Wadi Cement Works 15th Oct. 2018
Best Practices Towards Environmental Excellence
1
ACC Limited, Wadi Cement Works
ACC Wadi Geographic Location
KARNATAKA
STATE
Plant Site
Clinkering : 5.83 MTPA, Cement - 6.03 MTPA Power - 125 MW
Wadi-1
Wadi-2
2
ACC Limited, Wadi Cement Works
Genesis of the plant...............Wadi Cement Works
1978 1983 1995 2001 2006 2010 2014
1968
1968: Wadi I set up with installed capacity of 0.4 MTPA
Kiln 1 & 2 1978: MFC Installation
1983: Ist 1.0 MTPA Indigenous
Plant in India & 25 MW
CPP installed
1995: CPP expanded to 50 MW
Wadi-2 Commissioning
2.0 MTPA
2006 With in house
modification at Wadi II total capacity of Wadi- 4.2 MTPA
WD 2Expansion
clinkering & CPP(50 MW)
Total capacity 6 million Tons &
125 MW CPP
CommissioningAFR platform
(16 TPH)
India’s Ist 1.0MTA Plant
2018-19
Expansionof AFR platform
(20% TSR)
ACC Limited, Wadi Cement Works
Plant layout_Wadi-2
L&T make impact bar crusher Crusher 1 – 1000 TPHCrusher2 – 1200 TPH
Raw Mill-1 (Atox 50)Capacity – 450 TPHRaw Mill-2 (Pfeiffer 5600 B)Capacity – 560 TPH
Raw Meal Silo1 Nos. CF SiloCapacity – 21000 T
Complex SLC & ILC Combination of
6 stage PH
ILC Height –182 mSLC Height - 120 m
Kiln : Size – 6 m Dia X 96 m Length,BDP – 12500 TPD, Make –FLS, Inclination – 4%, RPM – 5 max. ,Drive – Twin Drive
RM1 RM2
Coal Mill-1 (Atox KM25)
Capacity – 50 TPH
Coal Mill-2 (Loeshe LM43.4 D)
Capacity – 93 TPH
Cr1 Cr2
SLC
ILC
K4
KM1 KM2
CM (Ball Mill)– 2 Nos.Capacity – 220 TPHx 2Make - FLS
VRPM – 2 Nos.Q –230 TPHMake- AMCL
Clinker SiloQ. – 1.15 LT
Cement SiloCap.- 10000t Tx 3
Packer- 4 Nos.Cap. -180 TPHX 4Double discharge
5
ACC Limited 23.10.2018
Emergency Preparedness
Emergency Handling Services available at Main Gate round the clock with
facility of Fire Engine with Fire fighters & Ambulance
ACC Limited, Wadi Cement Works
Organization Chart for Energy & Environment Dept.
ACC Limited, Wadi Cement Works
ENVIRONMENT POLICY
7
ACC Limited, Wadi Cement Works
IMS & Alternate fuel (AFR) Policy....
ACC Limited, Wadi Cement Works
Green Procurement & Green mission Policy
1. Optimization of natural resources
2. Installation waste heat recovery system to produce green energy
3. Sustainable reduction in Plant Energy consumption
4. Reduction in plant water consumption
5. Cement manufacturing with Zero harm to Environment
6. Our slogan “Manufacturing of Green Cement”
ACC Limited, Wadi Cement Works
Projects implemented in Green mission Policy
1. Dispatch of Bulk Cement to bulk terminal at Mumbai via rail transportation (16% of total dispatch- 359730.8 MT)
2. Major portion of Cement Bag dispatch through rail to reduce GHG emission (53% rail & 47% road)
3. Major portion of Clinker dispatch through rail to reduce GHG emission (82% rail & 18% road)
4. Finalizing the order of electrical equipments based on efficiency & BEE star rating.
5. 100 % own fly ash transportation through pumping. Bulker movement has been eliminated.
