BATCHING AND CRUSHING PLANT PROJECT
INITIAL ENVIRONMENTAL EXAMINATION ( IEE ) CHECKLIST REPORT for
Project name or Title
Below is the IEE Report Checklist for Batching and Crushing Plant Project:
Industry Parameter Threshold
Batching Plant (with or without crushing) All Batching Plants
Metallic Mineral or Ore Processing (e.g. copper, lead, nickel, cobalt, zinc, silver,
magnesium, and manganese, gold, placer with metal content) with Physical or
Mechanical Processing
Annual processing (inputs)
>200.0 MT annually but <70,000 MT
Read the questions carefully before answering the space provided. Uses additional sheets if necessary and indicate this in the appropriate space.
Misleading or erroneous answers are basic for legal actions and/or ECC.
EXECUTIVE SUMMARY
PROJECT FACT SHEET PD SUMMARY
Project Name: _________________________________________________________________
Project Site Location: __________________________________________________________
Nature of Project: ______________________________________________________________
Production Capacity: ___________________________________________________________
Total Land Area: ______________________________________________________________
Project Components: __________________________________________________________
Manpower Requirement: _______________________________________________________
Project Cost: _________________________________________________________________
PROCESS DOCUMENTATION
EIA Team:
Consultant Areas of Expertise
EIA Study Schedule (for primary data):
Activity Date Season
EIA Study Area:
Direct Impact Areas: (Complete Barangay, and Municipality/City) ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ Indirect Impact Areas: (Complete Barangay, and Municipality/City) ____________________________________________________________________ ____________________________________________________________________ ___________________________________________________________________________
EIA Methodology:
EIA Study Module
METHODOLOGY
Type of Data (please
check)
Source of Data/Remarks (e.g.
LGU )
Primary Secondary
Land
Land Use Classification
Geology/Geomorphology
Pedology
Terrestrial Biology
Water
Hydrology/Hydrogeology
Oceanography
Water Quality
Freshwater or Marine Ecology
Air
Meteorology/Climatology
Air Quality and Noise
People
* Section or page number where the primary data can be found
I. PROJECT DESCRIPTION 1.1 PROJECT LOCATION: Street Name, Barangay, and Municipality/City (Vicinity Map showing sitio, barangay, municipality, province and region boundaries. Attach location and vicinity maps and photographs of the project site as ANNEX 1.)
_____________________________________________________________________________________________________________________________________________________________________________________________________________________
Geographic coordinates of project area: _________________ 1.2 PROJECT RATIONALE: Cite and focus on the need for the project based on national and local economic development and in terms of contribution to sustainable development agenda and current development thrusts of the Philippines.
_____________________________________________________________________________________________________________________________________________________________________________________________________________________
1.3 PROJECT ALTERNATIVES: Reasons for selection of preferred option (please check): Technology Commercial Environmental Others
Facility Siting
Development Design
Process/Technology Selection
Resource Utilization
Others1
1 indicate a “no project” option in the comparative analysis at it still account for growth and
development even if the project were not approved. 1.4 PROJECT COMPONENTS Batching Plant
No. of Units Machinery/Equipment Specification
Cement Silos
Aggregate Hopper
Belt Conveyor
Transit Mixers
Payload
Generator Set
Fuel Storage Tank
Others:__________________________
(Use additional sheet, if necessary.) Crushing Plant
No. of Units Machinery/Equipment Specification
Steel Hopper Feeder
Vibrating Grizzly Feeder
Primary Jaw Crusher
Cone Crusher
Scalper Screen
Vibrating Screen
Sand Screw Classifier
Belt Conveyor
Water Pump
Others:___________________________
(Use additional sheet, if necessary.) Pollution Control Devices
No. of Units Pollution Control Device Facilities Being Served
Silencer/Muffler
Water Sprinkler
Dust Collector
Settling Pond
Silt/sediment traps
Septic Tank/Sewage Treatment Plant
Others: _________________________
(Use additional sheet, if necessary.)
