    MH # 1

    8 10 12 16 20 25 32

    Bittom mat

    Bottom Main 25 1 200 170725

    17400725

    18850 1250 100 20.000 3400.000 13117.200

    Bottom Main 28 1 200 10725 3150

    725 4600 0 112 4.488 44.880

    Bottom Main 25 1 200 10725

    12150725

    13600 1250 100 14.750 147.500 569.055

    Bottom Distribution 25 1 200 39725

    35700800

    37225 3750 150 40.825 1592.175 6142.611

    Bottom Distribution 25 2 200 20725

    35750725

    37200 3750 100 40.850 1634.000 6303.972

    Bottom Distribution 25 1 200 9725

    9775850

    11350 0 100 11.250 101.250 390.623

    Bottom Distribution 25 1 200 3850

    23825800

    25475 2500 150 27.825 83.475 322.047

    Bottom Distribution 25 1 200 6850

    23825850

    25525 2500 100 27.925 167.550 646.408

    Bottom mat Extra 20 2 200 34500 6650 7150 0 40 7.110 483.480 1194.196

    Bottom mat Extra 20 1 200 146500

    6200 6700 0 40 6.660 972.360 2401.729

    Bottom mat Extra 20 1 200 137500

    6200 6700 0 40 6.660 912.420 2253.677

    Bottom mat Extra 20 1 200 9500

    3150500

    4150 0 80 4.070 36.630 90.476

    Top Mat

    Shape of bar Cut Length Total Length

    DIA WISE TOTAL WEIGHT (KG)

    DRAWING REF:- STRUCTURE: Wagon Tipper REVISION NO

    SI.NO DESCRIPTIONDia. of

    Bar

    No. of

    MemberSpacing

    No. of

    Bar

    BAR BENDING SCHEDULE

    SEW INFRASTRUCTURE LTD

    PROJECT:-General Civil Works for BTG and BOP Area of 2x600 MW Singhitarai Thermal Power Project,Kharsia

    CLIENT:-ABIR INFRASTRUCTURE PVT. LTD AGREEMENT NO:-ABIR/TD/STPP/5311/EPC/004/C&C/002

    SEWIL Page 1 of 14 AIPL

  • 7/28/2019 BBS Template

    2/14

    MH # 1

    8 10 12 16 20 25 32Shape of bar Cut Length Total Length

    DIA WISE TOTAL WEIGHT (KG)

    DRAWING REF:- STRUCTURE: Wagon Tipper REVISION NO

    SI.NO DESCRIPTIONDia. of

    Bar

    No. of

    MemberSpacing

    No. of

    Bar

    BAR BENDING SCHEDULE

    SEW INFRASTRUCTURE LTD

    PROJECT:-General Civil Works for BTG and BOP Area of 2x600 MW Singhitarai Thermal Power Project,Kharsia

