#6290 CL&P #6291 CL&P #6292 CL&P #26030 CL&P #6289 CL&P #6288 CL&P #22733 CL&P FENCE BOARD FENCE BOARD FENCE BOARD FENCE BOARD FENCE BOARD FL=132.51 FL=135.79 FL=134.01 FL=135.08 FL=134.97 FL=135.16 FL=1 D-2730 FENCE CH LNK FENCE BOARD FENCE BOARD FENCE BOARD B OA R D F E N C E 24'' RCP 24'' RCP W A LL W OOD R ET MAILBOXES W A LL W OOD R E T R ET W A LL BLUE STONE LOW CHORD=139.49 LOW CHORD=139.50 12" ACCM P 1 2 " A CC M P 12" ACCM P 12 " A CC M P (FND) IP (FND) IP N/F CHD N/F CHD (FND) SPIKE TIMBER (FND) AXLE CONC WALL (PER PROPERTY OWNER) ARTESIAN WELL WALK BLUE STONE 130 130 135 135 135 135 135 135 135 135 I.P.(FND) B.M. 140 140 140 140 140 140 140 140 B.M. NO# OHW OHW OHW OHW 100 + 00 101 + 00 102+00 103 + 00 104 + 00 105 + 0 0 106 + 00 N02 ° 25 ' 03 . 7 " E S 79 ° 12 ' 10 . 0 " E S 8 3 ° 44 ' 0 2 . 8 " E 69 . 402 ' 243 . 754 ' 146 . 235 ' E 815904 . 425 ' N624783 . 606 ' 100 + 00 . 00 B e g i n S t a . E 81 6 4 32 . 09 5 ' N 6 248 6 5 . 36 7 ' 1 0 6 + 4 4 . 8 8 E n d S t a. E 815907 . 352 ' N624852 . 947 ' 100 + 69 . 40 P C E 8162 4 7 . 6 39 ' N 624 8 87 . 19 3 ' 104 + 5 9 . 10 P C E 816008 . 200 ' N 624932 . 856 ' 102 + 15 . 35 P T E 81 6 28 6 . 734 ' N 624 881 . 32 8 ' 104 + 98 . 65 P T 83 COORDINATE GRID AD CONNECTICUT REHABILITATION STUDY REPORT A PP R O X S T R EE T L I N E A PP R O X S T R EET L I N E T O C E N TE R O F NO R WA L K R I V E R F AVO R O F 3 A RR O WH E AD R OAD 15 ' D R A I NAG E E A S E M E N T I N COMMON RI GHT OF W AY STREET LINE APPROXIMATE STA. 101+50.00 MEET EXISTING PAVEMENT BEGIN FULL DEPTH RECONSTRUCTION CUT BITUMINOUS CONCRETE PAVEMENT BEGIN STATE PROJECT NO 161-143 STA. 104+25.00 MEET EXISTING PAVEMENT END FULL DEPTH RECONSTRUCTION CUT BITUMINOUS CONCRETE PAVEMENT END STATE PROJECT NO 161-143 CU R VE#1 C U R V E #2 ARROWHEAD ROAD B L 161-143 REPLACEMENT OF BRIDGE NO. 05501 ARROWHEAD OVER NORWALK RIVER WILTON 05501 BRIDGE NO. PROPOSED (12:1 SIDE SLOPES FOR GUIDERAIL TYP.) APPROXIMATE SLOPE LIMITS (TYP.) O.H.W. WETLAND (TYP.) STATE/FEDERAL PROJECT DESCRIPTION: PROJECT NUMBER: DRAWING NO. SHEET NO. 9/8/2020 C O N N E C T I C U T D E P A R T M E N T O F T R A N S P O R T A T I O N 0 1" = 20' HORIZONTAL SCALE STATE OF CONNECTICUT TRANSPORTATION OF DEPARTMENT BLOCK: SIGNATURE/ DRAWING TITLE: ROADWAY PLAN ALTERNATE 1A - TOWN(S): DESIGNER/DRAFTER: DGW/RAC CHECKED BY: JDL PLOTTED DATE: T:\CTDOT_CONNECT_DDE\CT_Projects\161-143_Wilton\Highways\HW_0161-0143_Sheet_1A.dgn FILE NAME: 7380 LASTED SAVED BY: 20' 40' REVISION DESCRIPTION DATE REV. ATTACHMENT (TYP.) LEADING END PROPOSED TIMBER RAIL (TYP.) TIMBER GUIDE PROPOSED BOARD FENCE (TYP.) REMOVE EXISTING UTILITY POLE RELOCATE (TYP.) PAVEMENT EDGE OF CONCRETE DRIVEWAY PROPOSED BITUMINOUS (TYP. BOTH SIDES OF DRIVEWAY) RESET LANDSCAPE EDGING AND GRATE RESET FRAME WINGWALL (TYP.) PROPOSED RETAINING WALL EXISTING WOOD REMOVE A RR O WH E AD R OAD A RRO W HE AD ROAD NO RW A L K RI V E R CURBING (TYP.) TRANSITION GRANITE STONE PROPOSED 11 . 6 ' 1 1 . 8 ' 1 2 ' ANCHOR TIMBER END PROPOSED 12 . 3 ' LIGHT POST RELOCATE ANCHOR TIMBER END PROPOSED ANCHOR TIMBER END PROPOSED ANCHOR TIMBER END PROPOSED 12 ' 12 ' 12 ' + 7 5 12 ' UTILITY POLE RELOCATE (2:1 MAX SIDE SLOPES) APPROXIMATE SLOPE LIMITS 14 0 140 140 14 0 ( C T R OU T E 7 ) T O DAN B U R Y R D T O C U L - DE - S AC OUTLET RECONSTRUCT PLANTINGS LANDSCAPE RESTORE (TYP.) ESTABLISHMENT TOPSOIL AND TURF PROPOSED BRIDGE SUPERSTRUCTURE PROPOSED ROADWAY RECONSTRUCTION PROPOSED DRIVEWAY RECONSTRUCTION PROPOSED APPROACH GUIDERAIL LEGEND: NORWALK RIVER PROPOSED ROADWAY SECTION (2) - 12'± LANES PROPOSED FILL PROPOSED CUT WATERCOURSE WETLANDS R.O.W. LINE

