37
LIMS-314-6011 BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking to Enhance the Role of Demand Response in Meeting the State’s Resource Planning Needs and Operational Requirements. R.13-09-011 (Filed September 19, 2013) SOUTHERN CALIFORNIA EDISON COMPANY'S (U 338-E) OPENING COMMENTS ON DECISION APPROVING DEMAND RESPONSE PROGRAM IMPROVEMENTS AND 2015-2016 BRIDGE FUNDING BUDGET JANET S. COMBS R. OLIVIA SAMAD Attorneys for SOUTHERN CALIFORNIA EDISON COMPANY 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770 Telephone: (626) 302-3477 Facsimile: (626) 302-7044 E-mail: [email protected] Dated: May 5, 2014

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

LIMS-314-6011

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE

STATE OF CALIFORNIA

Order Instituting Rulemaking to Enhance the Role of Demand Response in Meeting the State’s Resource Planning Needs and Operational Requirements.

R.13-09-011 (Filed September 19, 2013)

SOUTHERN CALIFORNIA EDISON COMPANY'S (U 338-E) OPENING COMMENTS ON DECISION APPROVING DEMAND RESPONSE PROGRAM IMPROVEMENTS

AND 2015-2016 BRIDGE FUNDING BUDGET

JANET S. COMBS R. OLIVIA SAMAD

Attorneys for SOUTHERN CALIFORNIA EDISON COMPANY

2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770 Telephone: (626) 302-3477 Facsimile: (626) 302-7044 E-mail: [email protected]

Dated: May 5, 2014

Page 2: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

SOUTHERH CALIFORNIA EDISON COMPANY'S OPENING COMMENTS ON DECISION APPROVING DEMAND RESPONSE PROGRAM IMPROVEMENTS AND

2015-2016 BRIDGE FUNDING BUDGET

TABLE OF CONTENTS

Section Page

-i-

I. INTRODUCTION ....................................................................................................................................1

II. DISCUSSION .........................................................................................................................................2

A. The Proposed Decision’s Funding Authorization For SCE Should Be Corrected ..............................................................................................................................2

B. The Proposed Decision Should Be Modified To Allow For Advice Letter Submittal Of Negotiated AMP Contract Extensions ...........................................................4

C. The Reporting Requirements In Attachment 1 Of The Proposed Decision Should Be Modified To Improve The Report’s Value And Address Confidentiality Concerns .....................................................................................................4

D. The Proposed Decision Errs In Its Finding Of Fact 40 And Denial Of PG&E’s Demand Bidding Program Proposal ......................................................................6

III. CONCLUSION ......................................................................................................................................7

APPENDIX A - SCE’S PROPOSED CHANGES TO THE PD ...................................................................

APPENDIX B - PROPOSED CHANGES TO THE BUDGET TABLE FOR .............................................

SOUTHERN CALIFORNIA EDISON COMPANY .........................................................

Page 3: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

SOUTHERH CALIFORNIA EDISON COMPANY'S OPENING COMMENTS ON DECISION APPROVING DEMAND RESPONSE PROGRAM IMPROVEMENTS AND

2015-2016 BRIDGE FUNDING BUDGET

TABLE OF AUTHORITIES

Page

ii

CPUC Decisions

D.12-04-045 ……………………………………………………………………………… 2, 3

D.13-01-024 ……………………………………………………………………………… 2, 3

D.13-04-017 ……………………………………………………………………………… 2, 3

D.13-07-003 ……………………………………………………………………………… 2

D.14-01-004 ……………………………………………………………………………… 2

Page 4: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

1

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE

STATE OF CALIFORNIA

Order Instituting Rulemaking to Enhance the Role of Demand Response in Meeting the State’s Resource Planning Needs and Operational Requirements.

R.13-09-011 (Filed September 19, 2013)

SOUTHERN CALIFORNIA EDISON COMPANY'S (U 338-E) OPENING COMMENTS ON DECISION APPROVING DEMAND RESPONSE PROGRAM IMPROVEMENTS

AND 2015-2016 BRIDGE FUNDING BUDGET

I.

INTRODUCTION

Pursuant to Rule 14.3 of the Rules of Practice and Procedure of the California Public

Utilities Commission (Commission or CPUC), Southern California Edison Company (SCE)

respectfully submits these Opening Comments on the Proposed Decision (PD) of Administrative

Law Judge (ALJ) Hymes, “Decision Approving Demand Response Program Improvements and

2015-2016 Bridge Funding Budget,” which was mailed on April 15, 2014 in the Commission’s

Demand Response (DR) Order Instituting Rulemaking (R.)13-09-011.

SCE is pleased that the PD acknowledges SCE for implementing many changes over the

past two years to improve its DR programs, and that the Commission directs SCE to make no

further changes during the bridge period. Thus, SCE will continue to focus its DR program

improvement efforts on enabling direct participation in the California Independent System

Page 5: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

2

Operator’s (CAISO’s) wholesale market. The PD approves bridge funding for certain DR

programs and activities for the 2015 and 2016 program years for the California investor-owned

utilities (IOUs) and closes Phase One of the proceeding.

SCE recommends certain modifications to the PD, and includes its specific proposed

edits in the attached Appendix A and Appendix B.

II.

DISCUSSION

A. The Proposed Decision’s Funding Authorization For SCE Should Be Corrected

In Decision (D.) 14-01-004, the Commission established a bridge funding cap for DR

programs that includes funding approved in D.12-04-045, D.13-01-024, and D.13-04-017.1 The

PD concurs with D.14-01-004 and approves SCE’s 2015-2016 DR budget as approved by D.12-

04-045 and modified by D.13-01-024 and D.13-04-017.2 However, based on SCE’s analysis of

the PD’s Ordering Paragraph 15, and associated Attachment 4, it appears that corrections are

necessary to accurately reflect the correct authorized amounts of the previous funding decisions.

Table 1 below summarizes SCE’s recommended corrections to the ‘Authorized 2012-2014,’

‘Estimated 2013-2014,’ and ‘Requested 2015-2016,’ sections of the PD’s budget table in

Attachment 4. SCE’s corrections result in a PD funding authorization decrease of $8.2 million

from SCE’s 2015-2016 DR budget. SCE additionally provides a redlined version of Attachment

4 in Appendix B to these comments.

1 D.14-01-004, Ordering Paragraph (OP) 1. 2 PD, p. 36.

Page 6: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

3

Table II-1 Summary of SCE Bridge Funding Budgets

AUTHORIZED

2012-2014 ESTIMATED

2013-2014 REQUESTED

2015-2016

PD Total $ 187,296,217 $ 181,757,145 $ 180,528,395

SCE Correction $ 249,391,216 $ 185,608,478 $ 172,307,062

Difference - Increase/(Decrease) $ 62,094,999 $ 3,851,333 $ (8,221,333)

The ‘Authorized 2012-2014’ column of the budget table in Attachment 4 of the PD

excludes approximately $62.1 million of funding approved in:

D.12-04-045 for Integrated Demand Side Management (IDSM) activities

D.13-01-024 for Aggregator Managed Portfolio (AMP) contracts; and

D.13-04-017 for Summer Discount Plan (SDP), Auto-DR technology incentives,

Emerging Markets & Technologies (EM&T), and Flex Alert (Statewide Marketing).

The ‘Estimated 2013-2014’ column excludes funding approved for IDSM activities,

EM&T, and Flex Alert totaling approximately $3.9 million.

The ‘Requested 2015-2016’ column should be corrected to reflect a reduction of

approximately $8.2 million as a result of:

Statewide Marketing which has been transitioned to another proceeding (Application

12-08-007 et al.)

Local Marketing which was for one-time expenses in D.13-04-017 and for other

expenses for dynamic pricing which have moved to SCE’s General Rate Case,

pursuant to D.12-04-045; and

SDP funding which was to support a one-time expense to transition the Commercial

program from reliability-based program to price-responsive.

Page 7: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

4

B. The Proposed Decision Should Be Modified To Allow For Advice Letter Submittal

Of Negotiated AMP Contract Extensions

SCE is pleased that the PD allows for the extension of funding for the currently

authorized Aggregator Managed Portfolio (AMP) contracts; however, SCE recommends the PD

be modified to allow the re-negotiated contracts to be submitted and reviewed through the advice

letter process rather than an application.3 First, the re-negotiated contracts would be an extension

of what is already currently authorized by the Commission; SCE would not be seeking approval

of new or additional contracts with new parties, it only anticipates slight modifications to the

contracts. Second, the PD already authorizes the funding for the contracts based on what is

currently authorized, so SCE will not be seeking funding authorization for the AMP contracts.

