158
Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2/14-002/601

Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Embed Size (px)

Citation preview

Page 1: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Bay of Plenty West Joint NZTA/WBoPDC One Network

Maintenance Contract

Contract No: NZTA 2/14-002/601

Page 2: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contents

Page 1 of 157

1 Contract Works 3 1.1 Definitions 3 1.2 Acronyms 4

2 Value Management Proposition 5 2.1 Guide to the KRA Performance Framework 5

2.2 OPM Monthly Evaluation Example 20

3 Contract Management 23 3.1 Sections of the Network under the Current or Future Control of Separate Contractors 23

3.2 Standard Specifications 24 3.3 Other Publications 28 3.4 Stockpile Sites 31 3.5 Stockpile Management Plan 32

3.6 Resource Consents 33

4 Management Performance Measures 36 4.1 Meetings and Reporting 36 4.2 Quality Control – Management Plans 40

4.3 MMP Minimum Scope Content 48 4.4 Asset Management 51 4.5 Treatment Design 54

4.6 Planning 61

4.7 Network Control 62 4.8 Customer Satisfaction Index (CSI) 68

5 Key Performance Measures 69 5.1 High Speed Data Collection 69

5.2 Traffic Speed Deflection Data Collection 70 5.3 RAMM Condition Rating Data Collection 71 5.4 Traffic Counting Data Collection 75 5.5 Network Video 80 5.6 Roughness 84

5.7 Texture 94 5.8 Rutting 95

5.9 Surfacing Defects Index (Sealed) 96 5.10 Surfacing Defects Index (Unsealed) 99 5.11 Average Remaining Surfacing Life 103 5.12 Bridge Structures 106 5.13 Drainage Structures: Culverts 110

5.14 Drainage Structures: Surface Water Channels (Lined) 112 5.15 Drainage Structures: Surface Water Channels (Unlined) 116 5.16 Other Structures 119 5.17 Carriageway Lighting 122 5.18 Rural Bus Shelters 124 5.19 Footpaths 127 5.20 Safety Performance Index 128

Page 3: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contents

Page 2 of 157

5.21 Accidents 129 5.22 Visibility 131

6 Operational Performance Measures 132 6.1 Vulnerable Flooding Areas 132 6.2 Type of Vegetation Control 133

6.3 Extent of Control 135 6.4 Maintenance of Gardens, Planted Areas and Street Trees 138 6.5 Urban Vegetation Control 139 6.6 Urban Trees 142

6.7 Spray Free Frontage 145 6.8 Litter Removal (Rural) 154 6.9 Litter Control (Urban) 155 6.10 Urban Street Cleaning 156

Page 4: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Works

Page 3 of 157

1 1

Contract W orks

1.1 Definitions

In addition to First Schedule, Part B. Clause 1.2, Definitions and Appendix (State

Highways) 1.1, the table below provides clarification on definitions used within the

Contract Documents – CAPITALS are defined further as a separate entry.

Table 1.1: WBoPDC Local Roads Definitions

Term Definition

Carriageway Section

As defined in the RAMM database

Contract Standard In respect of MANAGEMENT PERFORMANCE MEASURES, are the minimum requirements and standards the Contractor is required to comply with at all times. In addition to the Contract Standards defined in this Maintenance Specification (WBoPDC Local Roads), the requirements and PERFORMANCE CRITERIA of the Contractor’s own management plans are also Contract Standards.

In respect of KEY PERFORMANCE MEASURES, means the minimum standard that the Contractor must demonstrate compliance with at specific times throughout the Contract.

Delivery Time In respect of MANAGEMENT PERFORMANCE MEASURES, means the time in which the Contractor must provide deliverables required by the CONTRACT STANDARDS. In addition to the Delivery Times defined in this Maintenance Specification (WBoPDC Local Roads), the timing requirements of the Contractor’s own management plans are also Delivery Times.

Litter As defined in the Litter Act 1979 and includes organic litter (such as dog droppings, dead animals, and leaves in urban areas) and inorganic litter (such as broken glass, bottles, paper and cans).

Excludes fly dumping and items unable to be removed by a single person, and or without special plant (e.g. abandoned vehicles, dead horse). Fly dumping is defined as an item or items of litter that could not be reasonably expected to be contained within a domestic refuse bag.

Performance Criteria

The MANAGEMENT PERFORMANCE MEASURES, KEY PERFORMANCE MEASURES and OPERATIONAL PERFORMANCE MEASURES relating to the WBoPDC Local Roads Network

Rehabilitation Any full width pavement treatment including area wide treatment. Note that this definition differs from that in Section 2 of the NZTA Planning, Programme and Funding Manual

Response Time In respect of OPERATIONAL PERFORMANCE MEASURES, means the time in which the Contractor must rectify any particular instance of a DEFECT. Response Time commences from the time at which the DEFECT is first identified by any party.

Page 5: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Works

Page 4 of 157

1 1.2 Acronyms

In addition to Appendix (State Highways) 1.2, the table below provides to certain

acronyms used within the Contract Documents.

Table 1.2: WBoPDC Local Road Acronyms

Acronym Meaning

AC Asphaltic Concrete

ADT Average Daily Traffic

BoPRC Bay of Plenty Regional Council

CCP Customer Care Plan

CQP Contract Quality Plan

EPP Environmental Protection Plan

HSD High Speed Data

KPM Key Performance Measure

MPM Management Performance Measure

RRPM Raised Reflective Pavement Marker

SMP Safety Management and Intervention Plan

SSSD Safe Sight Stopping Distance

WBoPDC Western Bay of Plenty District Council

Page 6: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 5 of 157

2 2

Value Management Proposition

2.1 Guide to the KRA Performance Framework

2.1.1 Introduction

Refer Appendix (State Highways) 2.1.1.

2.1.2 Objectives

The performance framework will support achievement of the aspirations and goals of the

contract in the following Key Result Areas:

• Safety

• Customer

• Assurance and Value

• Network Performance

2.1.3 Levels of Reporting

There are two main levels of reporting. This is designed so that each team member‟s role,

at each level will have maximum effect on the areas they are accountable for.

Table 2.1.1: Levels of Reporting

Level Key Focus Measured Against

Reporting Interval

Impact

Contract Management Team

Operational elements of the contract

OPM Monthly Financial pain (At-risk payment)

Contract Board Review KRAs KPIs aggregated into the KRAs

Annually Financial reward and contract tenure

2.1.4 Key Result Areas

The four Key Result Areas are presented in Table 2.1.2.

Table 2.1.2: Key Result Areas

KRA Weighting Reasoning

Safety 25% Safety is of paramount importance on the journey to zero harm.

Measure achievement and commitment to health and safety outcomes.

Measure performance towards improving safety outcomes for road users.

Page 7: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 6 of 157

2 Table 2.1.2: Key Result Areas

KRA Weighting Reasoning

Customer 15% Respond to customers’ requests and manage their expectations.

Assurance and Value

30% Quality outcomes underpinned by accurate Network information and knowledge.

Network Performance

30% Ensure the physical indicators of service quality have been met.

TOTAL 100%

2.1.5 Key Performance Indicators

The tables presented in Appendix (WBoPDC Local Roads) 2.1.8 indicate the Key

Performance Iindicators and measures aligned to each of the four KRAs, and the

weighting of each. The weightings may change if the Principal determines that other

business priorities need a higher level of focus.

Each KPI and its associated KPI measure will be scored in one of the performance bands

indicated in Appendix (WBoPDC Local Roads) Table 2.13.

2.1.6 Scoring

Each KRA is broken down into one or more KPIs, which are specifically assigned to one

KRA only; the KPIs are used to determine a KRA score.

Each KRA is made up of one or more KPI measures that demonstrate the Contractor‟s

level of performance achievement for that specific KPI. The measures will be evaluated

against condition criteria such as Network data, asset condition measures, customer

responses or stakeholder survey results. The Contractor must develop a mechanism for

recording and reporting their achievement against each stated measure that can withstand

Principal or independent scrutiny.

Each KPI will be one of the following:

• Aggregation of a number of measures that then add up to a clear quantitative range to

categorise the performance level

• Individual KPI measure that has a clear quantitative range to categorise the

performance level

Once a KPI performance level has been derived, it is assigned a normalised score as

detailed in Table 2.1.3.

Each individual KPI can have a different weight assigned in relation to other KPIs within

a specific KRA, depending on its importance or focus.

Page 8: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 7 of 157

2 A KRA score is derived from the individual KPI normalised score and then the sum of all

the KPIs for that KRA is averaged.

The assigned performance level for a KRA will be based on where the resulting KRA

score falls within the score range stated in the Measure Scoring Table 2.1.3. Once a KRA

performance level has been identified, it will then be assigned the normalised score.

Reporting to the CB should detail the KRA performance level, the KRA normalised score

and corresponding KPI normalised scores.

Once a year, an annual overall performance KRA score for the contract is to be developed.

The outcome of the overall performance KRA score will confirm what level of entitlement

and reward the Contractor has earned for the year, as stated in the Measure Scoring Table

2.1.3. Note the Contractor can earn both additional tenure and financial reward; however,

the additional tenure is limited to a maximum term as set out in the Conditions of

Contract.

Each individual KRA can have a different weight assigned in relation to other KRAs

depending on its importance or focus.

The annual overall performance KRA score is derived from the weighted sum of all the

KRA results for the year.

The annual overall performance KRA score is categorised according to the score range in

Table 2.1.3 and assigned a performance level. It is this final performance level which will

confirm the level of entitlement and reward the Contractor has earned.

There are four overriding exceptions to the scoring system outlined above:

• If the performance level is Poor for any KPI measure relating to pavement condition

in three or more consecutive years, the annual overall performance KRA score shall

be Poor

• If the performance level is Poor for three or more KPI measures in any one year, the

annual overall performance KRA score shall be Poor

• If the Contractor fails to collect the data required to report KPM or OPM compliance,

the annual overall performance KRA score shall be Poor

• If the Contractor fails to deliver a KPM Compliance Report, or demonstrates a pattern

of failure to produce monthly OPM compliance reports, the annual overall

performance KRA score shall be Poor

An example of a KRA calculation score is represented in Appendix (WBoPDC Local

Roads) 2.1.10.

Page 9: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 8 of 157

2 Table 2.1.3: Measure Scoring Table

Score Range Normalised Score Performance Level Outcome

≥ 3 3.6 Outstanding Tenure adjusted in accordance with Conditions of Contract,

First Schedule Part B, Clause 10.8

KRA Reward determined in accordance with Basis of

Payment (State Highways), Preamble Item iii

2 < and < 3 2.6 Best Practice

1.45 < and ≤ 2 1 Minimum Condition of Satisfaction

≤ 1.45 0 Poor Loss of Tenure

The Principal and Contractor may provide additional information in their CB performance

report on extenuating circumstances which may have affected the Contractor‟s ability to

achieve a higher performance level. Additional information in no way allows the

performance level to be changed.

The Contractor and Engineer‟s Representative will work together to develop a

specification for each KPI that indicates:

• What is being measured, how and when it is measured, and by whom

• The performance targets for each individual measure and the measurement band it

relates to: Poor, Minimum Condition of Satisfaction, Best Practice and Outstanding

• The business rules for the provision of the KPI information

• The data sets, data specifications, data calculation and data delivery for each measure

• The supporting information the Contractor must provide and retain on record to

support the KPI score given

Table 2.1.4: Performance Levels and Descriptions

Level of Performance Description of Performance

Poor Significant performance failures and serious gaps in service delivery

Minimum condition of satisfaction An adequate standard of performance with improvement required

Best practice Results reflecting consistent performance achievement underpinned by constructive behaviours that enhance the relationship and deliver innovative solutions for both parties

Outstanding The Contractor is exceeding the Principal’s expectation of performance and has consistently delivered results at a level not previously achieved by suppliers.

Page 10: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 9 of 157

2 2.1.7 Performance Evaluation and Monitoring

The results obtained from the monitoring of the KPIs and KRAs will be evaluated to:

• Measure performance and ascertain a score for each KPI for the year under

consideration, in accordance with the performance framework guidelines

• Identify the reasons for poor performance and jointly learn from them

• Create an environment where the behaviours and results associated with poor

performance are considered unacceptable by both the Contractor and the Principal

• Address the potential likelihood of future poor performance and reaffirm the

Principal‟s expectations of performance

• Determine the contract tenure and financial impact outcomes annually

Performance will be measured by each of the operational tiers as specified in the reporting

intervals in Appendix (WBoPDC Local Roads) Table 2.11. It is expected that there will be

a grace period (between three to six months dependent on contract commencement date)

from the time of contract commencement so that the Contractor can complete the

implementation of the system that scores Contractor performance. This will enable the

Principal and the Contractor to ensure there are systems and processes in place that

support the collection and verification of the data and information required for effective

evaluation of performance.

It is expected that the Principal and Contractor will work collaboratively to fully

implement the system in the allocated time frame.

Each KPI within a given KRA will be formally reported in the CB annual report. The

format of the report will be developed jointly between the Contractor and the Principal to

ensure visibility to all, and to enable the provision of clear assessment of performance

over the Contract Period.

Page 11: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 10 of 157

2

2.1.8 Contract Performance Framework

KRA: Safety

Outcome:

Safety is of paramount importance on the journey to zero harm.

Measure achievement and commitment to health and safety outcomes.

Measure performance towards improving safety outcomes for road users.

KPI Class KPI Measure Weighting Poor MCOS Best Practice Outstanding

Health and Safety

1. Overall Safety triangle score

A. Total recordable injury frequency rate

B. No. of non-compliances

C. Close out of non-compliances

D. No. of safety presentations

E. No. of near misses reported

100% Overall safety triangle score <0

Overall safety triangle score 0 < to < 10

Overall safety triangle score < 10 to < 20

Overall safety triangle score < 20

Road User Safety 1

1. KPM 118: Percent Accidents with Road Related Factors

100% > 110% Control Group

110% Control Group ≤ to < 90% Control

Group

90% Control Group ≤ to < 80% Control

Group

≤ 80% Control Group

Road User Safety 2

1. KPM 22: Percent with Mean Profile Depth < 0.7mm

20% > 1.5% 1.5% ≤ to < 1.0%

1.0% ≤ to < 0.5%

≤ 0.5%

2. KPM 23 to KPM 26: Percent with Mean Profile Depth < 0.7mm

80% > 2.5% 2.5% ≤ to < 2.0%

2.0% ≤ to < 1.5%

≤ 1.5%

Page 12: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 11 of 157

2 KRA: Safety

Outcome:

Safety is of paramount importance on the journey to zero harm.

Measure achievement and commitment to health and safety outcomes.

Measure performance towards improving safety outcomes for road users.

KPI Class KPI Measure Weighting Poor MCOS Best Practice Outstanding

Road User Safety 3

1. KPM 110 to KPM 116: Safety Performance Index (Sealed)

100% > 2.0 2.0 ≤ to < 1.5 1.5 ≤ to < 1.0 ≤ 1.0

Page 13: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 12 of 157

2

KRA: Customer

Outcome:

Respond to customers’ requests and manage their expectations.

KPI Class KPI Measure Weighting Poor MCOS Best Practice Outstanding

Customer Satisfaction

1. Customer Satisfaction Index 100% < 85% ≥ 85% to ≥ 90% > 90% to ≥ 95% > 95%

Page 14: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 13 of 157

2

KRA: Assurance and Value

Outcome:

Quality outcomes underpinned by accurate Network information and knowledge.

KPI Class KPI Measure Weighting Poor MCOS Best Practice Outstanding

All Remaining KPMs

1. KPMs compliant with Contract

Standard, excluding:

A. KPMs taken into account in other KPIs/KRAs)

B. KPMs that do not have a Contract Standard

100% < 96% ≥ 96% to ≥ 98% > 98% to < 100% 100%

Page 15: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 14 of 157

2

KRA: Network Performance

Outcome:

Ensure the physical indicators of service quality have been provided.

Demonstrate that promises made during tendering add value and are delivered.

KPI Class KPI Measure Weighting Poor MCOS Best Practice Outstanding

Network Condition and Integrity

1. KPM 1: Roughness – Mean NAASRA (Road Group 1 - Urban)

7% > 86 86 ≤ to < 84 84 ≤ to ≤ 80 < 80

2. KPM 2: Roughness – Mean NAASRA (Road Group 1 - Rural)

10% > 80 80 ≤ to < 78 78 ≤ to ≤ 76 < 76

3. KPM 3: Roughness – Mean NAASRA (Road Group 2 - Urban)

6% > 100 100 ≤ to < 98 98 ≤ to ≤ 94 < 94

4. KPM 4: Roughness – Mean NAASRA (Road Group 2 - Rural)

10% > 82 82 ≤ to < 80 80 ≤ to ≤ 78 < 78

5. KPM 5: Roughness – Mean NAASRA (Road Group 3 - Urban)

6% > 100 100 ≤ to < 98 98 ≤ to ≤ 94 < 94

6. KPM 6: Roughness – Mean NAASRA (Road Group 3 - Rural)

10% > 86 86 ≤ to < 84 84 ≤ to ≤ 82 < 82

7. KPM 29 to KPM 30: Surfacing Defect Index (Sealed) (Road Group 1)

10% > 0.6 0.6 ≤ to < 0.5 0.5 ≤ to ≤ 0.4 < 0.4

Page 16: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 15 of 157

2 KRA: Network Performance

Outcome:

Ensure the physical indicators of service quality have been provided.

Demonstrate that promises made during tendering add value and are delivered.

KPI Class KPI Measure Weighting Poor MCOS Best Practice Outstanding

8. KPM 31 to KPM 32: Surfacing Defect Index (Sealed) (Road Group 2)

10% > 0.6 0.6 ≤ to < 0.5 0.5 ≤ to ≤ 0.4 < 0.4

9. KPM 33 to KPM 34: Surfacing Defect Index (Sealed) (Road Group 3)

10% > 0.6 0.6 ≤ to < 0.5 0.5 ≤ to ≤ 0.4 < 0.4

10. KPM 52: Surfacing Defect Index (Unsealed)

5% > 3.1 3.1 ≤ to < 2.9 2.9 ≤ to ≤2.4 < 2.4

11. KPM 53: Surfacing Defect Index (Unsealed)

5% > 2.9 2.9 ≤ to < 2.7 2.7 ≤ to ≤2.2 < 2.2

12. KPM 54: Surfacing Defect Index (Unsealed)

5% > 2.9 2.9 ≤ to < 2.7 2.7 ≤ to ≤2.2 < 2.2

13. KPM 55: Surfacing Defect Index (Unsealed)

5% > 3.0 3.0 ≤ to < 2.8 2.8 ≤ to ≤2.3 < 2.3

Page 17: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 16 of 157

2 2.1.9 Safety Triangle

The safety triangle is a combination of several of the safety elements measures to give an

overall score. It has both positive and negative elements combined. The aggregated safety

triangle formula represents the safety score. Within the overall score is the opportunity to

recognise positive performance as represented in the triangle and an incentive to minimise

negative performance.

Total Recordable Injuries (TRI)

Total Recordable Injury includes Serious Harm Injury, Lost Time Injury, Medical

Treatment Injury and employees on restricted work duties. It excludes First Aid Injury.

The Contractor maintains records of all TRIs for each year. For the year measured, the

score is calculated based on the number of TRIs reported multiplied by (-20) to give the

overall TRI score for that year.

Safety non-compliances

The Contractor maintains records of all safety non-compliances for each year. For the year

measured, the score is calculated based on the number of safety non-compliances reported

multiplied by (-10) to give the overall safety non-compliance score for that year.

Close out of Safety non-compliances

The Contractor maintains records of all safety non-compliances closed out for each year

and the number of safety non-compliances still open. For the year measured, the score is

calculated based on the number of safety non-compliances closed out multiplied by (+20)

plus the number of safety non-compliances still open multiplied by (+0.5) to give the

overall safety non-compliance close-out score for that year.

TRI

Safety Non-Compliance

Close out of safety non- compliances

Safety training, safety workshops, safety

presentations

Near-Miss Reporting

-20

-10

+20 if

closed,

0.5 if

open

+1

+0.5

per

event

#

#

#

#

#

-20x#

-10x#

(20x#)

+

(0.5x#)

1x#

0.5x#

Calc Event Score

Page 18: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 17 of 157

2 Safety training, workshops, presentations

The Contractor maintains records of all safety training, workshops, and presentations for

each year multiplied by the number of FTEs attended. For the year measured, the score is

calculated based on the number of safety training, workshops, and presentations multiplied

by FTE attendance multiplied by (+1) to give the overall safety training, workshops, and

presentations score for that year.

Near-miss reporting

The Contractor maintains records of all near-miss reports for each year multiplied by the

number of different FTEs who provided near misses. For the year measured the score is

calculated based on the number of near misses reported multiplied by number of different

FTEs who provided near-miss reports multiplied by (+0.5) to give the overall near-miss

report score for that year.

Page 19: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 18 of 157

2 2.1.10 Example Calculation of KRA Score

There are 4 Key Result Areas (KRAs). Each KRA is evaluated annually. The annual

overall performance level determines the contract‟s outcome, for example additional

tenure and financial reward.

KPI

Each Key Performance Indicator (KPI) can have more than one measure. Each measure

has a different weighting. The KPI performance level is dependent on the relevant KPI

measures performance levels. In this example, KPI 1 has three relevant measures

(Measure 1, Measure 2 and Measure 3). The KPI measure performance level has been pre-

determined for this example.

Weighting Performance Level Normalised Score

(see Table 2.1.3)

KPI 1 Measure 1 30% Outstanding 3.6

Measure 2 50% MCoS 1

Measure 3 20% Best Practice 2.6

Average (3.6*0.3)+(1*0.5)

+(2.6*0.2)

= 2.1

Range (see Table 2.1.3)

2 < and < 3

Performance Level Best Practice

KRA Each KRA can have more than one KPI. The KRA performance level is dependent on the

relevant KPIs‟ performance levels. In this example, KRA 1 has two relevant KPIs (KPI 1

and KPI 2). All KPIs have equal weighting (1).

Performance Level Normalised Score

(see Table 2.1.3)

KRA 1 KPI 1 Best Practice 2.6

KPI 2 MCoS 1

Average [(2.6*1)+(1*1)] / 2

= 1.8

Range (see Table 2.1.3)

1.45 < and < 2

Performance Level MCoS

Page 20: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 19 of 157

2 Annual overall performance score

The annual overall performance score, derived from all the annualised KRA scores

determines the outcome for the year. Each KRA has a different weighting.

Weighting Performance Level Range

(see Table 2.1.3)

Normalised Score

KRA 1 25% MCoS 1.45 < and < 2 1

KRA 2 15% Best Practice 2 < and < 3 2.6

KRA 3 30% MCoS 1.45 < and < 2 1

KRA 4 30% Outstanding > 3 3.6

Weighted Performance

score (all KRAs)

(1*0.25) + (2.6*0.15) + (1*0.3) +

(3.6*0.3)

= 2.02

Range

(see Table 2.1.3) 2 < and < 3

Annual Overall

Performance Level

Best Practice

Page 21: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 20 of 157

2 2.2 OPM Monthly Evaluation Example

Part A: Establishing the At-Risk Payment Value for the Contract Period

Monthly At-Risk Payment

Tendered lump sum for Schedule Item 1

$109.2M

Annual tendered lump sum for Schedule Item 1

$109.2M / 7 years = $15.6M

Monthly tendered lump sum for Schedule Item 1

(1/12) * $15.6M =$1.3M

Maximum monthly at-risk payment

$109.2M / 2,500

= $43,680

For further information on payment, see Basis of Payment (WBoPDC Local Roads),

Section 1.

The value of the monthly at-risk payment is vulnerable to change dependent on the level

of non-conformance.

Part B: Monthly Network Compliance Evaluation

Occurrences

The OPM non-compliances for the full Network length are summarised. All these OPMs

evaluate non-compliant response times for a calendar month.

Sealed Pavements Litter Control (Urban) Pedestrian Lighting

OPM 201 205 213 336 339 340 342 331 332 333 334

Occurrences

(OPM) 1 1 2 2 1 2 3 2 3 1 3

OPM Category Safety-related OPMs Customer-related OPMs All other OPMs

Occurrences

(OPM Category) 4 8 3

Total Responses

(OPM Category) 100 53 50

%Non-compliance 4% 15% 6%

Weighting Depending on the nature and context of each OPM, they may have different weighting

consequences for not achieving the response time. The following table lists the weightings

by each of the OPM categories as listed in Maintenance Specification (WBoPDC Local

Roads), Section 2.

Page 22: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 21 of 157

2 OPM Category Weighting

Safety-related OPMs 0.25

Customer-related OPMs 0.20

All other OPMs 0.15

OPM Non-compliance identified by Service Request or Principal and not previously identified by Contractor

0.20

MPMs not delivered to acceptable standard or not delivered within specified Delivery Time

0.20

Number of non-compliance notices issued by the Engineer’s Representative during the previous month plus the number of non-compliance notices still open from previous months

1.00

Types of non-compliances and their corresponding weightings

Sealed Pavements Litter Control (Urban) Pedestrian Lighting

OPM Category Safety-related OPMs Customer-related OPMs All other OPMs

%Non-compliance 4% 15% 6%

Weighting 0.25 0.20 0.15

Total The Monthly Network Compliance score (MNCS) is calculated using the following

equation:

𝑀𝑁𝐶𝑆 = (%𝑁𝑜𝑛 − 𝐶𝑜𝑚𝑝𝑙𝑖𝑎𝑛𝑐𝑒 × 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔)

OPM Category %Non-Compliance Weighting MNCS

Safety-related OPMs 4% 0.25 = 4% * 0.25 1

Customer related OPMs 15% 0.20 = 15% * 0.20 3

All other OPMs 6% 0.15 = 6% * 0.15 0.9

OPM Non-compliance

identified by Principal

0% 0.20 = 0% * 0.20 0

MPMs not delivered to

specification

0% 0.20 = 0% * 0.20 0

Number of non-compliance

notices open

2 1.00 = 5 * 1.00 2

6.9

Page 23: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Value Management Proposition

Page 22 of 157

2 In this example the MNCS is less than 7; therefore no financial penalty is imposed

assuming an equivalent high level of performance on the State Highway network. If the

MNCS was between 7 and 25 a variable financial penalty would result assuming an

equivalent level of performance on the State Highway OPM evaluation. If MNCS was

over 25, or if the %Non-Compliance for any OPM Category was over 35%, then 100%

financial penalty would be imposed.

If the overall monthly score was 21

The following equation determines the proportion of payment that is adjusted, where x =

21, which is the MNCS:

Proportion adjustment = −0.2865x2 + 3.804x + 87.414

Proportion adjustment (%) = 100 − (−0.2865 21 2 + 3.804 21 + 87.414)

= 100 − ( −126.3 + 79.9 + 87.414)

= 59.0

Maximum monthly at-risk payment: $43,680

Proportion adjustment: 59.0%

Monthly at-risk payment post-

adjustment:

$43,680 * 59.0%

= $25,771

Payment for month post-adjustment: = $(1,300,000-25,771)

$1,274,229

Page 24: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Management

Page 23 of 157

3 3

Contract Management

3.1 Sections of the Network under the Current or Future Control of Separate Contractors

Table 3.1: Sections of the Network under the Current or Future Control of Separate Contractors

Type of Work Start Date Completion Date and/or Period of Defects Liability

Contact Person and Contact Numbers

Contract No. 13/1011: Western Urbanisation Road Improvement Works

Island View, Waihi Beach

Dolphin Avenue

Broadway Road

Albacore Avenue

Waiti Avenue

Katikati

Beach Road

Wills Road

10 Dec 2013 Due Date for Completion: 30 June 2015

12 months defects liability

Higgins Contractors Ltd

Rowan Meredith

027 588 2022

Page 25: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Management

Page 24 of 157

3 3.2 Standard Specifications

3.2.1 NZTA Standard Specifications

The following NZTA Standard Specifications apply to this contract.

Table 3.2.1: NZTA Standard Specifications

Specification Reference

Issue Specification Description

NZTA HM/09 2006 Incident Response

NZTA M/10 2012 Asphalt Concrete

NZTA P/9 1975 Construction of Asphalt Concrete Pavement

NZTA P/11 2007 Open-Graded Porous Asphalt

NZTA P/22 2006 Reflectorised Pavement Marking

Other NZTA HM Series Standard Specifications will apply only for the provision of

definitions and good practice relevant to this Contract.