6. Zero waste discharge from the boundary of the plant.
7. Major portion of fly ash transportation through rail transportation.
ACC Limited, Wadi Cement Works
IS/ISO 14001:2015 Certification
11
12
ACC Limited 23.10.2018
ACC – SD 2030 Plan
2020
2030
Water & Nature
We will
•Reduce net specific CO2 emissions by 40% per tonne of cement (vs. 1990)
We will
•Reduce specific freshwater
withdrawal in cement operations by 30%
•Show a positive change for biodiversity•Implement WASH pledge at all
our sites
We will
•Have zero fatalities
•Reduce LTI FR <0.20•Reduce TIFR by 50%
•Benefit 3.25 million people from our social programs•Assess 100% high risk active
suppliers+ Top sub-suppliers with high risk identified & assessed
Note:. Baseline year is 2015 unless stated otherwise
WASH Pledge: Water, Sanitation and Hygiene Implementation at the Workplace, LTIFR: Lost Time Injury Frequency Rate, TIFR: Tot al Injury Frequency Rate
We will
•Reduce specific freshwater
withdrawal in cement operations by 19%
•Complete BIRS baseline assessments at all quarries•Have BMP for all quarries
We will
•Have zero onsite fatalities
•Reduce LTI FR < 0.50•Reduce TIFR by 30%
•Benefit >1 Mio people from our social programs•Assess 80% high risk active
suppliers
Climate CircularEconomy
People & Communities
We will
•Use 9.6 million tonnes of waste-
derived resources per year
We will
•Reduce net specific
CO2 emissions by 34% per tonne of cement (vs. 1990)
We will
• Use 10.7 million tonnes of waste-
derived resources per year
13
23.10.2018
13
ACC Limited
Spot Measurement Details
Measurement of Kiln stack gases is carried out every year by third party in direct & compound mode which includes measurement of (O2,CO,CO2,NOX,VOC,PM,Sox,HCl,HF,NH3,Benzene,Formaldehyde,Dioxin & Furan, Mercury & heavy Metals)
14
ACC Limited 23.10.2018
Environment permits
Sr. No. Authorization Name Validity
1 Consent to Operate for WD#1 30th June 2021
2 Consent to Operate for WD#2 30th June 2021
3 Consent to Operate for CPP 30th June 2021
4 Consent to Operate for Mines 30th June 2021
5 Bio-Medical Waste Authorization Life time
6 Hazardous Waste Authorization 30th June 2021
7 Permission to use Pet coke as a fuel in cement Kiln
8 Kagina Water Withdrawal Permission 1st Feb 2019
ACC Limited, Wadi Cement Works
GHG Inventorisation
15
Scope -1 : Emissions from Kiln fuel, CPP fuel, Own vehicle fuel consumption, Calcination, fuel for drying if any
Scope -2 : Emissions from Grid electricity consumptionSpecific GHG (KG CO2/T cem) increased in the year 2015 due to higher clinker production
✓Various Energy Efficiency
measures taken for reduction of SEEC & STEC, resulting reduced
GHG Emission
✓ Increased in TSR from 6.43% in 2016 to 9.69% in 2017
✓ CPP SHR has been reduced from 3448 Kcal/kWh in Y 2014-15 to
3363 Kcal/kWh in Year 2017-18
✓ CPP, APC has been reduced from 13.3 % to 12.8% due to various
energy efficiency measures taken like VVFDs in BFW, ACWP, CEP, SA
fan in STGs .
✓ Way forward - Potential to be tapped for additional reduction in
GHG Emission by WHRS – 13.2 MW & Improve TSR up to 20%
0
200
400
600
800
1000
1200
1400
1600
1800
2015 2016 2017 2018
1651
1394 13961354
992939 916 904
Sp. Net CO2 (Kg CO2/T Cem) Sp. Net CO2 (Kg CO2/T Clic.)
ACC Limited, Wadi Cement Works 16
Environment Protection InitiativesE
nv
iro
nm
en
tal
Pro
ject
s /
Be
st P
ract
ice
s ▪ Continuous Emission monitoring system for ILC & SLC string has beeninstalled for online monitoring of flue gases and reporting to SPCB/CPCB.▪ Online ambient Air Quality monitoring Station has been installed formonitoring the quality of ambient air.▪ ROC-F9 & L-8 Drill Machine with dust collector is used at mines for reducing the fugitive emission during drilling.▪ Nonel technology is being used for ground vibration monitoring analysis and redesigning of Blasting pattern.▪ Eco- friendly Electric Shovel is being used for dumper loading inside the mines. ▪CPP ZLD project has been commissioned to reduce water consumption▪ESP transformers has been replaced from single phase to 3 phase to improve ESP performance▪ TSR (Thermal substitution rate) has been increased up to 12% by commissioning Pre & Co-processing platform (PCPF). ▪New water tanker with spray nozzles has been procured at mines to reduce fugitive emission- Rs. 1.7 Cr.