BEGIN STATE PROJECT NO 161-143 CUT BITUMINOUS … · begin state project no 161-143 sta. 104+25.00 meet existing pavement end full depth reconstruction cut bituminous concrete pavement

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • #6290

    CL&P

    #6291

    CL&P

    #6292

    CL&P

    #26030

    CL&P

    #6289

    CL&P

    #6288

    CL&P

    #22733

    CL&P

    FENCE

    BOARD

    FENCE

    BOARD

    FENCE

    BOARD

    FENCE

    BOARD

    FENCE

    BOARD

    FL=132.51

    FL=135.79

    FL=134.01

    FL=135.08

    FL=134.97

    FL=135.16

    FL=135.37

    D-2730

    FENCE

    CH LNK

    FENCE

    BOARD

    FENCE

    BOARD

    FENCE

    BOARD

    BOARD FENCE

    24'' RCP

    24'' RCP

    WALL

    WOOD RET

    MAILBOXES

    WALL

    WOOD RET

    RET WALL

    BLUE STONE

    LOW CHORD=139.49

    LOW CHORD=139.50

    12"

    AC

    CM

    P

    12"ACCMP

    12"

    AC

    CM

    P

    12"ACCMP

    (FND)

    IP

    (FND)

    IP

    (FND)

    IP

    N/F

    CHD

    N/F

    CHD

    (FND)

    SPIKE

    TIMBER

    (FND)

    AXLE

    CONC WALL

    (PER PROPERTY OWNER)

    ARTESIAN WELL

    WALK

    BLUE STONE

    130

    130 135

    135

    135

    135

    135

    135

    135

    135

    I.P.(FND)

    B.M.

    140 140

    140

    140

    140

    140

    140

    140B.M.

    NO#

    OH

    W

    OH

    W

    OH

    W

    OH

    W

    100+00

    101+00

    102+00

    103+00

    104+00

    105+00

    106+00

    N02°2

    5'0

    3.7"E

    S79°12'10.0"E

    S83°44'02.8"E

    69.4

    02'

    243.754'

    146.235'

    E 815904.425'

    N 624783.606'

    100+00.00 Begin Sta.

    E 8

    16432.0

    95'

    N 6

    24865.3

    67'

    106+44.8

    8End Sta.

    E 815907.352'

    N 624852.947'

    100+69.40 PC

    E 8

    16247.6

    39'

    N 6

    24887.1

    93'

    104+59.1

    0

    PC

    E 8

    16008.2

    00'

    N 6

    24932.8

    56'

    102+15.3

    5

    PT

    E 8

    16286.7

    34'

    N 6

    24881.3

    28'

    104+98.6

    5P

    T

    PI STA 101+42.38

    PI E 815911.5048

    PI N 624951.2968

    R 85.000'

    L 145.949'

    T 98.438'

    DELTA 98°22'46.3"

    CURVE #1

    PI STA 104+78.89

    PI E 816267.0703

    PI N 624883.4869

    R 500.000'

    L 39.543'

    T 19.782'

    DELTA 04°31'52.7"

    CURVE #2

    ARROWHEAD ROAD

    CURVE DATA

    83

    CO

    OR

    DIN

    AT

    E G

    RID

    AD

    CO

    NN

    EC

    TIC

    UT

    REHABILITATION STUDY REPORT

    105 DANBURY ROAD

    OTTAVIANO VECCIA, ET ALN/F

    3 ARROWHEAD ROAD

    16 ARROWHEAD ROAD

    DAVID M. MISITAN/F

    24 ARROWHEAD ROAD

    ASSOCIATION, INCORPORATEDTHE ARROWHEAD COMMUNITY

    N/F

    34 ARROWHEAD ROAD

    MICHAEL W. BARNETT ET ALN/F

    23 ARROWHEAD ROAD

    PAUL T. EGAN, ET ALN/F

    MICHAEL CYRN/F

    Drawing Copyright c 2020

    860-290-4100 | www.chacompanies.com

    101 East River Drive, 1st Floor

    25 ARROWHEAD ROAD

    REVOCABLE TRUSTTHE FRANK J. MAGUIRE

    SHEVAUN MACARI, TRUSTEE OF N/F

    APPROX STREET LINE

    APPROX STREET LINE

    TO CENTER OF NORWALK RIVER

    FAVOR OF 3 ARROWHEAD ROAD

    15' DRAINAGE EASEMENT IN

    CO

    MM

    ON

    RIG

    HT

    OF

    WA

    Y

    HORIZONTAL ALIGNMENT: MAINTAIN EXISTING

    PROFILE: RAISE 0.4' ±

    DECK UNITS

    PROPOSED STRUCTURE:

