31
© Boyum IT Solutions | 1 RELEASE NOTES BEAS MANUFACTURING 9.3 PL 03 NOV 2019

BEAS MANUFACTURING 9.3 PL 03 RELEASE NOTES › docs › notes › beas9.3PL3ReleaseNotes.pdfBSL use ODATA. Data via JSON ODATA 2, ODATA 3 and ODATA 4 supported(not 100%) Additional

  • Upload
    others

  • View
    142

  • Download
    1

Embed Size (px)

Citation preview

© Boyum IT Solutions | 1

RELEASE NOTES

BEAS MANUFACTURING9.3 PL 03

NOV 2019

© Boyum IT Solutions | 2

9.3 PL 03 Release Notes

9.3 PL 03 Highlights

| 3

9.3 PL 02 RELEASE NOTES

© Boyum IT Solutions

Boyum WMSIntegration

New Webapps Terminal

New Features

FeatureImprovement

SystemImprovement

▪ Support to WMS warehouse: production stock transactions can be able to read information from WMS warehouse

▪ Production goods receipt generating WMS information (SSCC and batch extended information)

▪ Production goods issues considering WMS information

▪ Reservation, allocations and QC transfer

▪ Backflush apps: to allow report material issue for a work order

▪ Interruption apps; start or stop a resource interruption

▪ Picking list: based on SAP picking list

▪ Pick and Pack: based on Reservation of Sales order

▪ Delivery: Creation of the delivery document from Reservation

▪ Create a Stock transfer request

▪ New screen for Item version stock detail

▪ Work list to have a view of all open routing positions including parallel resources

▪ QC transfer target quantity

▪ Introducing the Beas Service Layer (BSL), a API to provide communication to Beas business object allowing to read data or update information by REST service.

▪ MRP better performance

▪ MRP calculation progress bar

▪ QC transfer different documents

▪ Work order Structure view performance

▪ Better performance in Reservation list

▪ APS Material check for external operations

▪ Script Editor: Display content of a datastore

▪ Memory Usage optimization especially in MRP, APS and work order creation

▪ Manage server with more information and additional functions for all Beas services

▪ Installation: Setup without "Windows protected your PC" message

▪ Print Object/crreportsupport to new crystal engine

Integration Support for WMS warehouse:Extending better Manufacturing management capabilities to WMS

Extending logistic support for Beas Customer especially who require serialization

For customers who combine Beas Manufacturing and WMS, we have worked on the communication between them to support production stock transactions even when they are required in a WMS warehouse.

In this version the users can make productions goods issues and goods receipt directly to a WMS warehouse taking advantage of all the features offered by WMS and avoiding having to transfer to a SAP warehouse.

| 4

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Note: Pick to Production will be available from versions: Beas Manufacturing 9.3 PL 03 HF 01 and WMS 19.3

Integration Support for WMS warehouse:WMS warehouse and their bin locations are displayed and supported in Beas screen.Work Order Material issues:

Time receipt: Automatic pre-assign process accepts WMS warehouses for Issue and also for receipts. For automatic receipts during time receipt, the system reads bin assignment also from WMS definition:

| 5

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Integration Support for WMS warehouse:Production Goods Receipt:WMS warehouse are supported in Productions stock transactions . When an produced item is receipt , it is also created the WMS additional information as the SSCC number.Additional Information:The Inventory history and the batch tracing screen show information of all types of warehouse supported by Beas (Normal SAP warehouses, SAP Bin locations, Beas warehouses and WMS warehouses).

Reservation / Allocation: It is possible to reserve or allocate considering a WMS warehouse structure:

Work order cancelation process: Support to the cancelation of the material goods issues

| 6

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Integration Support for WMS warehouse:Quality Control Transfer:Users can generate all documents from this screen for WMS warehouses (Transfer, issue, goods receipt PO and issue + receipt)“From warehouse” and “To warehouse” fields can be all types or Beas supported warehouse (SAP, Beas bin locations, SAP bin warehouses and now WMS warehouses)

Attention: Transferring from a WMS warehouse to a WMS warehouse, or between two bin locations of the same WMS warehouse, is NOT possible. For this type of transfer, use WMS features.Webapps 2.1:Beas supports WMS warehouse in Production goods issues and Goods receipt from the Webapps 2.1

| 7

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Webapps 2.1 TerminalContinuing with Webapps 2.1, in this version we have the following new apps:

▪ Backflushing apps: to allow report material issue for a work order▪ Interruption apps; start or stop a resource interruption▪ Picking list: based on SAP picking list▪ Pick and Pack: based on Reservation of Sales order▪ Delivery: Creation of the delivery document from Reservation▪ Create a Stock transfer request

| 8

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Webapps 2.1 TerminalBackflushing app

This app allows reporting material issue for a work order positionIf the parameters “Post finished items when” Or material booking “Automatic Material posting” are set to be reported as “Work order backflushing”, Users can use this app to identify the workorder position (barcode field) and specify the total quantity to be reported. After inputting the number of units, the corresponding quantity of materials is issued and the finished good entered.

