Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
© Navis, LLC. All other trademarks are the property of their respective owners.
Best Practices for Implementing a Successful Automated TerminalApril 2018
© Navis, LLC. All other trademarks are the property of their respective owners.
Audience participation
• No login
• No app download
© Navis, LLC. All other trademarks are the property of their respective owners.
The importance of automation
*Tech Validate Survey of 78 users of Navis
© Navis, LLC. All other trademarks are the property of their respective owners.
Terminal automation benefits
*Tech Validate Survey of 78 users of Navis
© Navis, LLC. All other trademarks are the property of their respective owners.
Terminal automation and operational costs
*Tech Validate Survey of 78 users of Navis
© Navis, LLC. All other trademarks are the property of their respective owners.
Automated terminal first steps
• Brownfield vs. Greenfield
• Port/Government regulation
• Layout constrains
• Labor constrains
• Terminal design and validation
• Equipment/System selection
• Implementation plan
© Navis, LLC. All other trademarks are the property of their respective owners.
Automation categories
HORIZONTAL
TRANSPORT
YARD
CRANE
• Container Handling Equipment (CHE) automation
• Automated yard crane = semi-automated
• Automated horizontal transport = fully automated
RAIL
CRANE
QUAY
CRANE
© Navis, LLC. All other trademarks are the property of their respective owners.
Yard crane automation
• End-Load ASC/ARMG
• Side-Load ASC/(C-)ARMG
• AutoRTG
• AutoStrad
© Navis, LLC. All other trademarks are the property of their respective owners.
Horizontal transport automation
• AutoShuttle (1/1)
• LoLo AGV
• Lift AGV
• Cassette AGV?
• Auto tractor trailer?
© Navis, LLC. All other trademarks are the property of their respective owners.
Quay crane automation
• Sing trolley
• Dual trolley
• Automated vs. manual
• Multi-Lift
© Navis, LLC. All other trademarks are the property of their respective owners.
Finalize design, equipment and validate
• Semi-Auto Ex• ASC
• Shuttle
• Single Trolley QC
© Navis, LLC. All other trademarks are the property of their respective owners.
System integration design
12
Terminal Operating
System (TOS)
Control System
Onboard Systems
• Plan all moves• Schedule all moves• Assign CHEs to container moves• Handle all manned equipment• Visualize process status• Order CHE movement
• Routing of ASCs and AHTs• QC Trolley Control QC• Control Equipment Traffic• Monitor all Equipment• Fast Stop and Safety• Report real-time CHE status to TOS
TOS should provide a flexible and fully integrated interfacing with TOS Core Modules
ABB, TMEIC, AEMS (TEAMS),
TLS, ZMPC
QC ASC AHT
© Navis, LLC. All other trademarks are the property of their respective owners.
Working as one survey results
supply chain executives and professionals
200 TOP CHALLENGES
Lack of industrystandards
Unwillingness toshare data
VALUE OF COLLABORATION
50%-100%
performance improvements
Vital to the industry 83%
© Navis, LLC. All other trademarks are the property of their respective owners.
N4 Platform integration solution
N4 uses proven interfaces for comprehensive integration
N4 TOS Framework
AYC
& A
HT
RTLS A
PI
CA
S AP
I
Gate &
A
pp
oin
tmen
t A
PI
Vesse
l Co
llabo
ration
&
EDI En
gine
XVELA & Shipping
Community
GOS / VBS
AYC AHT CS
QC CS
Vessel Berth Update
Pre-plan update
Stowage update
Vessel Visit Update
Discharge notification
Pre-advise
Holds/Permissions
OCR
Transport Orders
Orders Progress
Crane Status
Area Status
Vessel phase update
Ship Geometry
Container List
QC OCR
Truck Visit
Truck Progress
Truck Appointment
Gate OCR
ECN4WEB
PDS
Manned Equipment
Jobs
Location
Auto Equipment
© Navis, LLC. All other trademarks are the property of their respective owners.