Third, the advice letter process can provide for a more timely resolution than the application

process. SCE expects that an advice letter with the contract extensions could be approved by the

Commission in time for operations to begin on January 1, 2015. Lastly, similar to DR

procurement, the Demand Response Auction Mechanism (DRAM) proposed in this Rulemaking

presents the advice letter process as a reasonable method for approval of contracts.4

C. The Reporting Requirements In Attachment 1 Of The Proposed Decision Should Be

Modified To Improve The Report’s Value And Address Confidentiality Concerns

The PD includes a new reporting template for transparency of the utilities’ administration

of DR.5 SCE appreciates the Commission’s and ORA’s desire to better understand the reasoning

behind the dynamics of least-cost dispatch decisions that include supply-side and demand-side

resources. SCE is supportive of some, but not all, the components in the proposed template

3 PD, OP 17 at p. 49. 4 Joint Assigned Commissioner And Administrative Law Judge Ruling And Revised Scoping Memo

Defining Scope And Schedule For Phase Three, Revising Schedule For Phase Two, And Providing Guidance For Testimony and Hearings, Attachment B, p. 15.

5 PD, OP 2, p. 45. See also, PD, Attachment 1.

Page 8: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

5

(which is to be used as a starting point in the development of the final template). SCE is

committed to working with interested stakeholders to strike a balance between providing

valuable information to the Commission while avoiding unnecessary complexity, duplication of

existing efforts, and confidentiality concerns. SCE recommends the following principles in the

development of the reporting template.

First, the report should be implemented on a trial basis. The report should only be

required for the period of July through September 2014. After that period, the Commission

should host a lessons-learned workshop so that parties can jointly assess the report’s value and

compliance burden.

Second, the trial report should be viewed as informational only for the edification of

interested stakeholders, and not as a tool for making operational changes to DR programs and

procedures during the critical summer period. The lessons-learned workshop suggested above is

a more appropriate venue to discuss program modifications resulting from information in the

template.

Third, because the report’s intended purpose is to evaluate dispatch decisions that are

made on an economic basis, the following programs should be excluded:

The Base Interruptible Program and the Agricultural Pumping & Interruptible

program. These programs are dispatched only on an emergency basis in the event of

system constraints or the implementation of CAISO emergency procedures;

The Summer Discount Plan. This program’s use and availability will be transitioned

into the CAISO market under a limited number of hours that are not tied to a fixed

price trigger;6 and

The Summer Advantage Incentive program. This program (also known as Critical

Peak Pricing) must be dispatched twelve times each year regardless of market prices,

6 SCE expects to file an advice letter which will limit the number of CAISO dispatch hours as it transitions the resource into the CAISO market.

Page 9: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

6

temperatures, or other conditions. As a result, SCE’s decision of whether to dispatch

this program is not subject to an economic criterion.

Fourth, reporting should only occur on an exception basis. In other words, the report

should only cover times in which a program’s trigger condition was met but the program was not

dispatched. The report should not cover times when DR programs were actually dispatched,

because this is currently reported on a weekly basis pursuant to OP 3 of D.13-07-003.

Fifth, interested stakeholders should address confidentiality concerns from disclosing

pricing information. The PD’s draft template requires the disclosure of confidential or

proprietary information regarding the Utilities’ forecasted prices and resource strategies. The

potential impacts from this disclosure should be discussed and mitigated during the initial

meeting outlined in OP 2 of the PD.

SCE recommends the PD be modified to include these principles as rules that will govern

the stakeholder meeting directed in OP 2. In addition, SCE recommends OP 2 be modified to

direct a Tier One Advice Letter to be consistent with the discussion on page 16 of the PD.

D. The Proposed Decision Errs In Its Finding Of Fact 40 And Denial Of PG&E’s

Demand Bidding Program Proposal

In their March 3, 2014 DR program proposals for 2015 and 2016, Pacific Gas and

Electric Company (PG&E) proposed seven specific program changes to their Demand Bidding

Program (DBP). One of the changes involved expanding the dispatch window for the program to

“increase dispatch potential of resource.” 7 The PD denies PG&E’s request on the grounds the

change would place an unfair burden on participants. SCE disagrees with the PD’s finding and

its denial of PG&E’s proposal, and requests that the PD be corrected to allow PG&E to

implement the proposal so that SCE can learn from the experience.

7 Pacific Gas and Electric Company’s Demand Response Program Proposals For 2015 and 2016, p. 4.

Page 10: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

7

The current window for DBP events is non-holiday weekdays 12 p.m. through 8 p.m.

PG&E’s proposal would allow customers to “bid” their voluntary load reductions to be

dispatched over a broader period during the day of the DR event between the hours of 6 a.m. to

10 p.m. The DBP is structured as a voluntary pay for performance program that allows

customers to bid in their anticipated load shed a day in advance of the DR event. Customers are

compensated only for the actual amount of reduction they provide when an event is called. The

customer is not penalized for not offering a bid, nor are they penalized if they bid but do not

perform (no measurable reduction).

The PD should be modified because it errs in its Finding of Fact that “the request by

PG&E to expand the DBP dispatch window could place an unfair burden on participants.”8

Based on its experience and review of the record in this proceeding, SCE is not aware of any

detrimental effect to a customer if the DBP is offered to provide a wider window of opportunity

for customers to bid and perform load reductions. SCE respectfully requests that Finding of Fact

40 be struck and the PD be revised to allow PG&E to expand the DBP dispatch window to be

6:00 a.m. to 10:00 p.m. to offer customers more opportunity to participate in the program.

III.

CONCLUSION

SCE appreciates the opportunity to provide these comments on the PD.

8 PD, Finding of Fact 40.

Page 11: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

8

Respectfully submitted, JANET S. COMBS R. OLIVIA SAMAD

/s/ R. Olivia Samad By: R. Olivia Samad

Attorneys for SOUTHERN CALIFORNIA EDISON COMPANY

2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770 Telephone: (626) 302-3477 Facsimile: (626) 302-7044 E-mail: [email protected]

Date: May 5, 2014

Page 12: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

Appendix A

SCE’s Proposed Changes to the PD

Page 13: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

A-1

SCE’S PROPOSED CHANGES TO THE PD OF ALJ HYMES “DECISION APPROVING DEMAND RESPONSE PROGRAM IMPROVEMENTS AND 2015-2016

BRIDGE FUNDING BUDGET”

Reference Proposed Modifications

Findings of Fact

40 The request by PG&E to expand the DBP dispatch window could place an unfair

burden on participants.

[Delete in its entirety]

41 PG&E did not present evidence that the benefits of expanding the DBP dispatch

window would counterbalance the participant burden.

[Delete in its entirety]

Conclusions of Law

15 It is reasonable to deny approve the PG&E request to expand the DBP dispatch

window to be 6:00 am to 10:00 pm.

Ordering Paragraphs

2 Within 30 days from the issuance of this decision Pacific Gas and Electric

Company, San Diego Gas & Electric Company and Southern California Edison

Company (jointly, the Utilities) shall organize and meet with the appropriate

Commission Staff, the Office of Ratepayer Advocates, and any other interested

stakeholders to develop an agreed-upon reporting template for providing weekly

exception reporting, using the draft reporting template in Attachment A as a

starting point. All stakeholders should take into consideration other utility reporting

requirements to ensure no unnecessary duplication. Within 30 days following the

initial meeting, the Utilities shall file a Tier Two One Advice Letter requesting

Page 14: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

A-2

Reference Proposed Modifications

approval by the Commission of the final reporting template.

Ordering Paragraphs (cont’d)

6 The following requested changes to Pacific Gas and Electric Company (PG&E)

2015-2016 Demand Response Programs are denied:

a. to specifically state that PG&E can dispatch a Demand Bidding Program

(DBP) event at its discretion;

b. to expand the DBP dispatch window to be 6:00 am to 10:00 p.m.;

c.b. all changes to the Air Conditioning Cycling program;

d.c. to carry over the 2012-2014 Permanent Load Shifting budget;

e.d. to extend the Transmission & Distribution Pilot and to perform a Supply

Side Demand Response Pilot; and

f.e. the request by the Office of Ratepayer Advocates to target the marketing of

the SmartRate program.

15 We authorize a budget of $180,528,395 $172,307,062 for Southern California

Edison Company for its 2015-2016 demand response programs to be allocated in

the previously approved demand response categories as indicated in Attachment 4.

17 No later than July 15, 2014, Southern California Edison Company shall file an

application Tier One Advice Letter requesting approval of 2015-2016 re-negotiated

Aggregator Managed Portfolio program agreements.

