    NEW MIDDLE SCHOOL  –

    SCHOOL BOARD SCHEMATIC

    DESIGN PRESENTATION

    Bedford County Public Schools

     April 14, 2016

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    2/60

    New Middle School

    FLOOR PLANS

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    3/60

    New Middle School

    First Floor Plan

    MAIN ENTRY

    COURTYARD

    SERVICE

    DINING/ AUDITORIUM

    ENTRY

    BUS LOOP/GYMNASIUM

    ENTRY

    6TH

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    4/60

    New Middle School

    Second Floor Plan

    COURTYARD

    SECOND FLOORROOF GARDEN

    SECOND FLOORROOF GARDEN

    MEDIA CENTER

    BELOW

    GYMNASIUMBELOW

    DININGBELOW

    7

    TH

    8

    TH

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    5/60

    New Middle School

    OPTION 1

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    6/60

    New Middle School

    Option 1 – Overall Middle & High School Site Plan

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    7/60New Middle School

    Option 1 – Middle School Site Plan

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    8/60New Middle School

    Option 1 – Overall High & Middle School Context Aerial

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    9/60New Middle School

    Option 1 – Middle School Aerial

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    10/60

    New Middle School

    Option 1 – Middle School Aerial 2

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    11/60

    New Middle School

    Option 1 – Middle School Axial Approach

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    12/60

    New Middle School

    Option 1 – Middle School Front Overall

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    13/60

    New Middle School

    Option 1 – Middle School Cafeteria Side

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    14/60

    New Middle School

    Option 1 – Middle School Bus Loop Entry

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    15/60

    New Middle School

    Option 1 – Middle School Courtyard Aerial 2

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    16/60

    New Middle School

    OPTION 2

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    17/60

    New Middle School

    Option 2 – Overall Middle & High School Site Plan

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    18/60

    New Middle School

    Option 2 – Middle School Site Plan

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    19/60

    New Middle School

    Option 2 – Overall High & Middle School Context Aerial

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    20/60

    New Middle School

    Option 2 – Middle School Aerial

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    21/60

    New Middle School

    Option 2 – Middle School Aerial 2

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    22/60

    New Middle School

    Option 2 – Middle School Axial Approach

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    23/60

    New Middle School

    Option 2 – Middle School Front Overall

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    24/60

    New Middle School

    Option 2 – Middle School Front Overall Close

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    25/60

    New Middle School

    Option 2 – Middle School Cafeteria Side

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    26/60

    New Middle School

    Option 2 – Middle School Bus Loop Entry

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    27/60

    New Middle School

    Option 2 – Middle School Courtyard Aerial 2

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    28/60

    New Middle School

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    29/60

    New Middle School

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    30/60

    New Middle School

    Site

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    31/60

    New Middle School

    Traffic Study

    The turn lane warrant analysis is complete; existing

    turn lanes from Big Island Highway into high schoolwill be adequate even after middle school traffic is

    added.

    The following ‘Concept Plan’ shows a connection

    to Otterburn Circle for emergency access only.

    The following ‘Road Construction Revenue Sharing’

    exhibit has been sent to VDOT to initiate the

    Revenue Sharing process. No response yet from

    VDOT.

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    32/60

    New Middle School

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    33/60

    New Middle School

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    34/60

    New Middle School

    Environmental

    Wetland Delineation and Long Eared Bat

    investigations are complete. The design team hasscheduled a Wetland Confirmation site visit with

    the U.S. Corps of Engineers for April 26th

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    35/60

    New Middle School

    Water

    Water model provided by Bedford Regional Water

    Authority indicates available flow is 500 gpm at 20psi at the high school. Plumbing fixtures at middle

    school will likely require a booster pump.

    Discussions with Building Official Donnie Dillon

    confirmed that we must comply with 2012International Building Code and NFPA 13 for fire

    protection. The design team is working to

    determine if the existing water system can meet

    these requirements or if a water tank and pump

    will be needed. Working with Rich Gardiner on

    this issue.

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    36/60

    New Middle School

    Wastewater

    The design team is evaluating the following

    options: Pump station at middle school that will send wastewater

    to high school pump station that will likely need

    upgrades to accommodate additional flow.

    Build a pump station that that will accommodate middleschool and high school. Existing high school pump

    station would be removed from service.

    Findings and recommendations will be presented

    in the next couple weeks.

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    37/60

    New Middle School

    Schedule

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    38/60

    New Middle School

    April 14

       S   C   H   E   M   A   T   I   C

       D   E   S   I   G   N   D   E   V

       C   O   N   S   T .   D   O   C

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    39/60

    New Middle School

    Questions & Next Steps

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    40/60

    LIBERTY HIGH SCHOOL

    GYMNASIUM

    SCHOOL BOARD SUMMARYPRESENTATION

    Bedford County Public Schools

     April 14, 2016

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    41/60

    Liberty High School Gymnasium Addition

    Programming

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    42/60

    Liberty High School Gymnasium Addition

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    43/60

    Liberty High School Gymnasium Addition

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    44/60

    Liberty High School Gymnasium Addition

    Building Diagrams

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    45/60

    Liberty High School Gymnasium Addition

    94’ court length

    1,322 seating capacity

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    46/60

    Liberty High School Gymnasium Addition

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    47/60

    Liberty High School Gymnasium Addition

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    48/60

    Liberty High School Gymnasium Addition

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    49/60

    Liberty High School Gymnasium Addition

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    50/60

    Liberty High School Gymnasium Addition

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    51/60

    Liberty High School Gymnasium Addition

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    52/60

    Liberty High School Gymnasium Addition

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    53/60

    Liberty High School Gymnasium Addition

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    54/60

    Liberty High School Gymnasium Addition

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    55/60

    Liberty High School Gymnasium Addition

    Schedule

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    56/60

    Liberty High School Gymnasium Addition

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    57/60

    Cost

    • Proposed Project

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    58/60

    SITEWORK $ 6,200,000 $ 6,400,000

    NEW MIDDLE SCHOOL $ 23,800,000 $ 24,000,000

    COMPETITION GYM $ 4,800,000 $ 5,000,000

    Soft Costs (design, testing, mgmt.,procure, etc.)

    $ 4,700,000 $ 4,700,000

    Subtotal $ 39,500,000 $ 40,200,000

    OTHER OWNER COSTS(furniture, technology, project

    contingency)

    $ 4,200,000 $ 4,200,000

    Inflation (included in cost above) $ 0 $ 0

    TOTAL PROJECT COST $ 43,700,000 $ 44,400,000

    Proposed Project• New 700 student middle school•  Approximately 120,000 SF• High school gym is a stand alone project on

    LHS campus•  Approximately 19,000 SF

    • Upcoming Cost Impact Decisions

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    59/60

    Upcoming Cost Impact Decisions

    • Site Conditions• Potential road construction revenue-sharing (VDOT)

    • Wetlands – Corps of Engineers (Site visit 04/26/16)• Water supply – possible water tank for sprinkler system• Sanitary sewer design

    • Systems Selection• HVAC, Controls, Lighting, Roofing, etc.

    • Materials Selection• Exterior & interior walls, floors, equipment brands, etc.

    •  Alternate Funding for Specific Items• FF&E (Fixtures, furnishings & equipment)• Technology

  • 8/17/2019 Bedford School Board Presentations 4-14-16

    60/60

    Questions & Next Steps