1.5 PROCESS/ TECHNOLOGY OPTIONS Type of batching Process: Dry-type Wet-type (Provide a process flow diagram) Raw Materials No RAW MATERIALS CONSUMPTION /DAY
1 Cement
2 Gravel
3 Sand
4 Water
5 Admixture
(Use additional sheet, if necessary.) Water Supply
Community Water Demand : [ ] dry season ____ m3/sec [ ] rainy season ______ m
3/sec [ ] annual
_____ m3/sec
Water Source
[ ] surface water S/W Type : [ ] river (Name: _____________) [ ] rainwater collector
[ ] ground water G/W Type: [ ] well [ ] spring [ ] others: ____________________________
Location of water source ____________________________________________________________________________
(Sitio/Zone, Barangay, Municipality/City, Province, Region)
Water source flow: a) dry season flow: _______ m3/sec b) rainy season: _______ m
3/sec
Percent & Flow of water source to be tapped:
a) dry season: ___ % (_____ m3/sec) b) rainy season: ___% (___ m
3/sec) c) annual: ___%
(___ m3/sec)
Location of communal water box/faucet area: ____________________________________________________________
(If water box/faucet area is to be provided) (Lot Number, Street, Sitio/Zone, Barangay, Municipality/City, Province, Region)
Communal box/faucet surface area: _____ m2 Volume :_______ m
3 Distance of box from
source: ______ m
Pipe length from source to water box: _____ m Pipe Material: [ ] GI pipes [ ] PVC
[ ] bamboo___________
Overflow of Concrete Water Box: ____ m (height) Target overflow: dry season____ m3/sec;
rainy season ____m3/sec
Power Supply
Sources of Power Supply
Yes No Estimated Daily Kilowatt consumed:
Local Electric Utility
Generator
Others, please specify
(Use additional sheet, if necessary)
Waste Management System Type of Waste
Source of Waste Volume Per Day Mode of Treatment2
Liquid
Air
Dust
Noise
Solid
(Use additional sheet, if necessary.) Include in the discussion how waste will be properly discharge/disposed-off during project pre-construction, construction and operation, as necessary. 1.6 PROJECT SIZE Total Land Area, sq.m _______ Land Area to be occupied, sq.m ________ Is the area owned or leased ___________ If leased, period covered ________________ (Attach document, TCT, as ANNEX 3) Production Rate
RAW MATERIALS CONSUMPTION (MT)/DAY
Cement
Gravel
Sand
Water
Admixture
Others_______________ Total
1.7 DEVELOPMENT PLAN, DESCRIPTION OF PROJECT PHASES AND CORRESPONDING TIMEFRAMES Pre-Operation/ Construction phase
3
Construction Schedule
ACTIVITY TIMEFRAME (no. of days)
Plans/Design
Permits/ Clearances
Site Preparation & Clearing
Excavation
Civil Works
Finishing Site Clearance
Installation of Equipment
Commissioning & Start-up Operation
(Use additional sheet if necessary. Include civil works undertaken as part of the project, e.g., Construction of office for operation, administration, canteen, and other amenities.
Operation Phase Provide brief discussion on the process: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Process Flowchart Abandonment Phase and schedule
Decommissioning Activities
Waste Generated Mode of Disposal Restoration Plan
□ Removal wastes
□ Dismantling of
plant structures and equipment
□ Retrenchment
package and labor support program
□ Used oil
□ Aggregates
stockpiles □ Others, please
specify_____
□ Used oil
□ Used pipes □ Used cables □ Concrete masonry □ Broken
equipments
□ Others, please
specify_____
□ EMB authorized
recyclers □ Landfill □ Others, please
specify_____
□ EMB authorized
recyclers
□ Landfill
□ To be donated
□ Others, please
specify_____
□ Revegetation
□ Leveling and
backfilling of settling ponds and non-usable drainage channels □ Repair of road
networks
□ Others, please
specify_____
□ Employee re-
training
□ Entrepreneurial
skills development
□ Others, please
specify_____
(Use additional sheet, if necessary.)
