13
CV................................. [Abobaker Mohssen Fager Saeed] Personnel Data: Nationality: Sudanese Religion: Muslim Date & Place of Birth: 25/03/1986. Khartoum. Marital Status: Married. Health: Excellent Discipline: Electrical Engineer Full Address: RiyadhKhalid bin alwaleed Street. Mobile Number: 00966530197129. Electronic Email: [email protected]. Skype account: abobakermohsenfager Objective……. I am Electrical Engineer. my experience in HV 380kv UGC ,115,110kv OHTL, UGC & Substation +Oil & Gas projects my short to medium objective is to develop my skills & academic background with practical implementation &to be involved in a dynamic organization to enhance the development of my competencies & experience as well as continual improvement working with a team work. Academic Qualifications: Sudan University B.SC . Electrical Engineer . Graduated with degree of Bachelor of Engineering in Electrical (power& machines) second class division two (Honors) from Sudan University Of Science & Technology - 2009. Personal Skills: ........................................................................ Sociable. Tenacious to complete job in schedule. Able to manage and motivate teamwork to complete given tasks within no time scale and proper quality. Technical Skills: ……………………………………………….. Skill in Microsoft office applications &internet. Fine in Construction Technique. AutoCAD. PMP certificate. Skills …….

BEKO CV 2016

Embed Size (px)

Citation preview

Page 1: BEKO CV 2016

Page 1 of 13

CV................................. [Abobaker Mohssen Fager Saeed]

Personnel Data:

Nationality: Sudanese

Religion: Muslim

Date & Place of Birth: 25/03/1986. Khartoum.

Marital Status: Married.

Health: Excellent

Discipline: Electrical Engineer

Full Address: Riyadh–Khalid bin alwaleed Street.

Mobile Number: 00966530197129.

Electronic Email: [email protected].

Skype account: abobakermohsenfager

Objective…….

I am Electrical Engineer. my experience in HV 380kv UGC ,115,110kv OHTL, UGC & Substation +Oil & Gas projects my short to medium objective is to develop my skills & academic background with practical implementation &to be involved in a dynamic organization to enhance the development of my competencies & experience as well as continual improvement working with a team work.

Academic Qualifications:

Sudan University

B.SC . Electrical Engineer .

Graduated with degree of Bachelor of Engineering in Electrical (power& machines) second class division two (Honors) from Sudan University Of Science & Technology -2009.

Personal Skills: ........................................................................

Sociable.

Tenacious to complete job in schedule.

Able to manage and motivate teamwork to complete given tasks within no time scale and proper quality.

Technical Skills: ………………………………………………..

Skill in Microsoft office applications &internet.

Fine in Construction Technique.

AutoCAD.

PMP certificate.

Skills …….

Page 2: BEKO CV 2016

Page 2 of 13

EXPERIENCE:

Electrical Engineer Masar Consulting Engineers Period: from Feb 2015 up to Present.

Scope of work- Project Title: Metro-1(9052) UGC PJT, Location: Riyadh (COA), Contract No.4400004660

Supervision of contractors works, extra high voltage (380KV) underground cable of

1*1/C*2500mm2 XLPE Cables, projects for Riyadh metro project double circuit from 9052 S/S

TO 9026/9004 S/S by following SEC Standard &specifications for pulling, Jointing activities for

power &DTS cables and connect termination to (GIS) compartment by coordinating with

contractor &GIS Manufacturer (ABB, Alstom). With supervision of electrical &HV tests

(gassing &de-gassing) &Installation of (OFMR&DTS) Panels inside communication &control

room as well.

Responsibilities:

Ensures that the project as per SEC standard &specification.

Ensure that the progress at site is as per approved time schedule & Drawing.

Inspect work done, samples, materials, workmanship, 380kv cable laying, and

transposition, jointing &marking phases as per (IFC) &schematic diagram drawing,

ensuring compliance with project documents.

Follow up and supervising all requests for inspection (RFI’s).

Ensuring that all materials used and work performed are as per specifications, ITP

and method of statement.