3.2.2 Underslip Minimum Repair Standard Specification

The Contractor is required to repair any underslip to a minimum width of 0.3m from the

outside of the original edge of the seal or carriageway (prior to the slip) plus an additional

width determined in accordance with Table 3.2.3. The objective of the additional width is

to take into account environment factors associated with the Carriageway Section

including terrain, width, and road group and speed zone. The repair is to be completed at

grade with the existing seal.

For the derivation of the additional width the terrain type, existing width, road group and

speed zone are taken from the RAMM carriageway table current at the time of the

underslip. The number of metres underwidth are determined as the difference between the

required width, determined in accordance with the WBoPDC Development Code, and the

existing width.

The additional repair width is determined as the maximum width from Table 3.2.2 from

the four environmental factors.

Page 26: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Management

Page 25 of 157

3

Table 3.2.2: Underslip Repair Requirement in addition to 0.3m

Terrain Type Mountainous Hilly Level

0.5m 0.3m 0.0m

Underwidth >2m underwidth 1 to 2m underwidth < 1m underwidth

0.4m 0.2m 0.0m

Road Group 1, 2 & 3 4 & 5 6 & 7

0.5m 0.3m 0.0m

Speed Zone >80 km/hr 50 to 80 km/hr <50 km/hr

0.5m 0.3m 0.0m

The following example is provided for the avoidance of doubt. Where an underslip has

occurred at a road segment categorised as:

Mountainous terrain

0.5m underwidth

Road group 4

80km/hr speed zone

From Table 3.2.2, the additional width is determined as 0.5m required as a result of the

mountainous terrain being greater than the 0m required for the 0.5m underwidth, the 0.3m

for the road group 4 and the 0.3m for the 80km/hr speed zone. The total repair width

required from the outside edge of the original seal or carriageway (prior to the slip) is

therefore the minimum 0.3m plus the additional 0.5m (total 0.8m).

3.2.3 Unsealed Aggregate Material Specification

Introduction

Materials used in the construction and maintenance of unsealed roads in the Network shall

comply with this specification immediately prior to laying on a particular road.

The unsealed aggregate (metal) to be used on unsealed roads shall have a high clay

content as detailed in this specification.

Definitions

Subgrade: The soil foundation on which the road pavement is built.

Subbase: A layer of aggregate placed between the subgrade and the basecourse layer.

Basecourse: The main structural layer in a pavement constructed using a dense, stable,

well-graded aggregate.

Page 27: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Management

Page 26 of 157

3 Wearing Course: The wearing course (or top layer) shall conform to the basecourse

specification.

Subbase

Subbase aggregate shall comprise crushed quarried rock or river gravel that is well graded

with a maximum particle size not exceeding 100mm. When compacted in a mould and

after soaking for 4 days it shall have a CBR value not less than 25%.

Basecourse

Basecourse aggregate shall comprise of crushed quarried rock or river gravel that is well

graded. Two grades of aggregate may be used according to the circumstances, one with a

maximum particle size of 25mm and the other with 40mm. The particle size range shall

fall within one of the following envelopes

25mm Basecourse

Sieve Size (mm) Percent Passing

26.5 100

19.0 85 – 100

9.5 70 – 100

4.75 53 – 85

2.36 40 – 70

0.425 25 – 45

0.075 12 - 26

40mm Basecourse

Sieve Size (mm) Percent Passing

37.5 100

19.0 65 – 90

9.5 50 – 73

4.75 35 – 60

2.36 27 – 48

0.425 17 – 32

0.075 10 - 20

The aggregate shall comprise of a mixture of crushed rock particles, sand, silt and clay

manufactured from quarried rock or river gravel. Blending of materials from a variety of

sources will be acceptable.

The Crushing Resistance of Aggregate (NZS 4407:1991 Test 3.10) shall be such that not

more than 10% fines are produced when a load of 130KN is applied.

Page 28: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Management

Page 27 of 157

3 The fines shall be plastic and when tested in accordance with NZS 4402:1988, Tests 2.2 –

2.6, the product (Plasticity Index X percentage passing 0.425 mm sieve) shall be in the

range 300 to 400. In addition the Shrinkage Product which is the product (Linear

Shrinkage X percentage passing the 0.425mm sieve) shall be in the range 100 – 250.

The aggregate shall be supplied at a moisture content in the range of -2% to +0 % of the

optimum water content for Standard Compaction NZS 4402:1988 Test 4.1.1. The CBR of

a compacted sample of the aggregate, which has been soaked for 4 days, shall be not less

than 25%.

Page 29: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Management

Page 28 of 157

3 3.3 Other Publications

The following publications apply to this contract.

Table 3.3: Other Publications

Specification Reference

Specification Description

WBoPDC Accident KPM Analysis

WBoPDC Bridge Rating Standards and Definitions (Bridge Condition Form 01, Bridge Word Picture Condition 01, Bridge Risk Rating Form 01, Bridge Word Picture Risk Form 01)

WBoPDC Compensation for Land Acquired for Road

WBoPDC Culvert Rating Standards and Definitions

WBoPDC Cultural Monitoring Protocols 2014

WBoPDC Customer Satisfaction Index Questionnaire

WBoPDC Customer Satisfaction Index Calculation Methodology

WBoPDC Development Code

WBoPDC District Plan

WBoPDC Drainage Risk Rating and Assessment Guidelines

WBoPDC Financial Plan Process and Procedures Manual

WBoPDC Group 3 Roads – Available Sight Distance Review (2002)

WBoPDC Health and Safety – 112 Contractor’s Policy

WBoPDC Long Term Plan

WBoPDC Minor Structure Rating Standards and Definitions (Retaining Wall Word Picture Condition Form 01, Retaining Wall Condition Risk Form 01, Retaining Wall Word Picture Risk Form 01)

WBoPDC Policy on Compensation for Land Acquired for Road

WBoPDC Policy on Consultation for Roading Projects

WBoPDC Safety Performance Index Model

WBoPDC Safety Provisions for Road Works Policy

WBoPDC Street Lighting Rating Standards and Definitions

WBoPDC Street Trees Maintenance Policy

WBoPDC Transportation Asset Management Plan

WBoPDC Urban Tree Rating Standards and Definitions

BoPRC Air Plan 2012

Page 30: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Management

Page 29 of 157

3 Table 3.3: Other Publications

Specification Reference

Specification Description

BoPRC Plant Pest Management Strategy (2011 – 2016)

SP/M/016 NZTA Bridge Inspection and Maintenance Manual

SP/M/022 NZTA Bridge Manual

CoPTTM NZTA Code of Practice for Temporary Traffic Management (4th Edition November 2012)

EEM NZTA Economic Evaluation Manual

SM051 NZTA Location Referencing Management System Manual

MOTSAM NZTA Manual of Traffic Signs and Markings

NLTP NZTA National Land Transport Programme

NZTA Network Outcomes Contract Visual Intervention Guide

NZTA Planning and Investment Knowledge Base

NZTA Process Manual for Network Standards and Guidelines

NZTA RAMM Road Condition Rating Manual

SM020 NZTA State Highway Asset Management Manual

SM050 NZTA State Highway Database Operation Manual

SHGDM NZTA State Highway Geometric Design Manual

SP/M002 NZTA State Highway Safety Management System Manual

TCD Manual NZTA Traffic Control Devices Manual

AustRoads Guide to Road Design: Part 3

AustRoads Rural Road Design – Guide to the Geometric Design of Rural Roads

AustRoads Guide to Pavement Technology: Parts 2 and 5

NZ Supplement to AustRoads Pavement Design Guide

New Zealand Bitumen Contractors Association Safe Handling of Bituminous Materials

New Zealand National Roads Board Road Condition Rating Manual

Road Safety Manufacturers Association Standards for the Manufacture and Maintenance of Traffic Signs, Posts and Fittings

National Code of Practice for Utility Operators Access to Transport Corridors

International Infrastructure Management Manual 2011 Edition

Page 31: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Management

Page 30 of 157

3 Table 3.3: Other Publications

Specification Reference

Specification Description

KiwiRail/NZTA Road Controlling Authority Level Crossing Agreement

Urban Maintenance Areas: Waihi Beach Area (February 2014) Volume 1

Urban Maintenance Areas: Katikati Area (February 2014) Volume 2

Urban Maintenance Areas: Omokoroa Area (February 2014) Volume 3

Urban Maintenance Areas: Te Puke (February 2014) Volume 4

Urban Maintenance Areas : Maketu, Paengaroa and Pukehina (February 2014) Volume 5

Page 32: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Management

Page 31 of 157

3 3.4 Stockpile Sites

Table 3.4: Stockpile Sites

Location Name

Road Name Displ. (m) Side

Mountain Road 50 RHS

Wainui Road South 120 RHS

Wairoa Road 180 LHS

Young Road 280 RHS

Page 33: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Management

Page 32 of 157

3 3.5 Stockpile Management Plan

Table 3.5: Stockpile Management Plan

Mountain Road Wainui South Road Wairoa Road Young Road

RP 50 120 180 280

Side Right Right Left Right

Distance from road edge Stockpiled material not to encroach within 2.5m of edge line/edge of seal

Stockpiled material not to encroach within 2.5m of edge line/edge of seal

Stockpiled material not to encroach within 2.5m of edge line/edge of seal

Stockpiled material not to encroach within 2.5m of edge line/edge of seal

Material restriction Sealing chip/base course material Sealing chip/base course material Sealing chip/base course material Sealing chip/base course material

Volume 150m3 150m3 250m3 300m3

Time limit One month One month One month One month

Required Traffic Management Plans Stockpiling of material:

Operations> 2.5m from E of S

Operations < 2.5m from E of S

Operations on Live Lane:

Stockpiling of material:

Operations> 2.5m from E of S

Operations < 2.5m from E of S

Operations on Live Lane:

Stockpiling of material:

Operations> 2.5m from E of S

Operations < 2.5m from E of S

Operations on Live Lane:

Stockpiling of material:

Operations> 2.5m from E of S

Operations < 2.5m from E of S

Operations on Live Lane:

Sightline encroachment

Intersection sightlines 160m must be maintained at all times N/A 160m must be maintained at all times N/A

Vehicle Entrance

Construction Traffic Movement – stockpiling and removing material

Truck and/or trailer/loader movements should be planned so as they do not encroach within 2.5m of the road edge. Any traffic movements that encroach within 1 metre of the trafficable lane will require a shoulder closure. Traffic movements that encroach into the trafficable lane will require stop/go.

Refer to Required Traffic Management Plans

Truck and/or trailer/loader movements should be planned so as they do not encroach within 2.5m of the road edge. Any traffic movements that encroach within 1 metre of the trafficable lane will require a shoulder closure. Traffic movements that encroach into the trafficable lane will require stop/go.

Refer to Required Traffic Management Plans

Truck and/or trailer/loader movements should be planned so as they do not encroach within 2.5m of the road edge. Any traffic movements that encroach within 1 metre of the trafficable lane will require a shoulder closure. Traffic movements that encroach into the trafficable lane will require stop/go.

Refer to Required Traffic Management Plans

Truck and/or trailer/loader movements should be planned so as they do not encroach within 2.5m of the road edge. Any traffic movements that encroach within 1 metre of the trafficable lane will require a shoulder closure. Traffic movements that encroach into the trafficable lane will require stop/go.

Refer to Required Traffic Management Plans

Maintenance of stockpile areas

Stockpile in use Contractor to keep stockpile area clean and tidy with no loose material encroaching onto the sealed pavement

Contractor to keep stockpile area clean and tidy with no loose material encroaching onto the sealed pavement

Contractor to keep stockpile area clean and tidy with no loose material encroaching onto the sealed pavement

Contractor to keep stockpile area clean and tidy with no loose material encroaching onto the sealed pavement

Stockpile not in use Contractor to keep clean and tidy including vegetation control (Types 6 and 9)

Contractor to keep clean and tidy including vegetation control (Types 6 and 9)

Contractor to keep clean and tidy including vegetation control (Types 6 and 9)

Contractor to keep clean and tidy including vegetation control (Types 6 and 9)

Page 34: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Management

Page 33 of 157

3 3.6 Resource Consents

Table 3.6: Resource Consents

Reference Location Description/Comments

40179 Maketu Estuary Right to reclaim area of foreshore for roading Beach Road

40191 Beach Road Maketu Right to deposit rock and form seawall to reclaim for road

50902 Waipapa River Remove, replace and use a structure over the bed of a tributary of the Waipapa River

50903 Ohourere Stream Remove an existing bridge to construct a new bridge across the Ohourere Stream

50904 To disturb and erect and use a bridge over a river

60419 Waimapu Stream Alter and use bridge number 31 over the Waimapu Stream

60975 Waiorohi Stream Alter and use the existing structure over the bed of the Waiorohi Stream

61014 Omanawa River To replace and use a culvert to extend an existing culvert. To divert an unnamed tributary of the Omanawa River

61211 Pongakawa Bush Road, Pongakawa

To install a 1200mm diameter culvert in a dry watercourse beneath Pongakawa Bush Road, Pongakawa

61380 Raparapahoe Stream Erect and use gabion structures and disturb the bed of the Raparapahoe Stream

61381 Kopurereroa Stream Erect and use gabion structures and disturb the bed of the Kopurereroa Stream

20743 Minden Road Discharge Stormwater

20815 Maruia Place Discharge Stormwater

21188 Minden Road Discharge Stormwater

40160 Ongare Point Construct a Culvert

50244 Wharawhara Stream Repair/Const/Maint/Structure: Wharawhara

50391 No 1 Road Construct/Maintain 3 structures Wairi

50602 No 1 Road Reconstruct/Maintain 3 structures

50902 Waipapa Block Road Replacement of single span bridge

50903 Crawford Road Bridge Replacement of single span bridge

50904 Rangiuru Road Bridge Disturb the bed and erect and use a bridge

60414 60 Main Road, SH2 Construct footbridge over Uretara Stream

60419 Waimapu Stream Alter & use bridge 31 over Waimapu Stream

Page 35: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Management

Page 34 of 157

3 Table 3.6: Resource Consents

Reference Location Description/Comments

60544 Omanawa Road Dis collected stormwater from Omanawa Road

60697 Mc Millan Road Reserve Erosion protection works at McMillan Reserve

60863 Castles Road Discharge stormwater to land

60975 Bridge 27, Oropi Gorge Road

Replace bridge deck over Waiorohi Stream

61014 Belk Road Divert stream; construct/extend culverts

61027 106 No 3 Road Discharge stormwater to water

61211 Pongakawa Bush Road Install culvert in dry watercourse

61216 Corner Westwood Road & SH2

Dis stormwater to tributary of Waiau River

61258 Muir Place & Raymond Ave

Carry out embankment protection works

61260 Hall Road Dis stormwater to Kaikokopu Drainage system

61331 Manoeka Road Kirikiri Stream erosion protection works

61380 Bridge 83, No 4 Road Bridge 83-stream bank protection works

61381 Taumata Road Bridge 6-gabion remedial emergency works

61466 311 Minden Road Permanent stormwater discharge

61556 Pyes Pa Road Extend existing twin culverts for new Road

61774 Wairoa River and Oturu Creek

Place structures over water courses

62142 302 and 308 Pukehina Parade

Permanent stormwater dis from roadway

62270 50 Ocean View Road Permanent stormwater discharge

62271 2 Ocean View Road Erect structure, gabion & reno mattress

62636 Bridge 12, Tuapiro Road Earthworks to widen bridge

62638 Joyce Road Replace culvert in unnamed tributary

62962 Wharawhara Road Attach steel pipeline to existing bridge

63175 Wharwhara Road to Lockington Road

L/S earthworks to attach pipe to bridge

63292 Poripori Road & Crawford Road

Earthworks to extend culvert

63308 Wilson Road Install culvert & gabion basket

Page 36: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Contract Management

Page 35 of 157

3 Table 3.6: Resource Consents

Reference Location Description/Comments

63748 Emerton Road Dis stormwater to water

63795 Emeny Road Earthworks for widening Road

63940 Kaituna River, at end of Bell Road

Alter a structure in the Kaituna River

64054 Beach Road Replace bridge over Waihi Stream

64055 Kaiate Falls Reserve Works to replace decked bridge

65098 No 1 Road Discharge stormwater to water

65381 Wilson Road North Replace culvert

65757 75 Omokoroa Road Earthworks for slip remediation

65920 Whakamarama Road Earthworks for roading improvements

65946 from 3.9km to 5.8km up Work Road, Apata

Earthworks for road widening & discharge

66933 Welcome Bay Road Welcome Bay Road rehabilitation project

Page 37: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 36 of 157

4 4

Management Performance Measures

4.1 Meetings and Reporting

4.1.1 Meetings

The Contractor shall prepare for and attend with the appropriate number and level of

personnel, all meetings as necessary to effectively meet the requirements and objectives of

the Contract, including but not limited to the following:

a) Meetings of the CB

b) Meetings of the WBoPDC, TCC Joint Road Safety Committee

c) Liaison meetings with other stakeholders, including service authorities and NZTA

d) Consultation meetings associated with planning functions under the Contract

e) Meetings with WBoPDC Elected Members

The Delivery Time for meetings is such that all meetings must be attended on time and for

the full duration of the meeting, and that the contractor is adequately prepared for the

meeting.

4.1.2 Handover Reports

The Contractor shall compile all relevant reports, databases, videos and other information

relating to the assets and deliver them to the Principal.

The Contractor shall make available facilities for the Principal to view video at such times

as required by the Principal.

The Delivery Times for the reports are two months from commencement of the Contract

for the incoming report and one month prior to Practical Completion for the outgoing

report.

4.1.3 Monthly Reports

Monthly Reports must include the:

a) Monthly progress claim

b) Updated programmes – including a minor capital works programme for the

Principal‟s funding consideration and review

c) Updated cashflow – this must show, on a year to date basis the actual percentage of

the annual contract value expended against each work category, as defined in the

NZTA Planning and Investment Knowledge Base, and the forecast cash flow for the

balance of the year.

d) Evidence of compliance with the Performance Criteria

The report shall either clearly separate information relating to NZTA and WBoPDC or

separate reports shall be provided for each Principal. Three copies shall be provided to

WBoPDC and one copy to the Engineer‟s Representative.

Page 38: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 37 of 157

4 The Delivery Time for the reports shall be 4:00pm on the 8

th Business Day of the month

following.

4.1.4 Accident Reports

In addition to the detailed accident reports required under the Contractors Safety

Management Strategy, interim Accident Reports must be received by the Engineer‟s

Representative for every fatal accident, any accident where there is a possibility or

allegation of Contractor initiated actions being associated with the accident or where there

is a possibility or allegation that the road condition was a major contributing factor, and

for any serious accident for which the Engineer‟s Representative requests a report,

including those reported by the New Zealand Police.

Accident Reports shall include the following information:

a) Date, time, location, nature and extent of crash

b) Weather conditions

c) Condition of surfacing and traffic services

d) Possible causes

e) Damage caused to the Assets

f) Suggested improvements

Electronic copies shall be emailed to WBoPDC staff and Engineer‟s Representative.

The Delivery Time shall be 24 hours following the accident, or as soon as practicable

thereafter.

4.1.5 WBoPDC District Roading Programmes

The Contractor shall provide the WBoPDC district roading programme deliverables for

the NZTA Annual Achievement Reporting.

The Delivery Times for the various reports shall be 10 July of each year of the Contract.

4.1.6 WBoPDC 30 Year Rolling Programme

The Contractor shall provide, on an annual basis, a 30 year rolling programme to meet the

requirements of the WBoPDC Financial Plan for all maintenance and capital improvement

works associated with the Contract. The programme must include sufficient information to

inform the Principal of the Contractor‟s activities and to provide the Principal with the

opportunity to add value to the Assets in conjunction with the Contractor‟s activities,

should it choose to do so.

The Delivery Time shall be 1 September of each year of the Contract.

Page 39: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 38 of 157

4 4.1.7 Comments on Submissions to WBoPDC Annual and Long Term Plan

The Contractor shall provide comment on public submissions (relevant to the Services)

generated during WBoPDC Annual and Long Term Plans.

The Delivery Time shall be 10 days from the receipt of a request by the Engineer‟s

Representative.

4.1.8 Asset Register Data

WBoPDC staff will be given access to view all data and have reporting capability in the

Contractor‟s RAMM database.

4.1.9 Pavement Deterioration Modelling

The Principal has implemented pavement deterioration modelling to supplement treatment

intelligence currently limited to the RAMM Treatment Selection Algorithm and data

analysis, as detailed in the NZTA State Highway Asset Management Manual. It is

expected that the outputs of these models will form a significant input into the

development of the Forward Work Programme.

In order to achieve the above outputs, the Contractor is required to:

Purchase and maintain the appropriate New Zealand dTIMS software license through

Infrastructure Decision Support (IDS)

Agree the modelling procedure with the Principal on an annual basis prior to the

commencement of the annual planning cycle

Implement the latest IDS NZ dTIMs CT template and calibrate this for local

conditions prior to the first modelling run

Recalibrate the model annually following each Forward Works Programme cycle

Reporting Requirements

Input Parameters

Comments are required on any significant changes made to the default input parameters.

Outputs

Outputs from the predictive modelling should include:

Forecasting of maintenance needs; and

Prediction of future Network condition

Reporting will be on an as required basis as requested by the Engineer‟s Representative.

Reliability Statement

A statement on the reliability and usefulness of the system shall be included.

Utilisation of Outputs

Page 40: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 39 of 157

4 Interpretation and/or explanation must support all graphical outputs and should highlight:

The message illustrated with the figure (e.g. the roughness prediction suggests that the

current maintenance effort will maintain the current roughness across the Network);

Whether the graph supports actual expectations of the Network performance in the

opinion of the Contractor‟s expert asset managers.

Commercial Interest

Similar to the recording of maintenance cost in RAMM, actual unit cost rates to the

Contractor do not have to be used in the dTIMS modelling process. For this purpose the

Contractor is allowed to use typical unit rates expected of such a Network, which

realistically reflect cost differences between treatment types. The Principal is only

interested in global quantities of work and the impact of maintenance on the future

condition.

4.1.10 KPM Compliance Reports

The Contractor shall supply an annual KPM Compliance Report. The report shall

compare actual performance against relevant Contract Standards in both tabular and

graphical form using the most recent condition data gathered in the year of the report.

Ongoing performance reporting will be summarised to allow year on year comparison.

The report will also include any relevant commentary.

The Delivery Time shall be 30 June of each year of the Contract.

Page 41: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 40 of 157

4 4.2 Quality Control – Management Plans

4.2.1 Health and Safety Management Plan

In developing the Health and Safety Management Plan required under Maintenance

Specification (State Highways), Section 4.1, the Contractor shall take into consideration

and comply with the requirements of the WBoPDC Health and Safety Policy 112.

4.2.2 Quality Management Plan

The purpose of the Contract Quality Plan (CQP) is to integrate the Contract Document‟s

requirements and the Contractor‟s quality systems to deliver the Services.

The CQP describes those aspects of the Contractor‟s quality system that will be adopted

on the Contract, including how the Contractor will:

a) Identify the quality requirements specific to the Contract

b) Plan the work to satisfy those requirements

c) Control (manage) the work to comply with the planning

d) Inspect/test the work to ensure compliance with the quality requirements

e) Record the results as evidence of compliance using data management and presentation

and video recording

f) Ensure prompt action is taken to correct non-compliance

The CQP must:

i) Clearly describe the systems, procedures and methods that will be used to deliver and

monitor compliance of the Services

ii) Include documented procedures for at least the following:

CQP implementation and management

Programming including routine maintenance and annual programmes and the

maintenance management strategy

Reporting

Quality standards

Compliance monitoring

iii) Be certified for the site to the ISO 9001 Quality Standards and AS/NZS 4801 by an

independent third party certification body.

The Delivery Time for the initial CQP shall be as nominated in the Contractor‟s tender and

for CQP reviews and audits, as required by the plan.

The Delivery Time for certification shall be as nominated in the Contractor‟s tender.

Page 42: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 41 of 157

4 4.2.3 Traffic Management Plan

The Traffic Management Plan (TMP) establishes the practices for traffic management at

work sites. The TMP must be developed by the Contractor and agreed with the Engineer‟s

Representative.

The objectives of the TMP are to:

a) Clearly define and document the responsibilities and chain of command for the

development, implementation and management of traffic control measures and

systems

b) Establish the minimum requirements for temporary traffic control

c) Establish the minimum geometric, cross section and surfacing standards for

temporary works

d) Provide appropriate transitions and enable safe and efficient traffic flow into, through

and out of work sites

e) Protect the Contractor‟s personnel at all times

f) Protect the Assets and the Contractor‟s resources at all times

g) Meet the operational requirements as set out below.

The TMP must at include at least the following:

A documented process for preparation, review and approval of the TMP

A document tracking and control system to ensure that only the latest operative copy

of the TMP is in circulation

Contact details for Contractor, WBoPDC, emergency services and other stakeholders

Layout diagrams, method statements etc. for implementation of traffic control while

undertaking each aspect of the Services (including site specific layout diagrams and

method statements if the Services require traffic control measures not covered by

standard codes of practice)

Input from the police, emergency services and other stakeholders to ensure „buy in‟

from these parties

The Delivery Time for the first TMP issue will be before undertaking any works requiring

traffic management. The Delivery Time for subsequent TMP will be prior to any works

requiring a revised TMP.

Operational Requirements The Contractor is required to use the current version of CoPTTM, being 4

th Edition

November 2012.

Pilot Vehicles Pilot Vehicles must:

Be registered for normal use on the road by the Land Transport Safety Authority

Page 43: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 42 of 157

4 Have at least 4 rubber tyred road wheels

Be capable of travelling at the speed of the fastest of the working vehicles

Four wheel farm bikes are not permitted as pilot vehicles.

Parking and Access

The Contractor shall manage its operations so that disruption to parking in urban areas is

minimised. Approval of the Engineer‟s Representative is required in advance for works

resulting in any loss of parking or loss of access to parking adjacent to retail shopping

areas in the months of December and January.

The Contractor shall ensure that access is available to property at all times.

4.2.4 Environmental Protection Plan

The purpose of the Environmental Protection Plan (EPP) is to foster an environmentally

responsible attitude on the part of the Contractor and its subcontractors and employees,

and to ensure compliance with relevant environmental protection laws and especially the

Resource Management Act 1991.

Because of the nature of the Services, the Contractor may from time to time be exposed to

environmentally sensitive situations which could involve contamination of air, soil, and/or

water systems. Situations will arise when there is a need to use appropriate environmental

protection measures. In these cases, the provisions of the Resource Management Act 1991

and other similar Acts or Regulations must be strictly observed. The Contractor needs to

be aware of environmental laws and regulations and to understand the requirements

therein.

In undertaking work which involves environmental risks, emphasis should be on the

fundamentals such as how to avoid offences of:

Air and water pollution (by screening, filtering, channelling and washing at approved

sites)

Unlawful hazardous waste disposal, by containment, storage and dumping by

approved methods at approved sites

Chemical spills (by appropriate maintenance of suitable equipment)

Contamination (by cleaning equipment at an approved site after each job)

The EPP must:

a) Identify all obligations with respect to environmental matters in accordance with the

BoPRC and legislative requirements

b) Detail systems, work practices and actions to manage environmental outcomes

c) Identify the hazards to which the environment may be exposed in the process of

carrying out work

Page 44: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 43 of 157

4 d) Identify activities for which permission must be obtained before undertaking any

work

e) Identify the appropriate protective measures to be used

f) Identify any standard practices for environmental risk mitigation

g) Identify any emergency procedures for dealing with accidental pollution or imminent

danger.

The EPP shall as a minimum address:

i) Each specific consent requirement and condition

ii) Dust control at work sites including:

Highlighting that one of the most likely causes of dust damage is sweeping before

sealing is carried out

The particular susceptibility of kiwifruit grown within the region to dust damage

The requirement for the Contractor to locate the presence of any horticultural or

other susceptible crops within the vicinity of the work site.

iii) Sediment and stormwater control

iv) Noise control

v) Pest control

vi) Control of application of herbicides

vii) Storage of hazardous substances

viii) Refuelling of plant

The EPP must ensure reporting and recording of environmental incidents. It is a

requirement of this Contract that any such incident be advised promptly to the Engineer‟s

Representative.

