23
BUILDING STRONG ® MOBILE DISTRICT US Army Corps of Engineers BUILDING STRONG ® Beneficial Uses of Dredged Material US Army Corps of Engineers BUILDING STRONG ® Harbors & Navigation Committee Meeting Feb 12-13 2014 Alabama State Port Authority

Beneficial Uses of Dredged Material MOBILE DISTRICTaapa.files.cms-plus.com/2014H&NmtgFebBUDMlovelace.pdf · Beneficial Uses of Dredged Material ... Legal Constraints? BUILDING STRONG

Embed Size (px)

Citation preview

BUILDING STRONG®

MOBILE DISTRICT

US Army Corps of Engineers

BUILDING STRONG®

Beneficial Uses of Dredged Material

US Army Corps of Engineers

BUILDING STRONG®

Harbors & Navigation

Committee Meeting

Feb 12-13 2014

Alabama State Port

Authority

BUILDING STRONG®

MOBILE DISTRICT

Definition: Utilizing dredged sediments as

resource materials in productive ways which

provide environmental, economic, or social

benefit.

Beneficial Uses of Dredged Material

•Habitat Development

•Shore Restoration/Protection

•Reclamation

•Construction/Industrial

•Agriculture/Horticulture

BUILDING STRONG®

MOBILE DISTRICT

FEDERAL STANDARD

The Federal Standard is defined in USACE

regulations as the least costly dredge material

disposal or placement alternative identified by

USACE that is consistent with sound

engineering practices and meets all federal

environmental requirements, including CWA and

MPRSA.

BUILDING STRONG®

MOBILE DISTRICT

BUILDING STRONG®

MOBILE DISTRICT

BUILDING STRONG®

MOBILE DISTRICT

0

1

2

3

4

5

6

7

8

9

MS AL FL

MC

Y

Sand

Fine Grained

COASTAL ZONE QUANTITIES

BUILDING STRONG®

MOBILE DISTRICT

0

1

2

3

4

5

6

7

8

9

MS AL FL

MC

Y Sand

Fine Grained

BU Sand

BU Fine Grained

COASTAL ZONE QUANTITIES

BUILDING STRONG®

MOBILE DISTRICT What Constitutes Beneficial Use?

BUILDING STRONG®

MOBILE DISTRICT

BUILDING STRONG®

MOBILE DISTRICT

BUILDING STRONG®

MOBILE DISTRICT CADET BAYOU

BUILDING STRONG®

MOBILE DISTRICT

BUILDING STRONG®

MOBILE DISTRICT

BASIC QUESTIONS?

Environmentally Acceptable?

Cost Benefit?

Legal Constraints?

BUILDING STRONG®

MOBILE DISTRICT •Who is Defining Beneficial Use and Why?

•Are the Expectations Reasonable?

•Will Beneficial Use Govern Funding?

•Does Beneficial Use Jeopardized Long-

Term Management Plans?

BUILDING STRONG®

MOBILE DISTRICT Selling Points?

BUILDING STRONG®

MOBILE DISTRICT

Dredge Material Ratios:

In-Situ Channel Material 1 : 2 Initial Placement Into Site

In-Situ Channel Material

In-Situ Channel Material

In-Situ Channel Material

1 : 1

2 : 1

3 : 1

Within Site Relay Material

Truck Haul

Dike and Final Floor Material

BUILDING STRONG®

MOBILE DISTRICT

DEER ISLAND 204 SITE

BUILDING STRONG®

MOBILE DISTRICT

High Priority

1,200 Acres

Medium Priority

780 Acres

Low Priority

700 Acres

•Gather the Decision Makers

•Present Your Problem

•Solicit “Out of the Box” Solutions

•Find Common Ground

•Foster Ownership of Solutions

•Assign Homework

•Accountability

•Pilot Projects

•Myth Buster

THE BUG

BUILDING STRONG®

MOBILE DISTRICT

FY13 RSM IPR-Mobile District Evaluation of Short Term Biodegradable Containment Structures for Shallow Water BU

Nate Lovelace (SAM), Larry Parson (SAM)

BUILDING STRONG®

MOBILE DISTRICT

PICTURE(s) to assist in

Describing informaiton

**Optional

FY13 RSM IPR-Mobile District Evaluation of Short Term Biodegradable Containment Structures for Shallow Water BU

Nate Lovelace (SAM), Larry Parson (SAM)

BUILDING STRONG®

MOBILE DISTRICT

BUILDING STRONG®

MOBILE DISTRICT DO YOU HAVE A BUG

ENDORSED MASTER PLAN?

•Environmentally Acceptable

•Cost Benefit – Fed Standard

•Legal

•Proactive vs Reactive

•Shovel Ready Project

BUILDING STRONG®

MOBILE DISTRICT ANY QUESTIONS?