    CROSS SLOPE, 2% CROWN

    2' SHOULDERS-(STRIPED)

    (2) - 10' LANES

    PROPOSED ROADWAY SECTION:

    CROSS SLOPE, 0%-2%

    NO SHOULDERS

    (2) - 12'± LANES

    EXISTING ROADWAY SECTION:

    DESIGN SPEED: 30 MPH

    POSTED SPEED LIMIT: UNKNOWN

    LOCAL URBAN STREETS

    CLASSIFICATION:

    ROADWAY FUNCTIONAL

    NOTES

    STREET LINE

    APPROXIMATE

    STA. 101+50.00

    MEET EXISTING PAVEMENT

    BEGIN FULL DEPTH RECONSTRUCTION

    CUT BITUMINOUS CONCRETE PAVEMENT

    BEGIN STATE PROJECT NO 161-143

    STA. 104+25.00

    MEET EXISTING PAVEMENT

    END FULL DEPTH RECONSTRUCTION

    CUT BITUMINOUS CONCRETE PAVEMENT

    END STATE PROJECT NO 161-143

    CURV

    E #1

    CURVE #2

    ARROWHEAD ROADBL

    161-143

    REPLACEMENT OF BRIDGE NO. 05501 ARROWHEAD OVER NORWALK RIVER

    WILTON

    05501

    BRIDGE NO.

    PROPOSED

    (12:1 SIDE SLOPES FOR GUIDERAIL TYP.)

    APPROXIMATE SLOPE LIMITS

    (TYP.)

    O.H.W.

    WETLAND (TYP.)

    STATE/FEDERAL

    PROJECT DESCRIPTION:

    PROJECT NUMBER: DRAWING NO.

    SHEET NO.

    9/8/2020

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    0

    1" = 20'HORIZONTAL SCALE

    STATE OF CONNECTICUT

    TRANSPORTATION

    OF

    DEPARTMENT

    BLOCK:

    SIGNATURE/

    DRAWING TITLE: ROADWAY PLAN ALTERNATE 1A

    -

    TOWN(S):

    DESIGNER/DRAFTER: DGW/RAC CHECKED BY: JDL

    PLOTTED DATE:

    T:\CTDOT_CONNECT_DDE\CT_Projects\161-143_Wilton\Highways\HW_0161-0143_Sheet_1A.dgn FILE NAME: 7380 LASTED SAVED BY:

    20' 40'

    RE

    VIS

    ION

    DE

    SC

    RIP

    TIO

    ND

    AT

    ER

    EV

    .

    ATTACHMENT (TYP.)

    LEADING END

    PROPOSED TIMBER

    RAIL (TYP.)

    TIMBER GUIDE

    PROPOSED

    BOARD FENCE (TYP.)

    REMOVE EXISTING

    UTILITY POLE

    RELOCATE

    (TYP.)

    PAVEMENT

    EDGE OF

    CONCRETE DRIVEWAY

    PROPOSED BITUMINOUS

    (TYP. BOTH SIDES OF DRIVEWAY)

    RESET LANDSCAPE EDGING

    AND GRATE

    RESET FRAME

    WINGWALL (TYP.)

    PROPOSED

    RETAINING WALL

    EXISTING WOOD

    REMOVE

    ARROWHEAD ROAD

    AR

    RO

    WH

    EA

    D R

    OA

    D

    NO

    RW

    AL

    K RIV

    ER

    SUMP=133.09

    12"OUT(NE)=133.95

    12"IN(S)=133.98

    G=137.09

    CLCB (3)

    SUMP=32.82

    12"(OUT)=134.67

    G=136.82

    CLCB (4)

    SUMP=134.78

    12"OUT(S)=135.28

    G=137.83

    CLCB (1)

    SUMP=134.50

    12"OUT(W)=135.50

    12"IN(N)=135.32

    G=138.10

    CLCB (2)

    CURBING (TYP.)

    TRANSITION

    GRANITE STONE

    PROPOSED

    11.6'

    11.8'

    12'

    ANCHOR

    TIMBER END

    PROPOSED

    12.3'

    LIGHT POST

    RELOCATE

    ANCHOR

    TIMBER END

    PROPOSED

    ANCHOR

    TIMBER END

    PROPOSED

    ANCHOR

    TIMBER END

    PROPOSED

    12'

    12'

    12'

    +75

    12'

    UTILITY POLE

    RELOCATE

    (2:1 MAX SIDE SLOPES)

    APPROXIMATE SLOPE LIMITS

    140

    140 140

    140(CT ROUTE 7)

    TO DANBURY RD

    TO C

    UL-D

    E-S

    AC

    OUTLET

    RECONSTRUCT

    PLANTINGS

    LANDSCAPE

    RESTORE

    (TYP.)