The Delivery Time for the initial EPP shall be prior to commencement of Services and for

reviews, as required by the plan.

Resource consents held in respect of the Services are identified in Appendix (WBoPDC

Local Roads) 3.6

Further environmental information is available locally from:

Ministry for the Environment

Environmental Management Division of the local Regional Council (Pollution

Hotline)

National Poisons Information Centre – 0800 764 766 (24/7)

Page 45: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 44 of 157

4 4.2.5 Customer Care Plan

Introduction

The following is a summary of the way we do things at WBoPBC.

WBoPDC‟s Customer Focus Approach aims to provide an environment where:

Customer needs are understood

Information is accurate and user-friendly

Advice and services are provided in a timely and professional manner

WBoPDC‟s customers and communities do not necessarily make a distinction between

service provided by a contractor or service provider, and services provided directly by

WBoPDC. Consequently customer care and service provided through a contractor or

service provider should display the same values and care that WBoPDC would provide.

How we do it

The customer is our first and most important priority at WBoPDC. We try very hard to

provide outstanding customer service every time. This is done by meeting clearly stated

customer service performance levels that encourage us to:

Be easy to contact

Listen and learn from customers

Work with customers to find solutions

Explain our decisions

Respond and update customers accurately and promptly

Give consistent and reliable service

Keep our promises

Learn from our mistakes

Continuously improve our services

Be friendly and professional

What will the Contractor need to know and do, to meet our Customer Focus

requirements?

Have knowledge of and a commitment to, our Customer Focus Charter

http://www.westernbay.govt.nz/Documents/CustomerFocusCharter.pdf. Be prepared

to participate in Customer Focus training where appropriate

Be supportive of actions required to be taken to improve processes (by WBoPDC), as

a result of customer feedback

Page 46: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 45 of 157

4 As an agent of WBoPDC we expect the Contractor to provide a similar level of customer

service. It is essential that the community can rely on consistent performance from

WBoPDC and anyone acting on our behalf.

Customer Care Plan (CCP) The CCP will as a minimum address the following issues:

External Customer Care Strategy

1. Identification of external customers and their interface with WBoPDC on roading

issues

2. Use of technology to facilitate communication between the customer, Contractor and

WBoPDC on roading issues

3. Integration of WBoPDC‟s service request system in order to provide a seamless

interface with the WBoPDC, management of information and customer care

4. Identification of critical roading issues and appropriate response times

5. Customer satisfaction monitoring and reviews

6. Development of corporate standards for customer care

Internal Customer Care Strategy

1. Customer interface analysis.

2. Training needs analysis for enhancing customer care.

3. Recruitment and training issues

4. Information pamphlets on customer care issues.

5. Action plans or operational strategies to enhance customer care.

6. WBoPDC/Contractor Service Delivery

Public Interface and Hours of Business The Principal intends remaining the point of contact for local roading issues, and will pass

enquires either directly or indirectly to the Contractor. The Principal reserves the right to

contact any or all persons making contact in any particular day to check on the quality of

service and/or information provided.

The Contractor shall develop systems for capturing the appropriate information in order

that the Principal remains informed.

To this end, the Contractor premises will remain open to respond to customers during the

hours of 08:00am to 5:00pm, Monday to Friday, but will maintain a 24 hour after hours

contact to respond to emergency issues.

The Contractor will develop a system and customer care protocols that capture into the

WBoPDC Service Request and customer contact systems by way of any one of the

following;

Page 47: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 46 of 157

4 Telephone

Facsimile

E-mail

Personal contact

Written correspondence

The protocols will include but not be limited to:

1. Telephone protocols, including ringing times, greeting style, use of 0800 numbers

2. Voicemail protocols, including greeting style and standard information supplied,

acknowledgments and clearance times

3. Email protocols, and the use of a web page

4. Correspondence protocols, including the ability to respond within 10 working days,

the style of language, “jargon” avoidance, recording and filing

5. Counter and field contact protocols, including providing the customer with full

attention and accurate information, contact recording

Delivery Times The Delivery Times relating to the determination and/or identification of issues and

responding to the customer with information on the intended response should be based on

the following broad criteria:

The proposed Service Delivery Agreement is to be made available to the Engineer‟s

Representative for the initial meeting of the CB.

Level 1 Response (less than 30minutes)

Probability of failure very high and will result in injury or damage to a significant asset

(public or private)

Level 2 Response (less than 24 hours )

Probability of failure high, but consequence unlikely to result in injury, but might result in

damage to property

Level 3 Response (less than 3 working days)

Probability of failure low and unlikely to result in damage to property.

Level 4 Response (less than 10 working days)

Probability of failure very low, or the consequence of the failure low.

Level 5 Response (no response required)

Information only, for example a letter of thanks.

Customer Care Staff The CCP will demonstrate how the selection and training of customer care staff will

ensure that they are able to:

Page 48: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 47 of 157

4 1. Understand their role in the context of the contract, including the extent of their

delegated authority to provide the information requested

2. Display technical competence on issues relating to the roading industry

3. Use a full range of listening and speaking techniques

4. Know when their explanation is not being understood and be able to rephrase their

response in a manner that enables understanding and accurate interpretation of the

issues and effective communication of the proposed actions

4.2.6 Emergency Procedures and Preparedness Plan

The scope of the Emergency Procedures and Preparedness Plan required under

Maintenance Specification (State Highways), Section 4.7 shall include WBoPDC Local

Roads.

4.2.7 Maintenance Management Plan

Maintenance Specification (State Highways) Section 4.8 applies in respect of WBoPDC

Local Roads, with the following modifications:

a) The following references do not apply:

1. State Highway Asset Management Manual (SM020)

2. Annual Plan Instructions (SM018)

3. NZTA T/10 Skid Resistance Investigation and Treatment

b) “Base level of specified renewals” is replaced with “renewal quantities nominated in

the Contractor‟s tender”

c) A detailed Maintenance Intervention Strategy is not required for WBoPDC Local

Roads. It should be more generic in nature and describe how it relates to the renewals

programme, and how observation of network condition during inspections will affect

maintenance interventions

d) Add new item 12) as follows:

12. The unsealed pavement minimum quantities stating the annual quantities of

maintenance metal that will be applied throughout the Contract Period.

The minimum scope content of the MMP in respect of WBoPDC Local Roads is specified

in Appendix (WBoPDC Local Roads) 4.3.

4.2.8 Safety Management and Intervention Plan

The purpose of the Safety Management and Intervention Plan (SMP) is to proactively:

a) Identify existing and potential safety problems on the road Network

b) Eliminate, reduce or address safety problems in an appropriate manner

c) Manage information and data relating to road safety

d) Give effect to the Safer Journeys Action Plan

Page 49: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 48 of 157

4 4.3 MMP Minimum Scope Content

The Contractor shall, at a minimum, cover the following WBoPDC Local Roads

components within its MMP.

Strategic

How the Contractor will optimise maintenance activities across the different

classifications assigned across the network

Use of data in decision making and achieving advanced asset management

Linkage with the Contract Quality Plan

Resource management including number of full time equivalents for contract and

network management, operational management and workforce delivery staff

Critical success factors

Proposed measures and targets

Stakeholder engagement

Use of systems and processes

Recognise the network differences for WBoPDC Local Road components

Display knowledge of the (joint) Principals planning processes and timeframes to be

able to contribute the required inputs to them

Recognise the relationships between customer levels of service and technical asset

management levels of service

Development and Maintenance of Forward Works Programmes

Detailing the process for developing a forward view of needs over a 10-year planning

period for all assets including:

o Pavements and surfacing

o Drainage systems including pavement drainage

o High value assets (Railings and barriers, minor structures, large signs etc.)

o Other assets

Optimising against classification

Optimise interventions against levels of service for WBoPDC Local Road KPM and

OPM delivery

Failure mode analysis

Programming, risk management and prioritisation

The use of performance modelling

Periodic treatment justification process

Page 50: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 49 of 157

4 Consider safety improvement intervention opportunities in association with the FWP

Pavement Strategies

Identification of preventive maintenance opportunities

The impact of pavement classification

Pavement and surfacing preservation strategies (maximising life) for sealed and

unsealed roads

WBoPDC Local Road KPM and OPM relationships and their impacts on each other

Pavement design methodologies

Treatment investigation (binder/stone analysis etc.).

Surfacing Strategies

First coat/second coat sealing strategies

Surfacing treatment selection process

Resurfacing design process

Material selection (e.g. skid resistance performance)

Urban treatment including environmental treatment cost minimisation

Strategies for high traffic demand environments

Material application, for example intended use of emulsion and PMBs

Drainage Strategies

Condition monitoring

Analysis and prioritisation

Forward works programming

Input into maximising life of pavement and surfacing assets

Input into minimising emergency works response and reinstatement activity

Maintenance Activity Requirements

Integration of maintenance activities

The impact of classification

Intervention strategies and thresholds

Monthly and annual programming procedures

Cyclic maintenance management

Inspection and defect management

Treatment selection process and repair methods

Page 51: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 50 of 157

4 Programming and management of preventive maintenance work

Maintenance design process

Material selection criteria

Equipment sizing considerations (to minimise pavement effects)

Standard operating procedures for maintenance activities

Maintenance activity delivery

Defect liability management

Implementation of the MIS

Maintenance Performance Management

Utilising data trend analysis

Monitoring the effectiveness of the MMP

Monitoring maintenance effectiveness

Monitoring the effectiveness of the MIS

The use of maintenance cost activity in decision making

Baseline Plans

The Minimum Pavement Rehabilitation Plan, stating the Contractor‟s tendered annual

quantities for the Contract Period, clearing itemising pavement strengthening,

smoothing and thin AC smoothing lengths

The Minimum Resurfacing Plan, stating the Contractor‟s tendered annual quantities

for the Contract period, clearly itemising chip seal lengths from Asphaltic Concrete

lengths

The Minimum Unsealed Metal quantities (loose or truck measure) and material

specification for the Contract Period

Page 52: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 51 of 157

4 4.4 Asset Management

4.4.1 Conservancy of WBoPDC Datasets

The Contractor shall maintain all WBoPDC datasets in a condition of accuracy, currency

and completeness appropriate to the uses for which the datasets are intended.

The Contractor shall provide hard and/or electronic copy of inventories and asset

information, in colour if applicable, to the Principal as reasonably requested.

RAMM database updates must be 100% accurate.

The Delivery Times are as follows:

a) For changes following the completion of capital works – 2 months

b) For changes to the database supplied by others – 2 months

c) For condition rating and validation – 1 month

d) For updating of the District Wide Street Tree Inventory, 1 October on each year of the

Contract

e) For hard copy requested by the Engineer‟s Representative, 1 week

4.4.2 RAMM Validation

By the end of year 2 of the contract, the Contractor shall carry out a detailed validation

check on 20% of the Network.

For the following years of the contract, the Contractor shall carry out a detailed validation

check on a different 20% of the Network annually such that over the first six-year period

all data will have been validated.

Upon completion, of each annual validation, the Contractor shall provide the Principal

with a report advising any problems or anomalies identified, the recommended steps to be

taken to prevent future issues and to correct data errors. Following the Principal‟s review

and acceptance of the report the Contractor shall rectify problems and data issues

identified in the validation exercise.

4.4.3 Maintenance of dTIMS Input File

The Contractor shall maintain the dTIMS input file in accordance with the Infrastructure

Decision Support setup and best practice current at the time and shall have access to

competent dTIMS modelling staff for the duration of the contract.

The Delivery Time is 1 September of each year of the Contract for delivery of the 30 year

programme based on dTIMS modelling.

Page 53: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 52 of 157

4 4.4.4 WBoPDC Roading Asset Valuation

The Contractor shall snapshot a complete database at 30th

June of each year of the

Contract and from it provide the Optimised Replacement Cost, the Optimised Depreciated

Replacement Cost and the Annual Depreciation using the WBoPDC Asset Valuation

dTIMs module. The valuations provided shall meet the requirements of both Audit New

Zealand and WBoPDC.

The Delivery Time is 1 August of each year of the Contract.

4.4.5 Asset/Network Management

The Contractor is required to develop credible systems to manage the Assets, with the

planning period being 30 years.

The Contractor shall be able to demonstrate to the Engineer‟s Representative when

required:

a) The proposed maintenance strategies that will achieve the contracted KPMs

b) That maintenance interventions and treatments are being forecast with a reasonable

„hit rate‟

c) That the Network condition will meet the requirements of the Contract for the term of

the Contract

d) The forecast Network condition for a 30 year period beyond the term of the Contract

The Delivery Time for such asset management information is two weeks following a

request by the Engineer‟s Representative for a report.

4.4.6 Bridge Assessment and Posting

The Contractor is required to manage the bridge stock in accordance with WBoPDC

policy and the Transportation Asset Management Plan, including assessment and posting

in accordance with NZTA Bridge Manual, Chapter 6.

All weight restrictions shall be advertised in accordance with Heavy Motor Vehicle

Regulations 1974, by 30 July each year of the Contract.

4.4.7 Information Technology Routine Change

Information technology associated with asset management is in a state of rapid expansion,

such that the information systems may be substantially different at the end of the Contract

to that which they were at the start. The Contractor shall continually maintain and improve

its systems in accordance with best practice and to be compatible with WBoPDC systems

at any time throughout the duration of the Contract. This shall include changes to the

nature and quantity of the data gathered and the software and hardware platforms

providing information from the data.

Page 54: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 53 of 157

4 Delivery Times for implementation of information technology changes shall be within 6

months of systems being operational within WBoPDC or within 12 months of substantial

uptake of a system by the road maintenance industry in New Zealand.

4.4.8 Setting of Speed Limits

The Contractor is required to develop and maintain a system of reviews, analysis,

processing and documentation to ensure compliance with NZTA rule on the setting of

speed limits. The scope includes but is not limited to:

a) Designation of urban traffic areas in which roads are subject to a 50kph speed limit

b) Validations of all speed limits except for 50kph limits on roads within a designated

urban traffic area or 100kph limits on roads within a rural area

c) Initial and ongoing validation of the appropriate sections of the traffic bylaw

d) The keeping of text based and diagrammatic speed limit registers

e) Taking account of the changing road environment land use patterns and community

concerns to ensure the posted speed limits remain safe and appropriate

f) Investigate and make recommendation to the WBoPDC, on an annual basis, any

additional speed limits that are deemed appropriate

g) Review speed limits in accordance with the Rule

h) Provide and maintain the appropriate signage (up to 20 new speed limit signs per

year) and all new markings

4.4.9 Updating WBoPDC Transportation Asset Management Plan

The Contractor shall update the WBoPDC Transportation Asset Management Plan

annually to reflect changes in the inventory and database, WBoPDC funding and policy

decisions, changing national strategies and the annual dTIMs modelling of the Network.

Planning is to be to a 30 year horizon to meet current legislated requirements. All asset

management plan documents are to be updated and reissued to listed document holders.

All updating must meet NZTA requirements and the annual financial audit requirements

of Section 14 of the Public Audit Act 2001 and comply with the current International

Infrastructure Management Manual.

Page 55: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 54 of 157

4 4.5 Treatment Design

Pavement design and geometric design standards for pavement renewals (strengthening),

seal extensions, seal widening, and any other new pavement works (e.g. intersection

improvement) shall be undertaken in accordance with the latest Austroads Guide to

Pavement Technology: Parts 2 and 5 together with the N.Z. Supplements to the Austroads

Guides, and the WBoPDC Development Code. Design life is to be 25 years.

4.5.1 Pavement Treatment

A specific design and technical specification shall be produced by the Contractor prior to;

The construction of any seal extension, seal widening, or other capital works

Any maintenance activity or treatment that changes the RAMM carriageway width at

year 0 by more than 300mm on either side of the road

Any pavement Rehabilitation in excess of 100m length

4.5.2 Geometric Standards

Prior to undertaking Rehabilitation works, the Contractor shall identify and seek an

instruction from the Engineer‟s Representative to perform the following and any other

asset improvements:

a) Camber correction above 2

b) Provision of super-elevation from a camber cross-section

c) Overlay above 200mm depth extra to the design overlay thickness to correct shape in

the longitudinal direction

d) Seal widening

e) Flattening of shoulder, berm and side slopes

Consequential works arising from any aspect of Rehabilitation that are not defined as part

of the Services are also to become part of the Services. Consequential works include, but

are not limited to:

a) Earthworks

b) Drain recutting, and consequential scour protection

c) Raising or lowering of service covers, kerbs, sight rails and guardrails

d) Culvert extensions

e) Construction or extension of retaining walls

The Contractor shall take care to ensure that shoulder, berm and side slopes within the

clear zone are not made steeper by the Rehabilitation treatment, and that the width of such

slopes that can safely be traversed by errant vehicles is not reduced.

Page 56: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 55 of 157

4 4.5.3 Construction Requirements

Rehabilitation shall not result in more than 1000m of traffic lane (having been sealed prior

to the Rehabilitation works) remaining unsealed for a period exceeding four weeks at any

single project site, unless specific approval has been provided by the Engineer‟s

Representative; such approval shall not be unreasonably withheld.

The Contractor shall ensure, through attention to design and construction methodology,

that:

a) Pavement works do not unravel and that detritus and loose or surplus material does

not create a traffic hazard

b) There is no flushing, bleeding, scabbing or stripping and that binder is not picked up

on any tyres. There must be no accidents associated with surfacing performance

c) In urban areas, detritus and loose or surplus material shall not be tracked into

adjoining properties and businesses.

All pavement markings and raised pavement markers shall be reinstated after completing

resurfacing or Rehabilitation work within one week, and before the removal of temporary

traffic control.

Worksites that affect property frontages must be left in the same or better condition and

berms that are mowable must be reseeded to provide a result that matches the pre-existing

condition. Rural berms must provide for safe cutting of shelter belts where reasonably

possible. Access should be reinstated on a like for like basis. The Contractor needs to

take sufficient photographs before and after construction to demonstrate compliance with

this requirement.

4.5.4 Quality Assurance and Post Construction Demonstration of Pavement Design Life Achievement

The minimum design life of any Rehabilitation (strengthening) carried out by the

Contractor shall be 25 years, unless stipulated otherwise by the Engineer‟s Representative

in writing.

For short pavement repairs having a total length less than 100m, the minimum design life

shall equal or exceed the remaining life of the adjoining pavement.

In order to provide the Principal with assurance that the required design life for both

pavement renewals and new pavements is likely to be achieved the following quality

assurance process is to be followed.

Design Report At least 2 months for capital works including seal extension, seal widening and minor

improvements, and at least 1 month prior to the programmed start date for

renewal/Rehabilitations, a detailed design, and a design report shall be provided to the

Principal which incorporates:

Page 57: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 56 of 157

4 The geometric design standards previously approved by the Principal. This may or

may not comply with the current Austroads Guide to Road Design Part 3: Geometric

Design depending on site constraints, and funding provisions, and value for money

considerations

The design report is to document the investigations, predicted failure mechanism, and

is to include a quality plan setting out sampling and testing requirements, and critical

hold points

Risks are to be identified and mitigation measures presented

Communications with adjacent residents, Iwi, road users, and emergency services are

to be noted and taken into account in the design

The Contractor‟s Physical Works Manager is to be responsible for ensuring that all

the quality assurance requirements have been met

A road safety audit waiver (NZTA May 2013 Road Safety Audit Exemption Form)

completed for the Principal acceptance.

Pavement Rehabilitation/New Pavement - Construction Completion Report Within 2 months of the construction of the 1

st coat seal, the Contractor shall supply to the

Principal a Construction Completion Report for each Site which shall include, as a

minimum, the following:

Key original design assumptions

The renewal/new pavement quality plan

Evidence of construction compliance with key original design assumptions as well as

any deviation from the design

All quality assurance results

All compliance results (e.g. NZTA B/2 shape)

Photographs of the Site during treatment and on completion;

Customer engagement, issues , technical or construction challenges and any ongoing

commitments

As-built extracts from RAMM

New Pavement / Pavement Rehabilitation Post Construction Design Assessment

Post-construction design assessment will be used as the tool for verification of value

assurance.

Between 10 and 15 months after construction, the Principal will have undertaken high-

speed data surveys over road groups 1 to 3 and less frequently for other roads groups as

outlined in Appendix (WBoPDC Local Roads) Table 5.1.

Page 58: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 57 of 157

4 Within 2 months of receipt of this data, and in conjunction with other Contractor-sourced

inputs, the Contractor shall assess the success of the renewal/new work outcomes and

supply to the Principal a Post-Construction Design Assessment Report. The report shall

include:

Construction Completion Report

Photographs of areas of concern

Roughness condition, see below

Rutting condition, see below

Shape condition, see below.

The Principal is seeking confirmation and assurance of the original treatment selection and

design through the evaluation of the above inputs, including cross-verification of outputs

and conclusions from these multiple data sources.

Annually thereafter, by 30th

June, the latest source information on roughness, rutting and

shape condition, for each project, shall be provided by the Contractor to the Principal. The

information will ideally be presented in a spreadsheet showing all of the projects involving

pavement renewals and new pavement undertaken under the contract for the duration of

the Contract. This information shall form a critical component for ongoing design

consideration in developing future optimal design solutions.

The post-construction design assessment period will be the lesser of:

5 years from the date of the first coat seal or

Contract Period left to run at the time of the first coat seal plus any additional tenure

reward

Roughness

Roughness will be assessed annually throughout the assessment period based on the

Principal‟s annual HSD survey. Assessment for compliance with the roughness criteria

shall be in terms of the 100m moving average NAASRA. The 100m moving average shall

be calculated from the HSD roughness measurements recorded at 20m intervals in each

lane.

The extent of survey shall include an additional 40m at each end of the treatment Site.

The progression in annual roughness shall be monitored and compared with the Principal‟s

expectation that roughness on new works should not exceed 75 NAASRA in the first 5

years following date of 1st coat seal, and 65 NAASA for asphalt.

Where more than 50% of the calculated moving averages exceed these values, the

Principal may conclude that the work is unlikely to achieve its design life and cannot be

counted as contributing towards meeting of the Contractor‟s nominated quantity

obligations.

Page 59: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 58 of 157

4 Rutting

Rutting will be assessed annually throughout the assessment period based on the

Principal‟s annual HSD survey of road groups 1 to 3 and less frequently for other roads

groups as outlined in Appendix (WBoPDC Local Roads) Table 5.1.

Assessment for compliance with the rutting criteria shall be in terms of the 20m mean rut

depth by wheel path.

For each wheel path the characteristic rut value shall be determined as follows:

Rx = ϻx +K □x

Where: Rx = Characteristic rut value for wheel path (e.g. RLWP or RRWP) x (mm)

ϻx = Mean of the 20m wheel path means for wheel path x

K = 1.28

□x = Standard deviation of the 20m wheel path means for wheel path x

x = Either left wheel path (LWP) or the right wheel path (RWP)

Note that the above assessment is based on wheel paths by site not by lane.

The rutting progression shall be assessed annually for projects within road groups 1 to 3,

and at the interval that HSD is collected for projects within the remaining road groups.

Where after 3 years following the first coat seal, the characteristic rut value of any

pavement construction or rehabilitation project exceeds 15mm in any wheel path and is

continuing to increase, the Principal will conclude that the work is unlikely to achieve its

required design life, and that unless major rework approved by the Principal is undertaken,

that particular project cannot be counted as contributing towards provision of the

nominated preservation quantity or the capital work programme.

Surface Shape and Condition

The surface shape requirements outlined in this clause shall be complied with throughout

the pavement assessment period.

Surface shape shall be measured with a straight edge and wedge. Using the methodology

set out in NZTA B/2, NZTA B/5, NZTA M/10 and NZTA P/11 depending on the

pavement type and layer. Surface shape measurements will be performed at transverse

construction joints, service covers and in any other area where the Principal considers the

limits may have been exceeded.

The surface shall meet the requirements of (or as agreed with the Principal):

a) NZTA B/2 for unbound granular pavements with chip seal

b) NZTA B/5 for modified pavements with chip seal

c) NZTA M/10 for Dense Graded Asphalt and Stone Mastic Asphalt layers

d) NZTA P/11 for OGPA layers

Page 60: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 59 of 157

4 In addition, the surface shape shall be such that there is no visible cracking or ravelling (or

fretting) within three years of the second coat seal or AC surface.

If any of the annual assessments of roughness, rutting or shape fail to achieve these

criteria, the Contractor shall agree with the Principal an appropriate repair methodology in

order to achieve compliance.

4.5.5 Carriageway Lighting

General Design Principles As a minimum, new and replacement carriageway lighting design must comply with the

requirements of AS/NZS 1158: 1999.

The design of street lighting must also meet the requirements of AS/NZS 1158.3.1: 1999

clause 2.3.3.4 in relation to “Light spilled onto abutting properties”.

Exemptions A large proportion of the existing lighting inventory have been designed in accordance

with the minor road provisions of NZS 6701 that has been superseded by AS/NZS 1158.

There are also a number of subdivisions that have decorative type fixtures. The

replacement of lighting fixtures, brackets, poles or decorative fixtures for the sole purpose

of meeting the AS/NZS1158 standard is not within the scope of the Contract.

In subdivisions, where the use of different installation types would compromise aesthetic

consistency, the Contractor shall make every effort to retain and procure installations

consistent with those existing. This may involve replacement of badly corroded or

discoloured components, minor modifications, painting or strengthening as appropriate.

The Contractor may replace decorative lights with agreed alternative AS/NZS 1158.3.1

category P3 or P4 compliant lighting after consultation with all local residents, including

residents adjacent to the adjacent carriageways 100m beyond the last light to be upgraded

and the Engineer‟s Representative. In such cases residents and the Engineer‟s

Representative shall be given full details of the proposed new installation, including

drawings of the lighting installation and plans of the proposed location of each installation.

The notification shall include the name and contact details of the Contractor‟s

Representative.

The demarcation points between types of lighting installation shall be at appropriate

locations, for example intersections, limit of residential area, or edge of reserve.

Power Network Company Undergrounding In the event of under grounding of any particular area, the ownership of reticulation poles

supporting street light installations will transfer to the Principal when the main power lines

are removed. At that time the condition rating of the lighting installations may change as a

result of the condition of the poles. As soon as notification of an under grounding project

is received, arrangements shall be made with the Engineer‟s Represnetative for the pole

condition to be surveyed.

Page 61: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 60 of 157

4 The CB may consider a recommendation to the Principal for additional funding for the

new cabling, renewals and capital works involved with replacing the light installations.

Previous condition ratings with the poles excluded will be consulted and where

replacement of brackets and/or luminaires could be expected under the Contract, the CB

will negotiate an appropriate reduction to the Contract Price.

Page 62: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 61 of 157

4 4.6 Planning

4.6.1 Investigation and Reporting of Planning Issues

The Contractor shall identify, investigate and report on all planning issues that might

affect the safety or efficiency of the Network. This shall include:

a) Review of planning issues referred to it by the Principal, including resource consent

applications/proposals, reviews, changes and variations to District and Regional

Plans, Policy Statements and strategy documents of District and Regional Councils

and government bodies

b) Site inspection

c) Preparation of requests for additional information

d) Preparation of submissions

The Contractor shall prepare evidence and appear for the Principal at planning hearings as

the need arises. This shall include hearings before district and regional councils, but

exclude High Court and Environment Court proceedings.

The Delivery Times in respect of actions required by the Contractor shall be such that all

planning issues can be responded to by the Principal 10 working days prior to the statutory

deadlines for close of submissions.

4.6.2 Consent Monitoring

The Contractor shall:

a) Monitor the Network to ensure that all consent conditions relating to protection of the

Network are being complied with

b) Monitor the Network to ensure that all necessary consents are being requested

c) Where applicable, on behalf of the Principal, certify compliance with consents on

completion of any works affecting the Network

d) Maintain an up to date database of all consents issued.

The Contractor shall report all incidences of non compliance with consent conditions to

the Principal.

The Delivery Times in respect of notification to the Principal of any incidence of non

compliance shall be within 10 days of the incidence of non compliance occurring.