    CLIENT:-ABIR INFRASTRUCTURE PVT. LTD AGREEMENT NO:-ABIR/TD/STPP/5311/EPC/004/C&C/002

    Top Main 28 2 200 34725

    6550 7275 0 56 7.219 490.892

    Top Main 28 1 200 1467

    25

    4850 5575 0 56 5.519 805.774

    Top Main 28 1 200 137725

    4850 5575 0 56 5.519 756.103

    Top Main 28 1 200 9725

    31503250

    7125 0 112 7.013 63.117

    Top Main 28 1 200 111250

    70001250

    9500 0 112 9.388 103.268

    Top Main 28 1 200 321250

    104001250

    12900 1400 112 14.188 454.016

    Top Main 28 1 200 1031250

    104001250

    12900 1400 112 14.188 1461.364

    Top Main 28 1 200 93250

    86501250

    13150 1400 112 14.438 129.942

    Top Main 28 1 200 181

    250

    65001

    250

    9000 0 112 8.888 159.984

    Top Distribution 25 2 200 11725

    35700725

    37150 3750 100 40.800 897.600 3462.941

    Top Distribution 25 2 200 20725

    4450 5175 0 50 5.125 205.000 790.890

    Top Distribution 25 1 200 101250

    287001250

    31200 2500 100 33.600 336.000 1296.288

    Top Distribution 25 1 200 361250

    32200800

    34250 3750 150 37.850 1362.600 5256.911

    SEWIL Page 2 of 14 AIPL

  • 7/28/2019 BBS Template

    3/14

    MH # 1

    8 10 12 16 20 25 32Shape of bar Cut Length Total Length

    DIA WISE TOTAL WEIGHT (KG)

    DRAWING REF:- STRUCTURE: Wagon Tipper REVISION NO

    SI.NO DESCRIPTIONDia. of

    Bar

    No. of

    MemberSpacing

    No. of

    Bar

    BAR BENDING SCHEDULE

    SEW INFRASTRUCTURE LTD

    PROJECT:-General Civil Works for BTG and BOP Area of 2x600 MW Singhitarai Thermal Power Project,Kharsia

    CLIENT:-ABIR INFRASTRUCTURE PVT. LTD AGREEMENT NO:-ABIR/TD/STPP/5311/EPC/004/C&C/002

    Top Distribution 25 1 200 103250

    203251250

    24825 2500 100 27.225 272.250 1050.341

    Top Distribution 25 1 200 103

    250

    62751

    250

    10775 0 100 10.675 106.750 411.842

    Top Distribution 25 1 200 371250

    31501250

    5650 0 100 5.550 205.350 792.240

    Sump Bottom Main 25 1 200 26850

    46503250

    8750 0 100 8.650 224.900 867.664

    Sump Botom

    Distribution25 1 200 14

    3250

    49003250

    11400 0 100 11.300 158.200 610.336

    Sump Top main 28 1 200 26850

    4650850

    6350 0 112 6.238 162.188

    Sump Distribution 25 1 200 24850

    4900850

    6600 0 100 6.500 156.000 601.848

    SF Bars 10 2 200 7500

    17400500

    18400 500 40 18.860 264.040 162.913

    SF Bars 10 2 200 7500

    35700500

    36700 1500 40 38.160 534.240 329.626

    Drain Man 25 1 200 37 2750 2750 0 0 2.750 101.750 392.552

    Drain Distribution 25 1 200 2 13500 13500 1250 0 14.750 29.500 113.811

    Drain Distribution 25 1 200 2 31800 31800 2500 0 34.300 68.600 264.659

    Drain Distribution 25 1 200 2 21920 21920 1250 0 23.170 46.340 178.780

    SEWIL Page 3 of 14 AIPL

  • 7/28/2019 BBS Template

    4/14

    MH # 1

    8 10 12 16 20 25 32Shape of bar Cut Length Total Length

    DIA WISE TOTAL WEIGHT (KG)

    DRAWING REF:- STRUCTURE: Wagon Tipper REVISION NO

    SI.NO DESCRIPTIONDia. of

    Bar

    No. of

    MemberSpacing

    No. of

    Bar

    BAR BENDING SCHEDULE

    SEW INFRASTRUCTURE LTD

    PROJECT:-General Civil Works for BTG and BOP Area of 2x600 MW Singhitarai Thermal Power Project,Kharsia

    CLIENT:-ABIR INFRASTRUCTURE PVT. LTD AGREEMENT NO:-ABIR/TD/STPP/5311/EPC/004/C&C/002

    Drain Distribution 25 1 200 2 7870 7870 0 0 7.870 15.740 60.725

    Drain Distribution 25 2 200 4 4700 4700 0 0 4.700 37.600 145.061

    Pedastals

    P1 (230X350mm)

    Vertical Bar 12 10 4200

    850 1050 0 24 1.026 41.040 36.485

    12 10 2150

    850 1000 0 24 0.976 19.520 17.353

    Stirrups 8 10 150 3 130

    250910 0 0 0.910 27.300 10.784

    P2 (150X150mm)

