Benefits of Predictive Maintenance Latest Malaysia

Embed Size (px)

Citation preview

  • 7/30/2019 Benefits of Predictive Maintenance Latest Malaysia

    1/3

    Hoestar Reliability Instruments Sdn Bhd (693347-T)

    CT-04-07, Subang Square Business Centre

    Jalan SS 15/4G, Subang Jaya

    47500 Petaling Jaya, Selangor Darul Ehsan, Malaysia

    Email: [email protected]

    Website: http://www.hoestarinsp.com.sg

    Tel: 603-56326832 Fax: 603-56376832RELIABILITY

    14 February 2007

    Benefits of Predictive MaintenanceUsing Partial Discharge Test for a Typical Plant

    1.Provide a Safe Working Environment To Plant Personnel.2.Prevent Breakdown Of Equipment Which May Cause:

    a.Man Power Loss : Companys Resources Wasted.b.Reputation Lost :Customers Confidence Level Reduced.c. Equipment Loss : RM 80K (Est.)

    i. High Repair Cost If Major Damage Occurs.ii. Longer Breakdown Time If Damaged Devices Are Not

    Available.

    d.Production Loss:

    RM 100K/DAY (Est.)

    i. Product Couldnt Deliver On Time.ii. Product Damaged In The Middle Of Processing.iii. Re-Planning Of Production Schedule.iv. Resetting of Production equipment

    3.Reduce Shutdown Time When Number of Equipment To BeServiced Are Reduced.

    4.Reduce Maintenance Cost for Servicing Of Equipment That AreStill In Good Condition.

    5.Extend the Service Life of The Equipment.

  • 7/30/2019 Benefits of Predictive Maintenance Latest Malaysia

    2/3

    Hoestar Reliability Instruments Sdn Bhd (693347-T)

    CT-04-07, Subang Square Business Centre

    Jalan SS 15/4G, Subang Jaya

    47500 Petaling Jaya, Selangor Darul Ehsan, Malaysia

    Email: [email protected]

    Website: http://www.hoestarinsp.com.sg

    Tel: 603-56326832 Fax: 603-56376832RELIABILITY

    Cost Saving

    The servicing cost per Transformer is RM400 and RM550 per switchgear

    and the servicing frequency is usually yearly and the conventional

    method of servicing is as follows:-

    Visual Inspection

    Oil Leaks Checking

    Open Connection

    Polishing

    Greasing

    Scope of Servicing for aTransformer (22 kV / 415V)

    Retightening

    Visual Inspection

    Vacuum Checker On Vacuum

    Circuit BreakerContact Resistant Measurement

    Open Connection

    Polishing

    Greasing

    Scope of Servicing for a

    Switchgear (22 kV)

    Retightening

  • 7/30/2019 Benefits of Predictive Maintenance Latest Malaysia

    3/3

    Hoestar Reliability Instruments Sdn Bhd (693347-T)

    CT-04-07, Subang Square Business Centre

    Jalan SS 15/4G, Subang Jaya

    47500 Petaling Jaya, Selangor Darul Ehsan, Malaysia

    Email: [email protected]

    Website: http://www.hoestarinsp.com.sg

    Tel: 603-56326832 Fax: 603-56376832RELIABILITY

    Lets take a look at the below example on

    Cost Saving Benefit for a Typical Plant

    Servicing Cost Partial Discharge

    Test Cost (RM)Type of Equipment

    Qty U/Price

    (RM)

    Total

    (RM)

    U/Price

    (RM)

    Total

    (RM)

    Transformers (22kV / 415 V) 7 400 2800 350 2450

    Switchgears (22 kV) 8 550 4400 350 2800

    Total Servicing Cost 7200

    Total Partial Discharge Test Cost 5250

    Note: From our experience, based on the total number of equipment tested,

    conservatively only 20% of the equipment is in need of servicing. Thus

    the saving is as follows:-

    Total Servicing Cost : RM 7200 20% of Equipment needs servicing : (RM 1350)

    after a Partial Discharge Test -------------

    Total Saving from Servicing : RM 5850 (81%)========

    Lets take a look at the Net Saving ** based on above illustrations

    Total Servicing Cost without Partial Discharge Test : RM 7200 20% of Equipment that Need Servicing after test - RM 1350 Partial Discharge Test Cost - RM 5250 : (RM 6600)

    Savings : RM 600

    Note: * Above calculation excludes the shut-down cost and production loss.

    Total servicingcost with Partial

    Discharge Test