Page 63: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 62 of 157

4 4.7 Network Control

In performing all network control activities the Contractor is expected to take ownership

of responses and managing customers‟ reasonable expectations within the bounds of

policies. The Principal is to be consulted where there may be uncertainty in terms of

policy and must be informed immediately of issues likely to be escalated to elected

members or be taken to the media. The Contractor will remain responsible for issues that

may arise unless the Principal advises the Contractor in writing that the Principal has taken

over the matter in question.

4.7.1 Processing of Applications for Activities within the Road Corridor

Applications include, but are not limited to, requests by other parties to:

a) Close a road

b) Hold sporting, recreational or other events on the road

c) Perform works on or below the road surface including the installation of utilities

d) Declare a Limited Access Road

e) Declare a Construction Zone

f) Construct an access onto a road

g) Authorise a fence encroachment

h) Authorise a stock crossing

i) Plant or remove a street tree

j) Install a service

k) Approve temporary Traffic Management Plans.

The Contractor shall appoint staff to act as Engineer and Traffic Management Coordinator

for the purposes of approving temporary Traffic Management Plans on behalf of the

Principal.

The Contractor shall process (including undertaking site visits and inspections; calculation

of impact fees etc) 100% of all applications and report to the Principal as required.

Delivery Times shall be as follows:

i) Application information sent to applicant – one week from request

ii) Any further information requested – one week from receipt of application

iii) Site visit (if required) – two weeks from receipt of application

iv) Application (including any deed or agreement) forwarded to Engineer‟s

Representative – one week from receipt of further information or site visit, whichever

is the later

v) Processed application forwarded to applicant – one week from receipt of processed

application

Page 64: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 63 of 157

4 vi) Initial inspection of any completed works – two weeks from receipt of notification of

completion

vii) Final inspection of any completed works – one month prior to the expiry of any

period of defects liability

4.7.2 Land Acquisition

Where acquisition of land for roading purposes is necessary to enable the Contractor to

carry out the Services, the Contractor shall initiate and administer the land acquisition

process and recommend compensation in accordance with the WBoPDC procedures

detailed below.

The Delivery Time for the survey plan of the land required for road to be delivered to the

WBoPDC Legal Property Officer shall be 2 months following completion of the physical

works for which land acquisition was required.

The WBoPDC procedure for acquisition of land for roading purposes is as follows:

1. The Contractor shall provide preliminary drawings to the landowner/occupier and the

WBoPDC Legal Property Officer indicating the area required for construction

purposes.

2. The Contractor shall calculate the amount of compensation on a per square metre

basis being offered by WBoPDC for the land required for construction purposes and

advise the WBoPDC Legal Property Officer of the proposed compensation. Once

WBoPDC has approved the compensation the Contractor will advise the

landowner/occupier, and advise them also of the alternatives available if the amount is

not acceptable.

3. The Contractor shall obtain a signed land entry agreement to enter from the

landowner/occupier prior to finalising the design and proceeding with construction.

Once the construction has been completed the Contractor will notify the WBoPDC

Legal Property Officer who will arrange for the works to be surveyed.

4. The WBoPDC Legal Property Officer will on receipt of the approved survey plan

write to all landowners providing a copy of the plan with the final land area required

along with the amount of compensation assessed. At this point landowners will need

to indicate whether they are registered for GST and whether there are any outstanding

issues relating to the construction.

5. The WBoPDC Legal Property Officer will then obtain WBoPDC‟s formal consent to

the acquisition of the land.

6. An agreement to acquire the land will be then sent to landowners for their perusal and

signatures. Landowners are to return the signed document along with an invoice to

WBoPDC for the compensation payable for the land.

7. On receipt of the agreement, WBoPDC will execute the document and subject to

Compensation Certificate being registered against the landowners title will then pay

the compensation to the landowners.

Page 65: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 64 of 157

4 8. Once the agreement has been lodged with LINZ, WBoPDC will undertake to

discharge the Compensation Certificate off the landowners‟ title.

9. In the case of multiple owned land where WBoPDC may have to become involved at

an early stage in the complex communication and protracted negotiation commonly

required when dealing with these situations, the Contractor is required to put in a

similar input as would be needed for purchase of land from any cautious, reluctant

landowner and WBoPDC would then provide the rest of the input required.

IMPORTANT NOTE: The Contractor shall advise the owner/occupier that, should at

any time during this process the landowner/occupier seek to on sell all or part of their

land, they must inform the WBoPDC Legal Property Officer of their intent and ensure a

clause is placed in their agreement for sale and purchase that the area to vest in WBoPDC

as road is excluded from the sale.

The WBoPDC procedure for negotiation of compensation follows. Under no

circumstances shall the Contractor offer or provide any form of compensation or payment

whether monetary or otherwise which has the intention or effect of inducing

landowners/occupiers to sign land entry consents other than compensation duly payable in

strict accordance with the procedure below:

1. The Contractor will obtain from the WBoPDC Legal Property Officer all necessary

valuation and GIS information held by WBoPDC, including a calculation of either

100% or 150% of property‟s unimproved land value on a per square metre basis – see

WBoPDC Policy Compensation for Land Acquired for Road.

2. Subject to WBoPDC approval, the Contractor is to supply landowners/occupiers with

an offer of compensation at either 100% or 150% of the unimproved land value per

square metre for the proposed land take area plus GST where the landowner is

registered for GST in respect of land, and subject to final survey.

3. The Contractor will supply to the landowner/occupier the above process summary,

laying out the process for the acquisition and the involvement of the Contractor and

WBoPDC in the process.

4. Should the landowner/occupier accept the above offer of compensation, the

calculation of the amount of compensation per square metre shall be included in the

land entry consent and a copy of the consent provided to the WBoPDC.

5. Should the landowner/occupier not accept the above offer of compensation, the matter

will be referred to the WBoPDC Legal Property Officer.

4.7.3 Access Control

The Contractor shall:

a) Monitor the Network to ensure no unauthorised or illegal accesses are constructed

b) Review and report on the traffic engineering implications of all applications for new

accesses or upgrading of accesses, including liaison with applicants to explain

WBoPDC‟s objectives and policies.

Page 66: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 65 of 157

4 c) The Contractor is to review and report on resource consent and development

applications, where access to the Network is affected and advise and recommend on

requirements which may include:

Road widening

Intersection or access improvements

Right turn bays

Shoulder widening

Parking requirements

Manoeuvring space

Structural strengthening of the road pavement

Sight line deficencies

The Contractor‟s assessment does not include detailed design, provision of a road

safety audit or peer reviews as part of the Services, as this is the responsibility of the

applicant. However, the Contractor has a responsibility to express concerns or

reservations which would be acted on by WBoPDC as part of the consenting process.

d) Monitor and report on segregation strips

e) Monitor and record condition of all stock crossings, noting compliance with safety

requirements (if stock are crossing) and commenting on the road surface. Pollution of

road is to be photographed with a date stamped image and reported to the Principal.

The Contractor will provide information as required by the Principal on the location

and use of stock crossings for the purposes of updating the Principal‟s Stock Crossing

database.

f) Process applications for vehicle crossings in accordance with WBoPDC processes,

including inspections as required before and after construction of the vehicle crossing.

Minimum requirements for reporting on access proposals and administering of

declarations shall be those contained in the NZTA Professional Services Contracts

Proforma Manual, “State Highway Network Management”, clause 3.2.4.

The Delivery Times for plans, schedules, certificates of title and Crossing Place Licence

Notices required for declarations shall be 20 days following such request by the Principal.

The Delivery Times in respect of notification to the Principal of any incidence of

unauthorised or illegal access shall be within 10 days of the incidence of non compliance

occurring.

4.7.4 Hazard Monitoring and Control

The Contractor shall identify and report all hazards which may have an adverse effect on

the condition of the Assets or the safety or road users. Hazards may include, but are not

limited to:

Page 67: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 66 of 157

4 a) Abandoned vehicles

b) Live animals, generally horses cows and/or cattle

c) Unauthorised works or newly planted vegetation

d) Unauthorised and/or non-complying signs

e) Structures, signs or vegetation/trees which are unsafe, unstable or cause obstruction

f) Roadside trading

g) Fences and encroachments

h) Illegal crossings and services

i) Drainage and land stability problems

j) Land use activities and/or special events which might give rise to increased vehicle

movements, heavy vehicle movements, or parking and manoeuvring problems

Hazards within the Site posing an immediate threat to safety shall be removed by the

Contractor or reported immediately to the appropriate authority. The Delivery Time for

removal shall be in accordance with the Response Times for the Incident Response OPM.

All other hazards within the Site shall be removed after every reasonable attempt has been

made to inform the owner and request removal. The Delivery Time shall be not less than

two weeks after the first attempt to inform the owner and not more than three weeks.

Further Contract Standards and Delivery Times for specific hazards are given below:

i) For all roads, upon the sighting of, or on receipt of a report about wandering stock

within the Site, the Contractor shall approach the stock owner and ask for the

immediate removal off the road of the stock in question. Where this is not possible

due to the inability to locate the legal owner of the stock, the Contractor shall ensure

the animal access on the carriageway is prevented and shall notify the WBoPDC

Livestock Control Officer in order to remove the stock off the road.

Where the WBoPDC Livestock Control Officer is unable to perform his duty, the

Contractor shall proceed and remove the animal off the road and into the WBoPDC

pound.

The NZ Police shall be called upon to help and protect the public in a situation where

the animal is wild and/or out of control.

ii) Abandoned vehicles: These should be reported to the Principal. A Separate Contractor

is responsible for the removal of abandoned vehicles

4.7.5 Management and Coordination of Utility Contractors

The Contractor shall manage and coordinate service related works.

The Contractor shall provide liaison and monitoring in a prompt and courteous manner in

accordance with the service authority or contractor‟s programme for the works. The

Delivery Time for reporting to the Principal in the event of any problems with the

Page 68: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 67 of 157

4 performance of the service authority or contractor shall be 24 hours in relation to safety

matters and one week in relation to any other matter.

4.7.6 Overweight and Overdimensioned Vehicles

The Contractor shall process and assess such applications and issue permits, in accordance

with WBoPDC policy and procedures.

For all overweight or overdimensioned vehicle movements the Contractor shall provide

suitably trained and experienced personnel to supervise the movement where required by

the permit issued to the operator.

The Contractor shall provide such supervision in a prompt and courteous manner. The

Delivery Time shall be such that there is no disruption to the operator‟s timetable.

4.7.7 High Productivity Motor Vehicles

Applications for High Productivity Motor Vehicle permits are to be referred to NZTA.

Following processing by NZTA, the Contractor may be required to review the application

with respect to the Local Road component and provide recommendations to NZTA.

Page 69: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Management Performance Measures

Page 68 of 157

4 4.8 Customer Satisfaction Index (CSI)

The Contractors customer care performance with respect to service requests will be

assessed by customer survey carried out by an independent research company selected and

engaged by the Principal using the sampling methodology, survey questionnaire and CSI

calculation detailed below.

4.8.1 Sampling Method

Sample Size 600 interviews per annum or 50 per month

1 interview will be conducted monthly per possible service request problem.

Interview Frequency Interviews will be distributed throughout the month.

Method of Interview Telephone interviewing

Sampling Frame Respondent contact details supplied – by way of Service Request raised by WBoPDC.

These shall be supplied in electronic format directly to the research provider on a weekly basis.

Service requests shall be selected from those that are off and for which customers have been informed of actions to be taken, if any. It is possible that at the time of interview works may be programmed in response to the request but not completed, or no further action may be required.

Reporting Monthly – appropriate format to be determined

Annually

4.8.2 Questionnaire

The Contractor will be provided with the questionnaire.

4.8.3 Index Calculation

The Contractor will be provided with the index calculation methodology.

Page 70: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 69 of 157

5 5

Key Performance Measures

5.1 High Speed Data Collection

NZTA‟s national High Speed Data (HSD) supplier is the Nominated Subcontractor for

HSD collection. The data collection and validation will be conducted in accordance with

the requirements of that contract, and supplied to the Contractor.

Invoices from this Nominated Subcontractor will be paid under a Provisional Sum in

accordance with the Basis of Payment (WBoPDC Local Roads). Coordination and

processing of data in accordance with the Contract is part of the Services.

High Speed Data surveys must:

a) Be completed in accordance with the requirements of the NZTA contract for HSD

collection

b) Be completed in the final quarter of each year (Mar/Apr/May)

c) Cover 100% of sealed carriageway sections, in the years defined below

Table 5.1: High Speed Data Collection Frequency

Road Group Year 1 (14/15)

Year 2 (15/16)

Year 3 (16/17)

Year 4 (17/18)

Year 5 (18/19)

Year 6 (19/20)

Year 7 (20/21)

1 to 3

4 to 5

6 to 7

Page 71: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 70 of 157

5 5.2 Traffic Speed Deflection Data Collection

NZTA‟s national Traffic Speed Deflectometer supplier is the Nominated Subcontractor for

traffic speed deflection data collection. The data collection and validation will be

conducted in accordance with the requirements of that contract, and supplied to the

Contractor.

Invoices from this Nominated Subcontractor will be paid under a Provisional Sum in

accordance with the Basis of Payment (WBoPDC Local Roads). Coordination and

processing of data in accordance with the Contract is part of the Services.

Traffic Speed Deflection surveys must:

a) Be completed in accordance with the NZTA contract for Traffic Speed Deflectometer

data collection

b) Cover the nominated length, as agreed with the Engineer‟s Representative, of the

sealed rural carriageway sections, in the years defined below

Table 5.2: Traffic Speed Deflection Data Collection Frequency

Road Group Year 1 (14/15)

Year 2 (15/16)

Year 3 (16/17)

Year 4 (17/18)

Year 5 (18/19)

Year 6 (19/20)

Year 7 (20/21)

1 to 3

4 to 5

6 to 7

Page 72: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 71 of 157

5 5.3 RAMM Condition Rating Data Collection

The Contractor may nominate their own independent team to undertake data collection

surveys. In any case the composition of rating teams shall comply with Maintenance

Specification (State Highways), Section 2.3.3 with respect to independence, objectivity

and links to the Quality Plan.

5.3.1 General Requirements

All personnel completing RAMM condition rating surveys shall be suitably qualified and

shall have attended a road condition rating workshop approved by the Engineer‟s

Representative within the previous 24 months. Copies of rating accreditation certificates

must be provided to the Engineer‟s Representative prior to survey work commencing.

All personnel completing RAMM condition rating surveys shall be independent of the

delivery team. For the avoidance of doubt, personnel who work for the Contractor (or its

suppliers) but are not located in the contract office and are not directly engaged in contract

delivery may be considered to be independent of the delivery team.

All data must be provided in a format that can be directly loaded into the WBoPDC

RAMM database without the need for further processing or modification. To demonstrate

this, the Contractor must process the data and ensure that the processed data meets the

requirements of the RAMM Input Validation Rules.

5.3.2 Survey Requirements (Roads)

Road condition rating surveys must:

a) Be completed in accordance with the version of the NZTA RAMM Road Condition

Rating Manual current at the time of tender

b) Cover 10% of the sealed carriageway sections each year in each of road groups 1 to 7,

using a sampling methodology agreed with the Engineer‟s Representative

c) Cover 10km of the unsealed carriageway sections each month in each of road groups

1 to 7, using a sampling methodology agreed with the Engineer‟s Representative, and

combined into a total survey length of 120km each year

5.3.3 Survey Requirements (Drainage)

Drainage condition (lined and unlined) rating surveys must:

a) Be completed in accordance with the version of the NZTA RAMM Road Condition

Rating Manual current at the time of tender

b) Cover 100% of the sealed carriageway sections each year in each of road groups 1 to

7

c) Include all surface kerb and channel items (e.g. kerb, kerb and channel, mountable

kerb, dish channel), other than where they are part of a raised island not designed to

collect water

Page 73: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 72 of 157

5 5.3.4 Survey Requirements (Footpaths)

Footpath condition rating surveys must:

a) Be completed in accordance with this specification and supplemented by the

definitions and descriptions in the New Zealand National Roads Board Road

Condition Rating Manual

b) Cover 100% of all footpaths in the Waihi Beach, Athenree, Pios Beach, Tanners

Point, Ongare Point, Katikati, Omokoroa, Te Puke, Makatu, Paengaroa, Pukehina and

rural communities each year, irrespective of road group

The question that the rater must ask is: could this footpath present a hazard to pedestrian

traffic?

A brief review of faults to be inspected for are as follows:

Table 5.3.4: Footpath Faults

Fault Type Assessment Rating

Settlement No settlement

Settlement > 10mm

Settlement > 20mm

0

3

5

Bumps No bumps

Minor bumps > 10mm

Major bumps > 20mm

0

3

5

Depressions No depressions

Minor depressions > 10mm

Major depressions > 20mm

0

3

5

Cracks No cracks

Minor cracks (2 cracks within 2m or single crack with width > 10mm)

Major cracks

0

3

5

Each footpath section shall have a length to be replaced recorded (0m is acceptable).

A fault shall be recorded against all sections where replacement length >0m. Each fault

shall have a number (0, 3, 5) and the fault is relative only to the length to be replaced.

No length to be replaced means no faults.

Page 74: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 73 of 157

5 Settlement, bumps, depressions or cracks that result in a 10mm to 20mm vertical

difference in height under a 0.5m straight edge would result in a 3 rating and be measured

at approximately 1m per fault.

Settlement, bumps, depressions or cracks that result in a greater than 20mm vertical

difference in height under a 0.5m straight edge would result in a 5 rating and be measured

at approximately 1m per fault.

Faults are to be marked and identified by a “T” or ““” mark on all grade 3‟s, and a

double stalk “∏” or a “∐” on all grade 5‟s, to enable faults to be found and verified in the

field.

5.3.5 Data Requirements

Data must:

a) Be provided in an ASCII delimited format agreed with the Engineer‟s Representative

b) Be stored in individual files by road number and carriageway section

The Contractor must supply the following data:

i) All information for sealed roads required by the NZTA RAMM Road Condition

Rating Manual current at the time of tender

ii) All information for unsealed roads required by the NZTA RAMM Road Condition

Rating Manual current at the time of tender

iii) All information for footpaths required by Maintenance Specification (WBoPDC Local

Roads), Section 5.15, by community

iv) The graded width for each rated carriageway section on unsealed roads

v) The length of footpath to be replaced in each rated carriageway section

5.3.6 Reporting Requirements

All data delivered for each survey must be accompanied by a Survey Data Report

containing the following information:

a) Results of compliance monitoring completed

b) Data quality check sheets

c) Inconsistencies or error trends between the rated values and the audited values

d) The actions to address the above problems and steps taken to ensure the quality and

reliability of the supplied data

e) Comment on the effect any differences between the rated values and audited values

would have on the outputs from the treatment selection programme

The Survey Data Report must be signed off by the Contractor‟s Representative to confirm

that all survey and data processing has been completed in accordance with this

specification and the Contractor‟s quality assurance procedures.

Page 75: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 74 of 157

5 At the completion of each year in which a survey is required, the Contractor shall prepare

a survey report summarising the issues encountered during the survey and actions taken.

The report should cover:

i) Notable events

ii) Traffic management

iii) Report of any accidents or incidents

iv) Public complaints received and actions taken

v) Daily operations (e.g. average daily achievement, operational problems)

vi) Delays due to weather

vii) Variations completed

viii) Quality assurance and non-conformances raised

ix) Recommendations for changes to future surveys

Page 76: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 75 of 157

5 5.4 Traffic Counting Data Collection

5.4.1 General Requirements

The Contractor shall provide and maintain all traffic counting equipment, including tubes,

clips, chains, locks and other hardware. For classified counting, a GK5000 or similar shall

be used to give detailed breakdowns of traffic mix, type and speed, and to enable hourly

splits over the counting period.

All data must be provided in an electronic format that can be directly loaded into the

WBoPDC RAMM database without the need for further processing or modification. To

demonstrate this, the Contractor must process the data and ensure that the processed data

meets the requirements of the RAMM Input Validation Rules. Where data must be

provided in a format that cannot be directly loaded into the WBoPDC RAMM database,

due to the structure of the WBoPDC RAMM database, it must be forwarded to the

Engineer‟s Representative in a form that allows it to be indexed and analysed.

5.4.2 Survey Requirements (Control Roads)

A 7 day classified ADT count shall be undertaken on the following roads every 3 months

at the same location and on a similar day to previous classification counts:

Table 5.4.2: Control Traffic Counts

No. Road Name Displacement

1 Waihi Beach Road 2.50km

2 Athenree Road 0.11km

3 Busby Road 0.36km

4 Wharawhara Road 0.10km

5 Esdaile Road 0.08km

6 Omokoroa Road 0.16km

7 Barrett Road 0.33km

8 Minden Road 0.38km

9 Te Puna Road 0.40km

10 Te Puna Station Road 0.20km

11 Wairoa Road 1.00km

12 Omanawa Road 0.67km

13 Poripori Road 0.67km

14 McLaren Falls Road 0.32km

15 Oropi Gorge Road 0.24km

Page 77: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 76 of 157

5 Table 5.4.2: Control Traffic Counts

No. Road Name Displacement

16 Oropi Road 3.30km

17 Ohauiti Road 3.90km

18 Kaitemako Road 3.56km

19 Welcome Bay Road 0.18km

20 Welcome Bay Road 8.04km

21 Bell Road 0.16km

22 No. 3 Road 1.02km

23 No. 2 Road 6.90km

24 Te Matai Road 0.15km

25 Te Matai Road 26.16km

26 Rangiuru Road 0.01km

27 Maketu Road 0.03km

28 Wilson Road South 1.38km

29 Old Coach Road 1.053km

30 Maungarangi Road 0.20km

31 Pongakawa Bush Road 0.10km

32 Maketu Road 0.40km

33 Pukehina Beach Road 0.07km

34 Rotoehu Road 0.20km

35 Maniatutu Road West 0.20km

The Contractor shall record any occurrence that may have affected the result, such as local

or seasonal events, weather, public or school holidays. In the event of equipment

malfunction or vandalism, the Contractor shall repeat the measurement at no additional

cost to the Principal.

5.4.3 Survey Requirements (Routine)

Routine traffic counts must be performed:

a) Over a seven day period at each site

b) Once every two years on each sealed rural carriageway section in road groups 1 to 7,

including all sections of any road that is predominantly rural but which begins or ends

in an urban area. Counts must be conducted at the same location and at the same each

year (within two weeks) to avoid seasonal swings in traffic

Page 78: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 77 of 157

5 c) Once annually on each unsealed rural carriageway section in road groups 1 to 7,

including all sections of any road that is predominantly rural but which begins or ends

in an urban area. Counts must be conducted at the same location and at the same each

year (within two weeks) to avoid seasonal swings in traffic

d) Once annually on all carriageway sections of the following urban roads:

Table 5.4.3: Routine Traffic Counts

No. Urban Area Road Name

1 Waihi Beach Beach Road

2 Waihi Beach Seaforth Road

3 Waihi Beach Wilson Road

4 Waihi Beach Athenree Road

5 Katikati Park Road

6 Katikati Beach Road

7 Katikati Tetley Road

8 Katikati Wills Rd

9 Omokoroa Omokoroa Road

10 Omokoroa Tralee Road

11 Omokoroa Hamurana Road

12 Paengaroa Old Coach Road

13 Paengaroa Wilson Road South

14 Te Puke No. 1 Road

15 Te Puke No. 2 Road

16 Te Puke No. 3 Road

17 Te Puke Boucher Avenue

18 Maketu Wilson Road

19 Maketu Maketu Road

5.4.4 Data Requirements

Data must:

a) Be provided in an ASCII delimited format agreed with the Engineer‟s Representative

b) Be stored in individual files by road number and carriageway section

The Contractor must supply the following data:

i) The average daily traffic count over the survey period for each carriageway section

Page 79: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 78 of 157

5 ii) In respect of control road surveys, the following traffic flow information for each

carriageway section

Separated bi-directional traffic volumes

Vehicle classification (light / medium / heavy as a minimum)

60 minute time interval between data sets

Speed

5.4.5 Reporting Requirements

All data delivered for each survey must be accompanied by a Survey Data Report

containing the following information:

a) Results of compliance monitoring completed

b) Data quality check sheets

c) Equipment failures or replacements

d) The actions to address the above problems and steps taken to ensure the quality and

reliability of the supplied data

The Survey Data Report must be signed off by the Contractor‟s Representative to confirm

that all survey and data processing has been completed in accordance with this

specification and the Contractor‟s quality assurance procedures.

To provide a record of the „extreme events‟, the Contractor shall prepare an exception

report recording:

a) The locations of all carriageway sections with abnormally high or low traffic volumes

of %HCV

b) Notes on the likely reason for the extreme event, such as a local or seasonal event,

weather, public holidays or school holidays

At the completion of each year in which a survey is required, the Contractor shall prepare

a survey report summarising the issues encountered during the survey and actions taken.

The report should cover:

i) Notable events

ii) Report of any accidents or incidents

iii) Public complaints received and actions taken

iv) Delays

v) Equipment failures

vi) Variations completed

vii) Quality assurance and non-conformances raised

viii) Issues relating to data processing

Page 80: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 79 of 157

5 ix) Results of any special studies completed

x) Seasonal correction results

xi) Recommendations for changes to future surveys

Page 81: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 80 of 157

5 5.5 Network Video

A video of the entire network, both sealed and unsealed shall be collected by the

Contractor each year. The purpose of the video is:

a) To have a historical record of the roading network

b) To have them available for consultants and other interested parties to use for

obtaining further information within the roading corridor

c) Provide evidence of road condition and deterioration

A sample video shall be provided to the Engineer‟s Representative for acceptance prior to

surveys commencing.

5.5.1 General Requirements

Video shall be captured using a minimum of one 3-CCD digital camera with wide angle

lens (60-70° horizontal field of view). All equipment used is to provide high quality colour

recording at normal survey speeds. The camera shall be dipped at 3°- 6° and aligned

parallel to the centre of the vehicle axis. The camera is to be fixed focus, with an

accurately calibrated lens-camera-image combination to allow height/width measurements

to within 0.2 metres). The shutter speed must be sufficient to minimise motion blur.

Particular consideration must be given to the mounting of the camera to minimise

vibration.

The minimum requirements for the network video survey equipment are:

Table 5.5.1 a): Network Video Minimum Requirements

Parameter Minimum Requirement

File format Current technology

Image height 768 pixels

Image width 1360 pixels

Audio recording No

Video interlacing Non-interlaced (i.e. progressive scan with no duplicated lines and no “field motion”)

Video quality High

The images are to be recorded with time stamp capabilities in a separate electronic file.

Images are to be indexed by either frame numbers or time stamp which are stored on the

video and synchronised to the true position data of the vehicle at all times (i.e.

displacement is to be rubberbanded to true network length). The file created shall be an

ASCII file in the following format, with the frequency of record creation agreed with the

Engineer‟s Representative:

Page 82: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 81 of 157

5 Table 5.5.1 b): Time Stamp Requirements

Field Description Field Information

1 Road ID integer (4) no nulls

2 Displacement integer (5) no nulls

3 Direction (I, D or null) char (1)

4 File reference char (25) no nulls

5 Frame number or time stamp no nulls

6 Date of recording ddmmyyy no nulls

All distance measuring equipment must be validated on an odometer calibration test track

in accordance with the NZTA Location Referencing Management System Manual. If an

already established odometer calibration test track is to be used, the Contractor must

supply confirmation from a Registered Surveyor that the calibration test track meets the

dimensional tolerances specified in the NZTA Location Referencing Management System

Manual. The Contractor must then measure the length of the test track at least 5 times

using the distance measuring equipment. The distance measuring equipment is validated

when all the measurements are within ±0.05% of the reference distance.

5.5.2 Survey Requirements

Network videos of all WBoPDC Local Roads must be performed:

a) Once annually on each sealed and unsealed carriageway in road groups 1 to 7

b) In each lane direction as a continuous survey

c) During period of fine weather with light conditions appropriate to provide good

quality video

d) Such that the lane width and roadside furniture are captured

e) Such that no part of the survey vehicle appears in the video

f) To be completed in the final quarter of each period (Mar/Apr/May)

The Contractor must record and report the route position of all network video survey data

to an accuracy of:

±(0.3% x D + 10m), for 100% of roads

±(0.25% x D + 10m), for 95% of roads

where:

D = the distance from the start of the road as defined in the WBoPDC RAMM

database.

