Bath and North East Somerset The place to live, work and visit BATH RIVER AVON OPTIONS APPRAISAL Stakeholder Workshop 15 October 2014 B&NES Council Environment Agency GBV JV Ltd

BATH RIVER AVON OPTIONS APPRAISAL

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BATH RIVER AVON OPTIONS APPRAISAL

Bath and North East Somerset – The place to live, work and visit

BATH RIVER AVON

OPTIONS APPRAISAL

Stakeholder Workshop

15 October 2014

B&NES Council

Environment Agency

GBV JV Ltd

Page 2: BATH RIVER AVON OPTIONS APPRAISAL

Bath and North East Somerset – The place to live, work and visit

Welcome

Councillor Ben Stevens

Cabinet Member for

Sustainable Development

B&NES Council

Page 3: BATH RIVER AVON OPTIONS APPRAISAL

Bath and North East Somerset – The place to live, work and visit

Introduction

1 CONTEXT Simon Martin B&NES

2 PULTENEY & TWERTON GATES Melvin Wood & Nigel Smith EA

3 OPTIONS PRESENTATION Andy Wallis GBV

4 QUESTION & ANSWER

5 OPTIONS WORKSHOP All

6 SUMMARY. ANY FURTHER QUESTIONS?

Page 4: BATH RIVER AVON OPTIONS APPRAISAL

Bath and North East Somerset – The place to live, work and visit

LEGISLATION

Flood and Water Management Act 2010 (FWMA)

The Act aims to improve the way we manage flood risk and

creates the new role of the Lead Local Flood Authority (LLFA)

ENVIRONMENT

AGENCY

LLFA

•Sea

•Main Rivers

•Reservoirs

•Ground water

•Surface Water

•Ordinary

Watercourses

Lead Local Flood Authority

Page 5: BATH RIVER AVON OPTIONS APPRAISAL

Bath and North East Somerset – The place to live, work and visit

Lead Local Flood Authority

LOCAL PARTNERSHIP

The FWMA enables

partnership to be formed

between the LLFA and the

other relevant authorities.

Page 6: BATH RIVER AVON OPTIONS APPRAISAL

Bath and North East Somerset – The place to live, work and visit

Strategic Flood Board

B&NES (various departments)

Environment Agency

Wessex Water

Lead Local Flood Authority

Operational Working Group

B&NES Council Highway

Maintenance and Drainage

Parish Council Rep.

Resident Rep.

Business

Public

Parish Council

Cluster Groups

B&NES Departments

Incl. Council Connect

(public)

Neighbouring Local

Authorities

Bristol Water

Avon Fire and Rescue

Canal and River Trust

Full Council

Bristol Avon River Trust

River Regeneration Trust

Planning, Transport & Environment

Management Scrutiny Panel

(Flood Risk Management)

Strategic Flood Board: Interactions

Page 7: BATH RIVER AVON OPTIONS APPRAISAL

Bath and North East Somerset – The place to live, work and visit

Lead Local Flood Authority Briefing

Page 8: BATH RIVER AVON OPTIONS APPRAISAL

Bath and North East Somerset – The place to live, work and visit

Objectives of the B&NES-Wide SWMP

8

1. To produce a B&NES area wide SWMP

2. Consultation with appropriate parties

3. Awareness of respective management

responsibilities of partners and

stakeholders

4. Provide a picture of local flood risk that

will be easily accessible by all

5. Increased understanding of where flooding

will occur to inform spatial and emergency

planning

6. Increased understanding of the causes,

probability and consequences of surface

water flooding

Page 9: BATH RIVER AVON OPTIONS APPRAISAL

Pulteney and Twerton

Name: Melvin Wood & Nigel Smith

Job title: Flood Risk Management

Date: 15th October 2014

Page 10: BATH RIVER AVON OPTIONS APPRAISAL

Why are we involved?

We protect and improve the environment for people and the wildlife

Exercise a supervisory duty on all matters relating to flood defence

Implement coastal improvements and flood defence schemes

Permissive powers to regulate activities on ‘Main River’

Opportunity to work in partnership with B&NES and developers to secure long term solutions for Twerton and Pulteney.

10

Page 11: BATH RIVER AVON OPTIONS APPRAISAL

Pulteney Radial Gate The radial gate is part of the Bath FAS built in the 1970’s.

This asset is approaching the end of its design life

Impounds water at low flows in conjunction with Pulteney weir

In flood conditions it automatically opens as the head of water increases.

In a large flood event the radial gate has limited benefits.

The weir and concrete footings of the gate are owned by B&NES. We own and operate the metal element of the gate.

Large costs to maintain

Difficult structure to maintain due to limited access.

Health and safety issues of operating the structure and for the public.

11

Page 12: BATH RIVER AVON OPTIONS APPRAISAL

How a radial gate operates

Page 13: BATH RIVER AVON OPTIONS APPRAISAL

Twerton Sluice Gates Twerton consists of a vertical and radial gate.

This asset is approaching the end of its design life

The concrete footings are owned by the EA and First Group. The gates are owned and operated by the EA.

Twerton’s primary function is to maintain water levels upstream in Bath. This is for navigation and amenity purposes as well as protecting foundations of structures in the World Heritage Area.

In flood conditions the gates are opened to allow water to continue downstream. This operation is automatic and rises to changes in river levels.