Page 15: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

Appendix B

Proposed Changes to the Budget Table for

Southern California Edison Company

Page 16: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

B-1

Budget for Southern California Edison Company~

PROGRAM AUTHORIZED 2012-2014

ESTIMATED 2013-2014

REQUESTED 2015-2016

AUTHORIZED 2015-2016

Category 1 - Reliability Programs

Agricultural Pumping Interruptible $1,543,052 $1,028,701 $1,028,701 $1,028,701

Base Interruptible Program $2,407,226 $1,604,817 $1,604,817 $1,604,817

Optional Binding Mandatory Curtailment (OBMC) $37,475 $24,983 $24,983 $24,983

Rotating Outages $321,658 $214,439 $214,439 $214,439

Scheduled Load Reduction (SLR) $15,000 $10,000 $10,000 $10,000

Category 1 Total $4,324,411 $2,882,941 $2,882,941 $2,882,941

Category 2 - Price Responsive Programs

Ancillary Service Tariff $0 $0 $0 $0

Capacity Bidding Program (CBP) $661,287 $440,858 $440,858 $440,858

Demand Bidding Program (DBP) $1,483,686 $989,124 $989,124 $989,124

Summer Discount Plan Program (AC Cycling)

$64,391,768 ^ $65,084,768

$45,520,845 ^ $43,620,845

$45,520,845 ^ $42,927,845

$45,520,845

$42,927,845

Peak Time Rebates (Save Power Day) $4,707,515 $3,138,343 $3,138,343 $3,138,343

Energy Options $0 $0 $0 $0

Category 2 Total $71,244,256

$71,937,256 $50,089,171 $48,189,171

$50,089,171 $47,496,171

$50,089,171 $47,496,171

Category 3 - Aggregator Managed Portfolio (AMP)

AMP Contracts * $0 $49,300,000 $49,300,000 $49,300,000 $49,300,000

Category 3 Total $0 $49,300,000 $49,300,000 $49,300,000 $49,300,000

Category 4 - Emerging & Enabling Technologies

Auto-DR Technology Incentives $35,576,277 # $40,576,277 # $28,717,518 $28,717,518 $28,717,518

DR Emerging Markets & Technologies $7,303,969

$8,278,969 $4,869,313

$5,844,313 $4,869,313

$5,844,313 $4,869,313

$5,844,313

Ag Pump Timer $0 $0 $0 $0

Technical Assistance/Technology Incentives (TA/TI) $0 $0 $0 $0

Category 4 Total $47,880,247 $48,855,246

$33,586,831 $34,561,831

$33,586,831 $34,561,831

$33,586,831 $34,561,831

Category 5 Pilots

Smart Charging Pilot $600,000 $400,000 $0 $0

Workplace Charging Pilot $1,243,125 $828,750 $0 $0

Category 5 Total $1,843,125 $1,228,750 $0 $0

Category 6 Evaluation, Measurement & Verification

DRMEC $6,404,147 $4,269,431 $4,269,431 $4,269,431

DR Research $1,200,000 $800,000 $800,000 $800,000

Page 17: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

B-2

PROGRAM AUTHORIZED 2012-2014

ESTIMATED 2013-2014

REQUESTED 2015-2016

AUTHORIZED 2015-2016

Category 6 Total $7,604,147 $5,069,431 $5,069,431 $5,069,431

Category 7 Marketing, Education and Outreach

Statewide Marketing $5,500,000

$5,675,000 $3,666,667

$3,841,667 $3,666,667

$0 $3,666,667

$0

Local Marketing $22,000,000

$23,900,000 $14,666,667

$16,566,667 $14,666,667

$11,730,000 $14,666,667

$11,730,000

Category 7 Total $27,500,000 $29,575,000

$18,333,333 $20,408,334

$18,333,333 $11,730,000

$18,333,333 $11,730,000

Category 8 DR System Support Activities

DR Systems $17,900,032 $11,933,355 $11,933,355 $11,933,355

DR Forecasting $0 $0 $0 $0

Category 8 Total $17,900,032 $11,933,355 $11,933,355 $11,933,355

Category 9 Integrated Programs and Activities

IDSM $0 $4,051,999

$0 $2,701,333 $0 $0

Category 9 Total $0 $4,051,999

$0 $2,701,333 $0 $0

Category 10 Special Projects

Permanent Load Shifting (PLS) $14,000,000 $9,333,333 $9,333,333 $9,333,333

Category 10 Total $14,000,000 $9,333,333 $9,333,333 $9,333,333

TOTAL $187,296,217 $249,391,216

$181,757,145 $185,608,478

$180,528,395 $172,307,062

$180,528,395 $172,307,062

~ SCE did not provide a breakdown of their budget request. SCE only stated they request the same budget amounts as approved in D.12-04-045, D.13-01-024, and D.13-04-017.

^ “Authorized” and “Estimated” amounts include Includes Commission approved funds of $1.9 Million for Residential Summer Discount Plan (SDP) and $693,000 for Commercial SDP, as approved in D.13 04017, but is excluded from the “Requested” and ‘Authorized’ amounts because $1.9 million for Residential SDP was moved to Local Marketing and $693,000 for Commercial SDP was for a one-time project.

* 2013-2014 AMP program agreements were approved by the Commission through D.13-01-024.

# “Authorized” and “Estimated” amounts include Includes the $5M approved in D.13-04-017 with the stipulation that $4.2 Million must go toward incentives. The program must follow the rules of D.12-04-045.

Amounts include Commission approved funds of $0.975 Million for Emerging Markets and Technology, as approved in D.13-04-017.

Amounts include Commission approved funds of $0.175 Million for Statewide Marketing, as approved in D.13-04-017.

Amounts include Commission approved funds of $1.9 Million for Residential Summer Discount Plan, as approved in D.13-04-017, and excludes other local marketing funding, approved in D.12-04-045, for DR Marketing, Education & Outreach, Critical Peak Pricing, and Real Time Pricing.

Page 18: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

BEFORE THE PUBLIC UTILITIES COMMISSION OF

THESTATE OF CALIFORNIA

Order Instituting Rulemaking to Enhance the Role of Demand Response in Meeting the State’s Resource Planning Needs and Operational Requirements.

R.13-09-011 (Filed September 19, 2013)

CERTIFICATE OF SERVICE

I hereby certify that, pursuant to the Commission’s Rules of Practice and Procedure, I have this day served a true copy of SOUTHERN CALIFORNIA EDISON COMPANY’S (U 338-E) OPENING COMMENTS ON DECISION APPROVING DEMAND RESPONSE PROGRAM IMPROVEMENTS AND 2015-2016 BRIDGE FUNDING BUDGET on all parties identified on the attached service list(s) R.13-09-011. Service was effected by one or more means indicated below:

Transmitting the copies via e-mail to all parties who have provided an e-mail address.

Placing the copies in sealed envelopes and causing such envelopes to be delivered by hand or by overnight courier to the offices of the Commissioner(s) or other addressee(s).

ALJ Kelly Hymes 505 Van Ness Avenue

San Francisco, CA 94102

Placing copies in properly addressed sealed envelopes and depositing such copies in the United States mail with first-class postage prepaid to all parties for those listed on the attached non-email list.

Directing Prographics to place the copies in properly addressed sealed envelopes and to deposit such envelopes in the United States mail with first-class postage prepaid to all parties.

Executed this 5th day of May, 2014 at Rosemead, California.

/s/ Janice Velarde Janice Velarde Project Analyst SOUTHERN CALIFORNIA EDISON COMPANY

2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770

Page 19: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

PROCEEDING: R1309011 - CPUC - OIR TO ENHANC FILER: CPUC LIST NAME: LIST LAST CHANGED: APRIL 30, 2014

DOWNLOAD THE COMMA-DELIMITED FILE ABOUT COMMA-DELIMITED FILES

Back to Service Lists Index

ELIZABETH KELLY JODY S. LONDON LEGAL DIRECTOR JODY LONDON CONSULTING MARIN CLEAN ENERGY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 FOR: SOUTHERN CA REGIONAL ENERGY FOR: MARIN CLEAN ENERGY (FORMERLY MARIN NETWORK/LOCAL GOVERNMENT SUSTAINABLE ENERGY AUTHORITY) ENERGY COALITION/BAY AREA REGIONAL JOHN W. LESLIE SETH FRADER-THOMPSON ATTORNEY PRESIDENT MCKENNA LONG & ALDRIDGE LLP ENERGYHUB EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, NY 00000 FOR: SHELL ENERGY NORTH AMERICA FOR: ALARM.COM AND ENERGHUB STEPHANIE WANG MICHAEL PANFIL POLICY DIRECTOR & ATTORNEY ENVIRONMENTAL DEFENSE FUND CLEAN COALITION 257 PARK AVENUE SOUTH, FLOOR 16 EMAIL ONLY NEW YORK, NY 10010 EMAIL ONLY, CA 00000 FOR: ENVIRONMENTAL DEFENSE FUND FOR: CLEAN COALITION COLIN MEEHAN HOWARD CHOY DIRECTOR, REGULATORY & MARKET STRATEGY DIR. - OFFICE OF SUSTAINABILITY COMVERGE, INC COUNTY OF LOS ANGELES 96 CHICON ST. 1100 NORTH EASTERN AVENUE, ROOM 300 AUSTIN, TX 78702 LOS ANGELES, CA 90063

CPUC Home

CALIFORNIA PUBLIC UTILITIES COMMISSION Service Lists

Parties

Page 1 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 20: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