ACC Limited, Wadi Cement Works 17
Environment Protection InitiativesE
nv
iro
nm
en
tal
Pro
ject
s /
Be
st P
ract
ice
s ▪ Primary measures has been implemented to reduce Nox Emission fromkiln stack e.g. Fuel mix optimization, Replacement of existing burner withlow NOx burner etc.▪De-Nox system is installed to further reduce the Nox emission from Kilnstacks▪Hydraulic Rock breaker is used to avoid the secondary blasting.▪Plant is having close circuit equipment cooling systems to minimize thewater consumption.▪Heavy metals & Gases monitoring has been carried out by third partyonce in a year.▪Monthly monitoring of Ambient air quality, stacks and water analysis bythird party.▪Reporting of CO2 emission on monthly basis to LH.▪There are 2 Reverse air bag house,2 cooler ESPs, 2 coal mill bag house,4Cement Mill bag house and 90 other process & auxiliary bag filtersinstalled to eliminate fugitive emission from all the transfer points.
ACC Limited, Wadi Cement Works
Initiative - Water Management
Action Areas
Water Conservation
Key Initiatives
▪Conservation of Rain water (Water storage in mining area equivalent to 185 days consumption)
▪ 48 lakh cu.m water in mines sump
▪Construction of Barrage at Kagina River▪Reverse Osmosis Plant
▪Reduction in water consumption ▪Zero water discharge from plant
▪Adopting new technology of air cooled condensers
& Zero Liquid Discharge etc
WaterManagement
ACC Limited, Wadi Cement Works
Water conservation at Kagina River
ACC Limited, Wadi Cement Works
Water Meters
River intake Mines Sump old line Mines Sump New line
Coal Mill -2 Raw Mill -2 Clinker cooler
ACC Limited, Wadi Cement Works
PCPF Facility for co-processing of waste
Pre-Processing
Co-Processing
▪ ACC Wadi invested Rs. 65 Cr to build this state-of-art modern facility as solution for waste disposal.
▪ Different type of waste are co-processed in this facility to save Environment and Help to promote “Clean
India Project”
▪ Different kind of bio-waste/industrial waste are being used as fuel to save natural resources (Coal).
▪ By using alternate source of energy, environmental benefits of lower CO2 emission.
ACC Limited, Wadi Cement Works
Effort toward sustainability(AFR Utilization)
22
27.5
28
28.5
29
29.5
30
30.5
31
31.5
32
32.5
33
2016
2017
H1-2018
29.38
32.18 32.53
Fly ash % PPC
0
2
4
6
8
10
12
2016 2017 H1-2018
6.43
9.69
11.39
Thermal substitution Rate %
ACC Limited, Wadi Cement Works
Effort toward sustainability….(Raw material optimization: long term planning software – QSO)
Taken Block Forced Block Wasted Block Passive Block
Planning 2018-2022
ACC Limited, Wadi Cement Works
Effort toward sustainability….(Raw material optimization:short term planning software – QM)
Description0 High Grade
Limestone
Shale
Qty (LT) 58.00 11.18
SiO2 11.34 23.64
Al2O3 2.14 5.24
Fe2O3 0.77 2.11
CaO 46.96 36.88
MgO 0.61 0.99
LS 135.00 50.00
Quarry Planning - 2018
Planning Blocks in Yellow with Black
dots. Quarry faces as on date are in white Lines
2018
25
23.10.2018
25
ACC Limited
Power Plant –
Stack 3, CEMS
Room
Power Plant –
Stack 3, Probe
set
Installation of CEMS in all three stacks of CPP and Kilns
26
23.10.2018
26
ACC Limited
Installation of opacity meter across the plant…
ACC Limited, Wadi Cement Works
New Online AAQ Monitoring system
De-NOx system to reduce NOx Emission-
Project Cost 48.8 Mio. INR
Air Compressor Control JB Piping Layout
Control Switch Indicators Ammonia Tank & structure Power supply feeder
29
ACC Limited 23.10.2018
STACK EMISSION REPORT
2
9
13.87
11.79
18.46 19.13
12.48
28.38 27.98
18.74 18.9920.65
19.6220.46 20.07
18.89 19.48
0.00
5.00
10.00
15.00
20.00
25.00
30.00
CPCB Emission Norms: <30 mg/NNm3
30
ACC Limited 23.10.2018
AAQ monitoring results
Near STPKagina Guest house
River pump ingalgi Wadi TownRawoor village
PM 2.5PM 10 SO2 NO2
Parameter Limit
PM10 100 µg/m3
PM 2.5 60 µg/m3
SO2 80 µg/m3
NO2 80 µg/m3
ACC Limited, Wadi Cement Works
Green curtainsaroundthe PCPF truck park & Coal Wagon movementarea
to control vehicular emissions.