Day-to-day supervision of the site, including supervising and monitoring the

progress and manpower,

Overseeing quality control, health and safety matters on site& raising site

observations; and ensure that construction is performed as per safety & quality plan.

Raise site instruction to contractors for any work not following (PTS& SEC

Standards).

Investigating sites condition to determine any kind of obstacles for the proposed

construction during work progress.

Coordinating for testing of materials, DC sheath test &earth resistance test

processes or systems related to engineering works.

Reports to Project Engineer site related issues (weekly report, meeting& obstacles if

any).

Page 3: BEKO CV 2016

Page 3 of 13

Review and make recommendation to project engineer of all Shop Drawings and

quantities for accuracy.

Conduct weekly progress meeting with contractors.

Discuss any difficulties and other problems that may arise at the site to project

engineer.

Check and inspect all fiber route, hand hole, joint box as per SEC specification.

Check &review all ampacity calculations study if there is any obstacle on the cable

route after prepared by cable Manufacturer (Taihan, Korea) & compare with

submitted data sheet from contractor to client.

Coordination between contractor & SEC for testing and commissioning works with

CSD, TSD department to hand over the line to client.

Electrical Engineer Hadi Haider Contracting Company (HHC) Period: from July 2013 up to Jan 2015.

Scope of work-

OHTL:

Project Title: 115kv double circuit OHTL+UGC, Location: QATIF (EOA),

Project include surveying, Installation , assembly, erection

&stringing of two transmission lines 115KV rated voltage &

laying of underground cables from lines (Gantry) up to S/S’s

(New qatif 380/115 kv BSP to qatif 115/13.8 kv).

UGC:

Taif project: Work for 110kv UGC of 1*1/C*1200mm2 XLPE

Cables, at taif airport S/S project from taif airport S/S to

hawiyaaS/S.

Project Title: Power supply to mardomah 115/13.8 kV, Location: Jubail (EOA), Contract No.564-C31.

Project: including115/13.8kv substation+ two 115kv underground

cables:

One line of 1*1/C*1600mm2 XLPE Cables, between jubail community-

2(8AB) 380/115kv BSP to mardomah 20BD 115/13.8KV& other line from

mardomah 21BD 115/13.8kv to mardomah 20BD 115/13.8KV &all cable

activities like: excavation of the trench, pulling power cables, backfilling,

Page 4: BEKO CV 2016

Page 4 of 13

jointing ,termination & Fiber optic cables pulling with installation of

hand holes &link boxes.

Responsibilities:

Ensures that the projects as per Aramco, RC, SEC standard &specifications. Ensure that the progress at site is as per approved time schedule 115kv cable laying, and transposition, jointing &marking phases as per (IFC)

Drawing ensuring compliance with project documents. Follow up and supervising all requests for inspection (RFI’s) with client inspector. Report &discuss any difficulties and other problems that may arise at the site to

project manager.

Attend weekly progress meeting with RC&SEC representative. Sending daily progress report to project manager. Make DC sheath test &earth resistance test with consultant. Discuss site related issues with project manager& site manager Prepare base design as per (PTS) requirement and submit to RC&SEC for review

and approval. Discuss with designer any site related issues. Make stringing & sagging for towers (mono pole –lattice) and installation of spacer,

damper &dropper jumper. Work as Aramco permit receiver& follow all Aramco requirements for towers

foundation locations & all crossing arrangement between Aramco facilities and our

line. Submit all base design for 115kv /13.8KV GIS S/S to RC&SEC. Submit method of statement for each work at site to RC for approval. Supervision for all labor, technicians &foramen.

Site Manager, Electrical Engineer Telecom networking operation Company (TNOC) Period: from Jan 2013 up to June 2013.

Scope of work-

Project including installation & erection of 13.8KV, 33KV UGC, OHL, Ring Main Units

(RMU), Mini pillars, meters & Transformer (USS) for distribution system improvement

(unity contract with SEC).

Responsibilities:

Coordinate with electrical team for on‐going electrical activities.

Manage with maintenance team for any emergency work.

Review shop drawing and execute it at site as per client requirement &specifications.