The surveys must start at the commencement of the road as defined in the WBoPDC

RAMM database. The start point must be recorded and the distance measuring equipment

set to the start point distance, usually 0. If the distance measurement at the end of the road

Page 83: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 82 of 157

5 is not within the specified tolerance, the Contractor must resurvey the road. The re-survey

must note any difference in the measurement point locations. If the second survey

confirms the initial survey, the Contractor must notify the Engineer‟s Representative

immediately and develop a remedial proposal for agreement with the Engineer‟s

Representative.

All data collected for each road is to be rubber-banded to adjust for the difference between

the measured length and the true length.

5.5.3 Data Requirements

Three sets of all data for each survey must be provided on media agreed with the

Engineer‟s Representative.

If review of the data by the Engineer‟s Representative reveals discrepancies, quality issues

or other problems in the data, the Contractor must correct the error and redeliver the data

within 5 working days, which may include resurvey if directed by the Engineer‟s

Representative.

5.5.4 Reporting Requirements

All data delivered for each survey must be accompanied by a Survey Data Report

containing the following information:

a) Results of compliance monitoring completed

b) Data quality check sheets

c) Distance measurement discrepancies (i.e. any roads where the measured distance was

outside the allowed tolerance and actions taken to verify true length)

d) Equipment failures or replacements

e) The actions to address the above problems and steps taken to ensure the quality and

reliability of the supplied data

The Survey Data Report must be signed off by the Contractor‟s Representative to confirm

that all survey and data processing has been completed in accordance with this

specification and the Contractor‟s quality assurance procedures.

The Contractor shall prepare a report detailing:

i) Equipment descriptions, specifications and configuration

ii) Distance rubber banding procedures

iii) Format and description of all raw data

iv) Correction procedures that were applied and how

5.5.5 Viewing Software Requirements

The Contractor shall provide a video viewer software package to enable the video to be

viewed. Minimum requirements for the software are:

Page 84: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 83 of 157

5 a) Ability to select video file by road

b) Ability to enter the route position and to jump to this location on the video

c) Ability to vary the video speed

d) Ability to flip between increasing and decreasing directions or view both at same time

e) Ability to capture images from the video and to set the file path for photo storage

f) Ability to display roadname, displacement, direction and GPS coordinates on the

video display, and to be able to toggle these displays on or off separately

g) Ability to import, select and view latest RAMM data concurrently either in tabular or

graphical form

h) Windows compatible

The Contractor shall provide technical support for the video viewer software.

Page 85: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 84 of 157

5 5.6 Roughness

5.6.1 Data Analysis

Roughness is to be analysed using the high speed data collected in accordance with

Appendix (WBoPDC Local Roads) 5.1.

The analysis shall exclude the following:

a) Records for roads owned by parties other than WBoPDC (e.g. Crown, Tauranga City

Council, Maori or privately-owned)

b) Records for roads less than 200m long

c) Records with the following event codes:

A (Post-Survey Added Value)

D (Detour Route)

H (Speed Humps)

U (Unsealed road begins/ends)

W (Road Works)

X (Railway crossings)

d) Records that were collected while the survey vehicle was travelling at 25km/hr or less

e) Records for the roads in the following table:

Table 5.6.1: Roads Excluded from Calculations Using HSD

Name Road ID Start End Length

Adela Stewart Drive 1014 0 87 87

Adrine Lane 1930 0 112 112

Albacore Avenue 1008 0 100 100

Allanah Place (Te Puke) 1951 0 120 120

Alley Road 1489 0 106 106

Angus Lane 1830 0 62 62

Aran Place 1770 0 83 83

Ashwood Grove 1851 0 66 66

Astelia Drive 1871 0 125 125

Athenree Heights Slip (North Lane) 7160 0 75 75

Athenree Slip Road (RS3679) 7253 0 57 57

Atlanta Court 1891 0 76 76

Ayr Street 1836 0 105 105

Page 86: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 85 of 157

5 Table 5.6.1: Roads Excluded from Calculations Using HSD

Name Road ID Start End Length

Baigent Place 1038 0 183 183

Baker Road 1121 0 145 145

Barnett Place 1769 0 44 44

Barrow Place 1743 0 112 112

Bayly Place 1740 0 83 83

Beach Grove 1268 0 188 188

Belmont Rise 1887 0 183 183

Bert Wall Drive 1983 0 192 192

Binnie Road 1072 0 192 192

Birch Lane 7147 0 107 107

Blundell Place 1095 0 193 193

Bonito Avenue 1003 0 137 137

Bonnieglen Road 1595 0 69 69

Boucher Avenue Service Lane (RP31 LHS) 7176 0 65 65

Boucher Avenue Service Lane (RP41 LHS) 7204 0 109 109

Bramley Drive 1277 0 149 149

Bransley Grove 1915 0 106 106

Breakers Crescent 1941 0 55 55

Brookby Place 1919 0 63 63

Burd Road 1607 0 41 41

Carberry Crescent 1734 0 85 85

Church Road 1555 0 148 148

Clifden Terrace 1796 0 80 80

Coleman Place 1954 0 133 133

Collins Lane (72-87) 2498 0 112 112

Commerce Lane Carpark 7205 0 174 174

Conifer Place 1785 0 136 136

Cooney Place 1777 0 100 100

Cresta Drive 1962 0 49 49

Crossley Street South 1839 0 60 60

Page 87: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 86 of 157

5 Table 5.6.1: Roads Excluded from Calculations Using HSD

Name Road ID Start End Length

Dawson Road 1878 0 54 54

Denby Close 1015 0 41 41

Dolphin Avenue 1007 0 100 100

Donegal place 1896 0 141 141

Donelle Place 1939 0 68 68

Dowman Place 1926 0 78 78

Dunlop Road Service Lane (RP55 RHS) 7230 0 80 80

Edwards Street 1841 0 135 135

Elizabeth Street 1821 0 111 111

Emeny Road North 2219 0 60 60

Fairlie Grove 1228 0 99 99

Farm Road 1828 0 65 65

Farnell Court 1269 0 66 66

Fencourt Crescent 1093 0 102 102

Fenton Terrace Slip 7067 0 68 68

Fleur Place 1950 0 83 83

Galway Place 1771 0 120 120

Gane Place 1261 0 126 126

Gardiner Place 1578 0 70 70

Garrett Road 1484 270 400 130

Gellibrand Place 1282 0 107 107

Gerald Place 1281 0 49 49

Giles Way 1037 0 129 129

Gisborne Road 1746 0 188 188

Gledstane Road 1090 0 126 126

Glen Isla Place 1837 0 130 130

Goldstone Road 1710 0 56 56

Gordet Drive 1895 0 128 128

Gordon Street 1790 0 123 123

Gray Avenue 1843 0 179 179

Page 88: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 87 of 157

5 Table 5.6.1: Roads Excluded from Calculations Using HSD

Name Road ID Start End Length

Gray Street 1079 0 139 139

Gray Street North 7300 0 66 66

Greystone Place 1975 0 59 59

Grosvenor Place 1888 0 90 90

Gunga Lane 1892 0 135 135

Haden Place 1964 0 169 169

Hansen Place 1862 0 62 62

Harbour View Road Side Road 7210 0 39 39

Harbour View Road Slip #1 7227 0 23 23

Harbour View Road Slip #2 (NOS 29-3 7228 0 45 45

Henry Road Slip (RP 118 RHS) 4020 0 50 50

Herbert Street 1757 0 153 153

Hereford Place 1856 0 195 195

Hillary Street 1826 0 111 111

Hinckley Road 1968 0 74 74

Hinemoa Road 1804 0 177 177

Hoggard Place 1960 0 188 188

Hyde Street 1086 0 100 100

Irwin Court 1067 0 94 94

Island Vista 1885 0 115 115

Jellicoe Street Slip (RP1357 RHS) 7174 0 86 86

Jellicoe Street Slip (RP1374 LHS) 7297 0 167 167

Kaharoa Avenue 1271 0 148 148

Kaimai Lane 7146 0 100 100

Katterns Street 1106 0 173 173

Kauri Place 1556 0 170 170

Kauri Place Slip 7035 0 30 30

Killarney Street 1735 0 107 107

Kiokio Place 1562 0 144 144

Kiri Place 1905 0 69 69

Page 89: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 88 of 157

5 Table 5.6.1: Roads Excluded from Calculations Using HSD

Name Road ID Start End Length

Kowai Grove 1272 0 134 134

Kowhai Avenue 1742 0 161 161

Kowhai Court 1073 0 174 174

Kylemore Place 1767 0 64 64

Lakeside Terrace 1974 0 37 37

Landscape Road Slip 4036 0 117 117

Lenihan Drive 1729 0 155 155

Lindoch Avenue 1231 0 152 152

Links View Drive Slip 7043 0 86 86

Lismore Lane 1873 0 199 199

Longboard Drive 1928 0 150 150

Ludlow Place 1917 0 122 122

Macmillan Street 1097 0 192 192

Magnolia Place 1791 0 63 63

Major Street 1083 0 69 69

Mako Avenue 1001 0 143 143

Mangatoi Road 1675 0 120 120

Mangawhai Place 1976 0 41 41

Marina Way 1016 0 142 142

Marlin Avenue 1006 0 128 128

Marshall Place 1110 0 110 110

Martha Lane 1292 323 395 72

Maruia Place 1424 0 193 193

Mayor View Terrace Side Road 7209 0 45 45

McKenna Lane 1925 0 94 94

McQuade Road (off Ross Road) 1288 0 114 114

Memorial Hall Service Lane 7218 0 75 75

Mends Lane 1572 0 193 193

Mermaid Place 1944 0 58 58

Mickells Drive 1876 0 55 55

Page 90: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 89 of 157

5 Table 5.6.1: Roads Excluded from Calculations Using HSD

Name Road ID Start End Length

Milsom Place 1846 0 157 157

Mountbatten Place 1797 0 106 106

Muir Place 1741 0 134 134

Munro Road East 1307 0 119 119

Nathan Place 1013 0 52 52

Nettlingham Place 1739 0 79 79

Nga Parae Road 1970 0 178 178

Ngamuwahine Road 1425 0 160 160

No. 1 Road High Level Access 7238 0 67 67

Noble Lane 1053 0 92 92

Nolan Place 1977 0 160 160

North Road 1174 0 94 94

Old Coach Road Slip 7155 0 25 25

Olive Close 1949 0 138 138

Omokoroa Road Slip #1 (No.s 74-80) 7225 0 63 63

Omokoroa Road Slip #2 (No.s 64 - 72) 7191 0 93 93

Omokoroa Road Slip #3 (No.s 24-38) 7226 0 99 99

Oropi Road High Level Access 7239 0 141 141

Oroua Street Extension (RP198 RHS) 7117 0 50 50

Otawa Street 1780 0 153 153

Otto Road 1832 0 152 152

Paama Court 1703 0 62 62

Palm Grove 1931 0 151 151

Palmer Place 1798 0 71 71

Park Avenue 1818 0 106 106

Park Lane (Te Puke) 1763 0 51 51

Park Road (Maketu) 1553 0 105 105

Parkland Rise 1963 0 122 122

Patterson Place 1833 0 108 108

Philip Walter Drive 1081 0 188 188

Page 91: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 90 of 157

5 Table 5.6.1: Roads Excluded from Calculations Using HSD

Name Road ID Start End Length

Plom Road 1971 0 49 49

Pokare Road 1580 0 66 66

Post Office Road (Matakana) 7141 0 70 70

Potu Road 1047 0 185 185

Preston Drive Parking Loop 7270 0 54 54

Pukehina Beach Road Slip 7004 0 71 71

Puriri Avenue 1745 0 188 188

Queen Street (Waihi Beach) 1820 0 177 177

Randell Place 1776 0 171 171

Rauporoa Road 1547 0 163 163

Reabrook Place 1920 0 94 94

Reel Road 1942 0 107 107

Reo Crescent 1929 0 166 166

Riverlea Drive 1071 0 184 184

Riverside Place 1965 0 180 180

Rosemary Place 1069 0 89 89

Ruamoana Place (2) 2278 0 71 71

Ruamoana Place (3) 3278 0 112 112

Ruamoana Place (4) 4005 0 90 90

Samantha Place 1907 0 70 70

Sandleigh Drive 1956 0 186 186

Saunders Place 1765 0 161 161

Scarborough Road 1815 0 194 194

Scott Street 1824 0 119 119

Sea Crest Place 1881 0 117 117

Sea Vista 1886 0 144 144

Seafoam Place 1957 0 126 126

Seaforth Slip Road #1 (RP5356 LHS) 7048 0 144 144

Seaforth Slip Road #3 (RP5886 LHS) 7050 0 174 174

Seaforth Slip Road #4 (RP6146 RHS) 7177 0 126 126

Page 92: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 91 of 157

5 Table 5.6.1: Roads Excluded from Calculations Using HSD

Name Road ID Start End Length

Service Lane #3 (Katikati) 7102 0 60 60

Slater Place 1754 0 126 126

Slater Place Service Lane (RP33 RHS) 7236 0 155 155

Stanley Street 1050 0 93 93

Stapleton Place 1847 0 103 103

Stewart Street (Katikati) 1084 0 110 110

Stock Road 1799 0 179 179

Stokes Road 1060 0 135 135

Strathaven Way 1872 0 83 83

Tapsell Road 1530 0 123 123

Te Kanawa Place 1882 0 117 117

Te Karaka Drive 1220 0 99 99

Teihana Road 1252 0 158 158

The Esplanade (Waihi Beach) 1805 90 154 64

The Terrace 1802 0 142 142

Thomas Road South 4012 0 78 78

Thorn Road 1428 0 175 175

Tinopai Drive Slip #1 (No.s 10-16) 7229 0 74 74

Tom Baikie Lane 1927 0 147 147

Tralee Street 1265 0 173 173

Tranquil Grove 1979 0 45 45

Treholme Lane 1244 0 131 131

Troon Drive 1937 0 134 134

Troy Place 1906 0 52 52

Tuhua Place 1860 0 194 194

Tuna Avenue 1005 0 128 128

Tutea Place 1646 0 141 141

Twickenham Close 1899 0 112 112

Uretara Drive 1900 0 104 104

Valley View Road 1589 0 114 114

Page 93: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 92 of 157

5 Table 5.6.1: Roads Excluded from Calculations Using HSD

Name Road ID Start End Length

Vantage Place 1973 0 93 93

Victoria Street 1052 0 162 162

Waiiti Avenue 1009 0 91 91

Waikaraka Drive East 1235 0 166 166

Wallace Road Cul-De-Sac 7296 0 58 58

Walnut Grove 1279 0 123 123

Waterview Terrace 1870 0 190 190

Wedgewood Lane 7101 0 163 163

Wedgewood Place 7148 0 56 56

West Street 1800 0 77 77

Westbank Drive 1145 0 170 170

Whenuariri Place 1563 0 186 186

Whenuariri Place Slip 7034 0 73 73

William Wood Place 1933 0 109 109

Williams Drive 1768 0 167 167

Wilson Road South Slip 7156 0 75 75

Wilson Road Service Lane (Waihi Beach) 7224 0 49 49

Wiltshire Place 1778 0 118 118

Young Road Slip 7175 0 97 97

Matakana Road 1695 0 2490 2490

Opureora Road 1697 0 1847 1847

Waihirere Road 1696 0 1330 1330

The analysis shall be completed using current high speed data only.

5.6.2 Calculations

The Mean Roughness KPM results are calculated from the 20m lane roughness data in the

RAMM table (hsd_rough) using the following formula:

𝑀𝑒𝑎𝑛 𝑅𝑜𝑢𝑔𝑕𝑛𝑒𝑠𝑠 = 𝑁𝐴𝐴𝑆𝑅𝐴 𝑟𝑒𝑎𝑑𝑖𝑛𝑔𝑠 𝑖𝑛 𝑎𝑙𝑙 𝑙𝑎𝑛𝑒𝑠

𝑁𝑜. 𝑜𝑓 𝑁𝐴𝐴𝑆𝑅𝐴 𝑟𝑒𝑎𝑑𝑖𝑛𝑔𝑠 𝑖𝑛 𝑎𝑙𝑙 𝑙𝑎𝑛𝑒𝑠

Page 94: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 93 of 157

5 The Percent Roughness > Threshold KPM results are calculated from the 100m lane

roughness data in the RAMM table (rough) using the following formula:

𝑃𝑒𝑟𝑐𝑒𝑛𝑡 𝑅𝑜𝑢𝑔𝑕𝑛𝑒𝑠𝑠 > 𝑇𝑕𝑟𝑒𝑠𝑕𝑜𝑙𝑑 = 𝑁𝑜. 𝑜𝑓 𝑁𝐴𝐴𝑆𝑅𝐴 𝑟𝑒𝑎𝑑𝑖𝑛𝑔𝑠 > 𝑡𝑕𝑟𝑒𝑠𝑕𝑜𝑙𝑑

𝑁𝑜. 𝑜𝑓 𝑁𝐴𝐴𝑆𝑅𝐴 𝑟𝑒𝑎𝑑𝑖𝑛𝑔𝑠 × 100%

The Length with Roughness > Threshold KPM results are calculated from the 100m lane

roughness data in the RAMM table (rough) using the following formula:

𝐿𝑒𝑛𝑔𝑡𝑕 𝑤𝑖𝑡𝑕 𝑅𝑜𝑢𝑔𝑕𝑛𝑒𝑠𝑠 > 𝑇𝑕𝑟𝑒𝑠𝑕𝑜𝑙𝑑 = 𝑁𝑜. 𝑜𝑓 𝑁𝐴𝐴𝑆𝑅𝐴 𝑟𝑒𝑎𝑑𝑖𝑛𝑔𝑠 > 𝑡𝑕𝑟𝑒𝑠𝑕𝑜𝑙𝑑

Smooth Travel Exposure KPM results are calculated from the 100m lane roughness data

in the RAMM table (rough) using the following formula:

𝑆𝑚𝑜𝑜𝑡𝑕 𝑇𝑟𝑎𝑣𝑒𝑙 𝐸𝑥𝑝𝑜𝑠𝑢𝑟𝑒 = 𝐴𝐷𝑇𝑒𝑠𝑡 /𝑁𝑜. 𝑜𝑓 𝑙𝑎𝑛𝑒𝑠 𝑅𝑒𝑎𝑑𝑖𝑛𝑔𝑠 <𝑡𝑕𝑟𝑒𝑠𝑕𝑜𝑙𝑑

𝐴𝐷𝑇𝑒𝑠𝑡 /𝑁𝑜. 𝑜𝑓 𝑙𝑎𝑛𝑒𝑠 𝐴𝑙𝑙 𝑟𝑒𝑎𝑑𝑖𝑛𝑔𝑠

× 100%

where ADTest and the number of lanes are taken from the RAMM carriageway table.

Page 95: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 94 of 157

5 5.7 Texture

5.7.1 Data Analysis

Texture is to be analysed using the high speed data collected in accordance with Appendix

(WBoPDC Local Roads) 5.1.

The analysis shall exclude the following:

a) Records for roads owned by parties other than WBoPDC (e.g. Crown, Tauranga City

Council, Maori or privately-owned)

b) Records with the following event codes:

A (Post-Survey Added Value)

D (Detour Route)

H (Speed Humps)

U (Unsealed road begins/ends)

W (Road Works)

X (Railway crossings)

c) Records for roads listed in Appendix (WBoPDC Local Roads) 5.6, Table 5.6.1

The analysis shall be completed using current high speed data only.

5.7.2 Calculations

The Percent Texture < Threshold KPM results are calculated from the 10m wheelpath

texture data in the RAMM table (hsd_texture) using the following formula:

𝑃𝑒𝑟𝑐𝑒𝑛𝑡 𝑀𝑒𝑎𝑛 𝑇𝑒𝑥𝑡𝑢𝑟𝑒 𝐷𝑒𝑝𝑡𝑕 < 𝑇𝑕𝑟𝑒𝑠𝑕𝑜𝑙𝑑 = 𝑙𝑑 + 𝑟𝑑𝑙 + 𝑟

× 100%

where:

ld = No. of 10m intervals in the left wheelpath with a mean profile depth reading less

than the specified threshold

rd = No. of 10m intervals in the right wheelpath with a mean profile depth reading less

than the specified threshold

l = No. of 10m intervals in the left wheelpath with a mean profile depth reading

r = No. of 10m intervals in the right wheelpath with a mean profile depth reading

Page 96: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 95 of 157

5 5.8 Rutting

5.8.1 Data Analysis

Rutting is to be analysed using the high speed data collected in accordance with Appendix

(WBoPDC Local Roads) 5.1.

The analysis shall exclude the following:

a) Records for roads owned by parties other than WBoPDC (e.g. Crown, Tauranga City

Council, Maori or privately-owned);

b) Records with the following event codes:

A (Post-Survey Added Value)

D (Detour Route)

H (Speed Humps)

U (Unsealed road begins/ends)

W (Road Works)

X (Railway crossings)

c) Records for roads listed in Appendix (WBoPDC Local Roads) 5.6, Table 5.6.1

The analysis shall be completed using current high speed data only.

5.8.2 Calculations

The Percent Rut Depth > Threshold KPM results are calculated from the wheelpath rut

depth data using the following formula:

𝑃𝑒𝑟𝑐𝑒𝑛𝑡 𝑅𝑢𝑡 𝐷𝑒𝑝𝑡𝑕 > 𝑇𝑕𝑟𝑒𝑠𝑕𝑜𝑙𝑑 = 𝑑𝑙 + 𝑑𝑟

𝑙 + 𝑟× 100%

where:

dl = Sum of length in the left wheelpath in each lane with rut depth greater than the

specified threshold. To be calculated by summing LWP_30, LWP_40, LWP_50,

LWP_60, LWP_100 and LWP_100plus bins in the high speed data rutting table

dr = Sum of length in the right wheelpath in each lane with rut depth greater than the

specified threshold. To be calculated by summing RWP_30, RWP_40, RWP_50,

RWP_60, RWP_100 and RWP_100plus bins in the high speed data rutting table

l = Sum of length of left wheelpath in each lane

r = Sum of length of right wheelpath in each lane

Page 97: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 96 of 157

5 5.9 Surfacing Defects Index (Sealed)

5.9.1 Data Analysis

Pothole, Scabbing, Edge Break and Shoving defects on sealed roads are to be analysed

using the current survey RAMM Rating Data held in the rating table in RAMM, and

collected in accordance with Appendix (WBoPDC Local Roads) 5.3.

Rutting and Flushing defects on sealed roads are to be analysed using the current survey

high speed data held in RAMM (hsd_rutting and hsd_texture tables respectively), and

collected in accordance with Appendix (WBoPDC Local Roads) 5.1.

The analysis shall exclude the following:

a) Records for roads owned by parties other than WBoPDC (e.g. Crown, Tauranga City

Council, Maori or privately-owned);

5.9.2 Calculations

The Surfacing Defects Index (Sealed) KPM is calculated using the following formula:

𝑆𝑢𝑟𝑓𝑎𝑐𝑖𝑛𝑔 𝐷𝑒𝑓𝑒𝑐𝑡𝑠 𝐼𝑛𝑑𝑒𝑥 𝑆𝑒𝑎𝑙𝑒𝑑 = (𝑊𝑒𝑖𝑔𝑕𝑡𝑒𝑑 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝐼𝑛𝑑𝑒𝑥 × 𝑇𝑟𝑒𝑎𝑡𝑚𝑒𝑛𝑡 𝐿𝑒𝑛𝑔𝑡𝑕)𝑆𝑒𝑎𝑙𝑒𝑑 𝑡𝑟𝑒𝑎𝑡𝑚𝑒𝑛𝑡 𝑙𝑒𝑛𝑔𝑡 𝑕𝑠

𝑇𝑟𝑒𝑎𝑡𝑚𝑒𝑛𝑡 𝐿𝑒𝑛𝑔𝑡𝑕𝑆𝑒𝑎𝑙𝑒𝑑 𝑡𝑟𝑒𝑎𝑡𝑚𝑒𝑛𝑡 𝑙𝑒𝑛𝑔𝑡 𝑕𝑠

where:

The Weighted Condition Index for each treatment length is calculated using the

following formula, and rounded to the nearest whole integer with a maximum value of

5:

𝑊𝑒𝑖𝑔𝑕𝑡𝑒𝑑 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝐼𝑛𝑑𝑒𝑥 = (𝐸𝑞𝑢𝑖𝑣𝑎𝑙𝑒𝑛𝑡 𝐹𝑎𝑢𝑙𝑡𝑠 × 𝐹𝑎𝑢𝑙𝑡 𝑊𝑒𝑖𝑔𝑕𝑡)

6

1

where:

1. The Fault Weight for each Fault Type is listed in the following table:

Table 5.9.2: Sealed Road Fault Type and Weight

No. Fault Type Fault Weight

1 Potholes 55%

2 Edge Break 10%

3 Shoving 15%

4 Scabbing 5%

5 Rutting 10%

6 Flushing 5%

Page 98: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 97 of 157

5 2. Equivalent Faults for the Pothole Fault Type are calculated using the following

formula:

𝐸𝑞𝑢𝑖𝑣𝑎𝑙𝑒𝑛𝑡 𝐹𝑎𝑢𝑙𝑡𝑠 = 𝑁𝑜. 𝑜𝑓 𝑃𝑜𝑡𝑕𝑜𝑙𝑒𝑠 ×50

𝐼𝑛𝑠𝑝𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑒𝑛𝑔𝑡𝑕 (𝑚)

3. Equivalent Faults for the Edge Break Fault Type are calculated using the

following formula:

𝐸𝑞𝑢𝑖𝑣𝑎𝑙𝑒𝑛𝑡 𝐹𝑎𝑢𝑙𝑡𝑠 = 𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝐸𝑑𝑔𝑒 𝐵𝑟𝑒𝑎𝑘 ×50

𝐼𝑛𝑠𝑝𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑒𝑛𝑔𝑡𝑕 (𝑚)

4. Equivalent Faults for the Shoving Fault Type are calculated using the following

formula:

𝐸𝑞𝑢𝑖𝑣𝑎𝑙𝑒𝑛𝑡 𝐹𝑎𝑢𝑙𝑡𝑠 = 𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝑆𝑕𝑜𝑣𝑖𝑛𝑔 ×50

𝐼𝑛𝑠𝑝𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑒𝑛𝑔𝑡𝑕 (𝑚)

5. Equivalent Faults for the Scabbing Fault Type are calculated using the following

formula:

𝐸𝑞𝑢𝑖𝑣𝑎𝑙𝑒𝑛𝑡 𝐹𝑎𝑢𝑙𝑡𝑠 = 𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝑆𝑐𝑎𝑏𝑏𝑖𝑛𝑔 ×7

𝑊𝑖𝑑𝑡𝑕×

50

𝐼𝑛𝑠𝑝𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑒𝑛𝑔𝑡𝑕 (𝑚)

where width is the weighted average carriageway width for the inspection length.

6. Equivalent Faults for the Rutting Fault Type are calculated using the following

formula:

𝐸𝑞𝑢𝑖𝑣𝑎𝑙𝑒𝑛𝑡 𝐹𝑎𝑢𝑙𝑡𝑠 = 𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝑅𝑢𝑡𝑡𝑖𝑛𝑔 ×50

𝑇𝑟𝑒𝑎𝑡𝑚𝑒𝑛𝑡 𝐿𝑒𝑛𝑔𝑡𝑕 (𝑚)

where the length of rutting is the total length of rutting greater than 30mm in all

wheelpaths within the treatment length. This can be calculated by summing

LWP_40, LWP_50, LWP_60, LWP_100 and LWP_100plus bins, and equivalent

RWP bins in the high speed data rutting table. Event codes A, D, H, W, X and U

are to be excluded.

7. Equivalent Faults for the Flushing Fault Type are calculated using the following

formula:

𝐸𝑞𝑢𝑖𝑣𝑎𝑙𝑒𝑛𝑡 𝐹𝑎𝑢𝑙𝑡𝑠 = 𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝐹𝑙𝑢𝑠𝑕𝑖𝑛𝑔 ×50

𝑇𝑟𝑒𝑎𝑡𝑚𝑒𝑛𝑡 𝐿𝑒𝑛𝑔𝑡𝑕 (𝑚)

where the length of flushing is the total length with sand circular diameter texture

≥ 275mm in both wheelpaths within the treatment length. This can be calculated

by summing LWP_300, LWP_400 and LWP_400plus bins, and equivalent RWP

bins, in the HSD Texture table. Event codes A, D, H, W, X and U are to be

excluded.

