajasthan 255.84 B O P December 07
5 92.2 MW CCPP TNEB, Valuthur (Phase-II),Tamil Nadu 433.92 E P C May 08
6 25 MW IPP MALCO, Mettur, Tamil Nadu 91.44 E P C March 09
7 500 MW TPP APGENCO, Vijayawada,
Andhra Pradesh706.56 B O P April 09
7/27/2019 BGR Presentation
26/37
7/27/2019 BGR Presentation
27/37
7/27/2019 BGR Presentation
28/37
7/27/2019 BGR Presentation
29/37
330 MW CCPP RRVUNL, Dholpur, Rajasthan
7/27/2019 BGR Presentation
30/37
330 MW CCPP RRVUNL, Dholpur, Rajasthan
7/27/2019 BGR Presentation
31/37
25 MW IPP - MALCO, Mettur, Tamil Nadu
7/27/2019 BGR Presentation
32/37
500 MW TPP APGENCO, Vijayawada, Andhra Pradesh
7/27/2019 BGR Presentation
33/37
E P C / B O P Experience Projects Under Execution
S/N Project Customer / LocationValue(Rs. In
Crores)Scope
1 500 MW TPP APGENCO, Bhoopalapalli, Andhra Pradesh 848.16 B O P
2 500 MW TPP MAHAGENCO, Khapherkheda,Maharashtra 1218.24 B O P
3 500 MW TPP APGENCO, Kothagudem, Andhra Pradesh 950.4 B O P
4 820 MW CCPP Konaseema Gas Power
Company, Andhra Pradesh792 EPC
5 600 MW TPP TNEB, Mettur, Tamil Nadu 3720 E P C
6 2 x 600 MW TPP RRVUNL, Kalisindh, Rajasthan 6125 E P C
7 2 x 500 MW TPP MAHAGENCO, Chandrapur,Maharashtra 1622.4 B O P
7/27/2019 BGR Presentation
34/37
Highlights of Turnkey Projects under execution500 MW TPP MAHAGENCO, Khapherkheda
7/27/2019 BGR Presentation
35/37
500 MW TPP MAHAGENCO, Khapherkheda
7/27/2019 BGR Presentation
36/37
Highlights of Turnkey Projects under execution
500 MW TPP APGENCO, KTPP
7/27/2019 BGR Presentation
37/37
Key DifferentiatorsEstablished in Product and Turnkey contract segmentsAn Engineering Company dedicated to Power, Oil & Gas and EnvironmentExecuted over 131 contracts in 42 overseas countries as of November 8, 2007Undertakes turnkey projects
Diverse Design & Engineering capabilities
Ability to Design & Manufacture customised products and projectsIn-house Design & Engineering gives control over costs, design and scheduling
Diverse range of product and services
Products well accepted by clients for their qualityManufacturing capability is an added advantage in EPC projects
Cost Competitiveness
Control costs by optimising product features and designGlobal sourcing
Technology tie-ups
Successfully tied up with several international companies to obtain technology know-
h