58
One Corps, One Regiment, One Team Barge Accident on 6 Jan 05 John Clarkson Belleville Locks & Dam

Belleville Locks & Dam

Embed Size (px)

DESCRIPTION

Belleville Locks & Dam. Barge Accident on 6 Jan 05 John Clarkson. Belleville Barge Accident. Salvage Operations Lessons Learned Preventive measures considered to lessen the chances of losing pool in the event of future barge accidents. BARGE ACCIDENT. - PowerPoint PPT Presentation

Citation preview

Page 1: Belleville Locks & Dam

One Corps, One Regiment, One Team

Barge Accident on6 Jan 05

John Clarkson

Belleville Locks & Dam

Page 2: Belleville Locks & Dam

One Corps, One Regiment, One Team

Belleville Barge Accident

Salvage Operations Lessons Learned Preventive measures considered to lessen the chances of losing pool in the event of future barge accidents. 

Page 3: Belleville Locks & Dam

One Corps, One Regiment, One TeamUS ArmyCorps of Engineers

BARGE ACCIDENTOn January 6, 2005 the M/V Jon Strong, a twin screw towboat was up bound with 12 loaded barges. Nine of the barges drifted down into the dam. Four of the barges went through the dam gates, however, five of the barges lodged or sank against the dam piers.

Page 4: Belleville Locks & Dam

One Corps, One Regiment, One Team

Barge Location

AEP 8815 – sank against the pier between Gates 3 and 4

AEP 8823 – lodged against the pier between Gates 4 and 5.

PEN 207 – wrapped around the pier between Gates 6 and Gate 7.

AEP 611 – lodged against the pier between Gates 6 and 7.

MEM 94256 - lodged against the pier between Gates 6 and 7.

Page 5: Belleville Locks & Dam

One Corps, One Regiment, One Team

Belleville Barge Accident

The barge accident blocked 5 of the 8 gatebays. 

The effects of the subsequent pool loss to the area caused approximately 5 million dollars a day in damages. 

 

Page 6: Belleville Locks & Dam

One Corps, One Regiment, One TeamUS ArmyCorps of Engineers

BARGE ACCIDENT, contHeavy Rains had caused flood conditions, the dam gates raised out of the water.High water allowed for some lockages to continue, Locks closed to traffic for two of the four weeksLoss of pool aided salvage operations

Page 7: Belleville Locks & Dam

One Corps, One Regiment, One Team

Aerial View of Belleville Locks and Dam

Gate No 1

Gate No 8

Page 8: Belleville Locks & Dam

One Corps, One Regiment, One Team

Location of Barges

Gate No 8

Gate No 1

Page 9: Belleville Locks & Dam

One Corps, One Regiment, One Team

•Tow Boat Operator responsible for hiring 2 salvagers to remove barges.•Assembled Belleville Team, Included Industry, Coast Guard and the Corps.

Belleville Locks & Dam

Page 10: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 11: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 12: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 13: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 14: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 15: Belleville Locks & Dam

One Corps, One Regiment, One Team

Belleville Locks & Dam

Get salvage equipment onsite as quickly as possible before loss of pool prohibits transport.

Page 16: Belleville Locks & Dam

One Corps, One Regiment, One Team

Salvager’s Equipment

2 towboats 4176 kilowatt (5600 HP) 454 metric ton (500 ton) A-frame

crane Pulling barge Hydraulic shear Cutting beam Numerous other smaller cranes, A-

frame cranes, and barges

Page 17: Belleville Locks & Dam

One Corps, One Regiment, One Team

Various Concepts to Remove the Barges

Push Floating Barge Pull Barges Upstream off the Dam Pull and Lift Barges Downstream Cutting Beam Hydraulic Shear Underwater Cutting by Divers Pull Downstream with Three

Towboats Lift out with Bulkhead Crane

Page 18: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 19: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 20: Belleville Locks & Dam

One Corps, One Regiment, One Team

Salvage Equipment Upriver

Okie MooreEquipment:Crane barge2 pulling bargesM/V Capt. Val

M/V JamesMoorehead

River Salvage digging with a crane to anchor a barge with winches to lower down their excavatorwith a hydraulic shear

Page 21: Belleville Locks & Dam

One Corps, One Regiment, One Team

Pad eye pic

Pull from UpstreamNeed to install pad-eye

Page 22: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 23: Belleville Locks & Dam