Insert process flowchart
1.8 MANPOWER
Manpower Requirement
Expertise/Skills No. of Women
No. of Men No. of IP’s Total
1.9 INDICATIVE PROJECT COST Project Cost (PhP): ____________ LIST OF ACRONYMS dB – Decibel DENR – Department of Environment and Natural Resources ECA – Environmentally Critical Area ECC – Environmental Compliance Certificate EIA – Environmental Impact Assessment EIS – Environmental Impact Statement EMB – Environmental Management Bureau ESWMP – Ecological Solid Waste Management Plan FPIC – Free, Prior and Informed Consent GenSet – Generator Set IP – Indigenous People LGU – Local Government Unit NCIP – National Commission on Indigenous Peoples NHI – National Housing Institute NOx – Nitrogen Oxide PA – Protected Area PAMB – Protected Area Management Board PCA – Philippine Coconut Authority PPE – Protective Personal Equipment ROW – Right of Way SLUP – Special Land Use Plan SOx – Sulfur Oxide TCT – Transfer Certificate of Title TSP – Total Suspended Particulates TSS – Total Suspended Solid
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN
Environmental Impact Management Plan
Project Phase / Activities
Possible Environmental/ Social Impacts
Baseline Data Parameter
Preventive/ Mitigating/Enhancement
Measures
Monitoring Parameters/
Implementation
Cost of Mitigation/ Monitoring (Assumed to be integrated in project cost per project phase)
Pre-construction Phase Site Selection and
Planning/ Design
Change/ Inconsistency in land use
Current land use:
Residential
Commercial/ Institutional
Industrial
Agricultural/ Recreational
Protected Ares History/record of hazard or damage to land and property
Infestation
Fire
Floods/drought
Typhoon
earthquake
Others, specify ____________ ____________
Consider alternative site
Secure LGU zoning clearance
Expand and strengthen data collection and monitoring in order to improve decision making;
Adopt short and long-term measures to increase resilience of resources;
Develop a comprehensive land use and management plan incorporating climate change concerns vis-à-vis vital requisites of project sustainability;
Others, specify: ____________ ____________ ____________
Presence of LGU zoning clearance
Comparative benefits and costs monitoring of applied land management schemes
Undertake monitoring systems for land use activities and related events to ensure trends can be detected
Others, specify ____________ ____________
Acquisition of Clearance integrated in Pre-construction Cost: ______
Design, construction, maintenance and monitoring of land management schemes
Others, specify ____________ ____________
Encroachment in Environmentally Critical Areas (ECAs)
Project is within an ECA:
All areas declared by law as national parks, watershed reserves, wildlife preserves, sanctuaries
Areas set aside as aesthetic potential tourist spots
Areas which constitute the habitat of any endangered or
Consider alternative site or design to be compatible with the PA zoning
Secure PAMB Resolution for PA
Consider alternative site to avoid/lessen construction impacts on IPs/IP areas unless the IPs are among the beneficiaries of the facility
Presence of PAMB Resolution
Proof of Completion of FBI
Presence of FPIC Document
Coordination with NCIP
Presence of NHI clearance
Proof of coordination arrangements or
Acquisition of Resolution integrated in Pre-construction Cost: _______
Survey Cost integrated in Pre-construction Cost: _____
Meetings Cost integrated in Pre-construction Cost: _____
Meetings on acquisition of clearance, clearance fees & coordination with NHI integrated in Pre-
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN
Project Phase / Activities
Possible Environmental/ Social Impacts
Baseline Data Parameter
Preventive/ Mitigating/Enhancement
Measures
Monitoring Parameters/
Implementation
Cost of Mitigation/ Monitoring (Assumed to be integrated in project cost per project phase)
threatened species of Philippine wildlife (flora and fauna)
Areas of unique historic, archaeological, or scientific interests
Areas which are traditionally occupied by cultural communities or tribes
Areas frequently visited and/or hard-hit by natural calamities (geologic hazards, floods, typhoons, volcanic activity, etc.)