Page 99: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 98 of 157

5 In addition to the Surfacing Defects Index (Sealed), the Contractor shall also report:

The total treatment length with Weighted Condition Index ≥ 4; and

The total treatment length with Weighted Condition Index = 5.

Page 100: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 99 of 157

5 5.10 Surfacing Defects Index (Unsealed)

5.10.1 Data Analysis

Surfacing defects on unsealed roads are to be analysed using the RAMM data collected in

accordance with Appendix (WBoPDC Local Roads) 5.3.

The analysis shall exclude the following:

b) Records for roads owned by parties other than WBoPDC (e.g. Crown, Tauranga City

Council, Maori or privately-owned)

5.10.2 Calculations

The Surfacing Defects Index (Unsealed) KPM is calculated using the following formula:

𝑆𝑢𝑟𝑓𝑎𝑐𝑖𝑛𝑔 𝐷𝑒𝑓𝑒𝑐𝑡𝑠 𝐼𝑛𝑑𝑒𝑥 𝑈𝑛𝑠𝑒𝑎𝑙𝑒𝑑 = (𝑊𝑒𝑖𝑔𝑕𝑡𝑒𝑑 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝐼𝑛𝑑𝑒𝑥 × 𝑆𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑒𝑛𝑔𝑡𝑕)𝐴𝑙𝑙 𝑢𝑛𝑠𝑒𝑎𝑙𝑒𝑑 𝑠𝑒𝑐𝑡𝑖𝑜𝑛𝑠

𝑆𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑒𝑛𝑔𝑡𝑕𝐴𝑙𝑙 𝑢𝑛𝑠𝑒𝑎𝑙𝑒𝑑 𝑠𝑒𝑐𝑡𝑖𝑜𝑛𝑠

where:

The Weighted Condition Index for each rating section is calculated using the

following formula:

𝑊𝑒𝑖𝑔𝑕𝑡𝑒𝑑 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝐼𝑛𝑑𝑒𝑥 = 1.75 × (𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 × 𝐹𝑎𝑢𝑙𝑡 𝑊𝑒𝑖𝑔𝑕𝑡)

9

1

where:

1. The Condition Rating for each Fault Type are listed in the following table:

Table 5.10.2 a): Unsealed Road Fault Type Condition Rating

No. Fault Type Condition Rating

1 2 3 4 5

1 Potholes 0 0≤x<2 2≤x<25 25≤x<50 x ≥50

2 Corrugations 0 0≤x<4 4≤x<50 50≤x<97 x ≥97

3 Graded Width <0.25 0.25≤x<0.5 0.5≤x<0.75 0.75≤x<1 x ≥1

4 Surface Water Channel

0 0≤x<50 50≤x<75 75≤x<100 x =100

5 Rutting 0 0≤x<5 5≤x<50 50≤x<100 x =100

6 Cross-section 0 1 2 3 4

7 Scour 0 0≤x<3 3≤x<50 50≤x<95 x ≥95

8 Shoving 0 0≤x<3 3≤x<9 9≤x<15 x ≥15

9 Loose Aggregate 0 0≤x<50 50≤x<100 100≤x<200 x ≥200

Page 101: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 100 of 157

5 2. The Condition Rating and Fault Weight for each Fault Type are listed in the

following table:

Table 5.10.2: Unsealed Road Fault Type Weighting

No. Fault Type Fault Weighting

1 Potholes 20%

2 Corrugations 20%

3 Graded Width 10%

4 Surface Water Channel 5%

5 Rutting 5%

6 Cross-section 5%

7 Scour 10%

8 Shoving 20%

9 Loose Aggregate 5%

3. The value for the Pothole Fault Type is calculated using the following formula:

𝑥 = (𝑁𝑜. 𝑜𝑓 𝑃𝑜𝑡𝑕𝑜𝑙𝑒𝑠 × 𝑃𝑜𝑡𝑕𝑜𝑙𝑒 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔) ×100

𝐼𝑛𝑠𝑝𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑒𝑛𝑔𝑡𝑕 (𝑚)

where the pothole weight is based on pothole diameter and depth as listed in the

following table:

Table 5.10.2 c): Pothole Weighting

Pothole Depth Pothole Diameter

100mm to 300mm

300mm to 600mm

600mm to 900mm

> 900mm

25mm to 50mm 1 1 2 3

50mm to 100mm 1 2 3 3

>100mm 1 2 3 3

4. The value for the Corrugations Fault Type is calculated using the following

formula:

𝑥 = 𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝐶𝑜𝑟𝑟𝑢𝑔𝑎𝑡𝑖𝑜𝑛 × 𝐶𝑜𝑟𝑟𝑢𝑔𝑎𝑡𝑖𝑜𝑛 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔 ×100

𝐼𝑛𝑠𝑝𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑒𝑛𝑔𝑡𝑕 (𝑚)

where the corrugation weight is based on corrugation depth as listed in the

following table:

Page 102: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 101 of 157

5 Table 5.10.2 d): Corrugations Weighting

Corrugation Depth Corrugation Weighting

25mm to 75mm 1

> 75mm 2

5. The value for the Graded Width Fault Type is calculated using the following

formula:

𝑥 = 𝑊𝑖𝑑𝑡𝑕 𝑓𝑟𝑜𝑚 𝑅𝐴𝑀𝑀 𝐶𝑎𝑟𝑟𝑖𝑎𝑔𝑒𝑤𝑎𝑦 𝑇𝑎𝑏𝑙𝑒 − 𝑀𝑒𝑎𝑠𝑢𝑟𝑒𝑑 𝑊𝑖𝑑𝑡𝑕

6. The value for the Surface Water Channel Fault Type is calculated using the

following formula:

𝑥 = (𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝐼𝑛𝑎𝑑𝑒𝑞𝑢𝑎𝑡𝑒 𝑆𝑊𝐶 𝐿𝐻𝑆 + 𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝐼𝑛𝑎𝑑𝑒𝑞𝑢𝑎𝑡𝑒 𝑆𝑊𝐶 𝑅𝐻𝑆) ×100

2 × 𝑆𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑒𝑛𝑔𝑡𝑕

7. The value for the Rutting Fault Type is calculated using the following formula:

𝑥 = 𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝑅𝑢𝑡𝑡𝑖𝑛𝑔 > 30𝑚𝑚 𝑑𝑒𝑒𝑝 ×100

𝐼𝑛𝑠𝑝𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑒𝑛𝑔𝑡𝑕 (𝑚)

8. The value for the Cross-section Fault Type is as recorded through RAMM

condition rating.

9. The value for the Scour Fault Type is calculated using the following formula:

𝑥 = 𝐴𝑟𝑒𝑎 𝑜𝑓 𝑆𝑐𝑜𝑢𝑟 (𝑚2) ×100

𝐼𝑛𝑠𝑝𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑒𝑛𝑔𝑡𝑕 (𝑚)

10. The value for the Shoving Fault Type is calculated using the following formula:

𝑥 = 𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝑆𝑕𝑜𝑣𝑖𝑛𝑔 ×100

𝐼𝑛𝑠𝑝𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑒𝑛𝑔𝑡𝑕 (𝑚)

11. The value for the Loose Aggregate Fault Type is calculated using the following

formula:

𝑥 = (𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝐿𝑜𝑜𝑠𝑒 𝐴𝑔𝑔𝑟𝑒𝑔𝑎𝑡𝑒 × 𝐿𝑜𝑜𝑠𝑒 𝐴𝑔𝑔𝑟𝑒𝑔𝑎𝑡𝑒 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔) ×100

𝐼𝑛𝑠𝑝𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑒𝑛𝑔𝑡𝑕 (𝑚)

where the loose aggregate weight is based on loose aggregate depth as listed in

the following table:

Page 103: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 102 of 157

5 Table 5.10.2 e): Loose Aggregate Weighting

Loose Aggregate Depth Weighting

< 50mm 0

50mm to 100mm 1

> 100mm 2

Page 104: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 103 of 157

5 5.11 Average Remaining Surfacing Life

5.11.1 Data Analysis

Average Remaining Surfacing Life is to be analysed in years using the RAMM data

collected in accordance with Appendix (WBoPDC Local Roads) 5.3.

The analysis shall exclude the following:

a) All surfacing types with a width less than 0.5m and/or a length less than 10m

5.11.2 Calculations

The Average Remaining Surfacing Life KPM is calculated using the following formula:

𝐴𝑣𝑒𝑟𝑎𝑔𝑒 𝑅𝑒𝑚𝑎𝑖𝑛𝑖𝑛𝑔 𝑆𝑢𝑟𝑓𝑎𝑐𝑖𝑛𝑔 𝐿𝑖𝑓𝑒 = 𝐴𝑟𝑒𝑎 𝑜𝑓 𝑆𝑢𝑟𝑓𝑎𝑐𝑖𝑛𝑔 × 𝑅𝑒𝑚𝑎𝑖𝑛𝑖𝑛𝑔 𝐿𝑖𝑓𝑒

𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝑜𝑓 𝑆𝑢𝑟𝑓𝑎𝑐𝑖𝑛𝑔

The Remaining Life of a surfacing length is calculated using the following formula:

𝑅𝑒𝑚𝑎𝑖𝑛𝑖𝑛𝑔 𝐿𝑖𝑓𝑒 = 𝐸𝑥𝑝𝑖𝑟𝑦 𝐷𝑎𝑡𝑒 − 01/07/𝑦𝑒𝑎𝑟

365

where:

Year is the current year of assessment

Expiry Date is the surfacing date plus the Design Life specified in the following table:

Table 5.11.2: Surfacing Type Design Life

Surfacing Type Grade Pavement Use*

1 2 3 4 5 6 7

Texturising Seal 6 6 5 4 3 2 1 1

Texturising Seal 5 8 7 6 5 4 3 2

Texturising Seal 4 12 10 8 7 6 5 4

Texturising Seal 3 14 12 10 9 8 7 6

Void Fill Seal 6 6 5 4 3 2 1 1

Void Fill Seal 5 8 7 6 5 4 3 2

Void Fill Seal 4 12 10 8 7 6 5 4

Void Fill Seal 3 14 12 10 9 8 7 6

Locking Coat Seal 6 6 5 4 3 2 1 1

Locking Coat Seal 5 8 7 6 5 4 3 2

First Coat Seal: Single Coat 6 1 1 1 1 1 1 1

Page 105: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 104 of 157

5 Table 5.11.2: Surfacing Type Design Life

Surfacing Type Grade Pavement Use*

1 2 3 4 5 6 7

First Coat Seal: Single Coat 5 1 1 1 1 1 1 1

First Coat Seal: Single Coat 4 3 2 1 1 1 1 1

First Coat Seal: Single Coat 3 4 3 2 1 1 1 1

First Coat Seal: Two Coat 4/6 6 4 3 2 2 1 1

First Coat Seal: Two Coat 3/5 8 6 5 4 3 2 1

First Coat Seal: Two Coat 2/4 10 8 6 5 4 3 2

Second Coat Seal: Single Coat 6 6 5 4 3 2 1 1

Second Coat Seal: Single Coat 5 8 7 6 5 4 3 2

Second Coat Seal: Single Coat 4 12 10 8 7 6 5 4

Second Coat Seal: Single Coat 3 14 12 10 9 8 7 6

Second Coat Seal: Single Coat 2 16 14 12 11 10 9 8

Second Coat Seal: Two Coat 4/6 14 12 10 9 8 6 4

Second Coat Seal: Two Coat 3/5 16 14 12 11 10 8 6

Second Coat Seal: Two Coat 2/4 18 16 14 13 12 10 9

Reseals: Single Coat 6 6 5 4 3 2 1 1

Reseals: Single Coat 5 8 7 6 5 4 3 2

Reseals: Single Coat 4 12 10 8 7 6 5 4

Reseals: Single Coat 3 14 12 10 9 8 7 6

Reseals: Single Coat 2 16 14 12 11 10 9 8

Reseals: Two Coat 4/6 14 12 10 9 8 6 4

Reseals: Two Coat 3/5 16 14 12 11 10 8 6

Reseals: Two Coat 2/4 18 16 14 13 12 10 9

Asphaltic Mixes: Thin Asphaltic Concrete - 12 11 10 9 8 7 6

Asphaltic Mixes: Structural Asphaltic Concrete - 20 20 19 19 18 17 16

Asphaltic Mixes: Open Graded Porous Asphalt - 12 11 10 9 8 7 6

Asphaltic Mixes: Open Graded Emulsion Mix - 12 11 10 9 8 7 6

Portland Cement Concrete - 60 60 50 50 40 40 40

Slurry Seal - 8 7 6 5 4 3 2

Prime and Seal - 7 6 5 4 3 2 1

Page 106: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 105 of 157

5 Table 5.11.2: Surfacing Type Design Life

Surfacing Type Grade Pavement Use*

1 2 3 4 5 6 7

Metal Running Course - 3 2 1 1 1 1 1

BOLIDT Polyurethane Mix - 18 16 14 12 11 10 8

Bicouche/Sandwich - 14 12 10 9 8 6 4

Interlocking concrete blocks 50 50 50 50 50 50 50

Note that the Pavement Use* is as defined in RAMM and may not be directly linked to the

road group number.

Page 107: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 106 of 157

5 5.12 Bridge Structures

All structural bridge maintenance and renewals (excluding deck replacement, waterway,

substructure, abutment and foundation renewals) are included within the Bridge Structures

KPMs.

For the avoidance of doubt, the following outlines a range of typical activities that may be

required and identifies the party responsible for the implementation of each activity. In the

event that an activity is required and it is not listed, the party responsible for the

implementation shall be in accordance with the intent of the table.

Table 5.12: Typical Bridge Activity and Responsibility

Component Group

Contractor’s Maintenance Responsibility

Principal’s Renewal and Capital Responsibility

General Appearance

Repairing accident damage such as guard rails, signs, general cleaning and painting

Superstructure Concrete

Crack repairs, concrete spalling Replace decks

Superstructure Steel

Cleaning and painting, tightening bolts and fixings

Replace beams

Superstructure Timber

Cleaning and painting, tightening bolts and fixings, replacing deck,

Replace main beams

Foundations and Substructure

Monitor scour and notify Principal of any work required

Erosion of abutment support

Scour and Waterway

Maintaining vegetation clear of waterway within 50 metres of bridge, removing accumulated debris on pile caps and abutments

Replacing concrete lining of culvert, erosion of a bank adjacent to abutments, providing concrete lining to invert of Armco culverts weakened by corrosion

Scour at abutments caused by stormwater runoff from the road surface or associated

drainage system is not classed as waterway scour and is the Contractor‟s maintenance

responsibility.

5.12.1 Component Condition Rating

The Component Condition Rating KPM is calculated using the following formula:

𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = 1.0 × 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔

Page 108: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 107 of 157

5 where:

The Condition Rating from 1 to 5 (or 0 if not able to be rated) is assigned to each of

the thirty one individual bridge components for each bridge, in accordance with the

following documents, during each required structural inspection:

1. NZTA Bridge Inspection and Maintenance Manual

2. WBoPDC Bridge-condition-form01

3. WBoPDC Bridge-WordPictureConditon-form01

5.12.2 Profile

The Bridge Profile KPM is calculated using the following formula:

𝑃𝑟𝑜𝑓𝑖𝑙𝑒 = 1.5 × 0.5 × 𝐵𝑟𝑖𝑑𝑔𝑒 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 + 0.25 × 𝐵𝑟𝑖𝑑𝑔𝑒 𝑅𝑖𝑠𝑘 𝑅𝑎𝑡𝑖𝑛𝑔

where:

The Bridge Condition Rating is calculated using the following formula:

𝐵𝑟𝑖𝑑𝑔𝑒 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = 𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐺𝑟𝑜𝑢𝑝 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 × 𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐺𝑟𝑜𝑢𝑝 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔

6

1

where:

1. The Component Group Condition Rating is the average condition rating of each

component group.

Each of the thirty-one individual bridge components are categorised into one of

the following six component groups:

a) General appearance

b) Superstructure concrete

c) Superstructure steel

d) Superstructure timber

e) Foundations and substructure

f) Scour and waterway

2. The Component Group Weighting is specified in the following table:

Page 109: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 108 of 157

5 Table 5.12.2 a): Component Group Weighting

Component Group

Bridge Type

Concrete Bridge

Concrete Deck/ Steel

Beams

Timber Deck/ Steel

beams

Timber Deck/

Timber Beams

Armco Culvert

General Appearance

20% 20% 20% 20% 20%

Superstructure Concrete

30% 15% - - -

Superstructure Steel

- 15% 15% - 30%

Superstructure Timber

- - 15% 30% -

Foundations and Substructure

20% 20% 20% 20% 20%

Scour and Waterway

30% 30% 30% 30% 30%

The Bridge Risk Rating is calculated using the following formula:

𝐵𝑟𝑖𝑑𝑔𝑒 𝑅𝑖𝑠𝑘 𝑅𝑎𝑡𝑖𝑛𝑔 = 𝐵𝑟𝑖𝑑𝑔𝑒 𝑃𝑟𝑜𝑏𝑎𝑏𝑖𝑙𝑖𝑡𝑦 𝑜𝑓 𝐹𝑎𝑖𝑙𝑢𝑟𝑒 + 𝐵𝑟𝑖𝑑𝑔𝑒 𝐶𝑜𝑛𝑠𝑒𝑞𝑢𝑒𝑛𝑐𝑒 𝑜𝑓 𝐹𝑎𝑖𝑙𝑢𝑟𝑒

where:

1. The probability of failure for each bridge is calculated using the following

formula:

𝐵𝑟𝑖𝑑𝑔𝑒 𝑃𝑟𝑜𝑏𝑎𝑏𝑖𝑙𝑖𝑡𝑦 𝑜𝑓 𝐹𝑎𝑖𝑙𝑢𝑟𝑒 = (𝐹𝑎𝑐𝑡𝑜𝑟 𝑃𝑟𝑜𝑏𝑎𝑏𝑖𝑙𝑖𝑡𝑦 𝑜𝑓 𝐹𝑎𝑖𝑙𝑢𝑟𝑒 × 𝐹𝑎𝑐𝑡𝑜𝑟 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔)

3

1

where:

a) The Factor Probability of Failure is rated in accordance with the following

documents during each required structural inspection:

NZTA Bridge Inspection and Maintenance Manual

WBoPDC Bridge_Risk-Rating_form01

WBoPDC Bridge_WordPictureRisk_form01

Page 110: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 109 of 157

5 b) The Factor Weighting is specified in the following table:

Table 5.12.2 b): Probability of Failure Factor Weighting

No. Factor Factor Weighting

1 Waterway 50%

2 Structural 20%

3 Approach 30%

2. The consequence of failure for each bridge is calculated using the following

formula:

𝐵𝑟𝑖𝑑𝑔𝑒 𝐶𝑜𝑛𝑠𝑒𝑞𝑢𝑒𝑛𝑐𝑒 𝑜𝑓 𝐹𝑎𝑖𝑙𝑢𝑟𝑒 = (𝐹𝑎𝑐𝑡𝑜𝑟 𝐶𝑜𝑛𝑠𝑒𝑞𝑢𝑒𝑛𝑐𝑒 𝑜𝑓 𝐹𝑎𝑖𝑙𝑢𝑟𝑒 × 𝐹𝑎𝑐𝑡𝑜𝑟 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔)

4

1

where:

a) The Factor Consequence of Failure is rated in accordance with the following

documents during each required structural inspection:

NZTA Bridge Inspection and Maintenance Manual

WBoPDC Bridge_Risk-Rating_form01

WBoPDC Bridge_WordPictureRisk_form01

b) The Factor Weighting is specified in the following table:

Table 5.12.2 c): Consequence of Failure Factor Weighting

No. Factor Factor Weighting

1 Impact on Road User 25%

2 Impact on Property 35%

3 Impact on Environment 15%

4 Reinstatement Cost 25%

5.12.3 Stock Index

The Stock Index KPM is calculated using the following formula:

𝐵𝑟𝑖𝑑𝑔𝑒 𝑆𝑡𝑜𝑐𝑘 𝐼𝑛𝑑𝑒𝑥 = 𝐵𝑟𝑖𝑑𝑔𝑒 𝑃𝑟𝑜𝑓𝑖𝑙𝑒𝑛

1

𝑛

where:

n = number of bridges for which a profile is derived.

Page 111: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 110 of 157

5 5.13 Drainage Structures: Culverts

5.13.1 Component Condition Rating

Each culvert is categorised into the following four components:

1. Pipe

2. Inlet

3. Outlet

4. Associated structures (e.g. flumes, drop structures, grates)

The Component Condition Rating KPM is calculated using the following formula:

𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = 1.0 × 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔

where:

The Condition Rating from 1 to 5 (or 0 if not able to be rated) is assigned to each of

the four components for each culvert, in accordance with the following documents,

during each required structural inspection:

1. WBoPDC Culvert Rating Standards and Definitions.

5.13.2 Profile

The culvert Profile KPM is determined using the following table:

Table 5.13.2 a): Drainage Structure Profile

Condition Rating Risk Rating

1 2 3 4 5

1 1.0 1.5 2.0 2.5 3.0

2 1.5 2.0 2.2 2.6 3.5

3 2.0 2.2 3.0 3.5 4.0

4 2.5 2.6 3.5 4.5 5.0

5 3.0 3.5 4.0 5.0 5.0

where:

The Condition Rating is calculated using the following formula:

𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = (𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 × 𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔)

4

1

Page 112: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 111 of 157

5 where:

1. The Component Condition Rating is calculated in accordance with Appendix

(WBoPDC Local Roads) 5.13.1

2. The Component Weighting is specified in the following table:

Table 5.13.2 b): Culvert Component Weighting

Component Component Weighting

Pipe 40%

Inlet 20%

Outlet 20%

Associated structures (e.g. flumes, drop structures, grates) 20%

The Risk Rating is determined using the following table:

Table 5.13.2 c): Culvert Risk Rating

Culvert Risk Rating Total Component Risk Rating

1 x 3

2 3 < x 6

3 6 < x 13

4 13 < x 23

5 x >23

where:

1. The Total Component Risk Rating is the sum of all component risk ratings for

each culvert rated in accordance with the following documents during each

required structural inspection:

WBoPDC Culvert Rating Standards and Definitions

5.13.3 Stock Index

The Stock Index KPM is calculated using the following formula:

𝐶𝑢𝑙𝑣𝑒𝑟𝑡 𝑆𝑡𝑜𝑐𝑘 𝐼𝑛𝑑𝑒𝑥 = 𝐶𝑢𝑙𝑣𝑒𝑟𝑡 𝑃𝑟𝑜𝑓𝑖𝑙𝑒𝑛

1

𝑛

where:

n = the total number of culverts for which a profile is developed.

Page 113: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 112 of 157

5 5.14 Drainage Structures: Surface Water Channels (Lined)

Data is to be taken from the following tables in RAMM including:

Surface Water Channel excluding the following channel types:

a) SWCS

b) SWCD

Sealed Rating. The latest rating data for the following fault types:

a) Surfaced Broken (LHS & RHS)

b) Surfaced High Lip (LHS & RHS)

c) Surfaced Broken Surface (LHS & RHS)

d) Surfaced Uphill Grade (LHS & RHS)

Rating data and surface water channel (lined) items shall be summarised to carriageway

lengths by grouping by Road ID and Carriageway start m, to give the following

information:

Total length of surfaced channel items per carriageway section

Total of each fault type per carriageway section

Where the length of surface water channel (lined) in any carriageway length is zero the

carriageway length is invalid and should not be considered with respect to the surface

water channel (lined) KPM.

5.14.1 Component Condition Rating

Surface water channel (lined) faults are categorised into the following four groups:

1. Broken channel

2. High lip

3. Broken surface

4. Uphill grade

The Component Condition Rating KPM for each valid carriageway length is calculated

using the following formula:

𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = 1.35 × 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔

Page 114: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 113 of 157

5 where:

The Condition Rating is determined using the following table:

Table 5.14.1: Surface Water Channel (Lined) Condition Rating

No. Fault Type Condition Rating

1 2 3 4 5

1 Broken Channel 0 0<x 0.4 0.4<x 8.0 8.0<x 15.0 >15.0

2 High Lip 0 0<x 0.3 0.3<x 6.0 6.0<x 11.0 >11.0

3 Broken Surface 0 0<x 0.3 0.3<x 11.0 11.0<x 22.0 >22.0

4 Uphill Grade 0 0 <x 0.3 0.3<x 2.0 2.0<x 4.0 >4.0

where:

𝑥 = 100 ×𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝑑𝑒𝑓𝑒𝑐𝑡𝑖𝑣𝑒 𝑠𝑢𝑟𝑓𝑎𝑐𝑒 𝑤𝑎𝑡𝑒𝑟 𝑐𝑕𝑎𝑛𝑛𝑒𝑙 (𝑙𝑖𝑛𝑒𝑑)

𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝑠𝑢𝑟𝑓𝑎𝑐𝑒 𝑤𝑎𝑡𝑒𝑟 𝑐𝑕𝑎𝑛𝑛𝑒𝑙 (𝑙𝑖𝑛𝑒𝑑)

5.14.2 Profile

The surface water channel (lined) Profile KPM for each valid carriageway length is

determined using Table 5.13.2 a).

where:

The Condition Rating is calculated using the following formula and rounded to the

nearest whole integer, with a maximum value of 5:

𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = (𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 × 𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔)

4

1

where:

1. The Component Condition Rating is calculated in accordance with Appendix

(WBoPDC Local Roads) 5.14.1

2. The Component Weighting is specified in the following table:

Table 5.14.2 b): Surface Water Channel (Lined) Component Weighting

Component Component Weighting

Broken Channel 20%

High Lip 30%

Broken Surface 30%

Uphill Grade 20%

Page 115: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 114 of 157

5 The Risk Rating is determined using the following table:

Table 5.14.2 c): Surface Water Channel (Lined) Risk Rating

Surface Water Channel (Lined) Risk Rating

Total Category Risk Rating

1 x 1

2 1 < x 7

3 7 < x 13

4 13 < x 17

5 x >17

where the Total Category Risk Rating is the sum of all category risk ratings rated in

accordance with the following table:

Table 5.14.2 c): Surface Water Channel (Lined) Category Risk Rating

No. Category Category Risk Rating

0 2 4 7 10

1 Channel grade Level 5% 10%

2 Accessways / Obstructions

No obstructions Minor obstructions

Major obstructions

3 Pavement / Soils Not cracked / no signs of scouring

Cracks up to 10mm / some

localised scouring

Major disjointing / extensive

scouring evident

4 Flooding No flooding Water ponds adjacent to the

road

Water ponding encroaches into the wheel path

Water ponds across the road but still drivable

Impassable

0 4 8 14 20

5 Scale of property damage

Property damage will

not occur

Property damage will

be low

Property damage will be moderate

Property damage will

be high

Property damage will be extreme

5.14.3 Stock Index

The Stock Index KPM is calculated using the following formula:

𝑆𝑡𝑜𝑐𝑘 𝐼𝑛𝑑𝑒𝑥 = (𝑆𝑢𝑟𝑓𝑎𝑐𝑒 𝑊𝑎𝑡𝑒𝑟 𝐶𝑕𝑎𝑛𝑛𝑒𝑙 𝐿𝑖𝑛𝑒𝑑 𝑃𝑟𝑜𝑓𝑖𝑙𝑒 × 𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝑆𝑢𝑟𝑓𝑎𝑐𝑒 𝑊𝑎𝑡𝑒𝑟 𝐶𝑕𝑎𝑛𝑛𝑒𝑙 𝐿𝑖𝑛𝑒𝑑) 𝑡

1

𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝑆𝑢𝑟𝑓𝑎𝑐𝑒 𝑊𝑎𝑡𝑒𝑟 𝐶𝑕𝑎𝑛𝑛𝑒𝑙 (𝐿𝑖𝑛𝑒𝑑)

Page 116: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 115 of 157

5 where:

t = the total number of valid carriageway lengths for which a profile has been

developed.