One Corps, One Regiment, One Team2 in (5cm) pulling cables being installed

Page 24: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 25: Belleville Locks & Dam

One Corps, One Regiment, One Team

Cutting Beam and Pile Driver

Page 26: Belleville Locks & Dam

One Corps, One Regiment, One Team

Started to use cutting beam (Successfully used by the Louisville District) Ultimately not used, only had one barge that might be able to use, restriction that the beam could not extend beyond pier

Page 27: Belleville Locks & Dam

One Corps, One Regiment, One Team

Pull and lift barges from downstream

Page 28: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 29: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 30: Belleville Locks & Dam

One Corps, One Regiment, One Team

Cutting torch is the salvagers most useful tool

Page 31: Belleville Locks & Dam

One Corps, One Regiment, One Team

Hydraulic shear

Page 32: Belleville Locks & Dam

One Corps, One Regiment, One Team

Gate 7

PEN 207

AEP 611

Diverscutting PEN 207

Divers ladderand support lines

Page 33: Belleville Locks & Dam

One Corps, One Regiment, One Team

After 17 days of trying, the first of 5 gates was cleared

Page 34: Belleville Locks & Dam

One Corps, One Regiment, One Team

Most of the wreckage came out by cutting in sections with a torch and pulling downstream

Page 35: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 36: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 37: Belleville Locks & Dam

One Corps, One Regiment, One Team

Upstream rigging pulled out of the last barge which left it on the floor of the dam.

Bow downriver, with cargocompartment outlined

Page 38: Belleville Locks & Dam

One Corps, One Regiment, One Team

Saturday, Jan 29th

Worked a sling under the bow of AEP 8815.

Page 39: Belleville Locks & Dam

One Corps, One Regiment, One Team

Last Barge

Running out of options and tried pulling the downstream rigging with three towboats. While unsuccessful, there was some movement, the barge appeared to be hung up on a part of the dam sill.

Page 40: Belleville Locks & Dam

One Corps, One Regiment, One Team

Lifting out with Bulkhead Crane and the 454 metric ton (500 ton) A-frame to lift the barge. The salvager raised one end of the barge with the A-Frame crane and worked a sling under the mid-section to rig to the dam’s bulkhead to lift the other end out of the water and then cut the barge into two pieces.

Page 41: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 42: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 43: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 44: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 45: Belleville Locks & Dam

One Corps, One Regiment, One Team

Sliding Deck Barge Under AEP 8815

Page 46: Belleville Locks & Dam

One Corps, One Regiment, One Team

M/Vs Capt John Reynoldsand James Garretcoordinated themovement out of Gate 3 and down river.

Page 47: Belleville Locks & Dam

One Corps, One Regiment, One Team

Finally, after 26 days the locks reopened

Queues at the lock increased to a total of fifty-three (53) towboats waiting

Page 48: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 49: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 50: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 51: Belleville Locks & Dam

One Corps, One Regiment, One Team

Page 52: Belleville Locks & Dam

One Corps, One Regiment, One Team

Past Accidents

Smithland Locks and Dam Cheatham Locks and Dam

Page 53: Belleville Locks & Dam

One Corps, One Regiment, One Team

Pike Island

Page 54: Belleville Locks & Dam

One Corps, One Regiment, One Team

Past Accidents

Columbia Lock and Dam Pipe to Protect Diver

from Current

Page 55: Belleville Locks & Dam

One Corps, One Regiment, One Team

Maxwell Locks and Dam

Page 56: Belleville Locks & Dam

One Corps, One Regiment, One Team

Barge Accident Study Studying modern era pool loss

accidents to find commonalities. Preventive measures are being

considered to lessen the chances of losing pool in the event of future barge accidents.

Homeland Security

Page 57: Belleville Locks & Dam

One Corps, One Regiment, One Team

Barge Accident Study, cont.

The preferred solution would be transported via roadway to quickly get onsite and be deployed with minimum if any floating plant (working barge). It would also be universal and could be used at many lock projects.

Several options are being considered, including an integrated pile driver/cutting beam that can move across the gate bay.

Page 58: Belleville Locks & Dam

One Corps, One Regiment, One Team

QUESTIONSQUESTIONS

[email protected]@usace.army.mil