Key terminal decision and vendor scope
TOS
Gate Management
Yard Planning &
Container Inventory
Equipment SchedulingVessel Planning
Berth Planning
© Navis, LLC. All other trademarks are the property of their respective owners.
Navis implementation approach
• Holistic Integration Management to ensure a seamless integrated system:
• Integrated N4-ECS solution to support required business process
• Pre-delivery N4-ECS release verification process
• Integrated Lab Test (emulation) Approach
• Integrated Live Equipment Test Approach
• Integrated operational analysis solution
Analysis Configure Lab Test LET Optimize
Integrated Solution
Pre-delivery Verification
Terminal Virtualization
Test
Live equipment
Test
Operational Analysis
Go Live
© Navis, LLC. All other trademarks are the property of their respective owners.
Automated terminal virtualization
• Real systems and interfaces
• Simulated equipment
• Necessary but not sufficient
© Navis, LLC. All other trademarks are the property of their respective owners.
Impact
less measurable
Impact
more measuable
Terminal Suppliers
Maximizing GMPH needs many components to work very well together….
GMPH
COST
weather
IT
Equipment
Operations
People
AGV
ASC
QC
Battery down
Breakdown
OCR frozen
Transponder
lost
Crane Cycle
Time
Knowledge
Motivation
Mindset
SkillsAnalysis, Remote
OPS
Systems,
Procedures
Maximize
performance
Continuous
Improvement
Networks
Software
Hardware
Internet
WIFI
TOS
ECS
GOS
Servers
DB
Other
OCR
SW Crash / Bugs
Decision making
SW Integration
Other (bad data)
Carrier
Cooperation
Terminal
Planning
OPS Processes
OPS Procedures
Vessel Stowage
Yard Planning
Twin / Tandem Lifts
Dual Cycling
Flex / Cat loading
Vessel Planning
Exception Handling
Breaks / Shift
handover
Pro-activeness to
catch things asap
© Navis, LLC. All other trademarks are the property of their respective owners.
… and can only be achieved by a structured CI process !
Equipment
Operations
People
IT
2. Develop
Improvements
Features / fixes
in new
releases
Equipment
improvements
New
Processes &
Procedures
Training Plan
3. Roll-Out Change
Upgrade &
Support
Upgrade &
Support
Implement
OPS changes
Train / Mentor
1. Analyse Data / Operations
Log files
Control Room
files / OPS
report
Tools:
• PIT
• KPI
• Splunk
• Emulation
• BI
• Vessel
Analysis
• Terminal
heat map
• Etc.
Operations
Shadowing
© Navis, LLC. All other trademarks are the property of their respective owners.
Lessons Learned
Change Management
IT Infrastructure Readiness
Data Migration
Appropriate Testing
Operational Readiness
Operational Recovery
System Integration
Lessons learned and best practices
20
Top 10 Best
Practices
1. Build a dedicated Team 2. Use a
Phased Approach
3. Minimize Customization
4. Ensure IT Infrastructure
Readiness
5. Develop a testing plan
6. Plan data migration early
and repeat
7. Develop a Systems
Monitoring Plan
8. Develop Operational
Recovery Plan
9. Have a Communications
Plan
10. Have a System
Trainings Plan
© Navis, LLC. All other trademarks are the property of their respective owners.
Develop and support your talent
Toyota Way Principle #8
© Navis, LLC. All other trademarks are the property of their respective owners.
Continuous improvement at fully automated terminals
© Navis, LLC. All other trademarks are the property of their respective owners.
Navis fully and semi automated terminals
20 Terminals Using Navis Software
Fully Automated using Navis Software
Semi-Automated using Navis Software
APMT Lazaro
VIG
GCT
LBCT
DPW Antwerp
LGW
Peel Ports
ECT
HHLA
APMT MVIIRWG
ADT
QQCTN BUSAN
VICT Patrick SPatrick B
DPW Brisbane
Thank you!
NCCcollaboration.navis.com
XVELAwww.xvela.com
linkedin.com
/company/navis
WEBSITEwww.navis.com
facebook.com
/naviscargo
TWITTER@naviscargo
INSTAGRAM@navispeople