12
Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution Beyond CMOS CTSG IRC Meeting December 15, 2009 DRAFT

Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution Beyond CMOS CTSG IRC Meeting December 15, 2009 DRAFT

Embed Size (px)

Citation preview

Page 1: Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution Beyond CMOS CTSG IRC Meeting December 15, 2009 DRAFT

Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution

Beyond CMOS CTSG IRC Meeting

December 15, 2009

DRAFT

Page 2: Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution Beyond CMOS CTSG IRC Meeting December 15, 2009 DRAFT

Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution

Objectives Beyond CMOS CTSG IRC FxF Meeting

Dec.15, 2009

♦ Follow up discussion of shared treatment of Alternate Channel Materials – Transfer to PIDS

♦ Mention new Emerging Research Architectural planning underway for the 2011 ERD Chapter

♦ Discuss ERD/ERM Workshops planned for 2010.– Memory Technology Assessment– Emerging Research Architectures– Emerging Research Devices – Hi Perf Computing– Emerging Research Devices – More than Moore

Page 3: Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution Beyond CMOS CTSG IRC Meeting December 15, 2009 DRAFT

ITRS 2009 Exec. Summary Propoals Draft – Nov 2009Work in Progress – Do Not PublishSource: 2009 ITRS – ERD/ERM/PIDS/FEP Proposal for

Production Ramp-up Model &Technology Cycle Timing Proposal [Example: III-V MOSFET Channel Replacement Materials]

1K

10K

100K

Months-72

1M

10M

100M

Alpha

Tool

0 24-48

Development Production

Beta

Tool

Product

Tool

Vol

ume

(Waf

ers/

Mon

th)

2

20

200

2K

20K

200K

-24

Research

-96

Transfer to PIDS/FEP(96-72moLeadtime)

First Tech. Conf.

Device PapersUp to ~12yrs

Prior to Product

20192017201520132011 2021

III/V Hi- gateExample:

1st 2Cos.

Reach

Product

First Tech. Conf.

Circuits PapersUp to ~ 5yrs

Prior to Product

Rev 3Hutchby

Page 4: Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution Beyond CMOS CTSG IRC Meeting December 15, 2009 DRAFT

ITRS 2009 Exec. Summary Propoals Draft – Nov 2009Work in Progress – Do Not PublishSource: 2009 ITRS – ERD/ERM/PIDS/FEP Proposal for

Production Ramp-up Model &Technology Cycle Timing Proposal [Example: III-V MOSFET Channel Replacement Materials]

1K

10K

100K

Months-72

1M

10M

100M

Alpha

Tool

0 24-48

Development Production

Beta

ToolProduct

Tool

Vol

ume

(Waf

ers/

Mon

th)

2

20

200

2K

20K

200K

-24

Research

-96

Transfer to PIDS/FEP(96-72moLeadtime)

First Tech. Conf.

Device PapersUp to ~12yrs

Prior to Product

20192017201520132011 2021

III/V Hi- gateExample:

1st 2Cos.

Reach

Product

First Tech. Conf.

Circuits PapersUp to ~ 5yrs

Prior to Product

Rev 4Hutchby

Page 5: Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution Beyond CMOS CTSG IRC Meeting December 15, 2009 DRAFT

Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution

Major Challenges of III-V MOSFETs♦ High K Gate Dielectric

♦ Passivation of High-K / III-V Semiconductor Interface

♦ Integration of Ge and III-V Compound Semiconductor on Silicon

♦ P-Channel III-V MOSFET or N-Channel Ge MOSFET

Page 6: Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution Beyond CMOS CTSG IRC Meeting December 15, 2009 DRAFT

Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution

Issues Related to III-V MOSFETs♦ Impact of parasitics on I-V Characteristics

• Effect of source resistance

• Ballistic model for III-V FETs: role of Density-of-States

• Ballistic FET I-V characteristics: InGaAs & Si

• Quasi-Ballistic I-V characteristics: InGaAs & Si♦ Impact of parasitics on switching behavior

• Estimation of switching behavior

• Switching behavior of quasi-ballistic FETs: InGaAs & Si♦ Performance projection with scaling

• Dimensional scaling

• Supply voltage scaling♦ Drain leakage current

Page 7: Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution Beyond CMOS CTSG IRC Meeting December 15, 2009 DRAFT

Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution

ERM ChallengesGe & III-V

• Growth of low defect III-Vs on silicon• Co-integration of Ge & III-Vs

– Ge dopant activation at higher temperatures– III-V doping of Ge

• Growth of a high quality high κ dielectric on Ge & III-Vs– Passivation of the interface

Page 8: Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution Beyond CMOS CTSG IRC Meeting December 15, 2009 DRAFT

Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution

ERD & ERM Alternate Channel Assessments

• Ge p-FET• III-V n-FET• Ge p-FET & III-V n-FETs (Separate

Assessment?)• Nanowire FETs• Graphene FETs• Carbon Nanotube FETs

Page 9: Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution Beyond CMOS CTSG IRC Meeting December 15, 2009 DRAFT

Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution

III-V Ge Alternate Channel Partition Proposal

ERM

Materials, Interfaces & Process Issues & Challenges

Critical Assessment of Materials & Integration Capabilities

ERD

Integrated Device Performance Assessment & Challenges

(For different structures surface, buried channel, etc.)

Critical Assessment of Device Performance

PIDS

III-V & Ge Potential Solution

SiGe P-FET with Si N-FET

Collaborate with ERD on device Readiness

FEP

Potential Solution: SiGe P-FET with Si N-FET

III-V & Ge Potential Solution

Track III-V & Ge Issues

Page 10: Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution Beyond CMOS CTSG IRC Meeting December 15, 2009 DRAFT

Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution

ERD Recommendation

ERD recommends to PIDS and FEP that we transfer the III-V and Ge Alternate Channel Materials Technology Element to PIDS and FEP in 2011

Page 11: Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution Beyond CMOS CTSG IRC Meeting December 15, 2009 DRAFT

Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution

2009 Emerging Architectures Benchmarking

Memory

Morphic

Thermodynamic

Page 12: Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution Beyond CMOS CTSG IRC Meeting December 15, 2009 DRAFT

Beyond CMOS CTSG Dec. 15, 2009 Work in Progress: Not for Distribution

Proposed ERD/ERM Workshops

Workshop Topic Location Date

Memory Assessment Lake Marjorie, Italy April 6-7, 2010

Emerging Architectures San Francisco, CA ITRS Dates in July, 2010

Emerging Devices for Hi Performance Computing

Seville, Spain Sept. 17, 2010

Emerging Devices for More than Moore

Tokyo, Japan Winter ITRS – Dec. 2010