FOR: COMVERGE, INC. FOR: THE SOUTHERN CALIFORNIA REGIONAL ENERGY NETWORK DANIEL W. DOUGLASS OLIVIA SAMAD ATTORNEY ATTORNEY DOUGLASS & LIDDELL SOUTHERN CALIFORNIA EDISON COMPANY 21700 OXNARD ST., STE. 1030 2244 WALNUT GROVE AVENUE WOODLAND HILLS, CA 91367 ROSEMEAD, CA 91770 FOR: WESTERN POWER TRADING FORUM FOR: SOUTHERN CALIFORNIA EDISON COMPANY DONALD C. LIDDELL SACHU CONSTANTINE ATTORNEY DIRECTOR OF POLICY DOUGLASS & LIDDELL CALIFORNIA CENTER FOR SUSTAINABLE ENERGY 2928 2ND AVENUE 9325 SKY PARK COURT, SUITE 100 SAN DIEGO, CA 92103 SAN DIEGO, CA 92123 FOR: CALIFORNIA ENERGY STORAGE ALLIANCE FOR: CALIFORNIA CENTER FOR SUSTAINABLE ENERGY (CCSE) THOMAS R. BRILL LOGAN OLDS SR COUNSEL & DIRECTOR VWRA SAN DIEGO GAS & ELECTRIC COMPANY 15776 MAIN STREET, STE. 3 8330 CENTURTY PARK CT., CP32E HESPERIA, CA 92345 SAN DIEGO, CA 92123-1530 FOR: VICTOR VALLEY WASTEWATER FOR: SAN DIEGO GAS & ELECTRIC RECLAMATION AUTHORITY MONA TIERNEY-LLOYD SUE MARA DIR., WESTERN REGUALTORY AFFAIRS PRINCIPAL ENERNOC, INC. RTO ADVISORS, LLC PO BOX 378 164 SPRINGDALE WAY CAYUCOS, CA 93430 REDWOOD CITY, CA 94062 FOR: ENERNOC, INC. FOR: DIRECT ACCESS CUSOMER COALITION (DACC); ALLIANCE FOR RETAIL ENERGY MARKETS (AREM) LISA-MARIE SALVACION DONALD P. HILLA CALIF PUBLIC UTILITIES COMMISSION SR. REGULATORY COUNSEL LEGAL DIVISION CONSUMER FEDERATION OF CALIFORNIA ROOM 5029 433 NATOMA STREET, STE. 200 505 VAN NESS AVENUE SAN FRANCISCO, CA 94103 SAN FRANCISCO, CA 94102-3214 FOR: CONSUMER FEDERATION OF CALIFORNIA FOR: ORA MARCEL HAWIGER PIERCE BULL THE UTILITY REFORM NETWORK NATURAL RESOURCES DEFENSE COUNCIL 785 MARKET ST., STE. 1400 111 SUTTER STREET, 20TH FLOOR SAN FRANCISCO, CA 94103 SAN FRANCISCO, CA 94104 FOR: THE UTILITY REFORM NETWORK (TURN) FOR: NATURAL RESOURCES DEFENSE COUNCIL BRIAN K. CHERRY NORA SHERIFF VP, REGULATORY RELATIONS ALCANTAR & KAHL, LLP PACIFIC GAS AND ELECTRIC COMPANY 33 NEW MONTGOMERY STREET, SUITE 1850 77 BEALE STREET, ROOM 1087 SAN FRANCISCO, CA 94105 SAN FRANCISCO, CA 94105 FOR: CALIFORNIA LARGE ENERGY CONSUMERS FOR: PACIFIC GAS & ELECTRIC COMPANY ASSOCIATION (CLECA)

Page 2 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 21: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

SHIRLEY WOO MEGAN M. MYERS ATTORNEY AT LAW LAW OFFICES OF SARA STECK MYERS PACIFIC GAS AND ELECTRIC COMPANY 122 - 28TH AVENUE 77 BEALE STREET, B30A SAN FRANCISCO, CA 94121 SAN FRANCISCO, CA 94105 FOR: CENTER FOR ENERGY EFFICIENCY AND FOR: PACIFIC GAS AND ELECTRIC COMPANY RENEWABLE TECHNOLOGIES (CEERT) SARA STECK MYERS MATTHEW BARMACK ATTORNEY AT LAW DIR 122 28TH AVENUE CALPINE CORPORATION SAN FRANCISCO, CA 94121 4160 DUBLIN BLVD., SUITE 100 FOR: JOINT DR PARTIES DUBLIN, CA 94568 FOR: CALPINE CORPORATION BETH REID GERALD LAHR OLIVINE, INC. ENERGY PROGRAMS MGR. 2010 CROW CANYON PLACE, STE. 100 ASSOCIATION OF BAY AREA GOVERNMENTS SAN RAMON, CA 94583 101 8TH ST. FOR: OLIVINE, INC OAKLAND, CA 94607 FOR: ASSOCIATION OF BAY AREA GOVERNMENTS (ABAG) DAVID WOOLEY MELISSA KASNITZ OF COUNSEL ATTORNEY KEYES FOX & WEIDMAN, LLP CENTER FOR ACCESSIBLE TECHNOLOGY 436 14TH STREET, STE. 1305 3075 ADELINE STREET, STE. 220 OAKLAND, CA 94612 BERKELEY, CA 94703 FOR: SOLARCITY CORPORATION FOR: CENTER FOR ACCESSIBLE TECHNOLOGY EDWARD KOCH MATTHEW O'KEEFE SENIOR FELLOW OPOWER HONEYWELL / AKUACOM 760 MARKET STREET, 4TH FLOOR 781 LINCOLN AVE., STE. 210 SAN FRANCISCO, CA 94920 SAN RAFAEL, CA 94901 FOR: OPOWER FOR: HONEYWELL / AKUACOM JOHN NIMMONS RICH QUATTRINI COUNSEL DIR. PRODUCT MANAGEMENT JOHN NIMMONS & ASSOCIATES, INC. JOHNSON CONTROLS 175 ELINOR AVE., STE. G 901 CAMPISI WAY, STE 260 MILL VALLEY, CA 94941 CAMPBELL, CA 95008-2348 FOR: SIERRA CLUB FOR: JOHNSON CONTROLS EUGENE S. WILSON HEATHER SANDERS LAW OFFICE OF EUGENE WILSON CALIFORNIA ISO 3502 TANAGER AVENUE 250 OUTCROPPING WAY DAVIS, CA 95616-7531 FOLSOM, CA 95630-8773 FOR: CALIFORNIA CLEAN ENERGY COMMITTEE FOR: CALIFORNIA INDEPENDENT SYSTEM OPERATOR (CAISO) ERIC EISENHAMMER KAREN N. MILLS COALITION OF ENERGY USERS ATTORNEY AT LAW 4010 FOOTHILLS BLVD., STE 103 NO. 115 CALIFORNIA FARM BUREAU FEDERATION ROSEVILLE, CA 95747 2300 RIVER PLAZA DRIVE

Page 3 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 22: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

FOR: COALITION OF ENERGY USERS (CEU) SACRAMENTO, CA 95833 FOR: CALIFORNIA FARM BUREAU FEDERATION STEPHEN GROVER PRESIDENT EVERGREEN ECONOMICS, INC. 333 SW TALYOR STREET, SUITE 200 PORTLAND, OR 97204 FOR: EVERGREEN ECONOMICS, INC.

AHMAD FARUQUI ALLEN FREIFELD THE BRATTLE GROUP VIRIDITY ENERY, INC. EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 ANDY SCHWARTZ ATHENA BESA DEPUTY DIR - EMERGING PRODUCTS SAN DIEGO GAS & ELECTRIC COMPANY SOLARCITY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 BARB BOICE BARBARA R. BARKOVICH EMAIL ONLY BARKOVICH & YAP, INC. EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000 CASE COORDINATION CEDRIC O. CHRISTENSEN PACIFIC GAS AND ELECTRIC COMPANY DIR - OPER & DEVELOPMENT EMAIL ONLY STRATEGEN CONSULTING LLC EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000 CHARLIE BUCK DAN CHIA CALIF. CENTER FOR SUSTAINABLE ENERGY DEP. DIR. - GOVERNMENT AFFAIRS EMAIL ONLY SOLARCITY EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000 DAVID E. MORSE DAVID NEMTZOW EMAIL ONLY NEMTZOW & ASSOCIATES EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000 DAVID REED DEANE BURK SOUTHERN CALIFORNIA EDISON EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 DEVRA WANG DIANE I. FELLMAN

Information Only

Page 4 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 23: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