    ESTABLISHMENT

    TOPSOIL AND TURF

    PROPOSED BRIDGE SUPERSTRUCTURE

    PROPOSED ROADWAY RECONSTRUCTION

    PROPOSED DRIVEWAY RECONSTRUCTION

    PROPOSED APPROACH GUIDERAIL

    PROPOSED BRIDGE SUBSTRUCTURE

    PROPOSED FILL

    PROPOSED CUT

    WATERCOURSE

    WETLANDS

    R.O.W. LINE

    LEGEND:

    NO

    RW

    ALK

    RIV

    ER

    PROFILE: RAISE 0.4' ±

    DECK UNITS

    PROPOSED STRUCTURE:

    CROSS SLOPE, 2% CROWN

    2' SHOULDERS-(STRIPED)

    (2) - 10' LANES

    PROPOSED ROADWAY SECTION

    CROSS SLOPE, 0%-2%

    NO SHOULDERS

    (2) - 12'± LANES

    PROPOSED FILL

    PROPOSED CUT

    WATERCOURSE

    WETLANDS

    R.O.W. LINE

  • 13

    9.1

    4'

    EL

    . 10

    1+

    89

    .84

    ST

    A.

    14

    1.9

    6'

    EL

    . 10

    3+

    44

    .84

    ST

    A.

    137.2

    7'

    EL

    . 10

    1+

    33

    .95

    ST

    A.

    139.0

    9'

    EL

    . 10

    1+

    88

    .95

    ST

    A.

    142.4

    2'

    EL

    . 10

    3+

    02

    .61

    ST

    A.

    HIG

    H P

    OIN

    T

    +0.80%+5.83%

    -2.18%

    140.2

    1'

    EL

    . 10

    4+

    25

    .00

    ST

    A.

    143.6

    5'

    EL

    . 10

    2+

    67

    .28

    ST

    A.

    13

    7.4

    8'

    EL

    . 10

    1+

    61

    .47

    ST

    A.

    +5.83%

    -2.18%

    K = 19.39

    H.S.D. = 212.33

    L.V.C. = 155.00

    LIMITS

    BRIDGE

    PROP.

    EL

    . 1

    42

    .34

    '

    ST

    A.

    10

    3+

    19

    .83

    C.L

    . B

    EA

    RIN

    G

    EL

    . 1

    42

    .13

    '

    ST

    A. 102+

    68.8

    3

    C.L

    . B

    EA

    RIN

    G

    K = 10.96

    S.S.D. = 103.19

    L.V.C. = 55.00

    REHABILITATION STUDY REPORT

    103+00 104+00 105+00 106+00100+00 101+00 102+00

    120

    130

    140

    150 150

    140

    130

    120

    Drawing Copyright c 2020

    860-290-4100 | www.chacompanies.com

    101 East River Drive, 1st Floor

    PROJECT DESCRIPTION:

    PROJECT NUMBER: DRAWING NO.

    SHEET NO.

    9/14/2020

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    STATE OF CONNECTICUT

    TRANSPORTATION

    OF

    DEPARTMENT

    BLOCK:

    SIGNATURE/

    DRAWING TITLE: ROADWAY PROFILE ALTERNATE 1A

    -

    TOWN(S):

    DESIGNER/DRAFTER: DGW/RAC CHECKED BY: JDL

    RE

    VIS

    ION

    DE

    SC

    RIP

    TIO

    ND

    AT

    ER

    EV

    .

    HORIZ. SCALE IN FEET

    VERT. SCALE IN FEET

    0 2 4

    0 20 40

    STA. 101+50.00

    MEET EXISTING PAVEMENT

    BEGIN FULL DEPTH RECONSTRUCTION

    BEGIN STATE PROJECT NO 161-143

    STA. 104+25.00

    MEET EXISTING PAVEMENT

    END FULL DEPTH RECONSTRUCTION

    END STATE PROJECT NO 161-143

    ALONG B

    PROPOSED GRADE

    ALONG B

    EXISTING GROUND

    161-143

    REPLACEMENT OF BRIDGE NO. 05501 ARROWHEAD OVER NORWALK RIVER

    WILTON

    EL.139.80

    50 YR STORM

    EL. 140.30

    100 YR STORM

    PLOTTED DATE:

    T:\CTDOT_CONNECT_DDE\CT_Projects\161-143_Wilton\Highways\HW_0161-0143_Sheet_1A.dgn FILE NAME: 7380 LASTED SAVED BY:

    EL. 141.60

    500 YR STORM

    L

    L

    EL. 140.10

    LOW CHORD

    EL. 140.40

    LOW CHORD

    PROPOSED BRIDGE SUPERSTRUCTURE

    PROPOSED ROADWAY RECONSTRUCTION

    LEGEND:

    (2) - 10' LANES

    PROPOSED ROADWAY SE

    CROSS SLOPE, 0%-2%

    NO SHOULDERS

    (2) - 12'± LANES

    PROPOSED FILL

    PROPOSED CUTCROSS SLOPE, 2% CROWN

    2' SHOULDERS-(STRIPED)

    (2) - 10' LANES

    PROPOSED ROADWAY SEPROPOSED CUT

    WATERCOURSE

    EL. 139.30

    500 YR STORMEL. 142.4

    100 YR STORMEL. 140.1

    LOW CHORDEL. 140.1

    50 YR STORMEL. 139.3

    LOW CHORDEL. 140.4

  • 12"ACC

    MP

    140

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    SHEET NO.:

    DRAWING TITLE: STATE PROJECT NO.:

    DATE:

    161-143

    DEPARTMENT OF TRANSPORTATION

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ONSTATE OF CONNECTICUT

    CITY/TOWN: BRIDGE NO.:

    05501

    SCALE:

    1"=10'WILTON

    EDGE OF PAVEMENT (TYP.)