Preparing for Shut down plan and tie-in.

Carryout all phase rotation test.

Installation of RMU, TR&OIL SWITCHES.

Review all invoices with accountant.

All stringing activities for OHL

Page 5: BEKO CV 2016

Page 5 of 13

Electrical Engineer Higleig Petroleum Service and Investment Co. (HPSIC)

Period: from Dec 2010 up to Jan 2013.South Sudan

Scope of work-

Follow Electrical activities for FSF-5 Power transmission line project in electrical engineer position:

Project including installation of 33KV UGC,overhead line, Ring Main Unit (RMU),electrical

submersible pumps(ESP)for(HV), Main Distribution Board(MDB), Air Condition system,

lighting system,(PCP)pumps for (LV),step down transformer from 33kv to 415v& testing(HI

pot test,meggering for 33KV cable & winding resistance test for transformer) and installation

of both temporary and permanent cathodic protection system for follow line and OGMs.

Responsibilities:

Coordinate with electrical team for on‐going electrical activities.

Following with inspector all regarding electrical activities such as cable pulling,

laying, connection, pole erections ,stringing conductor, termination (indoor

&outdoor ), installation of 50kVA transformer ,earthing grid, lighting fixture and

lightening system(MDB),(RMU) panel areva type for connecting 33KV feeders&

transformer with fuses protection along with testing activities for

(MDB,RMU,CABLES,TR..etc).

Review shop drawing and execute it at site as per client specification.

Construction for two (2) no. (16MVA), 66/33KV, ONAN/ONAF auto power

transformer, OLTC taps on 66KV.

Installation of 11KV switchgear with SF6 circuit breaker.

Installing Internal (sacrificial) and External (bottom of tank) Cathodic Protection

System on tanks and cathodic protection system for Piling Skids as well, using two

transformer unit for all site.

Carry out all tests required for transformers, RMU, cables, MDP, CIS, cathodic

protection system and energizing for ESP and PCP.

Preparing for Shut down plan and tie-in.

Report any difficulties and other problems that may arise at the site including HSE

issues.

Preparing of Final Quantity Measurement, cost estimation of Service Orders and

milestone.

Follow up and tests required for underground cable and OHL activities for various

rated voltage (33KV & 66KV).

Monitor and report regularly to owner the progress for FSF-05 maintenance work

for both (UGC) & (OHL).

Page 6: BEKO CV 2016

Page 6 of 13

Attend client (HSE) courses:

HSE Orientation &Awareness (GNPOC)

Safe Work Permit (GNPOC).

Risk assessment and Job Safety analyses (GNPOC).

ISO 14001 awareness (GNPOC).

Basic fire fighting (GNPOC).

Trainee Electrical Engineer National Electricity Corporation. (Sudan) .Period: 1/10 /2009 up to

1/11/2010

Responsibilities:

Coordinate with electrical team for on‐going electrical activities.

Following with inspector and engineer all regarding electrical activities such as

cable pulling, laying, connection, testing, termination, installation of earthing grid,

lighting fixture and lightening system...etc.

Solve all distribution trips for (NEC) customers.

Preparing daily progress report

Languages:

Arabic Native or bilingual proficiency

English Full professional proficiency

Page 7: BEKO CV 2016

Page 7 of 13

Page 8: BEKO CV 2016

Page 8 of 13

Page 9: BEKO CV 2016

Page 9 of 13

Page 10: BEKO CV 2016

Page 10 of 13

Page 11: BEKO CV 2016

Page 11 of 13

Page 12: BEKO CV 2016

Page 12 of 13

Page 13: BEKO CV 2016

Page 13 of 13

References:

Name : Ahmed Omer Ahmed

o Position: Electrical Engineer at SEGI

o Address: Jeddah, Saudi Arabia.

o Mob: 00966504906591.

Name : Mohd Gamal Mohd Ahmed

o Position: Safety Engineer.

o Address: Centreoid. Khartoum - Sudan

o Mob: 00249123639193.

Name: Tariq Kamal.

o Position: Project manager.

o Address: Alosais contracting company.

o Mob: 00966502835384.