The material is issued from the inventory location stored in the BOM and the primary item inventory, respectively. Depend on the parameter selected If this position has to be also close user should select confirm completion

| 9

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Webapps 2.1 TerminalInterruptions AppsFor Interruption management, we provide 2 apps; start or stop a resource or tools interruption

▪ The Start interruption allows to start the clock from all resources or a tool.▪ The Stop interruption for any started interruption.

Rules of the desktop terminal also are applied for webapps, The user can start or stop according to the resources allow in the personnel master data / FDC setings

| 10

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Webapps 2.1 TerminalPicking list apps:For a Picking process, Beas allows to work in 2 ways: Picking from a SAP Picking document or Picking directly from a Sales Order. (decide which of them is for the customer process)Note: For this feature, the reservation system has to be activated.

The apps available for support this process (Pick → Deliver)Picking list: We select a SAP picking list, and for each picked item, we create a reservation on Beas.

Pick and pack SO: Instead use the picking list from SAP, we use as reference the Sales order and quantity are reserved on Beas.

| 11

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Webapps 2.1 TerminalPicking list apps:Delivery: For picked items, this app allows select from Picking list or Sales order to create a delivery note. This app creates a delivery document with the quantities previously picked (Reserved) A parameter is available in the “App Setup” to select if Customer works from SAP Picking or Sales Order.

| 12

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Webapps 2.1 TerminalStock Transfer Request:With this WebApp you can create a stock transfer request in SAP from a specific warehouseIn the "Header" you can select the source warehouse, provide the delivery date and add your remarks to the requested transaction.Note: Bin Location fields are not required for this app and are not available in the screen

After entering the mandatory information in the "Header" tab, the "Line" tab becomes editable. Here you can provide Item-specific information. Upon selection, the exact "Item name" and "Target Warehouse“, the currently available number of the item in its unit of is also indicated .

Once you have saved the document, the SAP transfer request is created.

| 13

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

New FeatureItem Version Stock information:New additional TAB in Item master data to provide stock information for Item version items.See the several version available for an item, batches related to this version and current inventory also the bin-location information when applied.Additionally, We included yellow arrows to add in this TAB or Bin location TAB link to information with the additional master data:

• Link to Batch / Serial Number• Link to Bin Location• Link to Item Version

And the possibility to search for Batch / Serial, Warehouse and Item Version

| 14

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

New FeatureWork List:Many customers uses the terminal pool list to have an overview of all pending operations in all resources, when is view by user and theirsspecific resources. With Beas 9.3 PL 3 a new own report called "Work list" is available.

The new work list, can be used for:- View of all open routing positions and parallel resources- Link (yellow arrow) to all documents and data (Item master data,

work order, routing and so on)- Use as Pool list inside SAP (part of basic license)- Manage many entries.- Administration of open work order positions- Check situation- Define Pool

- Lock/Unlock Routing position for Time receipt- View existing Time receipt- Create different statistics- Define the operator employee- Check material situation

| 15

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

http://www.beascloud.net/docs/help/online_eng/index.html?work_list.htm

New FeatureQC Transfer – Target Quantity:In Quality control transfer screen we extend the feature to allow define a quantity for the target item in its Unit of measure. In this way when the user select change current Item by another one the system display A Target Quantity based on the Units of measure of the to Item

Beas now allows to set different quantities in the "Issue+Receipt" options. When the user selects this option, now the system is able to select different quantities

| 16

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

New FeatureBeas Service Layer (BSL):Introducing the Beas Service Layer (BSL), a new is a new generation of extension APIto provide communication to Beas business object allowing users read data or update information by REST serviceThe Beas service layer is a middle layer between the application and the database.

With the BSL you can create WEB Applications and Services without develop a Backend. The BSL is working in same way as SAP Service LayerIt is possible to use BSL via Common Service and via HTTP

All components inside the Beas core:- OData Server- WEB Server- HTTP Server

The way to communicate with the BSL are:BSL use ODATA. Data via JSON ODATA 2, ODATA 3 and ODATA 4 supported(not 100%)Additional functions supported, which not ODATA conformThe complete interface is optimized for the requirements in BEAS/SAP world

BSL support additional formats for return Data as example- different JSON variants- XML- CSV- HTML

| 17

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

New FeatureBeas Service Layer and Common Services:With the common service▪ The WEB-Server service sends all Crystal Report ▪ Users can create SAP transactions, via which this asynchronous can

be worked off. ▪ And External services and third programs can be linked here e.g. to

execute transactions

In this version: We extended the Beas common service to use the BSL. You could also execute your owns script interacting with the Beas Service Layer with a Jason command before it was only possible to write Beas Script.

| 18

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Feature ImprovementMRP performance:Special for large volume of data to be possible processing the MRP, we improve Beas 9.3 PL 3 to get a better performance up to 3 time faster in MRP.

The MRP took a lot of time to calculate if there were many open production orders.The complete calculation process in this area was revised.

