43
ChanceryGreen PO Box 47516, Ponsonby 1144 +64 9 357 0600 BEFORE THE NORTHLAND REGIONAL COUNCIL IN THE MATTER OF WKH 5HVRXUFH 0DQDJHPHQW $FW ³50$´ AND IN THE MATTER OF D UHVRXUFH FRQVHQW DSSOLFDWLRQ E\ 7KH 1HZ =HDODQG 5HILQLQJ &RPSDQ\ /WG XQGHU VHFWLRQ RI WKH 50$ WR GHHSHQ DQG UHDOLJQ WKH :KDQJDUHL +DUERXU HQWUDQFH DQG DSSURDFKHV APPLICATION NO. $33 STATEMENT OF EVIDENCE OF JUSTIN CROSS (CHANNEL DESIGN AND DREDGING) 12 FEBRUARY 2018

BEFORE THE NORTHLANDREGIONAL COUNCIL IN THE MATTER … · ChanceryGreen PO Box 47516, Ponsonby 1144 +64 9 357 0600 BEFORE THE NORTHLANDREGIONAL COUNCIL IN THE MATTER OF

  • Upload
    buiminh

  • View
    222

  • Download
    6

Embed Size (px)

Citation preview

ChanceryGreen PO Box 47516, Ponsonby 1144 +64 9 357 0600

BEFORE THE NORTHLAND REGIONAL COUNCIL

IN THE MATTER OF

AND

IN THE MATTER OF

APPLICATION NO.

STATEMENT OF EVIDENCE OF JUSTIN CROSS

(CHANNEL DESIGN AND DREDGING)

12 FEBRUARY 2018

INTRODUCTION

Qualifications and experience

Code of Conduct

SCOPE OF EVIDENCE

EXECUTIVE SUMMARY

CRUDE SHIPPING PROJECT: SUMMARY

CHANNEL DESIGN

Basis of design

Environmental considerations

Iterative design process

Concept design

Option 1:

Option 2:

Option 3:

Option 4:

Options 4.1 4.2

Desktop ship simulation

Option 5:

Full bridge ship simulation

Navigational Risk Assessment

Channel Depth

1 Sedimentation refers to the process whereby sediment that is naturally occurring in the water column, settles out. Due to changes in current velocity, the rate at which sedimentation occurs in a channel is generally higher than in the surrounding area.

Channel Side Slopes

Aids to navigation

Installing aids to navigation

ooooo

ooooo

ooo

oo

o

o

ooo

o

ooo

oooo

o

ooo

o

o

oo

oo

o

oo

o

DREDGING

Dredge volumes

Section Dredge to design depth (m3)

Including over-dredge allowance (m3)

Total 3,177,000 3,638,000

Dredging disposal sites

Dredging equipment

2 This was the Dredging Methodology Assessment, dated 11 August 2016, forming Appendix A to the Tonkin+Taylor Dredging and Disposal Options Synthesis Report.

Expected dredge production rate

Dredger & Hopper Capacity

Cycle time to offshore disposal site (minutes)

Inner Section Middle Section Outer Section

Dredger & Hopper Capacity

Expected dredge production rate (m3 /week)

Inner Section Middle Section Outer Section

RESPONSE TO SUBMISSIONS

Item 1:

Item 2:

Item 3:

Item 4:

Item 6:

Item 7:

Item 8:

Item 9:

Item 10:

RESPONSE TO THE SECTION 42A REPORT

PROPOSED CONDITIONS