    GENERAL PLAN

    ALTERNATE 1A

    & ELEVATION

    BRIDGE PLAN

    EDGE OF PAVEMENT (TYP.)

    } ARROWHEAD ROAD

    SOUTH CURB LINE

    { BEARINGS, EAST ABUTMENT

    RIV

    ER

    NO

    RW

    AL

    K

    { BEARINGS, WEST ABUTMENT

    APPROX. CHANNEL BED EL. 130.0|

    R.O.W.

    NORTH CURB LINE

    METAL PIPE

    CORRUGATED

    EXISTING 12"

    R.O.W.

    METAL PIPE

    CORRUGATED

    EXISTING 12"

    TOP OF ROADWAY (TYP.)

    SOUTH ELEVATION

    BANKS (TYPICAL BOTH SIDES)

    BOULDER WALL ALONG RIVER

    OPEN BRIDGE RAIL

    3-TUBE CURB MOUNTED

    6:1

    ATTACHMENT (ALL 4 CORNERS)

    PROPOSED TIMBER RAIL BRIDGE

    CONCRETE DECK UNIT

    PRESTRESSED

    STONE FORMLINER (TYP.)

    5'-0" ENDBLOCK WITH SIMULATED

    Drawing Copyright c 2020

    860.290.4100 www.chacompanies.com

    East Hartford, CT 06108

    101 East River Drive, 1st Floor

    3'-6" (TYP.)

    1'-6" (TYP.)

    12'-0"

    12'-0"

    PILE CAP (TYP.)

    REMOVE EXISTING BRIDGE

    RELOCATE UTILITY POLE (TYP.)

    51'-0"

    51'-0"

    EAST ABUTMENT

    { BEARINGS,

    WEST ABUTMENT

    { BEARINGS,

    OVER SUBGRADE (TYP.)

    12" GRANULAR FILL

    (APPROX EL. 65|)

    PILE DRIVEN TO BEDROCK WATER EL. 132.1|

    ORDINARY HIGH

    50-YR STORM EL. 139.8

    100-YR STORM EL. 140.3

    500-YR STORM EL. 141.6

    (APPROX. ELEV. 70|)

    PILE DRIVEN TO BEDROCK

    UTILITIES

    RELOCATE OVERHEAD

    OF ABUTMENT (TYP.)

    RIPRAP IN FRONT

    103+00

    PROPOSED SE WINGWALLPROPOSED SW WINGWALL

    PROPOSED BRIDGE SEAT ELEV. 140.2

    PROPOSED NW WINGWALL

    PROPOSED SE WINGWALL

    PROPOSED SW WINGWALL

    APPROACH SLAB (TYP.)

    90°

    1'-10" CURB (TYP.)

    PROPOSED BRIDGE NO. 05501

    ABUTMENT (TYP.)

    FACE OF PROPOSED

    STA. 102+67.33

    BEGIN BRIDGE

    5'-0" PROPOSED CONCRETE ENDBLOCK (TYP.)

    BRIDGE ATTACHMENT (TYP.)

    PROPOSED TIMBER RAIL

    PROPOSED NE WINGWALL

    PROPOSED BRIDGE SEAT ELEV. 139.9ELEV. 140.4

    LOW CHORD

    ELEV. 140.1

    LOW CHORD

    EL. 137.8| EL. 138.2|

    PROPOSED GRADE (TYP.)

    REMOVE EXISTING BRIDGE SUPERSTRUCTURE

    83/2011

    CO

    OR

    DIN

    ATE

    GRID

    AD

    CO

    NN

    EC

    TIC

    UT

    ELEV. 133.0| (TYP.)

    BOTTOM OF ABUTMENT;

    ALONG CHANNEL BANK (TYP.)

    EXISTING BOULDER WALL

    SEMI-INTEGRAL ABUTMENT (TYP.)

    (TYP.)

    10'-0"

    STA. 103+21.33

    END BRIDGE

    PROPOSED BRIDGE SUBSTRUCTURE

    WATERCOURSE

    WETLANDS

    R.O.W. LINE

    PROPOSED BRIDGE SUPERSTRUCTURE

    PROPOSED ROADWAY RECONSTRUCTION

    PROPOSED DRIVEWAY RECONSTRUCTION

    PROPOSED APPROACH GUIDERAIL

    LEGEND:

    ARROWHEAD ROAD

    PROPOSED APPROACH GUIDERAIL

    PROPOSED BRIDGE SUBSTRUCTURE

    WATERCOURSE

    WETLANDS

    R.O.W. LINE

    EL 139.3EL 140.1

    EL 142.4

  • SCALE: 3/8"=1'-0"

    PROPOSED BRIDGE SECTION

    SIII-48

    4'-0"

    SIII-48

    4'-0"

    SIII-48

    4'-0"

    SIII-48

    4'-0"

    SIII-48

    4'-0"

    P.A.G.

