BEAM Pro Training and Examination
BEAM Plus – Energy Use for Existing Buildings
Ir Dr T T CHOWTechnical Review Committee Panel Chair (Energy Use )
25 July 2012
1
EU NB
No. of Prerequisites 1
No. of Credits 42
No. of Bonus 2
Credit Summary for NB:EU P1 Minimum Energy Performance EU 1 Annual Energy Use – Reduction of CO2 Emission (15)EU 1 Option 2 Alternative Route: Passive Design (20)EU 2 Peak Electricity Demand Reduction (3)EU 3 Embodied Energy in Building Structure Elements (1+1B)EU 4 Ventilation System in Car Parks (2)EU 5 Lighting System in Car Parks (2)EU 6 Renewable Energy Systems (5)EU 7 Air Conditioning Units (1)EU 8 Clothes Drying Facilities (1)EU 9 Energy Efficient Appliances (2)EU 10 Testing and Commissioning (4+1B)EU 11 Operation and Maintenance (3)EU 12 Metering and Monitoring (1)EU 13 Energy Efficient Building Layout (2)
BEAM Plus – EU Energy Use in New Buildings
3
Section 4 Energy Use (Eu) Credits Alternative Credits
Eu P1 Minimum Energy Performance Prerequisite Prerequisite
Eu1 Reduction of CO2 Emissions 15 6 (Alternative)
Eu 2 Peak Electricity Demand Reduction 3 (Commercial)
2 (Others)
2 (Alternative)
Eu 3 Ventilation Systems in Car Parks 2 Nil
Eu 4 Lighting System in Car Parks 2 Nil
Eu 5 Renewable Energy System 5 Nil
Eu 6 Air conditioning Units 1 Nil
Eu 7 Energy Efficient Appliances 2 Nil
Eu 8 Testing and Commissioning 3 (central A/C)2 (non-central A/C)
Nil
Eu 9 Metering and Monitoring 2 (central A/C)1 (non-central A/C)
Nil
Eu10 Energy Management 4 + 2 Bonus Nil
Total 39 + 2 Bonus
BEAM Plus (EB) – Energy Use
4
Summary of General Distribution of Credits
0123456789
101112131415
Eu 1 O
educ
tion of
CO2 Em
issions
Eu 2 P
eak El
ectri
city D
eman
d Re
duction
Eu 3 V
entil
ation Sy
stem
s in C
ar Parks
Eu 4 L
ighitng Sy
stem
in C
ar parks
Eu 5 R
enew
able E
nergy Sy
stem
s
Eu 6 A
ir Co
ndition
ing Units
Eu 7 E
nergy Ef
ficient A
pplia
nces
Eu 8 T
estin
g an
d Co
mmissio
ning
Eu 9 M
etering an
d M
onito
ring
Eu 10 En
ergy
Man
agem
ent
no. of
cre
dit
credit bonus credit
Total credit: 39 + 2bonus
Alternative
5
EU 1 Reduction of CO2 Emissions (Alternative)
Alternative Credit:
1 credit for compliance with the Code of Practice for Energy Efficiency of Air Conditioning Installations
1 credit for compliance with the Code of Practice for Energy Efficiency of Lighting Installations
6
EU 1 Reduction of CO2 Emissions (Alternative)
http://www.emsd.gov.hk/emsd/eng/pee/eersb_pub.shtml
7
EU 1 Reduction of CO2 Emissions (Alternative)
Alternative Credit:
EMSD’s Energy consumption indicators and benchmarkshttp://www.atechsupports.com/new-emsd/en/index00.htm1 credit where annual energy use 40% cumulative percentage2 credits where annual energy use 30% cumulative percentage3 credits where annual energy use 20% cumulative percentage4 credits where annual energy use 10% cumulative percentage
Energy use reduction demonstrated by billing/metering data
1 credit where annual energy use reduction has been 10%2 credits where annual energy use reduction has been 15%3 credits where annual energy use reduction has been 20%
8
EU 1 Reduction of CO2 Emissions (Alternative)
13
EU 1 Reduction of CO2 Emissions (Alternative)
Need to weight the achievement for complex building based on area
14
EU 1 Reduction of CO2 Emissions (Alternative)
17
EU 1 Reduction of CO2 Emissions (Alternative)
Alternative Credit:
EMSD’s Energy consumption indicators and benchmarkshttp://www.emsd.gov.hk/emsd/eng/pee/benchmarktool.shtml