    Vertical Bar 12 52 2100

    850 1800 0 24 1.776 184.704 164.202

    Stirrups 8 52 150 3100

    100

    550 0 0 0.550 85.800 33.891

    P3 (250X150)

    Vertical Bar 12 2 2100 850 1800 0 24 1.776 7.104 6.315

    Stirrups 8 2 150 3100

    150

    650 0 0 0.650 3.900 1.541

    0.046 0.493 0.224 - 5.940 43.789 -

    50.492GRAND TOTAL (MT)

    DIA WISE TOTAL

    WEIGHT IN MT

    SEWIL Page 4 of 14 AIPL

  • 7/28/2019 BBS Template

    5/14

    MH # 1

    REMARKS

    SEWIL Page 5 of 14 AIPL

  • 7/28/2019 BBS Template

    6/14

    MH # 1

    REMARKS

    SEWIL Page 6 of 14 AIPL

  • 7/28/2019 BBS Template

    7/14

    MH # 1

    REMARKS

    SEWIL Page 7 of 14 AIPL

  • 7/28/2019 BBS Template

    8/14

    MH # 1

    REMARKS

    SEWIL Page 8 of 14 AIPL

  • 7/28/2019 BBS Template

    9/14

    MH # 1

    8 10 12 16 20 25 32

    Bittom mat

    Main Bar 16 1 150 263400

    9500400

    10300 0 64 10.236 2692.068 4253.467

    Distribution Bar 16 2 150 24475 39230

    475 40180 2400 128 42.452 2037.696 3219.560

    Distribution Bar 25 1 150 16475

    39230475

    40180 3750 150 43.780 700.480 2702.452

    Hooks 10 132 150/300 26150

    680150

    980 0 0 0.980 3363.360 2075.193

    Draion Distribution 16 2 200 263300

    1900 2200 0 32 2.168 1140.368 1801.781

    Sump main 12 2 200 197450

    300 750 0 24 0.726 286.044 254.293

    Bottom mat Extra 20 1 150 263 3700 3700 0 0 3.700 973.100 2403.557

    Top Mat

    Main Bar 20 1 150 263300

    7900300

    8500 0 80 8.420 2214.460 5469.716

    Distribution Bar 16 2 150 16475

    39230475

    40180 2400 128 42.452 1358.464 2146.373

    Distribution Bar 20 1 150 22475

    39230475

    40180 3000 160 43.020 946.440 2337.707

    Distribution Bar 16 1 150 4 39230 39230 2400 0 41.630 166.520 263.102

    Wall 0 m 20 2 150 197 500

    4050 500

    5050 0 80 4.970 1958.180 4836.705

    Shape of bar Cut Length Total Length

    DIA WISE TOTAL WEIGHT (KG)

    DRAWING REF:- STRUCTURE: Tunnel RFC REVISION NO

    SI.NO DESCRIPTIONDia. of

    Bar

    No. of

    MemberSpacing

    No. of

    Bar

    BAR BENDING SCHEDULE

    SEW INFRASTRUCTURE LTD

    PROJECT:-General Civil Works for BTG and BOP Area of 2x600 MW Singhitarai Thermal Power Project,Kharsia

    CLIENT:-ABIR INFRASTRUCTURE PVT. LTD AGREEMENT NO:-ABIR/TD/STPP/5311/EPC/004/C&C/002

    SEWIL Page 9 of 14 AIPL

  • 7/28/2019 BBS Template

    10/14

    MH # 1

    8 10 12 16 20 25 32Shape of bar Cut Length Total Length

    DIA WISE TOTAL WEIGHT (KG)

    DRAWING REF:- STRUCTURE: Tunnel RFC REVISION NO

    SI.NO DESCRIPTIONDia. of

    Bar

    No. of

    MemberSpacing

    No. of

    Bar

    BAR BENDING SCHEDULE

    SEW INFRASTRUCTURE LTD

    PROJECT:-General Civil Works for BTG and BOP Area of 2x600 MW Singhitarai Thermal Power Project,Kharsia