STAFF SCIENTIST SR. DIR. - REGULATORY STRATEGY & POLICY NATURAL RESOURCES DEFENSE COUNCIL NRG WEST EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 DOCKET COORDINATOR DREW ADAMS KEYS AND FOX VIRIDITY ENERGY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 DYANA MARIE DELFIN-POLK EDWARD VINE POLICY MANAGER LAWRENCE BERKELEY NATIONAL LABORATORY CLEAN COALITION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 ENRIQUE GALLARDO GENE THOMAS THE GREENLINING INSTITUTE ECOLOGY ACTION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 GREGG FISHMAN GREGORY S.G. KLATT ECOLOGY ACTION DOUGLASS & LIDDELL EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 JAN MCFARLAND JASON KEYES SONIC KEYES FOX & WIEDMAN LLP EMAIL ONLY EMAIL ONLY EMAIL O NLY, CA 00000 EMAIL ONLY, CA 00000 JEREMY WAEN JESSICA COHEN REGULATORY ANALYST MANAGEMENT FOLLOW/PROGRAM MANAGER MARIN CLEAN ENERGY L.A.COUNTY OFFICE OF SUSTAINABILITY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 JOEL GAMORAN JONNA ANDERSON C3 ENERGY VIRIDITY ENERGY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 JONNA NADERSON KENNETH LAUGHLIN VIRIDITY ENERGY VIRIDITY ENERGY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 MALCOLM D. AINSPAN MARGARET BRUCE ENERGY CURTAILMENT SPECIALISTS ECOLOGY ACTION EMAIL ONLY EMAIL ONLY EMAIL ONLY, NY 00000 EMAIL ONLY, CA 00000

Page 5 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 24: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

MARINA TEPER MARK R. HUFFMAN ENERGYHUB, INC. ATTORNEY AT LAW EMAIL ONLY PACIFIC GAS AND ELECTRIC COMPANY EMAIL OINLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000 MATTHEW PLANTE MCE REGULATORY BIDGELY, INC. MARIN CLEAN ENERGY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 MELISSA P. MARTIN NATHAN MURTHY STATESIDE ASSOCIATES ANALYTICS ENGINEER EMAIL ONLY WIRELESS GLUE NETWORKS, INC. EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000 NICHOLAS J. PLANSON PAUL KARR CONSUMER POWERLINE TRILLIANT NETWORKS, INC. EMAIL ONLY EMAIL ONLY EMAIL ONLY, MD 00000 EMAIL ONLY, CA 00000 PETER PEARSON RICHARD H. COUNIHAN BEAR VALLEY ELECTRIC SERVICE SR. DIRECTOR CORPORATE DEVELOPMENT EMAIL ONLY ENERNOC, INC. EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000 RYAN BERNARDO SCOTT BLAISING BRAUN BLAISING MCLAUGHLIN, P.C. ATTORNEY EMAIL ONLY BRAUN BLAISING MCLAUGHLIN, P.C. EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000 SEAN P. BEATTY SEPHRA A. NINOW SR. MGR. EXTERNAL & REGULATORY AFFAIRS REGULATORY AFFAIRS MGR. NRG WEST CALIFORNIA CENTER FOR SUSTAINABLE ENERGY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 SHALINI SWAROOP SNULLER PRICE REGULATORY COUNSEL ENERGY AND ENVIRONMENTAL ECONOMICS MARIN CLEAN ENERGY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 THADEUS B. CULLEY TIMOTHY N. TUTT KEYES FOX & WIEDMAN LLP SACRAMENTO MUNICIPAL UTILITIES DISTRICT EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 TODD S. GLASSEY WARREN MITCHELL EMAIL ONLY THE ENERGY COALITION

Page 6 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 25: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000 MRW & ASSOCIATES, LLC ELAINE S. KWEI EMAIL ONLY PIPER JAFFRAY & CO EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000-0000 MARTIN HOMEC MICHELLE GRANT CALIFORNIANS FOR RENEWABLE ENERGY, INC. DYNEGY, INC. EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000-0000 EMAIL ONLY, TX 00000-0000 ROBIN J. WALTHER, PH.D. STEPHEN D. BAKER EMAIL ONLY FELLON-MCCORD AND ASSOC. EMAIL ONLY, CA 00000-0000 CONSTELLATION NEW ENERGY-GAS DIV. EMAIL ONLY EMAIL ONLY, KY 00000-0000 STUART SCHARE ERIN GRIZARD SUMMIT BLUE CONSULTING SENIOR MANAGER-REG.& GOV'T. AFFAIRS EMAIL ONLY BLOOMENERGY EMAIL ONLY, CO 00000-0000 EMAIL ONLY EMAIL ONLY, CA 00000-9162 ERIN MALONE SHELLY-ANN MAYE SYNAPSE ENERGY ECONOMICS, INC. NORTH AMERICA POWER PARTNERS 485 MASSACHUSETTS AVE., SUITE 2 308 HARPER DRIVE, SUITE 320 CAMBRIDGE, MA 02139 MOORESTOWN, NJ 08057 CLARK E. PIERCE MARIE PIENIAZEK LANDIS & GYR 1328 BOZENKILL ROAD 246 WINDING WAY DELANSON, NY 12053 STRATFORD, NJ 08084 GLEN E. SMITH ALICIA R. PETERSEN PRESIDENT AND CEO RHOADS & SINON LLP ENERGY CURTAILMENT SPECIALISTS, INC. ONE SOUTH MARKET SQUARE, PO BOX 1146 4455 GENESEE ST., STE.101 HARRISBURG, PA 17108 BUFFALO, NY 14225-1955 MONICA S. IINO SCOTT H. DEBROFF RHOADS & SINON LLP RHOADS & SINON LLP M&T BUILDING ONE SOUTH MARKET SQUARE, PO BOX 1146 ONE SOUTH MARKET SQUARE, PO BOX 1146 HARRISBURG, PA 17108-1146 HARRISBURG, PA 17108 DAN DELUREY JILL TAUBER DEMAND RESPONSE AND SMART GRID COALITION CHAIR, CLEAN ENERGY PRACTICE 1301 CONNECTICUT AVE., NW, STE. 350 EARTHJUSTICE WASHINGTON, DC 20036 1625 MASSACHUSETTS AVE., NW, STE. 702 WASHINGTON, DC 20036

Page 7 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 26: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

GRAYSON HEFFNER KEVIN SIMONSEN 15525 AMBIANCE DRIVE ENERGY MANAGEMENT SERVICES N. POTOMAC, MD 20878 20 KRISTIN CT. SANTA ROSA BEACH, FL 32459 FOR: ENERGY USERS FORUM KEN SKINNER RON BINZ VICE PRESIDENT, COO PUBLIC POLICY CONSULTING INTEGRAL ANALYTICS, INC 333 EUDORA 312 WALNUT STREET, SUITE 1600 DENVER, CO 80220-5721 CINCINNATI, OH 45202 ANDREW CAMPBELL DANIEL M. VIOLETTE TENDRIL SUMMIT BLUE CONSULTING 2580 55TH ST.,STE. 100 1375 WALNUT ST., STE. 200 BOULDER, CO 80301-5709 BOULDER, CO 80302-5242 KEVIN COONEY CAMERON BROOKS PRINCIPAL/CEO TOLERABLE PLANET ENTERPRISES SUMMIT BLUE CORPORATION 3020 JEFFERSON STREET 1375 WALNUT ST., STE. 200 BOULDER, CO 80304 BOULDER, CO 80302-5242 LARRY B. BARRETT PAUL BECK CONSULTING ASSOCIATES, INC. ELITE ENERGY SYSTEMS PO BOX 60429 20 INDUSTRIAL PARKWAY COLORADO SPRINGS, CO 80960 CARSON CITY, NV 89706 STEVEN D. PATRICK JOYCE LEUNG ATTORNEY SOUTHERN CALIFORNIA EDISON COMPANY SOCAL GAS CO 6060 J IRWINDALE AVE. 555 WEST FIFTH STREET, SUITE 1400 IRWINDALE, CA 91702 LOS ANGELES, CA 90013-1011 MARK S. MARTINEZ ANDREA HORWATT SOUTHERN CALIFORNIA EDISON SOUTHERN CALIFORNIA EDISON COMPANY 6060 IRWINDALE AVE., SUITE J 2244 WALNUT GROVE AVENUE IRWINDALE, CA 91702 ROSEMEAD, CA 91770 CARL SILSBEE CASE ADMINISTRATION SOUTHERN CALIFORNIA EDISON SOUTHERN CALIFORNIA EDISON COMPANY GO1, RP&A 2244 WALNUT GROVE AVE. / PO BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CA 91770 ROSEMEAD, CA 91770 DAVID P. LOWREY JANET COMBS REGULATORY POLICY & AFFAIRS SR. ATTORNEY SOUTHERN CALIFORNIA EDISON COMPANY SOUTHERN CALIFORNIA EDISON COMPANY 1515 WALNUT GROVE AVE. 2244 WALNUT GROVE AVENUE ROSEMEAD, CA 91770 ROSEMEAD, CA 91770 JENNIFER M. TSAO SHIGEKAWA KA-WING MAGGIE POON

