17
BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007 R. P. Gallagher Associates Structural Engineers

BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

  • Upload
    selia

  • View
    34

  • Download
    1

Embed Size (px)

DESCRIPTION

R. P. Gallagher Associates Structural Engineers. BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007. PORTABLE. MAIN BUILDING. N. KEY PLAN :. C. B. D. A. E. 1930’s BUILDING. SITE PLAN. MAIN BUILDING. OPTIONS CONSIDERED: REPAIR / REPLACE PORTABLE - PowerPoint PPT Presentation

Citation preview

Page 1: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

BEACH ELEMENTARY SCHOOL

CONCEPT DESIGN

October 24, 2007

R. P. Gallagher AssociatesStructural Engineers

Page 2: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

MAIN BUILDING

PORTABLE

Page 3: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

SITE PLAN

1930’s BUILDING

KEY PLAN :

N

A

C

BD

E

Page 4: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

MAIN BUILDING

OPTIONS CONSIDERED:

REPAIR / REPLACE PORTABLE INTERIOR / EXTERIOR STRENGTHENING LIFT / EXTERIOR RAMP VS. ELEVATOR

Page 5: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

PORTABLE

Page 6: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

UPGRADE CRITERIA

ORIGINAL 1930’S BUILDING TO BE STRENGTHENED

ASCE 41

LIFE SAFETY PERFORMANCE LEVEL

Page 7: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

OVERVIEW OF STRENGTHENING OPTIONS

RECOMMEND: ADD PLYWOOD SHEATHING TO INTERIOR SIDE OF

EXTERIOR WALLS STRENGTHEN MANY INTERIOR WALLS ADD PLYWOOD TO AUDITORIUM ROOF ADD HARDWARE, INCLUDING HOLD-DOWNS

Page 8: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

AUDITORIUM

LEGEND:

(N) WALL

(N) STEEL STRAPS AT WINDOWS

(N) STEEL STRAPS AT TOP OF WALL

(N) SHEAR WALL AT INTERIOR

KEY PLAN :

N

Page 9: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

KEY PLAN :

ADMINISTRATION

N

Page 10: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

CLASSROOMS (1936)

KEY PLAN :

N

Page 11: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

CLASSROOMS (1939)

KEY PLAN :

N

Page 12: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

CORRECTIVE MEASURES: NEW ACCESSIBLE PARKING NEW RAMP AT LAKE AVE REPLACE DAMAGED RETAINING WALLS ADA UPGRADES AT EXTERIOR STAIRS AND HANDRAILS REPLACE PORTABLE BUILDING

SITE PLANKEY PLAN :

N

ACCESSIBILITY / LIFE SAFETY

Page 13: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

AUDITORIUM/ ADMINISTRATION/ CLASSROOMS/ CLASSROOMS ADDITION

CORRECTIVE MEASURES:

FIRE-RATED CORRIDOR UPGRADES AT DOORS, STAIRS AND LANDINGS UPGRADES AT KITCHEN AND TOILET ROOMS REPLACE NON-COMPLIANT CLASSROOM SINKS AUTOMATIC FIRE SPRINKLERS THROUGHOUT UPGRADE FIRE ALARM

LEGEND:

(N) ARCHITECTURAL IMPROVEMENT

FIRE-RATED CORRIDOR

(N) RATED WALL(N) WALL

STRUCTURAL IMPROVEMENT

FIRE-RATED CORRIDOR

Page 14: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

KEY PLAN :

CORRECTIVE MEASURES:

NEW ELEVATOR FOR STAGE AND ART ROOM ACCESSUPGRADES AT DOORS, STAIRS, AND LANDINGSFIRE-RATED CORRIDOR

N

AUDITORIUM

LEGEND:

(N) ARCHITECTURAL IMPROVEMENT

FIRE-RATED CORRIDOR

(N) RATED WALL(N) WALL

STRUCTURAL IMPROVEMENT

FIRE-RATED CORRIDOR

Page 15: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

Building 32,133 163 5,227

New Portable 960 179 172

Sitework 91,482 12 1,107

TOTAL CONSTRUCTION AND SITEWORK WITHOUT PHASING 6,506

Phasing, allow 5.00% 325

TOTAL CONSTRUCTION COST WITH PHASING 6,831

GFA $/SF $ ,000

CONSTRUCTION COST ESTIMATE SUMMARY

Page 16: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

PHASED CONSTRUCTION

(18 -24 month construction, 3 phase project)

In $,000 *

CONSTRUCTION COST ESTIMATE: $ 6,800

SOFT COSTS: $ 1,800

(AE, PM, & CM Fees, Inspection, Agency, etc.)

CONTINGENCIES:

Construction: $ 700

Project: $ 300

SUBTOTAL: $ 9,600

ESCALATION: (assume 2009 start) $ 2,000

INTERIM HOUSING PROJECT: $ 600

TOTAL PROJECT CONCEPTUAL COST ESTIMATE $ 12,900

PROJECT COST SUMMARY

*rounded to nearest $ 100,000

Page 17: BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

BEACH ELEMENTARY SCHOOL

PRISCILLA MECKLEY-ARCHULETA

MIKE WASSERMANN

JOHN NELSON

RON GALLAGHER

* For more information, visit http://www.pusdbond.org

R. P. Gallagher AssociatesStructural Engineers