Areas with critical slopes
Areas classified as prime agricultural lands
Recharged areas of aquifers
Water bodies characterized by one or any combination of the following conditions: tapped for domestic purposes; within the controlled and/or protected areas declared by appropriate authorities; which support wildlife and fishery activities
Mangrove areas characterized by one or
Apply for FBI and secure FPIC from the IPs thru the NCIP
Consider alternative site or redesign to avoid or lessen probability of damage
Secure NHI clearance
Coordinate with NHI/NM on construction
Others, specify ____________ ____________
inclusion of NHI procedures in project design , construction manual, operating procedures manual
Others, specify ____________ ____________
construction Cost:____
Others, specify ____________ ____________
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN
Project Phase / Activities
Possible Environmental/ Social Impacts
Baseline Data Parameter
Preventive/ Mitigating/Enhancement
Measures
Monitoring Parameters/
Implementation
Cost of Mitigation/ Monitoring (Assumed to be integrated in project cost per project phase)
any combination of the following conditions: with primary pristine and dense young growth; adjoining mouth of major river systems; near or adjacent to traditional productive fry or fishing grounds; areas which act as natural buffers against shore erosion, strong winds and storm floods; areas on which people are dependent for their livelihood.
Coral reefs characterized by one or any combination of the following conditions: With 50% and above live coralline cover; Spawning and nursery grounds for fish; Act as natural breakwater of coastlines
Procurement/Hiring of labor and other manpower services (Note: Actual employment is implemented during Construction Phase)
In-migration
Population:_____ %Men:_____ %Women: ______
Give hiring preference to qualified local community residents, particularly those who will be displaced
Others, specify ____________ ____________
Proof of local residence, e.g. Community Tax Certificate (CTC) or certificate of residence issued by the Brgy. Captain
Others, specify ____________ ____________
Local Hiring cost integrated in Pre- & Construction Costs:____
Others, specify ____________ ____________
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN
Project Phase / Activities
Possible Environmental/ Social Impacts
Baseline Data Parameter
Preventive/ Mitigating/Enhancement
Measures
Monitoring Parameters/
Implementation
Cost of Mitigation/ Monitoring (Assumed to be integrated in project cost per project phase)
Non-hiring of qualified Indigenous Peoples in projects located in ancestral domain areas or where IPs are confirmed to reside
Population:_____ %Men:_____ %Women: ______
Prioritize hiring of qualified Indigenous Peoples, in projects located in ancestral domain claims or where IPs are confirmed to reside
Others, specify ____________ ____________
Proof of local residence, e.g. issued by the tribal chieftain or tribal council
Employment record \
Others, specify ____________ ____________
Local Hiring cost integrated in Pre- & Construction Costs: ____
Others, specify ____________ ____________
Construction Phase Installation of
Equipment Change in surface
landform/ topography/ terrain/slope
Slope:
flat (0-3%)
gently sloping to rolling (3-18%)
steep (>18%)
Provide erosion control and slope protection measures
Designate a Spoils Storage Area, with topsoil set aside for later use and allow maximum re-use of spoils
Others, specify ____________ ____________
Presence of slope protection in erosion-prone areas
Presence of new eroded areas near the site
Others, specify ____________ ____________
Slope/ Erosion Control integrated in Construction Cost:
Others, specify ____________ ____________
Tree cutting or vegetation clearing, and disturbance to wildlife within the influence area due to noise and other construction activities
Existing vegetation in the area:
Forest
Coastal/Marine
Marshland
Grassland
Mangrove
Wetland Others, specify __________ __________
Compliance with conditions in permits secured during the Pre-construction Phase
Implementation of tree planting around the facility ;
Promote restoration of damaged or destroyed vegetation where possible;
Vegetation to serve also as buffer to wildlife
Limit land clearing as much as possible
Compliance with conditions of DENR/LGU SLUP, Tree Cutting Permit, ROW, PCA Permit
Area replanted/ revegetated
# incidence of violation to protection guidelines
Presence of fences and markers
Others, specify ____________ ____________
Replacement planting cost depends on area opened up:
Compliance with other permit conditions integrated in Construction Cost:
Others, specify ____________ ____________
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN
Project Phase / Activities
Possible Environmental/ Social Impacts
Baseline Data Parameter
Preventive/ Mitigating/Enhancement
Measures
Monitoring Parameters/
Implementation
Cost of Mitigation/ Monitoring (Assumed to be integrated in project cost per project phase)
Specify the existing flora in the area ________ _________________ Specify the existing fauna in the area ________ _________________
Provide a temporary fencing to vegetation that will be retained
Others, specify ____________ ____________