Page 8 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 27: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

SOUTHERN CALIFORNIA EDISON COMPANY GO1, QUAD 2B 2244 WALNUT GROVE AVENUE 2244 WALNUT GROVE AVE. ROSEMEAD, CA 91770 ROSEMEAD, CA 91770 LARRY R. COPE RUSS GARWACRD ATTORNEY AT LAW SOUTHERN CALIFORNIA EDISON COMPANY SOUTHERN CALIFORNIA EDISON 2244 WALNUT GROVE PO BOX 800, 2244 WALNUT GROVE AVENUE ROSEMEAD, CA 91770 ROSEMEAD, CA 91770 NGUYEN QUAN DON WOOD MGR - REGULATORY AFFAIRS PACIFIC ENERGY POLICY CENTER GOLDEN STATE WATER CO. - ELECTRIC OP. 4539 LEE AVENUE 630 EAST FOOTHILL BOULEVARD LA MESA, CA 91941 SAN DIMAS, CA 91773 STEVEN C. NELSON KIM KIERNER ATTORNEY 4475 TIVOLI ST. SAN DIEGO GAS & ELECTRIC COMPANY SAN DIEGO, CA 92107 101 ASH STREET, HQ12 SAN DIEGO, CA 92101-3017 DONALD KELLY ANNLYN M. FAUSTINO EXE. DIR. REGULATORY CASE ANALYST & SUPPORT UTILITY CONSUMERS' ACTION NETWORK SDG&E/SCGC 3405 KENYON STREET, SUITE 401 8330 CENTURY PARK COURT, CP31E SAN DIEGO, CA 92110 SAN DIEGO, CA 92123 DAVID BARKER KATHRYN SMITH SAN DIEGO GAS & ELECTRIC COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY 8306 CENTURY PARK COURT 8306 CENTURY PARK COURT SAN DIEGO, CA 92123 SAN DIEGO, CA 92123 LISA DAVIDSON JOY C. YAMAGATA SAN DIEGO GAS AND ELECTRIC COMPANY REGULATORY MANAGER 8330 CENTURY PARK COURT, CP32A SAN DIEGO GAS & ELECTRIC/SOCALGAS SAN DIEGO, CA 92123 8330 CENTURY PARK COURT, CP 32D SAN DIEGO, CA 92123-1533 DAVE HANNA DOUGLAS A. AMES ITRON INC ATTORNEY AT LAW 11236 EL CAMINO REAL TRANSPHASE SYSTEMS, INC. SAN DEIGO, CA 92130-2650 4971 LOS PATOS AVENUE HUNTINGTON BEACH, CA 92649 DAVID M. WYLIE, PE JOEL M. HVIDSTEN ASW ENGINEERING KINDER MORGAN ENERGY FORECASTER 2512 CHAMBERS ROAD, SUITE 103 1100 TOWN & COUNTRY ROAD, SUITE 700 TUSTIN, CA 92780 ORANGE, CA 92868 SHAWN COX JEFF HIRSCH KINDER MORGAN ENERGY FORECASTER JAMES J. HIRSCH & ASSOCIATES 1100 TOWN & COUNTRY ROAD, SUITE 700 12185 PRESILLA ROAD

Page 9 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 28: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

ORANGE, CA 92868 SANTA ROSA VALLEY, CA 93012-9243 PAUL KERKORIAN WILLEM FADRHONC REPRESENTATIVE STEM, INC. UTILITY COST MANAGEMENT LLC 100 ROLLINS RD. 6475 N. PALM AVENUE, SUITE 105 MILLBRAE, CA 94030 FRESNO, CA 93704 FOR: STEM, INC. KARI KLOBERDANZ-YU THERESA MUELLER REGULATORY RELATIONS MANAGER DEPUTY CITY ATTORNEY SEMPRA ENERGY UTILITIES CITY AND COUNTY OF SAN FRANCISCO 601 VAN NESS AVE., STE. 2060 CITY HALL, ROOM 234 SAN FRANCISCO, CA 94102 SAN FRANCISCO, CA 94102 THOMAS ROBERTS THOMAS LONG CALIF PUBLIC UTILITIES COMMISSION LEGAL DIR. ELECTRICITY PRICING AND CUSTOMER PROGRAM THE UTILITY REFORM NETWORK ROOM 4108 785 MARKET ST., STE. 1400 505 VAN NESS AVENUE SAN FRANCISCO, CA 94103 SAN FRANCISCO, CA 94102-3214 DANIEL C. ENGEL STEVE GEORGE SENIOR CONSULTANT FSC GROUP FREEMAN, SULLIVAN & CO. 101 MONTGOMERY STREET, 15TH FLOOR 101 MONTGOMERY STREET, 15TH FLOOR SAN FRANCISCO, CA 94104 SAN FRANCISCO, CA 94104 CARA GOLDENBERG CHARLES R. MIDDLEKAUFF DIAN GRUENEICH CONSULTING, LLC PACIFIC GAS AND ELECTRIC COMPANY 201 MISSION STREET, SUITE 1200 LAW DEPT. SAN FRANCISCO, CA 94105 77 BEALE STREET, B30A / PO BOX 7442 SAN FRANCISCO, CA 94105 JOSEPHINE WU KAREN TERRANOVA PACIFIC GAS AND ELECTRIC COMPANY ALCANTAR & KAHL, LLP 77 BEALE STREET, MC B9A, RM. 975 33 NEW MONTGOMERY STREET, SUITE 1850 SAN FRANCISCO, CA 94105 SAN FRANCISCO, CA 94105 MATHEW VESPA MICHAEL P. ALCANTAR SR. ATTORNEY ATTORNEY AT LAW SIERRA CLUB ALCANTAR & KAHL, LLP 85 SECOND STREET, 2ND FLOOR 33 NEW MONTGOMERY STREET, SUITE 1850 SAN FRANCISCO, CA 94105 SAN FRANCISCO, CA 94105 ROSS JOHNSON SHADA DADRAS AT&T CALIFORNIA PACIFIC GAS & ELECTRIC COMPANY 525 MARKET ST., STE. 1944 77 BEALE STREET, MC B9A SAN FRANCISCO, CA 94105 SAN FRANCISCO, CA 94105 STEVEN R. HAERTLE ALICE LIDDELL PACIFIC GAS AND ELECTRIC COMPANY ICF INTERNATIONAL 77 BEALE STREET, MC B9A 620 FOLSOM STREET, STE, 200 SAN FRANCISCO, CA 94105 SAN FRANCISCO, CA 94107

Page 10 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 29: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

STEVEN MOSS STEVEN MOSS 2325 THIRD STREET, STE. 344 SAN FRANCISCO COMMUNITY POWER SAN FRANCISCO, CA 94107 2325 THIRD ST., STE. 344 SAN FRANCISCO, CA 94107 ADENIKE ADEYEYE BRIAN T. CRAGG EARTHJUSTICE GOODIN, MACBRIDE, SQUERI, DAY & LAMPREY 50 CALIFORNIA ST., STE. 500 505 SANSOME STREET, SUITE 900 SAN FRANCISCO, CA 94111 SAN FRANCISCO, CA 94111 MARLO A. GO OLIVIA PARA GOODIN MACBRIDE SQUERI DAY & LAMPREY LLP DAVIS WRIGHT TREMAINE, LLP 505 SANSOME STREET, SUITE 900 505 MONTGOMERY STREET, STE. 800 SAN FRANCISCO, CA 94111 SAN FRANCISCO, CA 94111 RAFI HASSAN ROBERT GEX SUSQUEHANNA FINANCIAL GROUP, LLLP DAVIS WRIGHT TREMAINE LLP 101 CALIFORNIA STREET, SUITE 3250 505 MONTGOMERY STREET, SUITE 800 SAN FRANCISCO, CA 94111 SAN FRANCISCO, CA 94111 ROSICELI VILLARREAL SETH D. HILTON LITIGATION ASSISTANT STOEL RIVES, LLP EARTHJUSTICE THREE EMBARCADERO CENTER, STE. 1120 50 CALIFORNIA STREET, STE. 500 SAN FRANCISCO, CA 94111 SAN FRANCISCO, CA 94111 SUMA PEESAPATI WILLIAM ROSTOV EARTHJUSTICE STAFF ATTORNEY 50 CALIFORNIA ST., STE. 500 EARTHJUSTICE SAN FRANCISCO, CA 94111 50 CALIFORNIA ST., STE. 500 SAN FRANCISCO, CA 94111 FOR: SIERRA CLUB JEFFREY P. GRAY IRENE K. MOOSEN DAVIS WRIGHT TREMAINE, LLP ATTORNEY AT LAW 505 MONTGOMERY STREET, SUITE 800 CITY AND COUNTY OF SAN FRANCISCO SAN FRANCISCO, CA 94111-6533 53 SANTA YNEZ AVE. SAN FRANCISCO, CA 94112 HILLARY CORRIGAN REGULATORY FILE ROOM CALIFORNIA ENERGY MARKETS PACIFIC GAS AND ELECTRIC COMPANY 425 DIVISADERO STREET, SUITE 303 PO BOX 7442 SAN FRANCISCO, CA 94117 SAN FRANCISCO, CA 94120 MARY A. GANDESBERY CASE ADMINISTRATION PACIFIC GAS AND ELECTRIC COMPANY PACIFIC GAS AND ELECTRIC COMPANY PO BOX 7442, MC B30A-3005 PO BOX 770000; MC B9A SAN FRANCISCO, CA 94120-7442 SAN FRANCISCO, CA 94177 MARK HUFFMAN CHRIS KING ATTORNEY AT LAW SIEMENS SMART GRID SOLUTIONS