If the gates were to fail shut in a 1in 100 year flood this would increase the risk of flooding to 240 properties.

13

Page 14: BATH RIVER AVON OPTIONS APPRAISAL

20 O

cto

ber

2014

TECHNICAL DIRECTOR ANDY WALLIS

RIVER AVON OPTIONS APPRAISAL TWERTON AND PULTENEY GATES

Page 15: BATH RIVER AVON OPTIONS APPRAISAL

• Pulteney and Twerton sluice gates are important, but degrading, assets

• Need to be considering now what the long term solutions are

• Complicated sites so need careful thought

• Lots of potential for improvement

BACKGROUND TO STUDY

20 October 2014

15

GBV R

IVE

R A

VO

N A

PP

RA

ISA

L –

PU

LT

EN

EY

AN

D T

WE

RT

ON

GA

TE

S

Page 16: BATH RIVER AVON OPTIONS APPRAISAL

Flood extents in 1 in 100 event with and without Twerton Gates open

20 October 2014

16

Black & Veatch R

IVE

R A

VO

N A

PP

RA

ISA

L –

PU

LT

EN

EY

AN

D T

WE

RT

ON

GA

TE

S

Page 17: BATH RIVER AVON OPTIONS APPRAISAL

Now is the right time

• Can link into other regeneration sites

• Potential for partnership funding

OPPORTUNITIES

20 October 2014

17

GBV R

IVE

R A

VO

N A

PP

RA

ISA

L –

PU

LT

EN

EY

AN

D T

WE

RT

ON

GA

TE

S

• Linkage to other plans and strategies

• Amenity/visual/biodiversity

Page 18: BATH RIVER AVON OPTIONS APPRAISAL

• Do Nothing

• Do Minimum

• Refurbish current sluice

• Like for like replacement

• Hydropower

OPTIONS – BOTH SLUICES 20 October 2014

18

GBV R

IVE

R A

VO

N A

PP

RA

ISA

L –

PU

LT

EN

EY

AN

D T

WE

RT

ON

GA

TE

S

Page 19: BATH RIVER AVON OPTIONS APPRAISAL

What have we missed?

OPTIONS - PULTENEY

20 October 2014

19

GBV R

IVE

R A

VO

N A

PP

RA

ISA

L –

PU

LT

EN

EY

AN

D T

WE

RT

ON

GA

TE

S

• Replace with fixed crest weir

• Replace with lock gates

• Infill the land

Page 20: BATH RIVER AVON OPTIONS APPRAISAL

What have we missed?

• Replace one or both gates with fixed crest weir

• Replace one or both gates with variable crest weir

• Lower the retained water level

OPTIONS - TWERTON

20 October 2014

20

GBV R

IVE

R A

VO

N A

PP

RA

ISA

L –

PU

LT

EN

EY

AN

D T

WE

RT

ON

GA

TE

S

Page 21: BATH RIVER AVON OPTIONS APPRAISAL

• So far talked about long term options only

• Opportunity to work with adjacent stakeholders at both sites to come up with combined solution that deliver all, or part of the final solution.

QUICK FIX OPTIONS

20 October 2014

21

GBV R

IVE

R A

VO

N A

PP

RA

ISA

L –

PU

LT

EN

EY

AN

D T

WE

RT

ON

GA

TE

S

Page 22: BATH RIVER AVON OPTIONS APPRAISAL

RIV

ER

AV

ON

AP

PR

AIS

AL

– P

UL

TE

NE

Y A

ND

TW

ER

TO

N G

AT

ES

Which is most important? What have we missed?

EVALUATION CRITERIA

20 October 2014

22

GBV

Flood Risk

Fisheries

Public Realm

Amenity

Heritage

Energy Generation

Navigation/Moorings

Safety

Education

Costs

Page 23: BATH RIVER AVON OPTIONS APPRAISAL

WHAT IS IMPORTANT TO YOU?

Over to you!

• Time for Q&A then split into groups

• Anything we have missed?

• What is most important to you?

• What are your concerns?

• How would you evaluate success on this project?

20 October 2014

23

GBV R

IVE

R A

VO

N A

PP

RA

ISA

L –

PU

LT

EN

EY

AN

D T

WE

RT

ON

GA

TE

S

30-40 minutes in groups to discuss the different options and prioritise the importance of the different criteria.

Group facilitator to feedback at end.

Page 24: BATH RIVER AVON OPTIONS APPRAISAL

FEEDBACK

Group facilitators to lead

20 October 2014

24

GBV R

IVE

R A

VO

N A

PP

RA

ISA

L –

PU

LT

EN

EY

AN

D T

WE

RT

ON

GA

TE

S

Page 25: BATH RIVER AVON OPTIONS APPRAISAL

NEXT STEPS

Thank you!

•Report and matrix of options by Christmas

• Further consultation at end of this stage on preferred options

•Detailed appraisal of small number of options in early 2015

20 October 2014

25

GBV R

IVE

R A

VO

N A

PP

RA

ISA

L –

PU

LT

EN

EY

AN

D T

WE

RT

ON

GA

TE

S

Page 26: BATH RIVER AVON OPTIONS APPRAISAL

Bath and North East Somerset – The place to live, work and visit

Question & Answer