Page 117: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 116 of 157

5 5.15 Drainage Structures: Surface Water Channels (Unlined)

Data is to be taken from the following tables in RAMM:

Surface Water Channel including only the following channel types:

a) SWCS (Shallow, <200mm below seal edge)

b) SWCD (Deep, >200mm below seal edge)

Sealed Rating. The latest rating data for the following fault types:

a) Earth SWC blocked (LHS & RHS)

b) Earth SWC inadequate (LHS & RHS)

c) Earth SWC ineffective shoulder (LHS & RHS)

Carriageway table

a) Terrain type

b) Length of each carriageway section

c) Pavement type (sealed)

Rating data and surface water channel (unlined) items shall be summarised to carriageway

lengths by grouping by Road ID and Carriageway start m, to give the following

information:

Total length of earth surface water channel items per carriageway section

Total of each fault type per carriageway section

Where the length of surface water channel (unlined) in any carriageway length is zero the

carriageway length is invalid and should not be considered with respect to the surface

water channel (unlined) KPM.

5.15.1 Component Condition Rating

Surface water channel (lined) faults are categorised into the following four groups:

1. Blocked

2. Inadequate, including where there is no channel and inadequate drainage

3. Ineffective shoulder

The Component Condition Rating KPM for each valid carriageway length is calculated

using the following formula:

𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = 1.5 × 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔

Page 118: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 117 of 157

5 where:

The Condition Rating is determined using the following table:

Table 5.15.1: Surface Water Channel (Unlined) Condition Rating

No. Fault Type Condition Rating

1 2 3 4 5

1 Blocked x<0 0<x 0.15 0.15<x 1.1 1.1<x 2.0 x>2.0

2 Inadequate y<0 0<y 8 8<y 50 50<y 95 y>95

3 Ineffective Shoulder

y<0 0<y 0.75 0.75<y 35 35<y 70 y>70

where:

𝑥 = 100 ×𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝑑𝑒𝑓𝑒𝑐𝑡𝑖𝑣𝑒 𝑠𝑢𝑟𝑓𝑎𝑐𝑒 𝑤𝑎𝑡𝑒𝑟 𝑐𝑕𝑎𝑛𝑛𝑒𝑙 (𝑢𝑛𝑙𝑖𝑛𝑒𝑑)

𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝑠𝑢𝑟𝑓𝑎𝑐𝑒 𝑤𝑎𝑡𝑒𝑟 𝑐𝑕𝑎𝑛𝑛𝑒𝑙 (𝑢𝑛𝑙𝑖𝑛𝑒𝑑)

𝑦 = 100 ×𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝑑𝑒𝑓𝑒𝑐𝑡𝑖𝑣𝑒 𝑠𝑢𝑟𝑓𝑎𝑐𝑒 𝑤𝑎𝑡𝑒𝑟 𝑐𝑕𝑎𝑛𝑛𝑒𝑙 (𝑢𝑛𝑙𝑖𝑛𝑒𝑑)

2 × 𝑐𝑎𝑟𝑟𝑖𝑎𝑔𝑒𝑤𝑎𝑦 𝑐𝑒𝑛𝑡𝑟𝑒𝑙𝑖𝑛𝑒 𝑙𝑒𝑛𝑔𝑡𝑕 − 𝐿𝑒𝑛𝑔𝑡𝑕 𝑜𝑓 𝑠𝑢𝑟𝑓𝑎𝑐𝑒 𝑤𝑎𝑡𝑒𝑟 𝑐𝑕𝑎𝑛𝑛𝑒𝑙 (𝑙𝑖𝑛𝑒𝑑)

5.15.2 Profile

The surface water channel (unlined) Profile KPM for each valid carriageway length is

determined using Table 5.13.2 a).

where:

The Condition Rating is calculated using the following formula and rounded to the

nearest whole integer, with a maximum value of 5:

𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = 𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔3

1

3

where the Component Condition Rating is calculated in accordance with Appendix

(WBoPDC Local Roads) 5.15.1

The Risk Rating is calculated using the following formula and rounded to the nearest

whole integer, with a maximum value of 5:

𝑅𝑖𝑠𝑘 𝑅𝑎𝑡𝑖𝑛𝑔 = 𝐶𝑎𝑡𝑒𝑔𝑜𝑟𝑦 𝑅𝑖𝑠𝑘 𝑅𝑎𝑡𝑖𝑛𝑔3

1

3

Page 119: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 118 of 157

5 where the Category Risk Rating is determined using the following table:

Table 5.15.2: Category Risk Rating

No. Category Category Risk Rating

1 2 3 4 5

1 ADT <100 100 - 500 >500

2 Terrain L H M

3 Width > 7 5 - 7 <5

5.15.3 Stock Index

The Stock Index KPM is calculated using the following formula:

𝑆𝑡𝑜𝑐𝑘 𝐼𝑛𝑑𝑒𝑥 = (𝑆𝑢𝑟𝑓𝑎𝑐𝑒 𝑊𝑎𝑡𝑒𝑟 𝐶𝑕𝑎𝑛𝑛𝑒𝑙 𝑈𝑛𝑙𝑖𝑛𝑒𝑑 𝑃𝑟𝑜𝑓𝑖𝑙𝑒 × 𝐶𝑎𝑟𝑟𝑖𝑎𝑔𝑒𝑤𝑎𝑦 𝐿𝑒𝑛𝑔𝑡𝑕)𝑡

1

𝐶𝑎𝑟𝑟𝑖𝑎𝑔𝑒𝑤𝑎𝑦 𝐿𝑒𝑛𝑔𝑡𝑕𝑡1

where:

t = the total number of valid carriageway lengths for which a profile has been

developed.

Page 120: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 119 of 157

5 5.16 Other Structures

5.16.1 Component Condition Rating

Each other structure is categorised into the following five components:

1. Overall appearance

2. Wall drainage

3. Vehicle barriers / pedestrian handrails

4. Wall structure

5. Wall foundations

The Component Condition Rating KPM is calculated using the following formula:

𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = 1.0 × 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔

where:

The Condition Rating from 1 to 5 (or 0 if not able to be rated) is assigned to each of

the five components for each other structure, in accordance with the following

documents, during each required structural inspection:

1. NZTA Bridge Inspection and Maintenance Manual

2. WBoPDC Retaining Wall-WordPictureConditon-form01

3. WBoPDC Retaining Wall-ConditionRisk-form01

5.16.2 Profile

The Other Structure Profile KPM is calculated using the following formula:

𝑃𝑟𝑜𝑓𝑖𝑙𝑒 = 1.5 × 0.6 × 𝑂𝑡𝑕𝑒𝑟 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 + 0.2 × 𝑂𝑡𝑕𝑒𝑟 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝑅𝑖𝑠𝑘 𝑅𝑎𝑡𝑖𝑛𝑔

where:

The Other Structure Condition Rating is calculated using the following formula:

𝑂𝑡𝑕𝑒𝑟 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = (𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 × 𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔)

5

1

where:

1. The Component Condition Rating is calculated in accordance with Appendix

(WBoPDC Local Roads) 5.16.1

2. The Component Weighting is specified in the following table:

Page 121: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 120 of 157

5 Table 5.16.2 a): Other Structure Component Weighting

Component Component Weighting

Overall Appearance 10%

Wall Drainage 15%

Vehicle Barriers / Pedestrian Handrails 15%

Wall Structure 30%

Wall Foundations 30%

The Other Structure Risk Rating is calculated using the following formula:

𝑂𝑡𝑕𝑒𝑟 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝑅𝑖𝑠𝑘 𝑅𝑎𝑡𝑖𝑛𝑔= 𝑂𝑡𝑕𝑒𝑟 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝑃𝑟𝑜𝑏𝑎𝑏𝑖𝑙𝑖𝑡𝑦 𝑜𝑓 𝐹𝑎𝑖𝑙𝑢𝑟𝑒 + 𝑂𝑡𝑕𝑒𝑟 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝐶𝑜𝑛𝑠𝑒𝑞𝑢𝑒𝑛𝑐𝑒 𝑜𝑓 𝐹𝑎𝑖𝑙𝑢𝑟𝑒

where:

1. The probability of failure for each other structure is calculated using the

following formula:

𝑂𝑡𝑕𝑒𝑟 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝑃𝑟𝑜𝑏𝑎𝑏𝑖𝑙𝑖𝑡𝑦 𝑜𝑓 𝐹𝑎𝑖𝑙𝑢𝑟𝑒 = 1.2 × (𝐹𝑎𝑐𝑡𝑜𝑟 𝑃𝑟𝑜𝑏𝑎𝑏𝑖𝑙𝑖𝑡𝑦 𝑜𝑓 𝐹𝑎𝑖𝑙𝑢𝑟𝑒 × 𝐹𝑎𝑐𝑡𝑜𝑟 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔)

2

1

where:

a) The Factor Probability of Failure is rated in accordance with the following

documents during each required structural inspection:

WBoPDC Retaining Wall_WordPictureRisk_form01

b) The Factor Weighting is specified in the following table:

Table 5.16.2 b): Probability of Failure Factor Weighting

No. Factor Factor Weighting

1 Structural 40%

2 Slope Stability 60%

2. The consequence of failure for each bridge is calculated using the following

formula:

𝑂𝑡𝑕𝑒𝑟 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝐶𝑜𝑛𝑠𝑒𝑞𝑢𝑒𝑛𝑐𝑒 𝑜𝑓 𝐹𝑎𝑖𝑙𝑢𝑟𝑒 = 1.2 × (𝐹𝑎𝑐𝑡𝑜𝑟 𝐶𝑜𝑛𝑠𝑒𝑞𝑢𝑒𝑛𝑐𝑒 𝑜𝑓 𝐹𝑎𝑖𝑙𝑢𝑟𝑒 × 𝐹𝑎𝑐𝑡𝑜𝑟 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔)

5

1

Page 122: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 121 of 157

5 where:

a) The Factor Consequence of Failure is rated in accordance with the following

documents during each required structural inspection:

WBoPDC Retaining Wall_WordPictureRisk_form01

b) The Factor Weighting is specified in the following table:

Table 5.16.2 c): Consequence of Failure Factor Weighting

No. Factor Factor Weighting

1 Impact on Road User 25%

2 Impact on Property 35%

3 Impact on Environment 15%

4 Reinstatement Cost 25%

5.16.3 Stock Index

The Stock Index KPM is calculated using the following formula:

𝑂𝑡𝑕𝑒𝑟 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝑆𝑡𝑜𝑐𝑘 𝐼𝑛𝑑𝑒𝑥 = 𝑂𝑡𝑕𝑒𝑟 𝑆𝑡𝑟𝑢𝑐𝑡𝑢𝑟𝑒 𝑃𝑟𝑜𝑓𝑖𝑙𝑒𝑛

1

𝑛

where:

n = number of minor structures for which a profile is developed.

Page 123: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 122 of 157

5 5.17 Carriageway Lighting

5.17.1 Component Condition Rating

Each carriageway light is categorised into the following three components:

1. Poles

2. Brackets

3. Lanterns

The Component Condition Rating KPM is calculated using the following formula:

𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = 1.0 × 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔

where:

The Condition Rating from 1 to 5 (or 0 if not able to be rated) is assigned to each of

the three components for each carriageway light, in accordance with the following

documents, during each required structural inspection:

a) WBoPDC Street Lighting Rating Standards and Definitions

Note: Where a reticulation pole owned by the lines network company is used, then the

condition of the pole is not taken into consideration. However the bracket condition

assessment must include the integrity of the fixings to the reticulation pole. Hence if the

pole is in a condition that there is any danger of the bracket falling off the pole, then it

must be rated 5. Responsibility for assessing the strength of a wooden pole rests with the

network company, and any concerns regarding poles should be passed on to them in

writing.

5.17.2 Profile

The carriageway light Profile KPM is calculated using the following formula:

𝑃𝑟𝑜𝑓𝑖𝑙𝑒 = 1.5 × 0.6 × 𝐶𝑎𝑟𝑟𝑖𝑎𝑔𝑒𝑤𝑎𝑦 𝐿𝑖𝑔𝑕𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 + 0.4 × 𝐶𝑎𝑟𝑟𝑖𝑎𝑔𝑒𝑤𝑎𝑦 𝐿𝑖𝑔𝑕𝑡 𝑅𝑖𝑠𝑘 𝑅𝑎𝑡𝑖𝑛𝑔

where:

The Carriageway Light Condition Rating is calculated using the following formula:

𝐶𝑎𝑟𝑟𝑖𝑎𝑔𝑒𝑤𝑎𝑦 𝐿𝑖𝑔𝑕𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = 𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 × 𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔

3

1

where:

1. The Component Condition Rating is calculated in accordance with Appendix

(WBoPDC Local Roads) 5.17.1

2. The Component Weighting is specified in the following table:

Page 124: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 123 of 157

5 Table 5.17.2: Carriageway Light Component Weighting

Component Component Weighting

Poles 30%

Brackets 40%

Lanterns 30%

The Carriageway Light Risk Rating from 1 to 5 is assigned to each carriageway light,

in accordance with the following documents, during each required structural

inspection:

a) WBoPDC Street Lighting Rating Standards and Definitions

When LED light fittings are rated and the lanterns have more than10% of light cells

that do not function, the lantern shall be rated 5. Lanterns rated 5 shall be replaced.

5.17.3 Stock Index

The Stock Index KPM for each community is calculated using the following formula:

𝐶𝑎𝑟𝑟𝑖𝑎𝑔𝑒𝑤𝑎𝑦 𝐿𝑖𝑔𝑕𝑡 𝑆𝑡𝑜𝑐𝑘 𝐼𝑛𝑑𝑒𝑥 = 𝐶𝑎𝑟𝑟𝑖𝑎𝑔𝑒𝑤𝑎𝑦 𝐿𝑖𝑔𝑕𝑡 𝑃𝑟𝑜𝑓𝑖𝑙𝑒𝑛

1

𝑛

where:

n = number of carriageway lights within the community for which a profile is

developed.

Page 125: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 124 of 157

5 5.18 Rural Bus Shelters

5.18.1 Component Condition Rating

Each rural bus shelter is categorised into the following six components:

1. Surrounding area

2. Structure

3. Cladding

4. Seating

5. Painting Requirements

6. Graffiti removal

The Component Condition Rating KPM is calculated using the following formula:

𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = 1.0 × 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔

where:

The Condition Rating from 1 to 5 is assigned to each of the six components for each

rural bus shelter, in accordance with the following table, during each required

inspection:

Table 5.18.1: Rural Bus Shelter Rating Standards

Condition Rating Component Description

1 Very good, 90% of its design life or function remaining requiring no repair maintenance

2 Good, 60-90 % of its design life or function remaining requiring future maintenance scheduling

3 Moderate, 40 – 60% of its design life or function remaining requiring minor repair or replacement scheduling

4 Poor, 10- 40% of its design life or function remaining and requiring major repair or replacement scheduling

5 Very Poor, less than 10% of it design life remaining or function remaining and requiring immediate repair or replacement.

5.18.2 Profile

The rural bus shelter Profile KPM is determined using Table 5.13.2 a).

where:

The Condition Rating is calculated using the following formula:

Page 126: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 125 of 157

5

𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = (𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 × 𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔)

6

1

where:

1. The Component Condition Rating is calculated in accordance with Appendix

(WBoPDC Local Roads) 5.18.1

2. The Component Weighting is specified in the following table:

Table 5.18.2 a): Rural Bus Shelter Component Weighting

Component Component Weighting

Surrounding Area 10%

Structure 20%

Cladding 20%

Seating 20%

Painting Requirements 20%

Graffiti Removal 10%

The Risk Rating is determined using the following table:

Table 5.18.2 b): Rural Bus Shelter Risk Rating

Rural Bus Shelter Risk Rating

Total Category Risk Rating

1 x 4

2 4 < x 5

3 x = 6

4 6 < x 8

5 9 < x 10

where the Total Category Risk Rating is the sum of all category risk ratings rated in

accordance with the following table:

Page 127: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 126 of 157

5 Table 5.18.2 c): Rural Bus Shelter Category Risk Rating

No. Category Category Risk Rating

1 2 3 4 5

1 Traffic Road group 7 Road group 6 Road group 5 Road group 4 Road group 1 to 3

5 Location (distance from edge of carriageway)

> 6m 3m to 6m < 3m Immediately adjacent

without kerb and channel

5.18.3 Stock Index

The Stock Index KPM is calculated using the following formula:

𝑅𝑢𝑟𝑎𝑙 𝐵𝑢𝑠 𝑆𝑕𝑒𝑙𝑡𝑒𝑟 𝑆𝑡𝑜𝑐𝑘 𝐼𝑛𝑑𝑒𝑥 = 𝑅𝑢𝑟𝑎𝑙 𝐵𝑢𝑠 𝑆𝑕𝑒𝑙𝑡𝑒𝑟 𝑃𝑟𝑜𝑓𝑖𝑙𝑒𝑛

1

𝑛

where:

n = number of rural bus shelters for which a profile is developed.

Page 128: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 127 of 157

5 5.19 Footpaths

5.19.1 Length for Renewal

The footpath length for renewal is determined directly from the Footpath Deficiency

Rating Survey completed in accordance with Appendix (WBoPDC Local Roads) 5.3.4.

The Length for Renewal KPM in each community is calculated using the following

formula:

𝐿𝑒𝑛𝑔𝑡𝑕 𝑓𝑜𝑟 𝑅𝑒𝑛𝑒𝑤𝑎𝑙 = 𝐿𝑒𝑛𝑔𝑡𝑕 𝑡𝑜 𝑏𝑒 𝑅𝑒𝑝𝑙𝑎𝑐𝑒𝑑

𝑛

1

where:

n = the number of footpath sections in each community

The Length to be Replaced in each footpath section is the length with any fault

recorded against it, and only this length. Where a footpath section has no faults the

Length to be Replaced is 0m.

Page 129: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 128 of 157

5 5.20 Safety Performance Index

The Principal will provide Field Input sheets that identify deficiency items to be recorded.

The field inspection procedure is:

1. Each section of road is based on lengths between junctions, surface changes or width

changes and hence each section varies in length. The Field Input sheets can record up

to 1500m. For sections longer than 1500m, several Field Input sheets will be required.

2. Each road section is considered in 300m portions. Each portion of 300m is driven

over slowly in each direction so that the information can be observed as required.

When the section is complete the entire length is driven at normal speed to record the

speed environment and sight distance deficiencies.

3. After inspection of a 300m length is complete, the Field Input sheets are marked with

the number of deficiencies or a percentage of the 300m length as indicated.

4. Intersection deficiencies relate to the approach leg only. Flag lighting deficiencies

apply when dealing with the main road (i.e. head of the tee section) and must only be

recorded once.

5. Some items relate to both directions (such as centreline markings) whilst others deal

with one side of the road only.

The collected information is entered into the Safety Performance Index model to be

provided by the Principal in the format of an electronic spreadsheet.

The model will produce the Safety Performance Index for each road section by:

Converting the individual row deficiencies to a rating between 0 (good) and 5 (bad)

based on the portion of deficient length

Calculating the road section Safety Performance Index using a weighted mean of the

individual row deficiency rating coupled with other influencing factors.

Page 130: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 129 of 157

5 5.21 Accidents

The NZTA publication on which this KPM is based also publishes, and is linked to the

„crash reporting rate‟ for the Western Bay of Plenty district, which is based on several

factors such as hospital accident rates. To avoid any penalty to the Contractor for

improving the reporting rate, this measure will be standardised for the reported injury

crashes, through an agreed standard statistical technique.

5.21.1 Percent with Road Related Factors

The Percent with Road Related Factors KPM is calculated using the following formula:

𝑃𝑒𝑟𝑐𝑒𝑛𝑡 𝑤𝑖𝑡𝑕 𝑅𝑜𝑎𝑑 𝑅𝑒𝑙𝑎𝑡𝑒𝑑 𝐹𝑎𝑐𝑡𝑜𝑟𝑠 =𝑁𝑜. 𝑜𝑓 𝐼𝑛𝑗𝑢𝑟𝑦 𝐶𝑟𝑎𝑠𝑕𝑒𝑠 𝑖𝑛 𝑊𝐵𝑜𝑃 × 𝑁𝑜. 𝑜𝑓 𝑇𝐿𝐴𝑠 𝑖𝑛 𝐺𝑟𝑜𝑢𝑝 𝐷

𝑁𝑜. 𝑜𝑓 𝐼𝑛𝑗𝑢𝑟𝑦 𝐶𝑟𝑎𝑠𝑕𝑒𝑠 𝑖𝑛 𝐺𝑟𝑜𝑢𝑝 𝐷× 100

where:

No. of Injury Crashes in WBoP is determined by creating a crash list in the Crash

Analysis System with the following parameters for Western Bay of Plenty district:

1. Latest complete 5 year period

2. Injury crashes only

3. Rural roads only

4. Local roads only

5. Crashes with Road Factors as a contributing factor

6. Exclude Matakana Island roads

7. Exclude crashes where wet surface or wet weather has been coded as a “Road

Factor”.

No. of Injury Crashes in Group D is determined by creating a crash list in the Crash

Analysis System with the above parameters for peer Group D, which as at December

2004 consisted of the following Territorial Local Authorities:

1. Ashburton

2. Far North

3. Franklin

4. Horowhenua

5. Manawatu

6. Marlborough

7. Matamata-Piako

8. Rodney

9. Selwyn

10. South Taranaki

Page 131: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 130 of 157

5 11. South Waikato

12. Southland

13. Tasman

14. Taupo

15. Thames-Coromandel

16. Waikato

17. Waimakariri

18. Waipa

19. Waitaki

20. Western Bay of Plenty

21. Whakatane

No. of TLAs in Group D is the number of Territorial Local Authorities used to create

the above crash list for peer Group D, which as at December 2004 was 21.

The method of analysis is described in the Accident KPM Analysis document to be

provided by the Principal.

5.21.2 Social Cost

The Social Cost KPM is calculated using the following formula:

𝑆𝑜𝑐𝑖𝑎𝑙 𝐶𝑜𝑠𝑡 =𝑆𝑜𝑐𝑖𝑎𝑙 𝐶𝑜𝑠𝑡 𝑜𝑓 𝐼𝑛𝑗𝑢𝑟𝑦 𝐶𝑟𝑎𝑠𝑕𝑒𝑠 𝑖𝑛 𝑊𝐵𝑂𝑃 × 𝑉𝐾𝑇 𝑖𝑛 𝑇𝐿𝐴𝑠 𝑖𝑛 𝐺𝑟𝑜𝑢𝑝 𝐷

𝑉𝐾𝑇 𝑖𝑛 𝑊𝐵𝑜𝑃 × 𝑆𝑜𝑐𝑖𝑎𝑙 𝐶𝑜𝑠𝑡 𝑜𝑓 𝐼𝑛𝑗𝑢𝑟𝑦 𝐶𝑟𝑎𝑠𝑕𝑒𝑠 𝑖𝑛 𝑇𝐿𝐴𝑠 𝑖𝑛 𝐺𝑟𝑜𝑢𝑝 𝐷× 100

where:

Social Cost of Injury Crashes in WBoP is determined from the crash list created

for Western Bay of Plenty to calculate the Percent with Road Related Factors KPM

Social Cost of Injury Crashes in TLAs in Group D is determined from the crash list

created for Territorial Local Authorities in peer Group D to calculate the Percent

with Road Related Factors KPM

The method of analysis is described in the Accident KPM Analysis document to be

provided by the Principal.

Page 132: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Key Performance Measures

Page 131 of 157

5 5.22 Visibility

5.22.1 Length with Inadequate Available Sight Distance

The objective of the Length with Inadequate Sight Distance KPM is to drive an

improvement in forward visibility and thus safety over the network by changing the

roading environment (e.g. sight benches, curve easing, land purchase and/or vegetation

control)

The Length with Inadequate Sight Distance KPM is calculated using the following

formula:

𝐿𝑒𝑛𝑔𝑡𝑕 𝑤𝑖𝑡𝑕 𝐼𝑛𝑎𝑑𝑒𝑞𝑢𝑎𝑡𝑒 𝑆𝑖𝑔𝑕𝑡 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = 𝐿𝑒𝑛𝑔𝑡𝑕 𝑤𝑕𝑒𝑟𝑒 𝑆𝑆𝑆𝐷 < 𝐴𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 𝑆𝑖𝑔𝑕𝑡 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑒

where:

Safe Sight Stopping Distance (SSSD) is determined for each 250m section using the

Mean Free Speed (as recorded in the RAMM database at 250m intervals for rural

sealed roads) less 10km/hr in accordance with AustRoads Rural Road Design – Guide

to the Geometric Design of Rural Roads (1993), Section 6

Available Sight Distance is determined by measuring the distance between targets

1.15m in height from the road surface continuously along the centre of each lane, as

described in the WBoPDC Group 3 Roads – Available Sight Distance Review –

Revision 1 (February 2002)

Page 133: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 132 of 157

6 6

Operational Performance Measures

6.1 Vulnerable Flooding Areas

Table 6.1: Vulnerable Flooding Areas

Community Road

Katikati Beach Road (SH 2 to Wills Road)

Blundell Place

Fairview Road (Carisbrooke Street to Alexander Street)

Gilfillan Drive

Kea Street

Tui Place

Te Puke Belvedere Street

Oroua Street

Te Puna Minden Road (SH2 to RP 200)

Waihi Beach Urban Area

Page 134: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 133 of 157

6 6.2 Type of Vegetation Control

Table 6.2.1: Vegetation Control – General

Location Control Types Approx. Area (m²) Comments

All lengths of Road Group 1 to 3;

Lengths of Road Group 4 having edge marker posts

5, 6, 9 Various Refer to vegetation extent of control templates in Appendix (WBoPDC Local Roads) 6.3

Lengths of Road Group 4 not having edge marker posts

Road Groups 5 to 7

5, 6, 8 Various Refer to vegetation extent of control templates in Appendix (WBoPDC Local Roads) 6.3

Table 6.2.2: Vegetation Control – Urban Areas

Location Control Types Approx. Area (m²) Comments

Waihi Beach

Katikati

Omokoroa

Te Puke

Maketu

Eastern Areas

1, 5, 7, 10 mowing types

A to G

Various Locations defined in Urban Maintenance Areas

Te Puke Main Street

Katikati Main Street

1, 5, 7, 10 mowing types

A

Various Locations defined in Urban Maintenance Areas

Table 6.2.3: Vegetation Control – Stockpile Sites

Location RP Side Control Types Comments

Mountain Road 50 RHS 6, 9 To be maintained and controlled in accordance with the Stockpile Management Plan. See Appendix (WBoPDC Local Roads) 3.5

Wainui South Road 120 RHS 6, 9

Wairoa Road 180 LHS 6, 9

Young Road 280 RHS 6, 9

Table 6.2.4: Vegetation Control – Rural Footpaths

Location Start Finish Side Control Type Approx. Length (m)

Borell Road 0 1550 LHS 9 1,550

Minden Road 0 420 LHS 9 420

Oropi Road 11,620 12,110 Varies 9 400

Te Puna Road 40 3100 LHS 9 3,060

Page 135: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 134 of 157

6 Rereatukahia Road 0 170 RHS 9 170

Table 6.2.5: Omissions

Location Description

All urban areas No boom chemical spraying

Road frontages of orchards displaying organic signs

No chemical control of any type

Spray Free Frontages listed in Appendix (WBoPDC Local Roads) 6.7

No chemical control of any type

Trees listed in the Operational District Plans Appendix 3: Significant Heritage Features

On written instruction from the Principal with approved Resource Consent

Page 136: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 135 of 157

6 6.3 Extent of Control

Page 137: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 136 of 157

6

Page 138: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 137 of 157

6

Page 139: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 138 of 157

6 6.4 Maintenance of Gardens, Planted Areas and Street Trees

Further to Maintenance Specification (WBoPDC Local Roads) Section 6.7.1 j), Type 7

maintenance including maintenance of gardens, planted areas and street trees includes:

a) Weeding of planted areas (including but not limited to perennials, roses, shrubberies

and juvenile trees)

b) Raking areas of bark and gravel chips. Bark must be maintained to a minimum depth

of 75mm

c) Mulching, fertilising and irrigation. Mulch must be maintained at a minimum depth

of 75mm

d) Maintaining and providing stakes and other supports

e) Replacement of dead, aged, diseased or unsuitable plant material with similar or

improved species

f) Control of pests and diseases

g) Trimming and/or pruning of trees, hedges, scrubs and ground cover to maintain:

All plants in a healthy condition

Sight distances

Appearance

Clearance to pedestrians, traffic, and encroachment on private property

h) Street tree maintenance as detailed in the Street Tree Inventory

i) Callouts to repair tree damage

j) All replacement trees must meet the requirements of the WBoPDC Development

Code and must in particular conform to the “Approved Street Tree Species List”.