Page 11 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 30: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

PACIFIC GAS AND ELECTRIC COMPANY 4000 E. 3RD AVE., STE. 400 PO BOX 770000, MC B30A FOSTER CITY, CA 94404-4827 SAN FRANCISCO, CA 94177 MICHAEL ROCHMAN DAVID MCCOARD MANAGING DIRECTOR SIERRA CLUB SPURR 725 KEARNEY STREET, NO. 1 1850 GATEWAY BLVD., SUITE 235 EL CERRITO, CA 94530 CONCORD, CA 94520 CARLOS LAMAS-BABBINI PHILLIP W. MCLEOD, PH.D PROGRAM MGR. LC&I CA PRINCIPAL COMVERGE FINANCE SCHOLARS GROUP 39899 BALENTINE DR., STE. 200 TWO THEATRE SQUARE, SUITE 218 NEWARK, CA 94560 ORINDA, CA 94563 AVIS KOWALEWSKI MARK J. SMITH VP - GOV'T & REGULATORY AFFAIRS CALPINE CORPORATION CALPINE CORPORATION 4160 DUBLIN BLVD., SUITE 100 4160 DUBLIN BLVD, SUITE 100 DUBLIN, CA 94568 DUBLIN, CA 94568 ROBERT W. ANDERSON SCOTT J. RAFFERTY OLIVINE, INC. 1913 WHITECLIFF CT. 2010 CROW CANYON PLACE, STE. 100 WALNUT CREEK, CA 94596 SAN RAMON, CA 94583 JOE PRIJYANONDA PHILIPPE AUCLAIR GLOBAL ENERGY PARTNERS, LLC 11 RUSSELL COURT 500 YGNACIO VALLEY RD., STE 450 WALNUT CREEK, CA 94598 WALNUT CREEK, CA 94596-3853 ERIC C. WOYCHIK ALEX KANG STRATEGY INTEGRATION LLC ITRON, INC. 9901 CALODEN LANE 1111 BROADWAY, STE. 1800 OAKLAND, CA 94605 OAKLAND, CA 94607 ANTHONY HARRISON ISABELLE GECILS CAL. ENERGY EFFICIENCY INDUSTRY COUNCIL OPINON DYNAMICS 436 14TH ST., SUITE 1020 1999 HARRISON ST., STE. 1420 OAKLAND, CA 94612 OAKLAND, CA 94612 MIKHAIL HARAMATI OLIVIA PATTERSON ASSOCIATE OPINION DYNAMICS OPINION DYNAMICS CORPORATION 1999 HARRISON ST., STE. 1420 1999 HARRISON ST., STE. 1420 OAKLAND, CA 94612 OAKLAND, CA 94612 TED POPE REED V. SCHMIDT PRESIDENT BARTLE WELLS ASSOCIATES ENERGY SOLUTIONS 1889 ALCATRAZ AVENUE 1610 HARRISON STREET BERKELEY, CA 94703-2714 OAKLAND, CA 94612

Page 12 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 31: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

STEVE KROMER TRAVIS O'GUIN SKEE LIGHTSAIL ENERGY 3110 COLLEGE AVENUE, APT 12 914 HEINZ AVE. BERKELEY, CA 94705 BERKELEY, CA 94710 GALEN BARBOSE PHILLIP MULLER LAWRENCE BERKELEY NATIONAL LABORATORY PRESIDENT 1 CYCLOTRON RD., MS90R4000 SCD ENERGY SOLUTIONS BERKELEY, CA 94720 436 NOVA ALBION WAY SAN RAFAEL, CA 94903 JAMES BOOTHE DAVID WEIDBERG THE ENERGY COALITION JOHNSON CONTROLS, INC. 9 REBELO LANE 901 CAMPISI WAY, STE. 260 NOVATO, CA 94947 CAMPBELL, CA 95008 TIM GOEBEN JENNIFER A. CHAMBERLIN JCI JOHNSON CONTROLS, INC. 901 CAMPISI WAY, STE. 260 901 CAMPISI WAY, SUITE 260 CAMPBELL, CA 95008 CAMPBELL, CA 95008-2348 MAHLON ALDRIDGE L. JAN REID VP - STRATEGIC DEVELOPMENT COAST ECONOMIC CONSULTING ECOLOGY ACTION 3185 GROSS ROAD 877 CEDAR STREET, STE. 240 SANTA CRUZ, CA 95062 SANTA CRUZ, CA 95060-3938 C. SUSIE BERLIN JEFF SHIELDS LAW OFFICES OF SUSIE BERLIN UTILITY SYSTEMS DIRECTOR 1346 THE ALAMEDA, STE. 7, NO. 141 SOUTH SAN JOAQUIN IRRIGATION DISTRICT SAN JOSE, CA 95126 11011 E. HWY 120 MANTECA, CA 95336 JOY A. WARREN ROGER VAN HOY REGULATORY ADMINISTRATOR MODESTO IRRIGATION DISTRICT MODESTO IRRIGATION DISTRICT 1231 11TH STREET 1231 11TH STREET MODESTO, CA 95354 MODESTO, CA 95354 THOMAS S. KIMBALL GAYATRI SCHILBERG MODESTO IRRIGATION DISTRICT JBS ENERGY 1231 11TH STREET 311 D STREET, SUITE A MODESTO, CA 95354 WEST SACRAMENTO, CA 95605 JEFFREY NAHIGIAN DOUGLAS M. GRANDY, P.E. JBS ENERGY, INC. CALIFORNIA ONSITE GENERATION 311 D STREET 1220 MACAULAY CIRCLE WEST SACRAMENTO, CA 95605 CARMICHAEL, CA 95608 RICHARD MCCANN JACQUELINE M. DEROSA M.CUBED DIRECTOR OF REGULATORY AFFAIRS - CA

Page 13 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 32: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

2655 PORTAGE BAY ROAD, SUITE 3 CUSTOMIZED ENERGY SOLUTIONS DAVIS, CA 95616 101 PARKSHORE DRIVE SUITE 100 FOLSOM, CA 95630 JOHN C. ANDERS KARL MEEUSEN SR. COUNSEL CALIFORNIA INDEPENDENT SYSTEM OPERATOR CALIFORNIA INDEPENDENT SYSTEMS OPERATOR 250 OUTCROPPING WAY 250 OUTCROPPING WAY FOLSOM, CA 95630 FOLSOM, CA 95630 KEITH G. JOHNSON MELANIE GILLETTE MANAGER, INFRASTRUCTURE POLICY DIR - WESTERN REG. AFFAIRS CALIFORNIA INDEPENDENT SYSTEM OPERATOR ENERNOC, INC. 250 OUTCROPPIING WAY 115 HAZELMERE DRIVE FOLSOM, CA 95630 FOLSOM, CA 95630 SAEED FARROKHPAY CYNTHIA HINMAN FEDERAL ENERGY REGULATORY COMMISSION CALIFORNIA ISO 1835 IRON POINT RD., STE. 160 250 OUTCROPPING WAY FOLSOM, CA 95630-8771 FOLSOM, CA 95630-8773 JOHN GOODIN JUDITH SANDERS CALIFORNIA ISO CALIFORNIA ISO 250 OUTCROPPING WAY 250 OUTCROPPING WAY FOLSOM, CA 95630-8773 FOLSOM, CA 95630-8773 LEGAL AND REGULATORY DEPARTMENT BRIAN THEAKER CALIFORNIA ISO NRG ENERGY 250 OUTCROPPING WAY 3161 KEN DEREK LANE FOLSOM, CA 95630-8773 PLACERVILLE, CA 95667 LON W. HOUSE, PH.D KAREN HERTER ASSN. OF CALIFORNIA WATER AGENCIES 2201 FRANCISCO DRIVE, STE. 140-120 4901 FLYING C RD. EL DORADO HILLS, CA 95762 CAMERON PARK, CA 95682 CAROLYN M. KEHREIN DAVID HUNGERFORD ENERGY MANAGEMENT SERVICES CALIFORNIA ENERGY COMMISSION 2602 CELEBRATION WAY DEMAND ANALYSIS OFFICE WOODLAND, CA 95776 1516 NINTH STREET, MS-22 SACRAMENTO, CA 95814 DOROTHY ROTHROCK KEVIN WOODRUFF VP - GOVERNMENT RELATIONS WOODRUFF EXPERT SERVICES CALIFORNIA MANUFACTURERS & TECHNO. ASSN. 1100 K STREET, SUITE 204 1115 11TH STREET SACRAMENTO, CA 95814 SACRAMENTO, CA 95814 LAUREN NAVARRO-TREICHLER MARGARET SHERIDAN ATTY./SR. MGR.-SMART POWER INITIATIVE CALIFORNIA ENERGY COMMISSION ENVIRONMENTAL DEFENSE FUND DEMAND ANALYSIS OFFICE 1107 9TH STREET, STE. 1070 1516 NINTH STREET, MS-22 SACRAMENTO, CA 95814 SACRAMENTO, CA 95814