    CLIENT:-ABIR INFRASTRUCTURE PVT. LTD AGREEMENT NO:-ABIR/TD/STPP/5311/EPC/004/C&C/002

    1m 16 2 150 197500

    4050500

    5050 0 64 4.986 1964.484 3103.885

    0 D 12 2 150 28275

    39230275

    39780 1800 96 41.484 2323.104 2065.239

    0 D 12 2 150 19275

    39230275

    39780 1800 96 41.484 1576.392 1401.412

    C1 32 9 0 4850

    4650300

    5800 0 128 5.672 204.192 1290.698

    25 9 0 6500

    4650300

    5450 0 100 5.350 288.900 1114.576

    20 9 0 4250

    4650300

    5200 0 80 5.120 184.320 455.270

    SP6 12 15 0 16 30 850

    100

    980 0 48 0.932 223.680 198.852

    Stirrups 8 15 150 16100

    100

    550 0 0 0.550 132.000 52.140

    10 15 150 56 1100 1100 0 0 1.100 924.000 570.108

    Slab Portion

    Bottom Main 16 1 150 243400

    9500400

    10300 0 64 10.236 2487.348 3930.010

    Bottom Distrbution 16 1 150 58350

    39230350

    39930 2400 128 42.202 2447.716 3867.391

    Top Main 16 1 200 191400

    9500400

    10300 0 64 10.236 1955.076 3089.020

    Top Distrbution 16 2 200 14350

    39230350

    39930 2400 128 42.202 1181.656 1867.016

    SEWIL Page 10 of 14 AIPL

  • 7/28/2019 BBS Template

    11/14

    MH # 1

    8 10 12 16 20 25 32Shape of bar Cut Length Total Length

    DIA WISE TOTAL WEIGHT (KG)

    DRAWING REF:- STRUCTURE: Tunnel RFC REVISION NO

    SI.NO DESCRIPTIONDia. of

    Bar

    No. of

    MemberSpacing

    No. of

    Bar

    BAR BENDING SCHEDULE

    SEW INFRASTRUCTURE LTD

    PROJECT:-General Civil Works for BTG and BOP Area of 2x600 MW Singhitarai Thermal Power Project,Kharsia

    CLIENT:-ABIR INFRASTRUCTURE PVT. LTD AGREEMENT NO:-ABIR/TD/STPP/5311/EPC/004/C&C/002

    20 1 150 21350

    39230350

    39930 3000 160 42.770 898.170 2218.480

    16 1 200 191 3700 3700 0 0 3.700 706.700 1116.586

    B1

    Bottom Main 25 1 2400

    39230400

    40030 3750 200 43.580 87.160 336.263

    16 1 1400

    39230400

    40030 2400 128 42.302 42.302 66.837

    Extra 20 1 4 3500 3500 0 0 3.500 14.000 34.580

    Top Main 25 1 0 2750

    39230750

    40730 3750 100 44.380 88.760 342.436

    Top Main 16 1 0 2750

    39230750

    40730 2400 64 43.066 86.132 136.089

    Skin Bar 12 1 2 39230 39230 1800 0 41.030 82.060 72.951

    Stirrups 10 1 0 170100

    100

    550 0 0 0.550 93.500 57.690

    0.052 2.703 3.993 28.861 17.756 4.496 1.291

    59.151GRAND TOTAL (MT)

    DIA WISE TOTAL

    WEIGHT IN MT

    SEWIL Page 11 of 14 AIPL

  • 7/28/2019 BBS Template

    12/14

    MH # 1

    REMARKS

    SEWIL Page 12 of 14 AIPL

  • 7/28/2019 BBS Template

    13/14

    MH # 1

    REMARKS

    SEWIL Page 13 of 14 AIPL

  • 7/28/2019 BBS Template

    14/14