Click here to load reader
Upload
layzinesskillsyahoo
View
214
Download
0
Embed Size (px)
Citation preview
7/30/2019 BFC Supplemental
http://slidepdf.com/reader/full/bfc-supplemental 1/3
ADDRESS: 11 44 Utica Avenue, Brooklyn, NY 1 1203 TEL: (718) 451-2000 URL: ederalpumps.com
All images and inormation contained in this booklet are the sole property o The Federal Pumps Corporation, and may not be reproduced without written permission.
S u p p l e m e n t a l # 0 2 1 0
T Y P E B F C
B o i l e r F e e d u n i t
Diagram
7/30/2019 BFC Supplemental
http://slidepdf.com/reader/full/bfc-supplemental 2/3
ADDRESS: 11 44 Utica Avenue, Brooklyn, NY 1 1203 TEL: (718) 451-2000 URL: ederalpumps.com
All images and inormation contained in this booklet are the sole property o The Federal Pumps Corporation, and may not be reproduced without written permission.
S u p p l e m e n t a l # 0 2 1 0
T Y P E B F C
B o i l e r F e e d u n i t
Specifications
Furnish and install as shown on-plans, a Federal Pump Corporation type BFC duplex boiler eed unit sized to provide eed
water to one boiler. Each pump shall be sized as shown in the pump schedule.
The unit shall be actory assembled by the pump manuacturer, including the eed water receiver, pump and motor units,
and accessories mounted on a steel base with pump suction piping complete.
Pumps shall be close-coupled, end suction, bronze-tted centriugal type, with centerline discharge or automatic venting.
Back pullout design shall permit removal o the motor and rotating assembly without disturbing piping.
Each pump shall have an enclosed balanced bronze impeller, mechanical shat seal and copper by-pass rom the pump
discharge into the seal chamber. Pumps shall be close-coupled to standard NEMA JM-rame motors in open, drip-proo
enclosures, rated as shown in the pump schedule.
Furnish a magnetic starter or each motor with overload protection on each phase and a hand-o-automatic selector
switch. Furnish a transer switch to permit manual selection o the lead pump. Starters and transer switch shall be actory
mounted on the unit and wired to the motors.
The pumps shall be controlled by a boiler water level controller mounted on the boiler, as herein specied. The eed water
receiver shall be o heavy steel construction with convex heads, gauge glass, thermometer, and connections or return, vent
and drain. A makeup water valve, fange mounted on the tank head, shall be all-bronze, foat operated type with strainer.
The receiver capacity shall be as shown in the pump schedule.
Pump Schedule:
No. o Boilers: 1 No. o Pumps: 2
Unit Model Number: BFC-
Pumps:_______GPM per pump_______ PSI discharge pressure
Motors:_______HP ________ RPM _______Phase, 60 cycles, ______ volts
Receiver: _______ gallon capacity
Project:
7/30/2019 BFC Supplemental
http://slidepdf.com/reader/full/bfc-supplemental 3/3
ADDRESS: 11 44 Utica Avenue, Brooklyn, NY 1 1203 TEL: (718) 451-2000 URL: ederalpumps.com
All images and inormation contained in this booklet are the sole property o The Federal Pumps Corporation, and may not be reproduced without written permission.
S u p p l e m e n t a l # 0 2 1 0
Furnish and install as shown on plans, a Federal Pump Corporation type BFC triplex boiler eed unit sized to provide eed
water to two boilers. Each pump shall be sized as shown in the pump schedule.
The unit shall be actory assembled by the pump manuacturer, including the eed water receiver, pump and motor
units, and accessories mounted on a steel base with pump suction piping complete. Pumps shall be close-coupled, end
suction, bronze-tted centriugal type, with centerline discharge or automatic venting. Back pullout design shall permit
removal o the motor and rotating assembly without disturbing piping.
Each pump shall have an enclosed balanced bronze impeller, mechanical shat seal and copper by-pass rom the pump
discharge into the seal chamber. Pumps shall be close-coupled to standard NEMA JM-rame motors in open, drip-proo
enclosures, rated as shown in the pump schedule. Furnish a magnetic starter or each motor with overload protection on
each phase and a hand-o-automatic selector switch.
Pump no. 1 shall eed boiler no. 1 and pump no. 2 shall eed boiler no. 2. A manual transer switch shall permit pump no. 3
to act as standby or either pump no. 1 or pump no. 2. Starters and transer switch shall be actory mounted on the unit
and wired to the motors. The pumps shall be controlled by a boiler level controller mounted on each boiler, as herein
specied.
The eed water receiver shall be o heavy steel construction with convex heads, gauge glass, thermometer, and connec-
tions or return, vent and drain. A makeup water valve, fange mounted on the tank head, shall be all-bronze, foat oper-
ated type with strainer. The receiver capacity shall be as shown in the pump schedule.
Pump Schedule:
No. o Boilers: 2 No. o Pumps: 3
Unit Model Number: BFC-
Pumps:_______GPM per pump_______ PSI discharge pressure
Motors:_______HP ________ RPM _______Phase, 60 cycles, ______ volts
Receiver: _______ gallon capacity
Project: _______________________________________________
T Y P E B F C
B o i l e r F e e d u n i t
Specifications