Page 14 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 33: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

STEVEN KELLY TANYA DERIVI POLICY DIRECTOR SO. CALIFORNIA PUBLIC POWER AUTHORITY INDEPENDENT ENERGY PRODUCERS ASSCIATION 915 L STREET, STE. 1410 1215 K STREET, STE. 900 SACRAMENTO, CA 95814 SACRAMENTO, CA 95814 RONALD LIEBERT ANDREW B. BROWN ATTORNEY AT LAW ATTORNEY AT LAW ELLISON SCHNEIDER & HARRIS LLP ELLISON SCHNEIDER & HARRIS, LLP 2600 CAPITOL AVENUE, STE. 400 2600 CAPITAL AVENUE, SUITE 400 SACRAMENTO, CA 95816 SACRAMENTO, CA 95816-5905 LYNN HAUG VIKKI WOOD ELLISON, SCHNEIDER & HARRIS L.L.P. SACRAMENTO MUNICIPAL UTILITY DISTRICT 2600 CAPITOL AVENUE, SUITE 400 6301 S STREET, MS A204 SACRAMENTO, CA 95816-5931 SACRAMENTO, CA 95817-1899 KAREN LINDH ROGER LEVY CALIFORNIA ONSITE GENERATION LEVY AND ASSOCIATES 7909 WALERGA ROAD, NO. 112, PMB 119 2805 HUNTINGTON ROAD ANTELOPE, CA 95843 SACRAMENTO, CA 95864 JACK ELLIS JACK ELLIS 1425 ALPINE WAY / PO BOX 6600 1425 ALPINE WAY / PO BOX 6600 TAHOE CITY, CA 96145 LAKE TRAHOE, CA 96145-6600 MIKE CADE BENJAMIN SCHUMAN ALCANTAR & KAHL PACIFIC CREST SECURITIES 1300 SW 5TH AVENUE, STE. 1750 111 SW 5TH AVE, 42ND FLR PORTLAND, OR 97201 PORTLAND, OR 97204 MARY WIENCKE JENNIFER HOLMES PACIFICORP ENERGY MARKET INNOVATIONS INC. 825 N. E. MULTNOMAH, SUITE 1800 83 COLUMBIA STREET, SUITE 400 PORTLAND, OR 97232 SEATTLE, WA 98104-1416 TYLER BERGAN EVERITT LONG POWERIT SOLUTIONS DIRECTOR OF INTELLECTUAL PROPERTY 568 1ST AVE. S., STE. 450 ECOBEE, INC. SEATTLE, WA 98104-2843 477 RICHMOND ST. WEST TORONTO, ON M5V 3E7 CANADA FOR: ECOBEE, INC. ANDY GASSNER SENIOR ANALYST ENBALA POWER NETWORKS 930 WEST 1ST ST., NO. 211 NORTH VANCOUVER, BC V7P 3N4 CANADA

Page 15 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 34: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

AUDREY LEE AUDREY LEE OFFICE OF PRESIDENT PEEVEY CALIFORNIA PUBLIC UTILITIES COMMISSION CPUC EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 CLARE LAUFENBER GALLARDO DANIEL BUCH STRATEGIC TRANSMISSION INVESTMNT PROGRAM CPUC - ENERGY CALIFORNIA ENERGY COMMISSION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 DAVID PECK DONALD J. BROOKS ORA CPUC - ENERGY DIV. CALIFORNIA PUBLIC UTILITIES COMMISSION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 JACLYN MARKS JAIME ROSE GANNON CALIFORNIA PUBLIC UTILITIES COMMISSION CPUC - ENERGY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 JOANNA GUBMAN JOHN ERICKSON REGULATORY ANALYST CPUC - ENERGY CPUC - PROCUREMENT ADEQUACY & OVERSIGHT EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 MICHAELA FLAGG NATHAN BARCIC CALIFORNIA PUBLIC UTILITIES COMMISSION CPUC ORA EMAIL ONLY EMAIL O NLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 NICOLAS L. CHASET RACHEL MCMAHON SPECIAL ADVISOR DISTRIBUTED ENERGY RES. CPUC CPUC EMAIL ONLY OFFICE OF GOV. ED. G. BROWN, JR. EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000 RACHEL PETERSON WERNER BLUMER CPUC CPUC EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 ALOKE GUPTA BRUCE KANESHIRO CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION INFRASTRUCTURE PLANNING AND PERMITTING B DEMAND SIDE PROGRAMS BRANCH AREA 4-A AREA 4-A

State Service

Page 16 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 35: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 CHRISTOPHER CLAY CHRISTOPHER R VILLARREAL CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION LEGAL DIVISION POLICY & PLANNING DIVISION ROOM 4300 ROOM 5119 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 FOR: ORA DAMON A. FRANZ DORRIS CHOW CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION PROCUREMENT STRATEGY AND OVERSIGHT BRANC DEMAND SIDE ANALYSIS BRANCH AREA 4-A AREA 4-A 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 ELIZABETH DORMAN HAZLYN FORTUNE CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION LEGAL DIVISION DEMAND SIDE PROGRAMS BRANCH ROOM 4300 AREA 4-A 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 JENNIFER CARON JOE COMO CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION EXECUTIVE DIVISION ORA - ADMINISTRATIVE BRANCH AREA 2-A ROOM 4201 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 KE HAO OUYANG KELLY A. HYMES CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION UTILITY & PAYPHONE ENFORCEMENT BRANCH DIVISION OF ADMINISTRATIVE LAW JUDGES AREA 2-E ROOM 5111 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 MICHELE KITO PAMELA NATALONI CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION DEMAND SIDE ANALYSIS BRANCH LEGAL DIVISION AREA 4-A ROOM 5124 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 PAULA GRUENDLING RACHEL MCMAHON CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION DEMAND SIDE PROGRAMS BRANCH DEMAND SIDE PROGRAMS BRANCH AREA 4-A AREA 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 RADU CIUPAGEA RUSSELL EDWARDS

Page 17 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 36: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION ELECTRICITY PRICING AND CUSTOMER PROGRAM DEMAND SIDE PROGRAMS BRANCH ROOM 4104 AREA 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 SCARLETT LIANG-UEJIO SUDHEER GOKHALE CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION DEMAND SIDE PROGRAMS BRANCH ELECTRICITY PRICING AND CUSTOMER PROGRAM AREA 4-A ROOM 4102 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 TIMOTHY J. SULLIVAN VALERIE KAO CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION DIVISION OF ADMINISTRATIVE LAW JUDGES ELECTRICITY PRICING AND CUSTOMER PROGRAM ROOM 5115 ROOM 4104 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 XIAN "CINDY" LI REBECCA TSAI-WEI LEE CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION ELECTRICITY PRICING AND CUSTOMER PROGRAM ORA - ADMINISTRATIVE BRANCH ROOM 4104 770 L Street, Suite 1250 505 VAN NESS AVENUE Sacramento, CA 95814 SAN FRANCISCO, CA 94102-3214

TOP OF PAGE BACK TO INDEX OF SERVICE LISTS

Page 18 of 18CPUC - Service Lists - R1309011

5/5/2014http://www.cpuc.ca.gov/service_lists/R1309011_81172.htm

Page 37: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE …...valuable information to the Commission while avoiding unnecessary complexity, duplication of existing efforts, and confidentiality

List�of�Non�Email�Recipients���

GRAYSON�HEFFNER�������15525�AMBIANCE�DRIVE��N.�POTOMAC�MD�20878�

� KEN�SKINNER��COO�INTEGRAL�ANALYTICS,�INC�����312�WALNUT�STREET,�SUITE�1600��CINCINNATI�OH�45202�

STEVE�GEORGE���FSC�GROUP����101�MONTGOMERY�STREET,�15TH�FLOOR��SAN�FRANCISCO�CA�94104�

� � � �

� � � �

� � � �

� � � �

� � � �

� � � �

� � � �

� � � �