    { 1" DIA. DRIP (TYP.)

    OPEN BRIDGE RAIL (TYP.)

    3-TUBE CURB MOUNTED

    CONCRETE DECK UNIT

    1'-6" PRESTRESSED

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    SHEET NO.:

    DRAWING TITLE: STATE PROJECT NO.:

    DATE:

    161-143

    DEPARTMENT OF TRANSPORTATION

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ONSTATE OF CONNECTICUT

    CITY/TOWN: BRIDGE NO.:

    ALTERNATE 1A

    CROSS SECTION

    05501

    SCALE:

    …"=1'-0"WILTON

    2%2%

    OUT TO OUT

    27'-8"

    CURB TO CURB

    24'-0"

    LANE

    10'-0"

    LANE

    10'-0"

    SIII-48

    4'-0"

    SIII-36

    3'-0"

    SHLDR.

    2'-0"

    SHLDR.

    2'-0"

    4"

    1'-10"1'-10"

    1'-6"

    2" (TYP.)

    (T

    YP.)

    3'-6"

    4"

    } ARROWHEAD ROAD

    { UHPC SHEAR KEY (TYP.)

    (COLD LIQUID ELASTOMERIC)

    MEMBRANE WATERPROOFING

    1"-4" HMA S0.25 (VARIABLE) OVER

    2" HMA S0.5 (TOP COURSE) OVER

    Drawing Copyright c 2020

    860.290.4100 www.chacompanies.com

    East Hartford, CT 06108

    101 East River Drive, 1st Floor

    PROPOSED BRIDGE SUPERSTRUCTURE

    LEGEND:

  • #6290

    CL&P

    #6291

    CL&P

    #6292

    CL&P

    #26030

    CL&P

    #6289

    CL&P

    #6288

    CL&P

    #22733

    CL&P

    FENCE

    BOARD

    FENCE

    BOARD

    FENCE

    BOARD

    FENCE

    BOARD

    FENCE

    BOARD

    FL=132.51

    FL=135.79

    FL=134.01

    FL=135.08

    FL=134.97

    FL=135.16

    FL=135.37

    D-2730

    FENCE

    CH LNK

    FENCE

    BOARD

    FENCE

    BOARD

    FENCE

    BOARD

    BOARD FENCE

    24'' RCP

    24'' RCP

    WALL

    WOOD RET

    MAILBOXES

    WALL

    WOOD RET

    RET WALL

    BLUE STONE

    LOW CHORD=139.49

    LOW CHORD=139.50

    12"

    AC

    CM

    P

    12"ACCMP

    12"

    AC

    CM

    P

    12"ACCMP

    (FND)

    IP

    (FND)

    IP

    (FND)

    IP

    N/F

    CHD

    N/F

    CHD

    (FND)

    SPIKE

    TIMBER

    (FND)

    AXLE

    CONC WALL

    (PER PROPERTY OWNER)

    ARTESIAN WELL

    WALK

    BLUE STONE

    130

    130 135

    135

    135

    135

    135

    135

    135

    135

    I.P.(FND)

    B.M.

    140 140

    140

    140

    140

    140

    140

    140B.M.

    NO#

    OH

    W

    OH

    W

    OH

    W

    OH

    W

    100+

    00

    101+00

    102+00N67°2

    2'59.0

    "E

    S79°12'10.0"E

    S47°03'33.0"E

    S79°12'10.0"E

    60.74

    2'

    90.788'

    0.577'

    1.952'

    E 8

    15951.9

    34'

    N 6

    24923.8

    77'

    100+00.0

    0

    Begin Sta.

    E 8

    16215.7

    24'

    N 6

    24893.2

    79'

    102+81.7

    3

    End Sta.

    E 8

    16008.0

    05'

    N 6

    24947.2

    36'

    100+60.7

    4

    PC

    E 8

    16134.3

    59'

    N 6

    24934.0

    76'

    101+89.4

    4

    PC

    E 816174.294'

    N 624913.664'

    102+34.90

    PC

    E 8

    16045.1

    78'

    N 6

    24951.0

    84'

    100+98.6

    5

    PT

    E 816173.872'

    N 624914.057'

    102+34.32

    PT

    E 8

    16213.8

    07'

    N 6

    24893.6

    45'

    102+79.7

    8

    PT

    PROJECT DESCRIPTION:

    PROJECT NUMBER: DRAWING NO.

    SHEET NO.

    9/8/2020

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    0

    1" = 20'HORIZONTAL SCALE

    STATE OF CONNECTICUT

    TRANSPORTATION

    OF

    DEPARTMENT

    BLOCK:

    SIGNATURE/

    DRAWING TITLE: TEMPORARY ROADWAY PLAN ALTERNATE 1A

    -

    TOWN(S):

    DESIGNER/DRAFTER: DGW/RAC CHECKED BY: JDL

    PLOTTED DATE:

    T:\CTDOT_CONNECT_DDE\CT_Projects\161-143_Wilton\Highways\HW_0161-0143_Sheet_TEMPBRDG.dgn FILE NAME: 7380 LASTED SAVED BY:

    20' 40'

    RE

    VIS

    ION

    DE

    SC

    RIP

    TIO

    ND

    AT

    ER

    EV

    .

