24
Belchatow 858 MW WTP By Rami E. Kremesti M.Sc. ALST OM

Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Belchatow 858 MW WTP

By Rami E. Kremesti M.Sc.

ALSTOM

Page 2: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Block Diagram

• Raw water pumping station/Rotating band screens

• 2 sludge bed upflow clarifiers @ 2x1000 m3/hr

• Filtration plant: 2 x 5 double chamber sand filters with capacity 2x1000 m3/hr/line

• SBS dechlorination dosing station

• Demin plant: 2 x (MMF – CIX – Degas – AIX- MBX) capacity each line 80 m3/hr. DOWEX UPCORE process

• ClO2 dosing station (Biggest in Poland)

• 3 neutralization pits

• Allan-Bradley PLC

Page 3: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Chemical Tanks

• HCl tank and NaClO2 tank for production of ClO2

• HCl and NaOH tanks for Demin plant regeneration

• FeCl3 tank for coagulant

• Flocculant dosing station (PROMINENT)

Page 4: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Chemical Unloading HCl

Page 5: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

ClO2 Dosing Station

Page 6: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Resin Loading

Page 7: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Clarifier

Page 8: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Clarifier Bad

Page 9: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Clarifier Good

Page 10: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Filling The Cooling Tower

Page 11: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Sand Filtration Plant

Page 12: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Lime Preparation and Dosing

Page 13: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Mixed Bed

Page 14: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Contractor Working Hard

Page 15: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Resin Backwashing

Page 16: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Resin Loading

Page 17: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Anion Exchanger Feed Pump

Page 18: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Water Quality

• Clarifier reduced SS and hardness down to 10 ppm

• SFP reduced SS down to 1 ppm

• Demin plant produced demin water with near 0.055 uS/cm conductivity

Page 19: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Technical Problems - I

• 1. raw water control valves not working properly due to high delta P

• 2. original resin backwash vessels scrapped for nothing

• 3. decarbo water pumps cavitating

• 4. demin pump impellers after CIX made from CS corroded

• 5. bolts in neutralization basin made from inox

Page 20: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Problems - II

• 6. Difficult to commission the clarifers no good instructions

• 7. ClO2 attacking the flocculant

• 8. no bypass line for ClO2 for the clarifiers

• 9. chemical unloading area no containment

• 10. regeneration with closed drain valves not foreseen

safety logic

Page 21: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Problems - III

• 11. Sludge pumps oversized for recirculation for clarifiers

• 12. Big decarbo pumps were noisier than 85 dB

• 13. degasifiers were carrying over and the acidic water was destroying the outside of bldg

• 14. there was no flushing line for the acid/base unloading lines

Page 22: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Problems - IV

• 15. bad HCl acid leak from flange on one of the unloading cabinets lead to destruction of aluminum housing

• 16. Lime mixing impellers were eroded after one year: make sure material is suitable.

• 17. Some pumps were vibrating and we needed to reinforce the supports

• 18. Issues with CO2 contamination of demin water tank. Prefer filling line to come to bottom of tank to avoid splashing. Issues with overflow line air lock

Page 23: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Problems - V

• Leaking pipe wall penetration for neutralization basins (Civil)

• Prominent recommended changing gaskets/membranes for ClO2 plant every 6 months (too early)

• Client was acting difficult (political)

Page 24: Belchatow 858 MW WTP · •Demin plant produced demin water with near 0.055 uS/cm conductivity . Technical Problems - I •1. raw water control valves not working properly due to

Delays in Commissioning

• Permanent power supply delayed

• Raw water supply delay

• Clarifier commissioning delay

• No hoses ordered by engineering for resin loading