All planted areas and adjacent pavement must be maintained free of weeds and litter so

they are neat and tidy at all times.

The Principal encourages the Contractor to employ a fulltime “Townsman/Janitor” in Te

Puke to carry out open space management and to ensure that compliance is maintained

with the relevant OPMs.

Page 140: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 139 of 157

6 6.5 Urban Vegetation Control

Further to Appendix (WBoPDC Local Roads) 6.2, Table 6.2.2, the requirements for

vegetation control in urban areas are detailed below.

6.5.1 Sealed and Paved Areas

The following standards shall be achieved within urban metalled areas, sealed and

concrete areas, vehicle and pedestrian access, pavement and footpath edges and kerbs:

a) Grass shall not encroach more than 100mm onto the paved surface, except isolated

strands of kikuyu may encroach 200mm.

b) All joints and cracks in paved surfaces on roads shall be kept weed free at all times,

including:

The joint between kerb channel and sealed carriageway

The joint between kerb and footpath

Construction joints in footpaths or kerbs

c) The trafficable shoulder on unkerbed roads shall be maintained in a vegetation free

condition.

d) Footpaths, parking areas and hard surfaces in the CBD areas of Te Puke and Katikati

must be vegetation free. Edges around all structures, gardens, footpaths, kerblines

and trees must be maintained and the vegetation shall be trimmed flush with the

edges.

6.5.2 Watertables and Drainage, Culvert Inlets and Outlets

Treatment shall ensure the free flow of water by eliminating rank growth and aquatic

growth in side drains. If any watertable or drain becomes subject to erosion, treatment

shall be modified to minimise instability of the drain.

6.5.3 Roadside Sign Posts, Manholes, Cesspits, Poles, Switchgear Boxes and Transformers

Vegetation around these items (and under structures supported by them) shall be treated

for a clearance of 200mm round each item.

6.5.4 Herbicides and Application of Sprays

Should the Contractor elect to use herbicides for temporary control of vegetation within

recreational reserves, public spaces and along roadsides and drains, the following

standards shall apply:

a) In general, the Contract is restricted to cosmetic spraying, that is spot spraying and

edge spraying using low pressure equipment (less than 3200 kPa or 40 psi). Where

practical, contact weed control should be used.

Page 141: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 140 of 157

6 b) Any chemical spraying outside these limits shall be done only by a Registered

Applicator under the Pesticides Act 1979 (and amendments).

c) The Contractor shall not spray more than 100mm behind the edge of kerb, footpath or

pavement.

d) Special care must be exercised to prevent damage to adjoining vegetation through

carrying out operations incorrectly. Damage caused by spray operations must be

reported to the Engineer‟s Representative and shall immediately be made good by the

Contractor at its expense.

e) Special care will be necessary in all landscaped areas and areas adjacent to private

property. Frontages in urban areas that are maintained by private individuals in a neat

and tidy condition shall not be sprayed.

f) In areas which are bounded by grassed or planted batters, any spraying shall be done

in a manner that minimises the risk of creating instability in the batter through loss of

vegetative cover.

g) To reduce the potential for fluvial erosion, herbicides shall not be used on the erodible

volcanic soils bounded within the area east of the Mangorewa River and South of

SH2.

6.5.5 Mowing

Mowing of each area shall conform to one of the following type definitions. The

Contractor shall work within the specified mowing tolerances without causing significant

damage to the ground or reducing grass height to less than 20mm.

Litter including glass shall be removed immediately prior to mowing. Any litter

subsequently shredded as a result of mowing shall be removed by the Contractor.

Type A

The height of grass must be maintained between a minimum height of 20mm and a

maximum height of 75mm. Clippings shall be removed. Grass clippings falling onto

paths, drives and carparks or other such similar areas shall be swept from the surface

before the Contractor leaves the site.

Type B

The height of the grass must be maintained between a minimum height of 20mm and a

maximum height of 75mm. Grass clippings shall lie where they fall except clippings

falling onto paths and drives, roadways and lined surface water channels or other such

similar areas shall be swept from the surface before the Contractor leaves the site.

Type C

The height of grass must be maintained between a minimum height of 20mm and a

maximum height of 75mm.

Type D

The height of grass must be maintained between a minimum height of 20mm and a

maximum height of 75mm. Grass clippings shall lie where they fall.

Page 142: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 141 of 157

6 In general, this relates to street berms. Typically these areas are being mown 20-30 times

per year.

Type E

The height of grass must be maintained between a minimum height of 25mm and a

maximum height of 200mm. The Contractor shall use equipment from which grass is

spread evenly over the cut surface, without windrows.

In general this applies to more remote street berms.

Type F

The height of grass must be maintained between a minimum height of 100mm and a

maximum height of 400mm.

In general this applies to large areas of unused reserves where a lesser standard of control

than Type E is required. Typically these areas are mown 1-5 times a year with a flail or

slasher type mower.

Type G Scrub Cutting

The Contractor‟s responsibility is limited to the cutting of light scrub growth and branches

of a nominal trunk diameter of less than 75mm located within the legal road reserve. Any

treatment which is required beyond the scope of this section because of location or size

shall be reported to the Engineer‟s Representative for further investigation.

On completion of a scrub cutting the following clearances shall have been provided:

a) Clear in a horizontal line 5.0m from the left edge of the carriageway for a height of

4.5m

b) Clear of the surface water channel

c) Clear to within 200mm of the bank, where the bank is within 3.0m of the carriageway

d) Clear to within 200mm of any banks, either above or below the carriageway, where

items a), b) and c) do not apply

Page 143: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 142 of 157

6 6.6 Urban Trees

6.6.1 Condition Rating

Trees within urban areas are categorised into the following five components:

1. Health

2. Suitability

3. Hazard evaluation

4. Safe pruning period

5. Maintenance priority

The Component Condition Rating is calculated using the following formula:

𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = 1.0 × 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔

where:

The Condition Rating is rated in accordance with the WBoPDC Urban Tree Rating

Standards and Definitions and the following table, during each required structural

inspection:

Table 6.6.1 a): Urban Tree Condition Rating

No. Component Condition Rating

1 2 3 4 5

1 Health Excellent Good Average Poor Very Poor

2 Suitability Ideal Average Less than ideal

Unsuitable Totally unsuitable

3 Hazard Evaluation

No potential hazard

No existing hazard

Minor potential hazard

Potential hazard

Hazardous

4 Safe Pruning Period

> 24 months

12-24 months

6 to 12 months

< 6 months

5 Maintenance Priority

Annual 3 to 9 months

Less than 3 months

The Tree Condition Rating is calculated using the following formula:

𝑇𝑟𝑒𝑒 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 = (𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝐶𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑖𝑛𝑔 × 𝐶𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔)

5

1

Page 144: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 143 of 157

6 where:

The Component Condition Rating is determined as above

The Component Weighting is specified in the following table:

Table 6.6.1 b): Tree Component Weighting

Component Component Weighting

Health 10%

Suitability 20%

Hazard Evaluation 20%

Safe Pruning Period 30%

Maintenance Priority 20%

6.6.2 Risk Rating

Trees within urban areas are categorised into the following six risk factors:

1. Tree height

2. Deciduous species

3. Invasive root species

4. Wire conflict

5. ADT (estimate)

6. Offset from the edge of the seal (offset seal road)

The Risk Factor Rating is calculated using the following formula:

𝑅𝑖𝑠𝑘 𝐹𝑎𝑐𝑡𝑜𝑟 𝑅𝑎𝑡𝑖𝑛𝑔 = 1.0 × 𝑅𝑖𝑠𝑘 𝑅𝑎𝑡𝑖𝑛𝑔

where:

The Risk Rating is rated in accordance with the WBoPDC Urban Tree Rating

Standards and Definitions and the following table, during each required structural

inspection:

Table 6.6.2 a): Urban Tree Risk Rating

No. Component Risk Rating

1 2 3 4 5

1 Tree Height < 3m 3m to 6m > 6m

2 Deciduous Species

No Yes

Page 145: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 144 of 157

6 Table 6.6.2 a): Urban Tree Risk Rating

No. Component Risk Rating

1 2 3 4 5

3 Invasive Root Species

No Yes

4 Wire Conflict No Yes

5 ADT (estimate) < 100 100 to 500 > 500

6 Offset Seal Road

> 4m 1m to 4m ≤ 1m

The Tree Risk Rating is calculated using the following formula:

𝑇𝑟𝑒𝑒 𝑅𝑖𝑠𝑘 𝑅𝑎𝑡𝑖𝑛𝑔 = (𝑅𝑖𝑠𝑘 𝐹𝑎𝑐𝑡𝑜𝑟 𝑅𝑎𝑡𝑖𝑛𝑔 × 𝑅𝑖𝑠𝑘 𝐹𝑎𝑐𝑡𝑜𝑟 𝑊𝑒𝑖𝑔𝑕𝑡𝑖𝑛𝑔)

6

1

where:

The Risk Factor Rating is determined as above

The Risk Factor Weighting is specified in the following table:

Table 6.6.2 b): Urban Tree Risk Factor Weighting

Risk Factor Risk Factor Weighting

Tree Height 20%

Deciduous Species 10%

Invasive Root Species 10%

Wire Conflict 10%

ADT (estimate) 30%

Offset Seal Road 20%

Page 146: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 145 of 157

6 6.7 Spray Free Frontage

Table 6.7: Spray Free Frontage

Owner Orchard Name

Orchard Address

Property File

Date requested

Letter sent

Letter Returned

Frontage Length

Postal Address

Donald Paterson 24 Arawa Avenue

1546/2395 30/11/05 C/- Natural Therapies, 28 Jellicoe St, Te Puke 3119

S & A McNutt 67 Armstrong Road

1250/18 PO Box 15-224 Tauranga 3030

Manatomo Partners 481 Belk Road 1321/5 481 Belk Rd,, Rd 1, Tauranga 3171

RHL Limited Huakiwi Orchard

516 Belk Road 1321/72 Tauranga Fruit Packers

PO Box 9121, Tauranga 3142

M Sjardin 637 Belk Road 1321/6391 Tauranga Fruit Packers

637 Belk Rd, RD 1, Tauranga 3171

Mr R J Armstrong Armstrong No 2 Trust

566 Belk Road 1321/5630 Tauranga Fruit Packers

7 Oliver Rd, RD1, Te Puna 3021

Jill Nutsford 26 Bridgman Lane (both sides of the road)

1030/222 1/12/04 New owners:

M & L Sydenham, 209 14th Ave, Tga South Tauranga 3112

B & H Baggenstos 47 Bruntwood Drive

1208/4 PO Box 4028 Mt Maunganui

Tauranga 3149

Page 147: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 146 of 157

6 Table 6.7: Spray Free Frontage

Owner Orchard Name

Orchard Address

Property File

Date requested

Letter sent

Letter Returned

Frontage Length

Postal Address

R Graveley 319 Busby Rd, RD 1, Katikati 3177

1065/3241 11 Dec 2013

166m Inroads installed markers in an effort to minimise erosion at RP 3190 and 4870.

Ms T Neill 17 Coppelia Avenue (boundary walkway))

1270/125 7/4/06 PO Box 17-007, Omokoroa 3154

Mrs A Gordon 70 Crawford Rd, RD1, Tauranga

1304/66 CCR 180270: 10/10/13

23/10/13 7/11/13 350m 70 Crawford Road, RD1, Tauranga 3171

No Spray posts installed to prevent bank erosion from .

Mr C Booth 130 Crawford Road

1304/83 9/3/07 Signed letter

130 Crawford Rd, RD 1, Tauranga 3171

Mr Brian Marriner 182 Crawford Road

1304/1642 CCR 143769 4/8/10

23/8/10 230m frontage

Robert Burns 437 Crawford Road

1304/113 437 Crawford Rd, RD 1, Tauranga 3171

NL Trebilco SH 2

(south of Hikurangi Rd)

3000/4537 76 Emeny Road, RD 2, Tauranga 3172

Page 148: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 147 of 157

6 Table 6.7: Spray Free Frontage

Owner Orchard Name

Orchard Address

Property File

Date requested

Letter sent

Letter Returned

Frontage Length

Postal Address

JE & CA Ballard 409 Esdaile Road

1186/151 24 Lindoch Avenue, RD 2 Te Puna, Tauranga 3172

Avalon Training Centre

Gill Lane (Albert Wigley 027 6011 899)

1217/7 Gill Lane, RD 2, Te Puna, Tauranga 3172

Dave Robertson Trust 21 I’Anson Road

1215/7 24/7/07 31/7/07 21 I’anson Rd, RD 6,Tauranga 3176

Donald Paterson 28 Jellicoe Street

3005/14241 30/11/05 Natural Therapies, 28 Jellicoe St, Te Puke 3119

AF & BA Carlyle 141 Joyce Road

1345/65 141 Joyce Road, RD 3, Tauranga 3173

Donald Munro 250 Junction Road

1309/11 22/10/03 250 Junction Rd, RD 1, Tauranga 3171

AF & BA Carlyle 139 Keenan Road

1460/11 141 Joyce Rd, RD 3, Tauranga 3173

P & J Dyer 162 Keenan Road

1460/1470 PO Box 2315 Tauranga 3140

Neil Cavell 194 Keenan Road

1460/6 CCR 146152 26/10/10

26/10/10 Not Yet PO Box 9199, Greerton, Tauranga 3142 130m frontage

Page 149: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 148 of 157

6 Table 6.7: Spray Free Frontage

Owner Orchard Name

Orchard Address

Property File

Date requested

Letter sent

Letter Returned

Frontage Length

Postal Address

Chris Dunstan 250 Keenan Road (at TCC boundary)

1460/…. TC

17/10/12 31/10/12 6/11/12 170m frontage,lhs

250 Keenan Rd, RD 3, Tauranga 3173

Cheryl Munro 46 – 54 Koutunui Road

1010/500 12/2/08 17/3/08 46 – 54 Koutunui Rd, RD 1, Katikati 3177

Reg Murray 21 Little Waihi Road

1554/124 3/11/10 9/11/10 16/11/10 Reg Murray, Counter Delivery, Maketu Post Centre, Maketu 3138

Gijsbert van Heuckelum

117 Lindemann Rd

1063/1076 CCR 150202 18/2/11

9/3/11 25/3/11 230m frontage

R & J Rassall 100 Lochhead Road

1241/992 100 Lochhead Rd, RD 6, Tauranga 3176

Grant Mayes 62 Lowe Road 1451/11 18/4/05 62 Lowe Road, RD 6, Tauranga 3176

Ian Douglas 47 McMillan Road

1042/289 47 McMillan Rd, RD 1, Katikati 3177

Juliette Brawn 344 Maketu Rd 1528/3264 CCR 151533 30/3/11

29/4/11 3/5/11 300m frontage

Glen Annandale 822 Maungarangi Rd (2km long frontage)

1639/15 21/01/09 822 Maungarangi Rd, RD 9, Te Puke 3189

Page 150: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 149 of 157

6 Table 6.7: Spray Free Frontage

Owner Orchard Name

Orchard Address

Property File

Date requested

Letter sent

Letter Returned

Frontage Length

Postal Address

Margaret Bentley 1849 Maniatutu Road

1542/10 PO Box 155, Rotorua 3046

Mr B B Pethybridge 634 Maniatutu Road

1542/5875 27/3/06 PB & P G Hermann, 634 Maniatutu Rd, RD 6 Te Puke 3186

Jeremy Barrett 1555 Maniatutu Rd

1542/48 6/11/07 7/11/07 1555 Maniatutu Rd, RD 6, Te Puke 3186

Phillipa Medlock 1706 Maniatutu Road

1542/123 4/8/04 17-6 Maniatutu Rd, RD 6, Te Puke 3186

Shirley Lancaster 112 Matahui Road

1146/56 Reed Estate Ltd, 112 Matahui Rd, RD 2, Katikati 3178

Ronny Neilsen 665 Minden Rd 1301/19 28/10/03 Postal Delivery Centre, Te Puna, Tauranga 3021

B & J Roderick 308 No 1 Road 1505/800 CCR 158566

5/12/11 9/12/11 970m frontage on 2 roads

308 No 1 Rd, RD 2, Te Puke 3182 (970m frontage on 2 roads No 1 and Roderick and (frontage no No1 Road and Roderick Lane)

D & D Robinson 413 No 1 Road 1504/61/2 New owner:

PB &MV Crawford, 413 No 1 Rd, RD 2, Te Puke 3182

Natalie Marsh 775 Old Coach Road

1586/7231 22/9/09 5/11/09 17/11/09 800m Mrs N Marsh, 775 Old Coach Road, RD 6, Te Puke 3186

Page 151: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 150 of 157

6 Table 6.7: Spray Free Frontage

Owner Orchard Name

Orchard Address

Property File

Date requested

Letter sent

Letter Returned

Frontage Length

Postal Address

D Wanless Everest Orchard

534 Ohauiti Rd (700m frontage)

1352/3376 534 Ohauiti Rd, RD 3, Tauranga 3173

Reiner Bragulla 998 Ohauiti Rd 1352/70 20/10/08 5/2/09 PO Box 3147, Greerton, Tauranga 3112

John Godwin Healing World

1002 Ohauiti Road (short frontage)

1352/146 29/1/09 4/2/09 1002 Ohauiti Rd, RD 3, Tauranga 3173

Carolyn Acworth 1134 Ohauiti Road

1352/112 New owner:

Brumag Trust, C/- B & R McCurdy, 1134 Ohauiti Rd, RD 3, Tauranga 3173

Neville Lowry 1174 Omanawa Road

1439/115 17/9/10 17/9/10 21/9/10 194m frontage

N Lowry, 1174 Omanawa Rd, RD 1, Tauranga 3171

Doreen Grundy 1331 Omanawa Road

1439/13225 10/7/03 31/8/06 1331 Omanawa Rd, RD 1, Tauranga 3171

T & J Williams Pottsbury Farm

244 and 254 Ongare Point Road

1045/15 3/9/07 Refused to sign

244 Ongare Point Road, RD 1, Katikati 3173

AF & BA Carlyle 358 Oropi Road

1347/65 24/1/06 141 Joyce Rd, RD 3, Tauranga 3173

Page 152: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 151 of 157

6 Table 6.7: Spray Free Frontage

Owner Orchard Name

Orchard Address

Property File

Date requested

Letter sent

Letter Returned

Frontage Length

Postal Address

P S McNamara Kiwicrop Orchard

951 Oropi Road

1347/7963 New owner

M & L Randrup, 586a Oropi Rd, Tauranga 3173

G & A Hollis 107 Pongakawa Stn Rd

1652/809 107 Pongakawa Station Rd, RD 6, Te Puke 3186

Esther Williams 50 Pugh Road 1680/90 CCR158161 4/11/11

23/11/11 1/2/12 550m frontage 50 Pugh Road

Warner Family Trust Belac Orchard

668 Pyes Pa Road

1339/6578 11/12/09 18/12/09 xx/12/09 Property managed by Oropi Management Services, PO Box 9475, Greerton, Tauranga 3142. Attn Bruce MacDiarmid

G Gibbs Pineview Orchard

850 Pyes Pa Road

1339/22 R & T Russell, 850 Pyes Pa Rd, RD 3, Tauranga 3173

Mike Fallows 347 Rangiuru Rd

1521/3246 9/9/10 9/9/10 18/11/10 120m frontage 347 Rangiuru Rd, RD 8, Tauranga 3188

Andrew and Fiona Collins

554 Rangiuru Rd

1521/2 554 Rangiuru Rd, RD 8, Te Puke 3188

B Hudson & M Thomas

Sugar Mountain Orchard

88 Rocky Cutting Road

1373/15 New Owner

TSS Holdings, C/- R & K Ellison, 18a Rota St, Mt Maunganui 3116

Sharon O’Brien 250 Rocky Cutting Road

1373/27 250 Rocky Cutting Road, RD 5, Tauranga 3175

Page 153: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 152 of 157

6 Table 6.7: Spray Free Frontage

Owner Orchard Name

Orchard Address

Property File

Date requested

Letter sent

Letter Returned

Frontage Length

Postal Address

Audrey (Margaret) Anderton

39a Rowe Road

1477/68 CCR 160353 19/1/12

8/2/12 No 120m frontage 39a Rowe Road, RD 3, Tauranga 3173

Brian Scrafton 394 Te Matai Road

1508/26 New Owner:

TSS Holdings, C/- R & K Ellison, 18a Rota St, Mt Maunganui 3116

Russell Williams 326 Te Puna Station Rd

1247/2912 10/12/10 16/12/10 24/1/11 190m frontage – may erect signs

Heath Smart 2 Tebbutt Road

1311/2 CCR 103906 13/11/06

23/11/06 No 2 Tebbutt Road, RD 1, Tauranga 3171

Susan Butcher 329 Thompsons Track, Katikati

1138/34 CCR 154565 30/6/11

7/7/11 No 150m frontage

S & T Newlands 83 Waiau Road

1028/685 83 Waiau Road, RD 1, Katikati 3177

Janet Dubler-Jacobs 233 Wainui South Rd

1181/2123 CCR112068 14/8/7

30/8/7 No 233 Wainui South Road, RD 2, Apata, Tauranga 3178

R & E Comyn 41 Wallace Road,, RD 4, Tauranga 3174

1230/11 CCR 180942 30/10/13

1/11/13 2/12/13 200m frontage 41 Wallace Road, RD 4, Tauranga

Long property frontage

Hoki Bruce 154 Walford Road

1166/33 23/8/10 CCR144243

26/8/10 1/9/10 285m frontage

Page 154: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 153 of 157

6 Table 6.7: Spray Free Frontage

Owner Orchard Name

Orchard Address

Property File

Date requested

Letter sent

Letter Returned

Frontage Length

Postal Address

Neville Dunton 375 Whakamarama Rd

1212/231 CCR 171901 1/2/13

4/2/13 4/6/13 112m frontage PO Box 835, Seventh Avenue, Tauranga 3140

Annabel Bracey 634 Whakamarama Rd

1212/6426 CCR160804 8/2/12

3/2/12 No 120m frontage 634 Whakamarama Rd, RD 6, Tauranga 3176

Mary Jenkins 9 Windrigdge Lane (from 50m – 100m, Aongatete

1879/21 CCR148151 23/12/10

No Ms M Jenkins, 24 Aongatete Road, RD2, Katikati 3178

Only part of frontage to be “No Spray”. Will erect signs

Mervyn Stockley 45 Winroy Road (Organic Orchard)

1043/12 CCR 123003 25/8/08

25/8/08 No 45 Winroy Road, RD 1, Katikati 3177

Christopher Muller 462 Wright Rd (corner of Upland Road)

1154/4484 CCR 156056

2/9/11 27/9/11 163m Wright Rd,

75m Upland Rd

462 Wright Rd, R D 2, Katikati 3178

Page 155: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 154 of 157

6 6.8 Litter Removal (Rural)

The Contractor shall collect Litter on the rural roads nominated in the following table on a

monthly basis. The Contractor shall remove Litter in the same week each month to ensure

Litter removal cycles are not extended beyond the monthly frequency.

Table 6.8: Litter Removal (Rural)

Location Approx. Road Length

Waihi Beach, Seaforth Road (Albacore Avenue to Pio Road) 2,215m

Waihi Beach, Waihi Beach Road (Boundary to Wilson Road) 2,988m

Waihi Beach, Athenree, Steel, Emmerton Route 1,879m + 1,450m + 1,648m

Maketu Road (SH2 to Spenser Road) 6,500m

Pukehina (Pukehina Beach Road and Pukehina Parade) 3,500m + 5,230m

Omokoroa Road (SH2 to The Esplanade) 4,113m

Te Puna Road

Te Puna Station Road

6,590m

Snodgrass Road (SH2 to Borell Road) 2,685m

Borell Road 1,550m

Page 156: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 155 of 157

6 6.9 Litter Control (Urban)

To ensure fulfilment of the Principal‟s responsibilities under the Litter Act 1979, the

Contractor shall maintain Litter bins provided in public places and make provision to

empty them. The scope of Litter control includes:

1. The removal and suitable disposal of Litter:

Within and around the provided bins

Located within the urban areas as may be brought to the attention of the

Contractor from time to time, termed free Litter

On nominated rural roads (typically at the entrance to urban areas)

2. Uplifting and removing leaves from footpaths and kerb and channel as required from

time to time to meet the Performance Criteria and in particular:

Uplifting and removing autumn fall deciduous leaves from footpaths and kerb

and channel in the defined CBD areas

Uplifting and removing autumn fall deciduous leaves from Beach Road Katikati,

(adjacent to Katikati College), Queen Street Te Puke (from Beatty Avenue to

Cameron Road), and Cameron Road Te Puke (from SH2 to Tui Street) every two

weeks over the leaf fall period or as requested via service request.

3. The maintenance, repair and reinstatement of existing litter receptacles and padlocks,

plus cleaning of Litter bins using fluids and disinfectants, and/or liners. Replacement

of existing Litter bins shall be like for like or agreed equivalent.

4. Where additional bins are required to meet the Performance Criteria, these shall be

provided and maintained by the Contractor. Additional Litter bins shall be the same

bins as existing adjacent bins or agreed equivalent.

5. Where additional bins are requested by the Engineer‟s Representative, the capital cost

shall be a variation to contract.

The Contractor shall determine the frequency of bin maintenance (including emptying) to

meet the intent of the Litter Act 1979.

Page 157: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 156 of 157

6 6.10 Urban Street Cleaning

Further to Maintenance Specification (WBoPDC Local Roads) Section 6.17, urban street

cleaning is intended to deliver to the commercial areas either washed surface or swept

surface as detailed below, to ensure such areas are clean and presentable to the general

public.

6.10.1 Scope

A washed surface is the process required to clean the required surfaces with a purpose

built scrub washer that removes surface grime, dirt and dust, via applied water, including

the substantial removal of any applied water and contaminants.

A swept surface is the mechanical and/or hand process that collects and removes loose

detritus, debris, leaves, litter, grit and the like, (but excludes adhesives such as chewing

gum), to ensure the required surfaces are fit for their intended purpose and includes

footpaths and kerb and channel: Note that hand sweeping will be required around blisters

to augment suction cleaning of kerb and channel.

Also included in this item is

a) The removal of graffiti to ensure surfaces are restored to a standard acceptable to the

Engineer‟s Representative by painting or graffiti removal

b) Replacement or repair for any damage sustained to existing bollards

6.10.2 Frequency

The minimum frequency of the required activity is presented in the following table:

Table 6.7.2: Urban Street Cleaning: Frequency

Location Sweeping Frequency

Approx. Area (m²) Footpath Washing

Frequency

Waihi Beach

Sweeping frequency to be twice weekly over the period Friday before October Labour Weekend to after Easter weekend. Cleaning days to be Monday and Friday.

Weekly by 8am Mondays. Then

also Fridays during summer season

Street Cleaning Areas defined in

Urban Maintenance Areas Volume 1

March, June, Sept. and Dec.

Katikati Daily by 8am

(7 Days per week)

Street Cleaning Areas defined in

Urban Maintenance Areas Volume 2

March, June, Sept. and Dec

Te Puke Daily by 8am

(7 days per week)

Street Cleaning Areas defined in

Urban Maintenance

March, June, Sept. and Dec

Page 158: Bay of Plenty West Joint NZTA/WBoPDC One Network ... · Bay of Plenty West Joint NZTA/WBoPDC One Network Maintenance Contract Contract No: NZTA 2 ... 2.1 Guide to the KRA Performance

Appendices (WBoPDC Local Roads)

1 Operational Performance Measures

Page 157 of 157

6 Table 6.7.2: Urban Street Cleaning: Frequency

Location Sweeping Frequency

Approx. Area (m²) Footpath Washing

Frequency

Areas Volume 4

Maketu Weekly by 8am Street Cleaning Areas defined in

Urban Maintenance Areas Volume 5

March, June, Sept. and Dec

Te Puke Heritage Walkway Daily by 8am

(7 days per week)

500 Monthly

Talisman Carpark Katikati Weekly 3500 N/A

Street cleaning in the Katikati CBD shall extend 20 metres into all side streets.