APPLICANT: City of BellinghamREFERENCE #: ADJACENT PROPERTYOWNERS: Bellingham Urology/Properties LLC, Mt Baker Kidney Center, City of Bellingham Finance Dept., POSLLA LLC, Robert McConchie, Racine Street Associates LP, Habitat Properties LP, Orchard Place Properties LLC, Calvin & Bernetta Leenstra
PROPOSED PROJECT: Bay-To-Baker Trail: Construct a segment of the Bay-to-Baker Trail. The project will construct a shared-use trail along an abandoned railroad alignment, with an alignment diversion to the north.NEAR/AT: BellinghamCOUNTY: Whatcom STATE: WA
LOCATION ADDRESS: Approximate mid-point of the trail alignment is located at the intersection of James Street Road and East Orchard DriveLAT/LONG: 48.7787N / -122.4643WSHEET: 1 of 9DATE: January 2015
VICINITY MAP
Canada
Washington
PacificOcean
Bellingham
Seattle
Tacoma
FILE
NA
ME
: Fi
g02.
.....
RE
F #\
\esa
_sf_
2k\e
sa\P
RO
JEC
TS\S
EA
\NAT
UR
AL
SC
IEN
CE
S\2
012\
1206
98_S
qua
licum
Crk
Cor
ridor
\05_
Figu
res_
Pho
tos\
Gra
phi
cs\J
AR
PA (J
AK
, 11/
2014
)
APPLICANT: City of BellinghamREFERENCE #: ADJACENT PROPERTYOWNERS: Bellingham Urology/Properties LLC, Mt Baker Kidney Center, City of Bellingham Finance Dept., POSLLA LLC, Robert McConchie, Racine Street Associates LP, Habitat Properties LP, Orchard Place Properties LLC, Calvin & Bernetta Leenstra
PROPOSED PROJECT: Bay-To-Baker Trail: Construct a segment of the Bay-to-Baker Trail. The project will construct a shared-use trail along an abandoned railroad alignment, with an alignment diversion to the north.NEAR/AT: BellinghamCOUNTY: Whatcom STATE: WA
LOCATION ADDRESS: Approximate mid-point of the trail alignment is located at the intersection of James Street Road and East Orchard DriveLAT/LONG: 48.7787N / -122.4643WSHEET: 2 of 9DATE: January 2015
PROPOSED TRAIL ALIGNMENT
Trib WNE Connector Culvert
Wetland GNE Connector Culvert
Trib W IrongateBox CulvertSouth Connector
Trail Bridge
Wetland A
Tributary W(Wetland B)
Wetland E
Wetland C Wetland D
Wetland H
Wetland I
Wetland M Wetland G Wetland L
Wetland KWetland J
Proposed Side Channel Mitigation Site
MAIN TRAIL NW CONNECTOR TRAIL NE CONNECTOR TRAIL MAIN TRAIL IRONGATE CONNECTOR TRAIL
S CONNECTOR TRAIL
Squalicum Creek
East Sunset D
rive
East Sunset D
rive
Jam
es S
tree
t
Orl
ean
s St
reet
East McLeod Road
Studio Lane
Racin
eStreet
Prim
rose
Lan
e
Clover Lane
Division Street
Cranberry Court
Gilbert Drive
Orc
hard
Pla
ce
East McLeod Road Rowan Lane
Baker Street
East Orchard Drive
Iron
gate
Roa
d
West Orchard Drive
Levi
n
Lane
Coolidge DriveSqualicum Parkway
Squa
licum
Park
way
Fruitland Drive
Fruitland Drive
Birchwood Avenue
U:\G
IS\G
IS\P
roje
cts\
12xx
xx\D
1206
98_S
qual
icum
Cre
ek\m
xd\M
itiga
tion_
Pla
n\FI
G01
_tra
ilalig
nmen
t_aq
uatic
res.
mxd
Proposed Trail Alignment
Wetlands (KPFF)
Proposed Side-channel Mitigation
Squalicum Creek Re-route Channel (by others)
Streams (DNR)
0 400
Feet
100 year floodplain (1 percent annual chance) indicated by white mask
FILE
NA
ME
: Fi
g03.
.....