    PI STA 102+12.49

    PI E 816156.9994

    PI N 624929.7584

    R 80.000'

    L 44.881'

    T 23.048'

    DELTA 32°08'37.0"

    CURVE #2

    PI STA 102+57.94

    PI E 816191.1671

    PI N 624897.9624

    R 80.000'

    L 44.881'

    T 23.048'

    DELTA 32°08'37.0"

    CURVE #3

    ARROWHEAD ROAD TEMPORARY ROADWAY

    CURVE DATA

    83

    CO

    OR

    DIN

    AT

    E G

    RID

    AD

    CO

    NN

    EC

    TIC

    UT

    REHABILITATION STUDY REPORT

    105 DANBURY ROAD

    OTTAVIANO VECCIA, ET ALN/F

    3 ARROWHEAD ROAD

    16 ARROWHEAD ROAD

    DAVID M. MISITAN/F

    24 ARROWHEAD ROAD

    ASSOCIATION, INCORPORATEDTHE ARROWHEAD COMMUNITY

    N/F

    34 ARROWHEAD ROAD

    MICHAEL W. BARNETT ET ALN/F

    23 ARROWHEAD ROAD

    PAUL T. EGAN, ET ALN/F

    MICHAEL CYRN/F

    Drawing Copyright c 2020

    860-290-4100 | www.chacompanies.com

    101 East River Drive, 1st Floor

    25 ARROWHEAD ROAD

    REVOCABLE TRUSTTHE FRANK J. MAGUIRE

    SHEVAUN MACARI, TRUSTEE OF N/F

    APPROX STREET LINE

    APPROX STREET LINE

    TO CENTER OF NORWALK RIVER

    FAVOR OF 3 ARROWHEAD ROAD

    15' DRAINAGE EASEMENT IN

    CO

    MM

    ON

    RIG

    HT

    OF

    WA

    Y

    CROSS SLOPE, 2%

    NO SHOULDERS

    (1) - 12' LANE

    TEMPORARY ROADWAY SECTION:

    CROSS SLOPE, 0%-2%

    NO SHOULDERS

    (2) - 12'± LANES

    EXISTING ROADWAY SECTION:

    ALTERNATING ONE-WAY TRAFFIC

    TEMPORARY SIGNAL CONTROLLED

    DESIGN SPEED: N/A

    POSTED SPEED LIMIT: UNKNOWN

    LOCAL URBAN STREETS

    CLASSIFICATION:

    ROADWAY FUNCTIONAL

    NOTES

    R.O.W.

    STA. 100+00.00

    MEET EXISTING PAVEMENT

    ROADWAY CONSTRUCTION

    BEGIN TEMPORARY

    STATE PROJECT NO 161-143

    STA. 102+82.00

    MEET EXISTING PAVEMENT

    ROADWAY CONSTRUCTION

    END TEMPORARY

    STATE PROJECT NO 161-143

    CURVE #1

    CURVE #2

    BL

    161-143

    REPLACEMENT OF BRIDGE NO. 05501 ARROWHEAD OVER NORWALK RIVER

    WILTON

    (2:1 MAX SIDE SLOPES)

    APPROXIMATE SLOPE LIMITS(TYP.)

    O.H.W.

    WETLAND (TYP.)

    STATE/FEDERAL

    ROAD

    TEMPORARY

    CURVE #3

    PI STA 100+80.25

    PI E 816026.0140

    PI N 624954.7386

    R 65.000'

    L 37.907'

    T 19.510'

    DELTA 33°24'51.0"

    CURVE #1

    12'

    12'

    SUMP=32.82

    12"(OUT)=134.67

    G=136.82

    CLCB (4)

    SUMP=133.09

    12"OUT(NE)=133.95

    12"IN(S)=133.98

    G=137.09

    CLCB (3)

    SUMP=134.78

    12"OUT(S)=135.28

    G=137.83

    CLCB (1)

    SUMP=134.50

    12"OUT(W)=135.50

    12"IN(N)=135.32

    G=138.10

    CLCB (2)

    UTILITY POLE

    RELOCATE

    NO

    RW

    AL

    K RIV

    ER

    ARROWHEAD ROAD

    AR

    RO

    WH

    EA

    D R

    OA

    D

    UTILITY POLE

    RELOCATE

    WALL

    RETAINING

    TEMPORARY

    PROPOSED

    TPCBC (TYP.)