ACC Limited, Wadi Cement Works
Construction of CC roads in and around the Plant.
ACC Limited, Wadi Cement Works
New Road Development (CHP and Raw Material area)
ACC Limited, Wadi Cement Works
Wadi-2 Truck parking yard concerting job: In Progress
ACC Limited, Wadi Cement Works
State of art latest technology water spraying system
ACC Limited, Wadi Cement Works
“Lechler Water Mist Beam” machine
ACC Limited, Wadi Cement Works
Installation of water spaying system on belt conveyors
ACC Limited, Wadi Cement Works
Telescopic chute facility for bulk cement loading
ACC Limited, Wadi Cement Works
Transfer point dust collectors
ACC Limited, Wadi Cement Works
Belt curtain in lime stone crusher hopper
ACC Limited, Wadi Cement Works
Water spray system and belt curtain arrangement to control dust emission
ACC Limited, Wadi Cement Works
Mechanized housekeeping
ACC Limited, Wadi Cement Works
Raw material covered shed
ACC Limited, Wadi Cement Works
Coal covered shed
ACC Limited, Wadi Cement Works
Covered belt conveyors
ACC Limited, Wadi Cement Works
Green belt development along the road
ACC Limited, Wadi Cement Works
Green belt development along the road
ACC Limited, Wadi Cement Works
Green belt development at main gate
ACC Limited, Wadi Cement Works
Tree Plantation/ Green Belt development
ACC Limited, Wadi Cement Works
Dense Afforestation Curtails Dust & Noise Pollution
ACC Limited, Wadi Cement Works
Afforestation Developed on Backfill area
ACC Limited, Wadi Cement Works
Green belt development in plant across the road…
ACC Limited, Wadi Cement Works
Environment Day Celebration...
ACC Limited, Wadi Cement Works
Go Green Initiatives
Promoting Envirofit smokeless chulla
Distribution of Plantation and Kitchen Garden Seeds
ACC Limited, Wadi Cement Works
Tree Plantation at nearby community
Mega Community Plantation in local villages
ACC Limited, Wadi Cement Works
ACC Limited, Wadi Cement Works
Mr. Piyuesh Goyal, Hon’ble Minister of State (Independent Charge) forMines, Power, Coal & New Renewable Energy GOI awarded the trophy toDr. S B Singh, Cluster Head South, ACC Limited
FIMI – Health & Safety Award
57
Wadi Cement works bagged the FIMI – Health & Safety Award Y15-16
ACC Limited, Wadi Cement Works 58
19th National Award for Excellence in Energy Management by CII
National Award as “Excellent Energy Efficient Unit” by CII in year 2018
ACC Limited, Wadi Cement Works
National Award for Excellence in Energy Management by CII
National Award as “Energy Efficient Unit” by CII in year 2017, 2016 & 2015
ACC Limited, Wadi Cement Works
Awards & Accolades
Green Manufacturing Excellence Gold Award - 2012
National Award for Excellence in Energy Management- 2011
India Manufacturing Excellence Gold Award - 2012
Green Manufacturing Excellence Award- 2014
ACC Limited, Wadi Cement Works
▪ National Award for outstanding performance in promoting rural and agriculturaldevelopment – by ASSOCHAM
▪ Indira Priyadarshini Vrikshamitra Award - by The Ministry of Environment andForests for "extraordinary work" carried out in the area of afforestation
▪ FICCI Award - for innovative measures for control of pollution, waste management& conservation of mineral resources in mines and plant
▪ Subh Karan Sarawagi Environment Award - by The Federation of Indian MineralIndustries for environment protection measures
▪ Drona Trophy - By Indian Bureau Of Mines for extra ordinary efforts in protectionof Environment and mineral conservation in the large mechanized mines sector
▪ Indo German Greentech Environment Excellence Award
▪ Golden Peacock Environment Management Special Award - for outstandingefforts in Environment Management in the large manufacturing sector
▪ Indira Gandhi Memorial National Award - for excellent performance inprevention of pollution and ecological development
Awards And Accolades
ACC Limited, Wadi Cement Works
Thank You