RE
F #\
\esa
_sf_
2k\e
sa\P
RO
JEC
TS\S
EA
\NAT
UR
AL
SC
IEN
CE
S\2
012\
1206
98_S
qua
licum
Crk
Cor
ridor
\05_
Figu
res_
Pho
tos\
Gra
phi
cs\J
AR
PA (J
AK
, 11/
2014
)
APPLICANT: City of BellinghamREFERENCE #: ADJACENT PROPERTYOWNERS: Bellingham Urology/Properties LLC, Mt Baker Kidney Center, City of Bellingham Finance Dept., POSLLA LLC, Robert McConchie, Racine Street Associates LP, Habitat Properties LP, Orchard Place Properties LLC, Calvin & Bernetta Leenstra
PROPOSED PROJECT: Bay-To-Baker Trail: Construct a segment of the Bay-to-Baker Trail. The project will construct a shared-use trail along an abandoned railroad alignment, with an alignment diversion to the north.NEAR/AT: BellinghamCOUNTY: Whatcom STATE: WA
LOCATION ADDRESS: Approximate mid-point of the trail alignment is located at the intersection of James Street Road and East Orchard DriveLAT/LONG: 48.7787N / -122.4643WSHEET: 3 of 9DATE: January 2015
EXISTING CONDITIONS
TRIBUTARY W TYPE F
0.106 ACRE 0.380 ACRE
TRIBUTARY W TYPE F
0.380 ACRE
0.113 ACRE
FLOW
2.708 ACRES
0.020 ACRE
SQUALICUM CREEK— 2015 RE-ROUTETYPE S
BUG LAKE
Scale in Feet
WETLAND
STREAM
FILE
NA
ME
: Fi
g43.
.....
RE
F #\
\esa
_sf_
2k\e
sa\P
RO
JEC
TS\S
EA
\NAT
UR
AL
SC
IEN
CE
S\2
012\
1206
98_S
qua
licum
Crk
Cor
ridor
\05_
Figu
res_
Pho
tos\
Gra
phi
cs\J
AR
PA (J
AK
, 11/
2014
)
EXISTING CONDITIONSAPPLICANT: City of BellinghamREFERENCE #: ADJACENT PROPERTYOWNERS: Bellingham Urology/Properties LLC, Mt Baker Kidney Center, City of Bellingham Finance Dept., POSLLA LLC, Robert McConchie, Racine Street Associates LP, Habitat Properties LP, Orchard Place Properties LLC, Calvin & Bernetta Leenstra
PROPOSED PROJECT: Bay-To-Baker Trail: Construct a segment of the Bay-to-Baker Trail. The project will construct a shared-use trail along an abandoned railroad alignment, with an alignment diversion to the north.NEAR/AT: BellinghamCOUNTY: Whatcom STATE: WA
LOCATION ADDRESS: Approximate mid-point of the trail alignment is located at the intersection of James Street Road and East Orchard DriveLAT/LONG: 48.7787N / -122.4643WSHEET: 4 of 9DATE: November 2014
TRIBUTARY TYPE F
Scale in Feet
SQUALICUM CREEK— 2015 RE-ROUTETYPE S
3.852 ACRES
0.077 ACRE
0.041 ACRE
0.081 ACRE
0.185 ACRE
0.008 ACRE
FLOW
Squalicum Creek Corridor . 120698
Figure 3Wetland Mitigation - Existing Conditions
Bellingham, Washington
SOURCE: KPFF, 2014.
FILE
NA
ME
: Fig
02_W
etla
ndM
itiga
tinoE
xist
ing.
ai\C
RE
ATE
D B
Y: J
AC
\DAT
E L
AS
T U
PD
ATE
D: 0
7/22
/14
WETLAND
STREAM
FILE
NA
ME
: Fi
g05.
.....
RE
F #\
\esa
_sf_
2k\e
sa\P
RO
JEC
TS\S
EA
\NAT
UR
AL
SC
IEN
CE
S\2
012\
1206
98_S
qua
licum
Crk
Cor
ridor
\05_
Figu
res_
Pho
tos\
Gra
phi
cs\J
AR
PA (J
AK
, 11/
2014
)
APPLICANT: City of BellinghamREFERENCE #: ADJACENT PROPERTYOWNERS: Bellingham Urology/Properties LLC, Mt Baker Kidney Center, City of Bellingham Finance Dept., POSLLA LLC, Robert McConchie, Racine Street Associates LP, Habitat Properties LP, Orchard Place Properties LLC, Calvin & Bernetta Leenstra
PROPOSED PROJECT: Bay-To-Baker Trail: Construct a segment of the Bay-to-Baker Trail. The project will construct a shared-use trail along an abandoned railroad alignment, with an alignment diversion to the north.NEAR/AT: BellinghamCOUNTY: Whatcom STATE: WA
LOCATION ADDRESS: Approximate mid-point of the trail alignment is located at the intersection of James Street Road and East Orchard DriveLAT/LONG: 48.7787N / -122.4643WSHEET: 5 of 9DATE: January 2015
IMPACT OVERVIEW MAP
0.020 ACRE
3.852 ACRES
0.041 ACRE
0.077 ACRE
FLOW
0.081 ACRE
0.185 ACRE
0.008 ACRE
TRIBUTARY W TYPE F
SQUALICUM CREEK— 2015 RE-ROUTETYPE S
WETLAND
STREAM
IMPACT DETAIL SHEET
WETLAND/STREAMIMPACT AREA
Scale in Feet
FILE
NA
ME
: Fi
g06.
.....