    PROPOSED

    90'

    12'

    TRAFFIC

    ALTERNATING

    ONE WAY

    TRAFFIC

    ALTERNATING

    ONE WAY

    140

    (CT ROUTE 7)

    TO DANBURY RD

    TO C

    UL-D

    E-S

    AC

    BRIDGE

    TEMPORARY

    PROPOSED

    TEMPORARY BRIDGE

    EXISTING PAVEMENT

    TEMPORARY ROADWAY

    TEMPORARY PRECAST CONCRETE BARRIER CURB

    PROPOSED FILL

    PROPOSED CUT

    WATERCOURSE

    WETLANDS

    R.O.W. LINE

    LEGEND:

    CROSS SLOPE, 2%

    PI N 62

    R 65.0

    L 37.90

    T 19.51

    DELTA

    CURVWATERCOURSE

    WETLANDS

    R.O.W. LINE

    TEMPORARY EARTH RETAINING SYSTEM

    NO

    RW

    ALK

    RIV

    ER

    90' TEMPORARY BRIDGE

    ARROWHEAD ROAD

    TO DANBURY RD(US 7)

    TEMPORARY FILL

    TEMPORARY CUT

    A

    RR

    OW

    HE

    AD

    RO

    AD

    TO

    CU

    L-D

    E-S

    AC

  • K = 13.20

    H.S.D. = 267.00

    L.V.C. = 60.00

    K = 19.81

    H.S.D. = 452.42

    L.V.C. = 50.00

    TEMP BRIDGE LIMITS

    EL

    . 140.6

    6'

    ST

    A.

    10

    0+

    99

    .00

    EL

    . 141.1

    1'

    ST

    A.

    10

    1+

    89

    .00

    138.9

    5'

    EL

    . 10

    0+

    30

    .96

    ST

    A.

    140.6

    2'

    EL

    . 10

    0+

    90

    .96

    ST

    A.

    141.1

    7'

    EL

    . 10

    2+

    01

    .60

    ST

    A.

    140.7

    9'

    EL

    . 10

    2+

    51

    .60

    ST

    A.

    141.1

    9'

    EL

    . 10

    2+

    11

    .50

    ST

    A.

    HIG

    H P

    OIN

    T

    +3.23%

    +5.05%

    +0.50%-2.02%

    137.6

    6'

    EL

    . 10

    0+

    00

    .00

    ST

    A.

    138.1

    3'

    EL

    . 10

    0+

    14

    .76

    ST

    A.

    140.1

    8'

    EL

    . 10

    2+

    81

    .73

    ST

    A.

    140.4

    7'

    EL

    . 10

    0+

    60

    .94

    ST

    A.

    141.2

    9'

    EL

    . 10

    2+

    26

    .60

    ST

    A.

    REHABILITATION STUDY REPORT

    103+00100+00 101+00 102+00

    120

    130

    140

    150 150

    140

    130

    120

    Drawing Copyright c 2020

    860-290-4100 | www.chacompanies.com

    101 East River Drive, 1st Floor

    PROJECT DESCRIPTION:

    PROJECT NUMBER: DRAWING NO.

    SHEET NO.

    9/8/2020

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    STATE OF CONNECTICUT

    TRANSPORTATION

    OF

    DEPARTMENT

    BLOCK:

    SIGNATURE/

    DRAWING TITLE: TEMPORARY ROADWAY PROFILE ALTERNATE 1A

    -

    TOWN(S):

    DESIGNER/DRAFTER: DGW/RAC CHECKED BY: JDL

    PLOTTED DATE:

    T:\CTDOT_CONNECT_DDE\CT_Projects\161-143_Wilton\Highways\HW_0161-0143_Sheet_TEMPBRDG.dgn FILE NAME: 7380 LASTED SAVED BY:

    RE

    VIS

    ION

    DE

    SC

    RIP

    TIO

    ND

    AT

    ER

    EV

    .

    HORIZ. SCALE IN FEET

    VERT. SCALE IN FEET

    0 2 4

    0 20 40

    STA. 100+00.00

    MEET EXISTING PAVEMENT

    ROADWAY CONSTRUCTION

    BEGIN TEMPORARY

    STATE PROJECT NO 161-143

    STA. 102+82.00

    MEET EXISTING PAVEMENT

    ROADWAY CONSTRUCTION

    END TEMPORARY

    STATE PROJECT NO 161-143

    161-143

    REPLACEMENT OF BRIDGE NO. 05501 ARROWHEAD OVER NORWALK RIVER

    WILTON

    ALONG B

    EXISTING GROUND

    ALONG B

    PROPOSED GRADE L

    L

    TEMPORARY BRDIGE SUPERSTRUCTURE

    TEMPORARY ROADWAY RECONSTRUCTION

    TEMPORARY EARTH RETAINING SYSTEM

    LEGEND:

    (2) - 10' LANES

    PROPOSED ROADWAY SE

    CROSS SLOPE, 0%-2%

    NO SHOULDERS

    (2) - 12'± LANES

    PROPOSED FILL

    PROPOSED CUTCROSS SLOPE, 2% CROWN

    2' SHOULDERS-(STRIPED)

    (2) - 10' LANES

    PROPOSED ROADWAY SEPROPOSED CUT

    WATERCOURSE

    2020_10_20_ALT_1A_HwyPlan_6.1_Alternative 1A PlansHighway Plans and Temp Bridge 1AHW_0161-0143_Sheet_1A

    2020_10_20_ALT_1A_HwyProf2020_10_20_ALT_1A_PlanElevation2020_10_20_ALT_1A_SectionProposed Section 1A

    2020_10_20_ALT_1A_TempHwy_7.1_Alternative 1A Staging Plans

    2020_10_20_ALT_1A_TempProf