Berkeley Update
Oswald Siegmund & Jason McPhateLAPP Weekly Telecon
11 January 2011
J. McPhate – LAPP Weekly Telecon 2
8” x 8” MCP Electroding
11 January 2011
•1 of 2 remaining large MCPs electroded (Inconel 600) on both sides•This is the one with the now longer crackOther plate will be coated this week
J. McPhate – LAPP Weekly Telecon 3
8” x 8” MCP Electroding (cont)
11 January 2011
•Multiple instances of large inter-multi gaps
•Like those noted by Anil for 33mm MCP #131 with outlier resistance value
J. McPhate – LAPP Weekly Telecon 4
200 mm Test Detector
11 January 2011
•Fabrication of large 8.66” cross-delay line anode complete
•Fabrication matches designs
•Bench-top electrical (pulsing) is under way to verify electrical properties
•Should allow <200 µm spatial resolution using existing electronics
•Other piece parts continue to arrive from the shop
J. McPhate – LAPP Weekly Telecon 5
Cathodes
• Antimony beads arrived from Bob - thanks- and we have loaded one of these, and one of ours into the next cathode shoot
• New ones are about 20% the size of ours, so it will only last for one of our cathode shots
• Next cathode shot has two sample holders, each with – 1X B33-bare– 2X B33 with ITO– 1X B33 with ITO and MgO
11 January 2011