RE
F #\
\esa
_sf_
2k\e
sa\P
RO
JEC
TS\S
EA
\NAT
UR
AL
SC
IEN
CE
S\2
012\
1206
98_S
qua
licum
Crk
Cor
ridor
\05_
Figu
res_
Pho
tos\
Gra
phi
cs\J
AR
PA (J
AK
, 11/
2014
)
APPLICANT: City of BellinghamREFERENCE #: ADJACENT PROPERTYOWNERS: Bellingham Urology/Properties LLC, Mt Baker Kidney Center, City of Bellingham Finance Dept., POSLLA LLC, Robert McConchie, Racine Street Associates LP, Habitat Properties LP, Orchard Place Properties LLC, Calvin & Bernetta Leenstra
PROPOSED PROJECT: Bay-To-Baker Trail: Construct a segment of the Bay-to-Baker Trail. The project will construct a shared-use trail along an abandoned railroad alignment, with an alignment diversion to the north.NEAR/AT: BellinghamCOUNTY: Whatcom STATE: WA
LOCATION ADDRESS: Approximate mid-point of the trail alignment is located at the intersection of James Street Road and East Orchard DriveLAT/LONG: 48.7787N / -122.4643WSHEET: 6 of 9DATE: January 2015
FILE
NA
ME
: Fi
g07.
.....
RE
F #\
\esa
_sf_
2k\e
sa\P
RO
JEC
TS\S
EA
\NAT
UR
AL
SC
IEN
CE
S\2
012\
1206
98_S
qua
licum
Crk
Cor
ridor
\05_
Figu
res_
Pho
tos\
Gra
phi
cs\J
AR
PA (J
AK
, 11/
2014
)
APPLICANT: City of BellinghamREFERENCE #: ADJACENT PROPERTYOWNERS: Bellingham Urology/Properties LLC, Mt Baker Kidney Center, City of Bellingham Finance Dept., POSLLA LLC, Robert McConchie, Racine Street Associates LP, Habitat Properties LP, Orchard Place Properties LLC, Calvin & Bernetta Leenstra
PROPOSED PROJECT: Bay-To-Baker Trail: Construct a segment of the Bay-to-Baker Trail. The project will construct a shared-use trail along an abandoned railroad alignment, with an alignment diversion to the north.NEAR/AT: BellinghamCOUNTY: Whatcom STATE: WA
LOCATION ADDRESS: Approximate mid-point of the trail alignment is located at the intersection of James Street Road and East Orchard DriveLAT/LONG: 48.7787N / -122.4643WSHEET: 7 of 9DATE: January 2015
FILE
NA
ME
: Fi
g08.
.....
RE
F #\
\esa
_sf_
2k\e
sa\P
RO
JEC
TS\S
EA
\NAT
UR
AL
SC
IEN
CE
S\2
012\
1206
98_S
qua
licum
Crk
Cor
ridor
\05_
Figu
res_
Pho
tos\
Gra
phi
cs\J
AR
PA (J
AK
, 11/
2014
)
APPLICANT: City of BellinghamREFERENCE #: ADJACENT PROPERTYOWNERS: Bellingham Urology/Properties LLC, Mt Baker Kidney Center, City of Bellingham Finance Dept., POSLLA LLC, Robert McConchie, Racine Street Associates LP, Habitat Properties LP, Orchard Place Properties LLC, Calvin & Bernetta Leenstra
PROPOSED PROJECT: Bay-To-Baker Trail: Construct a segment of the Bay-to-Baker Trail. The project will construct a shared-use trail along an abandoned railroad alignment, with an alignment diversion to the north.NEAR/AT: BellinghamCOUNTY: Whatcom STATE: WA
LOCATION ADDRESS: Approximate mid-point of the trail alignment is located at the intersection of James Street Road and East Orchard DriveLAT/LONG: 48.7787N / -122.4643WSHEET: 8 of 9DATE: January 2015
FILE
NA
ME
: Fi
g09.
.....
RE
F #\
\esa
_sf_
2k\e
sa\P
RO
JEC
TS\S
EA
\NAT
UR
AL
SC
IEN
CE
S\2
012\
1206
98_S
qua
licum
Crk
Cor
ridor
\05_
Figu
res_
Pho
tos\
Gra
phi
cs\J
AR
PA (J
AK
, 11/
2014
)
APPLICANT: City of BellinghamREFERENCE #: ADJACENT PROPERTYOWNERS: Bellingham Urology/Properties LLC, Mt Baker Kidney Center, City of Bellingham Finance Dept., POSLLA LLC, Robert McConchie, Racine Street Associates LP, Habitat Properties LP, Orchard Place Properties LLC, Calvin & Bernetta Leenstra
PROPOSED PROJECT: Bay-To-Baker Trail: Construct a segment of the Bay-to-Baker Trail. The project will construct a shared-use trail along an abandoned railroad alignment, with an alignment diversion to the north.NEAR/AT: BellinghamCOUNTY: Whatcom STATE: WA
LOCATION ADDRESS: Approximate mid-point of the trail alignment is located at the intersection of James Street Road and East Orchard DriveLAT/LONG: 48.7787N / -122.4643WSHEET: 9 of 9DATE: January 2015