1 credit where annual energy use 40% cumulative percentage2 credits where annual energy use 30% cumulative percentage3 credits where annual energy use 20% cumulative percentage4 credits where annual energy use 10% cumulative percentage
Energy use reduction demonstrated by billing/metering data
1 credit where annual energy use reduction has been 10%2 credits where annual energy use reduction has been 15%3 credits where annual energy use reduction has been 20%
Demonstrate
1. Initiatives implemented
2. Saving can be maintained
(Audit after building fully occupied or for at least past 3 years)
18
EU 1 Reduction of CO2 Emissions (Alternative)
Energy use reduction demonstrated by billing/metering data
Cumulative Electricity Consumption
05,000
10,00015,00020,00025,00030,00035,00040,000
Jan
Feb
Mar
Apr
May Jun
Jul
Aug Sep Oct
Nov
Dec
1,00
0 kW
h
2007 2008 2009
5,178,000 kWh saving
= 15%
19
EU 2 Peak Electricity Demand Reduction
Credit:
a) Commercial Buildings1 to 3 credits for a reduction in the peak electricity demand by 15%, 23% and 30% respectively (same as new buildings)
b) Hotel buildings1 to 2 credits where a reduction in electricity peak demand by 10% and 20% respectively
c) Educational and Residential Buildings1 to 2 credits where a reduction in electricity peak demand by 8% and 15% respectively
d) Other Building Types1 to 3 credits for a reduction in electricity peak demand by 8%, 12% and 15% respectively
reference to Baseline Model
20
EU 2 Peak Electricity Demand Reduction (Alternative)
Alternative Credit:
Maximum electricity demand reduction demonstrated by billing/metering data
1 credit where a reduction in the electricity maximum demand by 10%2 credits where a reduction in the electricity maximum demand by 20%
21
Cumulative On peak KVA
0
2,000
4,000
6,000
8,000
10,000
Jan
Feb
Mar
Apr
May Jun
Jul
Aug Sep Oct
Nov
Dec
kVA
2007 2008 2009
EU 2 Peak Electricity Demand Reduction (Alternative)
Energy use reduction demonstrated by billing/metering data
Peak Max demand at
July w/ 2,030 kVA
saving
= 22%
22
EU 8 Testing and Commissioning
Credit:
a) HVAC systems and equipmentBuilding with central air-conditioning system1 credit for ongoing commissioning program of water side equipment
1 credit for ongoing commissioning program of air side equipmentAlternative
Building with non-central air-conditioning system1 credit for ongoing commissioning program of all HVAC equipment
b) Non-HVAC systems and equipment1 credit for ongoing commissioning program of all non-HVAC equipment
(3 credits for centrally air-conditioned buildings, otherwise 2)
23
EU 8 Testing and Commissioning
1. T&C result & record (original + new)2. T&C approach3. Re-commissioning plan4. A systematic & continuous improvement plan5. Budgets & personnel
Ongoing T&C approach
At least 3 years documentation including
Ongoing Commissioning on
Owner’s Project Requirement (OPR)
Basis of Design (BoD)
Design Construction Operation
Continuous Commissioning for change in operation environment
To Review commissioning
design intent and methods
Commissioning for Equipment &System
Performance
O&M Manual w/ T&C results & records
Re-commissioning Plan
Continuous improvement Plan
24
EU 10 Energy Management
Credit:
a) Energy Auditing1 credit for conducting energy audit (EMSD’s Guidelines on Energy Audit) with evidence
