19
© ABB | Slide 1 BESS Business Introduction In China, for Asia Dedi LiEnergy Storage System & Substation, PSSS, Nov., 2016 November, 2016

BESS Business Introduction - ABB

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BESS Business Introduction - ABB

© ABB

| Slide 1

BESS Business IntroductionIn China, for Asia

Dedi Li,Energy Storage System & Substation, PSSS, Nov., 2016

November, 2016

Page 2: BESS Business Introduction - ABB

© ABB

| Slide 3

Grid connected energy storage applications

ESS

Integration of Renewables

新能源接入1-100 MW,1-10h

Peak shaving

削峰填谷0.5-10 MW, 1h

220 kV

110 kV

20 kV ring

20 kV

Conventional

central

Generation

传统发电厂

Variable

renewable

Generation

不稳定新能源发电

220 KV

Load leveling 平抑负荷for generation utilization 发电厂应用10-1000 MW, 1-8h

ESS

110 kV Industry/

Large commercial

工业、大型商业

Load center

负荷中心

20 kV

ESS

Spinning reserve 备用In case of line loss 防止断电10-500 MW, 0.25-1 h

Load leveling平抑负荷for postponement of grid upgrade 延缓电网升级1-10 MW, 1-6h

ESS

ESS

Frequency regulation

调频1-50 MW, 0.25-1h

220 kV

110 kV

ESSSolar PV time shift

光伏发电转移1-100 kW, 2-6h

ESS

0.4 kV

Residential/Small commercial

民用或小型商业

ESS

Microgrid

微电网

Stabilization

稳定系统0.1-5 MW,

5 min

November, 2016

Page 3: BESS Business Introduction - ABB

© ABB

| Slide 4

PCS for Energy Storage Design ComponentsLeveraging ABB’s product strengths & expertise

Transformer

Protective Relay

PLC Based Control

AC/DC Circuit Breaker

Inverter Module

November, 2016

Page 4: BESS Business Introduction - ABB

© ABB

| Slide 5

Energy Storage Integration

November, 2016

Page 5: BESS Business Introduction - ABB

© ABB

| Slide 6

ABB’s EssProTM Power Conversion SystemSystem Sizes from 10 kW to 50 MW

Indoor Units Outdoor Enclosures Outdoor system solutions

November, 2016

Page 6: BESS Business Introduction - ABB

© ABB

| Slide 7

ESS Container Design View - ISO 20’ ContainerSolution with Inverters, cooling, controls, breakers, transformer

PCS100 Inverter Lineups

AC & DC Circuit Breakers

Control Cabinet

Disconnect and Ground Switch

Fans and

Ventilation

Step up Transformer

November, 2016

Page 7: BESS Business Introduction - ABB

© ABB

| Slide 8

ESS Container Design View – ISO 40’ ContainerSolution with Inverters, cooling, controls, breakers, transformer

November, 2016

Page 8: BESS Business Introduction - ABB

© ABB

| Slide 9

ABB Energy Storage Experience100kW ESS Pro Taiwan Project

Customer Requirement

Provide support for micro-grid during

interruption of electric supply

Power flow control

Island mode and black start function

ABB Solution

150kW standard cabinet

Control unit intergration locally

Remote control function

User Benifit

ESS provide power supply during

interruption of grid

Black start function

Power flow control of mircro-grid

Location

Taiwan, China

Status

Installed in 2011

November, 2016

60 kWhSS

L

~

MT B

70 kW 60 kW

10 kWMirco-grid

(RS485)

60 kW

10 kW

Page 9: BESS Business Introduction - ABB

© ABB

| Slide 10

ABB Energy Storage Experience10*250kW ESS Pro SGCC Project

November, 2016

Customer

SGCC

Customer Requirement

Smooth renewables output power (wind and solar)

Peak shaving

Frequency regulation

Flow battery

ABB Supply Scope

ESS, transformer, circuit breaker and controller (PLC)

Status

Installed in 2012

Page 10: BESS Business Introduction - ABB

© ABB

| Slide 11

ABB Energy Storage Experience2*200kW ESS Pro Indonesia Project

Application

Grid connection

Integration of renewable energy

Location

Indonesia

Status

Installed in 2011

November, 2016

Page 11: BESS Business Introduction - ABB

© ABB

| Slide 12

ABB Energy Storage Experience100kW ESS Pro Flow Battery Project – Korea & Slovakia

Application

Grid connection

Integration of renewable energy

Location

Slovakia & Korea

Status

Installed in 2012

November, 2016

Page 12: BESS Business Introduction - ABB

© ABB

| Slide 13

ABB Energy Storage Experience2MW ESS Pro Raypower Project

Application

Frequency Regulation

A123 battery

Location

Beijing, China

Status

Installed in 2013

Running

November, 2016

Page 13: BESS Business Introduction - ABB

© ABB

| Slide 14

ABB Energy Storage Experience250kW ESS Pro Jereh Project

Application

Micro. Grid

Frequency Regulation

Power Quality

Location

Yantai, China

Status

Installed in 2014

Ran on site in Xianjiang,

China

November, 2016

Page 14: BESS Business Introduction - ABB

© ABB

| Slide 15

ABB Energy Storage Experience3x2.5MW ESS Pro Raypower Project

Application

Frequency Regulation

Li-iron battery

Location

Shanxi, China

Status

Installed in 2015

Running

November, 2016

Page 15: BESS Business Introduction - ABB

© ABB

| Slide 16

ABB Energy Storage Experience500kW ESI Jewei Project

Application

Peak Shaving

Battery Secondary Usage

Li-ion battery

Location

Tianjin, China

Status

Installed in 2015

Running

November, 2016

Page 16: BESS Business Introduction - ABB

© ABB

| Slide 17

ABB Energy Storage Experience500kW ESS Pro NEC Project

Application

Power ramp control of solar

generation

Li-ion battery

Outdoor solution

Location

Kumamoto, Japan

Status

Installed in 2015

SAT is planning

November, 2016

Page 17: BESS Business Introduction - ABB

© ABB

| Slide 18

ABB China Project Under Execution31MW ESS Pro of Hokkaido Chitose International Airport Solar Power Station

Customer

Hokkaido Electric Power Company

Customer Requirement

Smooth solar output power

Integration of 66kV solar and ESS system

Remote monitor and maintenance

Li-ion Battery

ABB Supply Scope

ESS Transformer, Circuit breaker and Control Unit (PLC)

High voltage integration

Remote monitor and maintenance

Outdoor installation cabinet

Status

Plan to complete installation at the end of year 2016

4MW Full Power Test System

November, 2016

Page 18: BESS Business Introduction - ABB

© ABB

| Slide 19

ABB Energy Storage ExperiencePower Converters Global Outlook - Total > 100MW > 60units

November, 2016

Page 19: BESS Business Introduction - ABB