Operation Phase Cement based
products manufacturing
Air Pollution
Air Quality Data Upwind:
TSP_____
SOx____
NOx_____
PM10______
Other, specify _________
Air Quality Data Downwind:
TSP_____
SOx____
NOx_____
PM10______
Other, specify _________
Wet areas of dust sources to minimize discomfort to nearby residents
Proper operation and maintenance of the dust producing installations (stone cutters) and its air pollution control facility
Good housekeeping to be strictly enforced
Proper operation of the generator set
Control of vehicle speed to lessen suspension of road dust
Remove soil. mud from tires of trucks and equipment before leaving the area
Other, specify _______ ___________________
# public complaints received by Proponent/ Contractor
Presence of emission test results/certificate of conformance with emission standards
Absence of white or black smoke from vehicles, heavy equipment and generator
Result of air quality sampling
Frequency :
Monthly
Quarterly
Semi-Annual
Annually
Others, specify_______
Water spraying/ Dust filters/barriers/fences Cost:____
Others, specify ____________ ____________
Water Pollution
Receptor:
Fresh
Brackish
Saline/Sally
Set-up proper and adequate toilet facilities
Strictly require the contractor and its workers to observe proper waste
# of public complaints received by the proponent or constructor
Visible turbid and/or silted condition of the
O&G traps: _____
Ring canals:______
Used oil containers: ________
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN
Project Phase / Activities
Possible Environmental/ Social Impacts
Baseline Data Parameter
Preventive/ Mitigating/Enhancement
Measures
Monitoring Parameters/
Implementation
Cost of Mitigation/ Monitoring (Assumed to be integrated in project cost per project phase)
Water Quality Data in upstream:
TSS
Oil and grease Water Quality Data in downstream:
TSS
Oil and grease
disposal and proper sanitation
Provision of wastewater treatment facility
Proper operation and maintenance of the toilet facilities and septic tank
Set up silt trap/stilling ponds to minimize downstream siltation
Provide oil & grease traps upstream of any run-off discharge from the project to the waterbodies
Provide ring canals around fuelling tanks/ motorpool/ maintenance areas
Collect used oils in containers
Limit, where possible, the extent of impervious (paved) areas
river
Visible oil & grease film on waterbodies
TSS concentration Frequency :
Monthly
Quarterly
Semi-Annual
Annually
Others, specify_______
Silt trap/stilling ponds integrated in Construction Cost:______
Others, specify ____________ ____________
Generation of solid waste from the project activities/ operations
Volume of solid waste generated from current sources
Implementation of the Ecological Solid Waste Management Plan (ESWMP);
Re-use and recycling
Others, specify ____________ ____________
Presence of waste/recycling bins for segregation
Absence of mixed garbage in the facility
Frequency :
Monthly
Quarterly
Semi-Annual
Annually
Others, specify_______
Implementation cost of ESWMP: __________
Others, specify ____________ ____________
Threat to public Health Facilities within Provide appropriate Safety standards, PPE,
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN
Project Phase / Activities
Possible Environmental/ Social Impacts
Baseline Data Parameter
Preventive/ Mitigating/Enhancement
Measures
Monitoring Parameters/
Implementation
Cost of Mitigation/ Monitoring (Assumed to be integrated in project cost per project phase)
health and safety
the project site, specify _____________ _____________
Heath and safety concerns
Respiratory illness Specify type and rate of occurrence: _______________ _______________
Accidents Specify type and rate of occurrence: _______________ _______________
warning signs, lighting and barricades, whenever practicable
Observe proper housekeeping
Provide on-site medical services and supplies for any emergency, thru institutional and administrative arrangements with the barangay health unit
Identification of hot spots or critical areas based on levels of vulnerability
Foster increased public awareness of resilience and develop approaches to climate adaptation
Effective IEC program as regards potential risks and vulnerabilities as a result of project implementation on the environment, and vice versa;
Others, specify ____________ ____________
Presence of signages
Potable quality of water source & supply
Presence of adequate sanitary facilities
# of medical complaints or cases
# of accidents
Frequency : ____________ ____________
Others, specify ____________ ____________
safety signs are expected to be integral part of the Occupational Safety program of the Proponent
Potability analysis integrated in Construction Cost:
Others, specify ____________ ____________
Increase in traffic volume and worsening of traffic flow
Traffic condition within the area:
Light
Moderate
Heavy
Observe traffic rules Implementation of traffic management system;
Promotion of green infrastructure, i.e. interconnected network of balancing open space with natural park and vegetation cover;
Presence of designated parking , pedestrian lanes, loading/ unloading zones, delivery areas, sidewalk vendor areas
Presence of signages
Presence/ Visibility of local traffic aide
Signages cost :______