1 BONUS credit for conducting carbon audit or GHG emission audit anddemonstrating that an action plan for GHG reduction is in progress
b) Monitoring and Targets1 credit for demonstrating an effective energy monitoring and targeting system
c) Energy Management Plan1 credit for demonstrating an approved budget to improve the energy performance of the building with management plan
d) Energy Management Manual1 credit for maintaining a comprehensive energy management manual
e) Energy Charge1 BONUS credit where separate charges are made for energy use
25
EU 10 Energy Management
Guidelines on Energy Audit (Credit) Carbon audit (BONUS Credit)
Evidence (e.g.):1. Energy consumption records2. O&M records3. Action plan based on audit findings
Evidence (e.g.):GHG reduction action plan
a) Energy Auditing
Energy breakdown by department/major equipment
26
EU 10 Energy Managementb) Monitoring and Target
Energy management - saving progress(2002 as Baseline Year)
-5,000,000
0
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
35,000,000
40,000,000
45,000,000
50,000,000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
Ann
ual k
Wh
savi
ng
bill saving estimates saving predicted saving
target
actual
27
EU 10 Energy ManagementOIE
CmH
3PP
c) Energy Management plan
28
EU 10 Energy Management
Client’s Onus demonstration
d) Energy management manualCumulative investment & savng w/ 2008 as baseline
0
100,000
200,000
300,000
400,000
500,000
600,000
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
cum
ulat
ive
inve
stm
ent
& s
avin
g ($
x,00
0)
cumulative capital cumulative saving
breakeven
Energy management - saving progress(2002 as Baseline Year)
-5,000,000
0
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
35,000,000
40,000,000
45,000,000
50,000,000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
Ann
ual k
Wh
savi
ng
bill saving estimates saving predicted saving
target
actual
A Collection of Documentation including Energy Monitoring, Targeting, Auditing and Planning
Demonstrate
1. Easy-to-follow
2. Up-to-date
Appropriate Financing
Monitoring & Targeting
Planning
29
EU 10 Energy Management
Building with tenants - Energy costs to tenants are separated from base rents and are separately charged by consumption
Single tenant/ownership - Individual departments are separately charged by consumption
e) Energy Charge (BONUS Credit)
1/F Jockey Club Environmental Building,
77 Tat Chee Road, Kowloon, Hong Kong香港九龍塘達之路77號賽馬會環保樓1樓
T +852 3610 5700
F +852 3996 9108
www.beamsociety.org.hk
31
EU 8 Testing and Commissioning
Riser A B C D E FkPa 54 55 57 58 56 56
A B C D E F85 110 95 95 100 10080 130 110 105 125 120
Set.
Actual.
A B C D E F85 110 95 95 100 10080 130 110 105 125 120
Set.
Actual.
Riser A B C D E Ffrom 85 110 90 90 100 100
to 75 110 80 80 80 80
Unit: kPa
0
500
1000
1500
2000
2500
3000
3500
4000
27-May-08
28-May-08
29-May-08
30-May-08
31-May-08
01-Jun-08
02-Jun-08
03-Jun-08
04-Jun-08
05-Jun-08
Power of SCHP(kWh/d)
2007 2008
Initial
Stage 1
Stage 1
Result
Stage 2
Ongoing commissioning Waterside System
32
WCC-L22-03 (CWE Temp: 27.6~31 deg C)
0.000
1.000
2.000
3.000
4.000
5.000
6.000
7.000
8.000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Part Load %
CO
P
WCC-L22-03 (CWE Temp: 22.6~27.5 deg C)
0.000
1.000
2.000
3.000
4.000
5.000
6.000
7.000
8.000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Part Load %
CO
P
EU 8 Testing and Commissioning
Ongoing commissioning Chiller Efficiency
Efficiency dropped !