In the following example a database with 46 000 open work order positions and 192 000 open Bill of Material positions.

Beas 9.3 PL 2: 31 MinutesBeas 9.3 PL 3: 11 Minutes

| 19

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Beas 9.3 PL 3

Beas 9.3 PL 2

Feature ImprovementMRP calculation progress barA new bar helps users to see what is the progress of the MRP

MRP, Custom Tables: New: Support Breakdown ReplenishmentIn MRP Scenario you can define your own (Custom) Tables, but Breakdown Replenishment was not supported for own tables Beas checks all settings defined in Breakdown Replenishment for own Tables, as well.

| 20

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Feature ImprovementQC transfer different documents:Now is available several Events from Quality control Transfer allowing to add your own validations in the Transfer documentsThe following extensions are executed in Beas 9.3 PL 3:windowevent pretransfer (for all document types)for every document, which the system is creating, it will post follow eventsVariable "e_docentry" / " e_docnum" is the reference to created documentInformation from dw_2 is not deletedIt is not allowed or possible to cancel or close the running processwindowevent transfercreatedwindowevent issuecreatedwindowevent receiptcreatedwindowevent poreturncreated

windowevent posttransfer (for all document types)

| 21

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Feature ImprovementWork order Structure view performance:Now we expand a maximum of 200 position in the work order structure, to allow to load the screen faster

Note for customers with more than 200 position should open the work order details:The system expands max. 200 Assemblies per structure level and displays a warning message.

Do not make sense to see all positions in the structure view, because the user may lose the overview inside the structure view.If the user needs a complete list, he can open the work order - Tab "Position"

| 22

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Feature ImprovementBetter performance in Reservation list If you have many Bill of Material positions, it took long time to open the Reservation list, Issue or Allocation window

The reason for this was the Item History function, which Beas executes for every material position. In the past it was possible to disable this function in the Configuration wizard.If disabled, the system didn't execute the slow item history function.

But now the Reservation / Issue window are gradually faster if you also activate item history function.

| 23

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Feature ImprovementAPS Material check for external operationsNot reserved stock on external warehouses is supported if the material is linked to an external routing position.Example:Work order with Material "RM", 3 PcsStock: 2 on external warehouse1 on internal warehouse

Result:Stock = 3, but with external warehouseBut the Bill of material position can only take 1 pcs from internal warehouse, Not Available: 2

When Material position is linked to an external operation. Now The system considers external warehouse for material linked to external operation.Stock is enough and you can't see the BoM Entry in the Shortage Report for this work order position

| 24

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Feature ImprovementScript Editor: Display content of a datastoreIn Area Object you can make a double-click on this object.Beas opens the standard internet explorer and displays the content of the datastore.

| 25

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

System ImprovementMemory Usage optimization specially in MRP, APS and work order creation

Past:If Beas calculated MRP, APS or other complex calculations, the used memory increased.One of the problem was memory leaks related to visual objects. These are areas which the system didn't delete after using.New:The problem with visual objects is solved. In combination with other changes we can reduce the needed memoryTogether with better Memory Handling this allows for calculating mass data.

Beas script function "wobooked"This function is used from many placesExample: Structure view, time receipt, closed work order and many more

Past: This function was slow; to check Booked quantity, the system read always the information from Table IGE1/IGNIf you have a big database, this process can take long.Now:In Beas a field is existing for Work order position and Bill of materials in which this information is saved. This column is always actual and the database test checks if the correct information really is inside or not. We don't need to check the big tables IGE1/IGN1In certain areas the program will be significantly faster, if you are working with a large database or many records in this table.With the following new beasscript function it is possible to check the changed function.This returns current booked quantity for work order positions and work order Bill of materialsobject=ue_fert_tools=wobooked=<belnr_id>=<belpos_id>=<pos_id>messagebox=<value>

| 26

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

System ImprovementManage server with more information and additional functions for all Beas servicesMore information available in this window:Correct and complete Web address for every Service with additionalfunctions- question mark: more information about this app.- arrow: open the application in standard browser.- clipboard: copy web address in clipboard.

| 27

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

System ImprovementPrint Object/crreport support to new crystal engineNow Beas support all properties from old crystal engine and additional properties

Properties, which existing in old crystal engine• PaperSize• PaperSource• TopMargin• BottonMargin• LeftMargin• RightMargin• paperorientation / landscape• duplex

Additional properties:• PaperSizeWidth• PaperSizeHeight

| 28

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

System ImprovementInstallation: Setup without "Windows protected your PC" messageThe Beas application and the Beas installation files are now signed.Before , when installing a new version of Beas, the systems showed messages like this:

Now: The files are signed with the company certificate, and the system does not try to prevent the execution.

| 29

9.3 PL 03 RELEASE NOTES

© Boyum IT Solutions

Your voice mattersWe design solutions for people. Join our community now!

Collaborate with product suggestions and vote for the feature requests you most like.

boyum-solutions.com/community

YOUR VOICE MATTERS

30

CONTACT

| 31