Cost of barangay or city/town traffic aide: ________
Others, specify ____________ ____________
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN
Project Phase / Activities
Possible Environmental/ Social Impacts
Baseline Data Parameter
Preventive/ Mitigating/Enhancement
Measures
Monitoring Parameters/
Implementation
Cost of Mitigation/ Monitoring (Assumed to be integrated in project cost per project phase)
Others, specify ____________ ____________
Frequency : _____________
Others, specify ____________ ____________
Increase economic activities and economic opportunities to local
Job opportunities
Increase tax revenue
Source of livelihood:
Construction _____
Farming _____
Fishing ______
Trading ______
Others _______
Priority of employment
Regular tax remittance
Number of jobs generated____
New jobs created :______________ _______________
Income tax generated
TOTAL EMP COST________
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN
CLIMATE CHANGE RISK MANAGEMENT PLAN
Project Phase / Activities
Climate Change Risk Baseline Data
Parameter Adaptation Measure
Monitoring Parameters/
Implementation
Cost of Adaptation / Monitoring
(Assumed to be integrated in project cost per project
phase) Occurrence of flooding Historical data on
flooding Improve efficiency of
water supply/irrigation systems
Protect water recharge areas to preserve quality and quantity
Increase, when practical, storage capacities of water supply structures for resilience to greater variations and extremes
In critical areas, develop flood plan maps, including climate change projections, and zoning measures to limit/restrict development activities
Others, specify ____________ ____________
Review monitoring systems for water levels, flows and water quality rainfall
drainage and flood control facilities to take into account climate change to date and projections;
Others, specify ___________ ___________
Construction cost:_____
Drought Historical data on drought
Tree planting to moderate temperature increases
Adapting drain water system
Water conservation techniques e.g. catchment basins
Improving water use efficiency, planning
Percent survival of trees planted
Effectiveness of drain water system
Effectiveness of water conservation techniques
Improvement on water use efficiency
Others, specify ____________
Planting cost depends on area: ______________
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN
Project Phase / Activities
Climate Change Risk Baseline Data
Parameter Adaptation Measure
Monitoring Parameters/
Implementation
Cost of Adaptation / Monitoring
(Assumed to be integrated in project cost per project
phase) for alternative water sources (such as treated wastewater or desalinated seawater), and making changes to water allocation
Others, specify ____________ ____________
_____________
Occurrence of landslide, gully erosion and rock falls
Historical record on landslide, gully erosion and rock falls
Slope stabilization
Establishment of buffer zone
Planting of trees
Others, specify ___________ ___________
Ocular inspection
Maintenance of slope
Percent survival of trees planted
Others, specify ____________ ____________
Planting cost depends on area: ______________
Damage to core operations and increased levels of heat stress, respiratory illness, chronic disease due to prolonged heat waves
Record on heat waves
Heat wave action plan
Information program for employees
Weather advisories to alert the public about dangerous heat conditions
Adequate financial and human public health resources, including training, surveillance and emergency response, and prevention and control programs
Others,
Review and monitor changes in weather pattern
Effectiveness of heat wave action plan
Temperature
Others, specify ___________ ___________
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN
Project Phase / Activities
Climate Change Risk Baseline Data
Parameter Adaptation Measure
Monitoring Parameters/
Implementation
Cost of Adaptation / Monitoring
(Assumed to be integrated in project cost per project
phase) specify_________ _______________
Longer and more intense rains that restrict access to construction sites and slow productivity
Historical data on intense rainfall
Scheduling the construction activity
Others, specify___________ ________________
Review and monitor changes in weather events
Monitor resilience of drainage and flood control facilities
Others, specify, ______________
Earthquake Historical Records
Number of occurrence _______( indicate years)
Highest magnitude recorded ____(indicate years)
Incorporate in emergency response plan the climate change risk reduction
Engineering design
Constant communication with concerned line agency
Regular inspection of buildings and related facilities and infrastructures
Regular monitoring of early warning devices and preparedness systems to ensure their effectiveness
Others, specify, _____________ _____________
Volcanic Eruption Historical Records
Number of occurrence _______( indicate years)
Establishment of buffer zone to prevent gaseous nuisance
TOTAL EMP COST________
III. ABANDONMENT /DECOMMISSIONING/REHABILITATION POLICIES AND GENERIC GUIDELINES (if Applicable)
Project Life or Service : ___________ years Provide description of the Abandonment activities, such as, dismantling and waste disposal.
IV. INSTITUTIONAL PLAN FOR EMP IMPLEMENTATION5
Organization Chart: 5 include in the plan improve coordination within and among affected stakeholders, organizing, and
providing scientific, technical and managerial personnel on climate change.
Insert chart here:
Attach sketch plan/lay-out of project site
(Use additional sheet if necessary)
Attach drawing/plan of air pollution source and control installation s (with dimensions and descriptions)
(Use additional sheet if necessary)
Attach drawing /plan of waste water treatment facilities (with dimensions and descriptions)
(Use additional sheet if necessary)
SWORN STATEMENT OF ACCOUNTABILITY OF THE PROPONENT*
T h i s i s t o c e r t i f y t ha t a l l t he i n f o rm a t i on and c om m i tm en t s i n t h i s Initial Environmental Examination Checklist REPORT for PROJECT are accurate and complete to the best of our knowledge, and that an objective and thorough assessment of the Project was undertaken in accordance with the dictates of professional and reasonable judgment. Should I/we learn of any information, which would make this IEE Checklist REPORT inaccurate, I shall immediately bring the said information to the attention of DENR-EMB Region ____.
I hereby certify that no DENR personnel was directly involved in the preparation of IEE Checklist REPORT other than to provide procedural and technical advice consistent with the guidelines in the DAO 03-30 Revised Procedural Manual.
I hereby bind myself to answer any penalty that may be imposed arising from any misrepresentation or failure to state material information in IEE Checklist REPORT. In witness whereof, I hereby set my hand this ____ day of __________ at ______________________.
NAME OF THE PROPONENT HEAD (Position) (Company)
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 200_, affiant exhibiting his/her Community Tax Certificate No. ___________________ issued at ______________________ on __________________________.
Doc. No. ____________________ Page No. ____________________ Book No. ____________________ Series of ____________________
SWORN STATEMENT OF ACCOUNTABILITY OF PREPARERS (If applicable)
This is to certify that all information in Initial Environmental Examination Checklist REPORT for the (state name of project) PROJECT are accurate and complete to the best of our knowledge, and that an objective and thorough assessment of the Project was undertaken in accordance with the dictates of professional and reasonable judgment. Should we learn of any information which would make IEE Checklist REPORT inaccurate, we shall immediately bring the said information to the attention of the DENR-EMB Region ___.
We hereby certify that no DENR personnel was directly involved in the preparation of this IEE Checklist REPORT other than to provide procedural and technical advice consistent with the guidelines in the DAO 03-30 Revised Procedural Manual.
We hereby bind ourselves jointly and solidarily to answer any penalty that may be imposed arising from any misrepresentation or failure to state material information in this IEE Checklist REPORT. In witness whereof, I hereby set my hand this ____ day of __________ at ______________________.
Name Field of Expertise Signature
1.
2.
3.
4.
5.
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 2006, affiants exhibiting their Community Tax Certificate information, as follows:
Name Community Tax Certificate Information
CTC No. Place of Issue Date of Issue
1.
2.
3.
4.
5.
Doc. No. ____________________ Page No. ____________________ Book No. ____________________ Series of ____________________