99
03/10/2020 Products Solutions Services Basic Service Training : Pressure Pressure General / Process Pressure / Differential Pressure / Dp Flow Slide 1 Poowadol C. / Service Department

Basic Service Training : Pressure

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

03/10/2020

Products Solutions Services

Basic Service Training : Pressure

Pressure General / Process Pressure / Differential Pressure / Dp Flow

Slide 1 Poowadol C. / Service Department

03/10/2020

Table of contents

â€Ē Introduction

â€Ē Pressure General

â€Ē Process Pressure

â€Ē Differential Pressure

â€Ē Dp flow

â€Ē Installation

â€Ē Wiring

â€Ē Commissioning

â€Ē Basic Maintenance / Repair

â€Ē Basic Diagnosis

â€Ē Application & Case study

Slide 2 Poowadol C. / Service Department

03/10/2020

Introduction : āļŦāļĨāļāļāļēāļĢāļ— āļēāļ‡āļēāļ™āļ‚āļ­āļ‡ sensor Endress

Certified Basic Service Training - Pressure General

Measuring Pressure:

Slide 3 Poowadol C. / Service Department

03/10/2020

Introduction : āļāļŽ Pascal’s

āļˆāļēāļāļāļŽ Pascal’s āļ—āļāļĨāļēāļ§āļ§āļē āđ€āļĄāļ­āļĄāđāļĢāļ‡ (F) āļ—āđ€āļāļ”āļ‚āļ™āļˆāļēāļāļ„āļ§āļēāļĄāļ”āļ™ (P) āļĄāļēāļāļĢāļ°āļ— āļēāļāļšāļžāļ™āļ— (A) āđƒāļ™āļ—āļĻāļ—āļēāļ‡āļ—āļ•āļ‡āļ‰āļēāļāđāļĨāļ§ āļ„āļēāļ„āļ§āļēāļĄāļ”āļ™āļ™āļ™ āļŠāļēāļĄāļēāļĢāļ–āđāļŠāļ”āļ‡āđ„āļ”āļˆāļēāļāļŠāļĄāļāļēāļĢāļ™

P āļ„āļ­āļ„āļ§āļēāļĄāļ”āļ™ (bar)

F āļ„āļ­āđāļĢāļ‡ (kg)

A āļ„āļ­āļžāļ™āļ—āļĢāļ­āļ‡āļĢāļšāđāļĢāļ‡ (cmÂē)

Slide 4 Poowadol C. / Service Department

p[Pa]= ðđ[𝑁]

ðī[𝑚Âē]

03/10/2020

Introduction: Ambient pressure (āļ„āļ§āļēāļĄāļ”āļ™āļšāļĢāļĢāļĒāļēāļāļēāļĻ)

Sealevel: 1013 mbar

Mont Blanc 546 mbar

𝑝 ≈−1𝑚𝑏𝑎𝑟

10 𝑚

Zugspitze 693 mbar

4810 m

2962 m

Slide 5 Poowadol C. / Service Department

āļ„āļ­āļ„āļ§āļēāļĄāļ”āļ™āļ‚āļ­āļ‡āļšāļĢāļĢāļĒāļēāļāļēāļĻāļ‚āļ­āļ‡āđ‚āļĨāļ āļŦāļĢāļ­āļ„āļ­āļ„āļ§āļēāļĄāļ”āļ™āļ‚āļ­āļ‡āļ­āļēāļāļēāļĻāđƒāļ™āļŠāļ™āļšāļĢāļĢāļĒāļēāļāļēāļĻāļ• āļēāļŠāļ”āļ‹āļ‡āđ€āļ›āļ™āļŠāļ™āļ—āļĄāļ™āļĐāļĒāļ­āļēāļĻāļĒāļ­āļĒ

03/10/2020

Introduction: Gauge and absolute pressure

Sea level: 1013 mbar abs

Mont Blanc: 546 mbar abs

0 1001013 1113

0 100 546 646

Absolute pressureāļ„āļ­āļ„āļēāļ„āļ§āļēāļĄāļ”āļ™āļˆāļĢāļ‡āļ—āļ‡āļŦāļĄāļ”āļ—āļŠāļēāļĄāļēāļĢāļ–āļ§āļ”āđ„āļ” Pabs=Pg+Patm

āļ„āļ­āļ„āļ§āļēāļĄāļ”āļ™āļ—āļŠāļ‡āļ‚āļ™āđ„āļ›āļˆāļēāļāļ„āļ§āļēāļĄāļ”āļ™āļšāļĢāļĢāļĒāļēāļāļēāļĻāļ‹āļ‡āđ€āļ—āļĒāļšāļāļšāļĢāļ°āļ”āļšāļ„āļ§āļēāļĄāļŠāļ‡āļ‚āļ­āļ‡āļ™ āļēāļ—āļ°āđ€āļĨ

in mbar

Slide 6 Poowadol C. / Service Department

03/10/2020

Introduction: Types of Pressure

Certified Basic Service Training - Process Pressure

Slide 7

p in bar

Absolute

pressure

Gauge

pressure

Atmospheric pressureVacuum

p [Pa] =[N]

[mÂē]FA

0 mbarGauge cell0 mbar

Absolute cell1013 mbar

Poowadol C. / Service Department

03/10/2020

Introduction: Measuring modes

Slide 8 Poowadol C. / Service Department

â€Ē Pressure

â€Ē Level

â€Ē Flow pQ

03/10/2020

Certified Basic Service Training - Hydrostatic / Deltapilot

Introduction: Operation Level measurement

Hydrostatic Pressure:

𝑝 = 𝜌 ∙ 𝑔 ∙ h

Acceleration of gravity

PressureHeight

Density

pambienth

pambient

phydr.

→ h =𝑝

𝜌∙𝑔

Slide 9 Poowadol C. / Service Department

03/10/2020

Introduction: Definitions – MWP (Max. Working Pressure)

MWP āļ„āļ­āļ„āļēāļ„āļ§āļēāļĄāļ”āļ™āļŠāļ‡āļŠāļ”āļ—āđ€āļ„āļĢāļ­āļ‡āļŠāļēāļĄāļēāļĢāļ–āļĢāļšāđ„āļ” āđƒāļ™āļāļēāļĢāđƒāļŠāļ‡āļēāļ™ āđ‚āļ”āļĒāļˆāļ°āđāļŠāļ”āļ‡āļ—āļ•āļ§āļ­āļ›āļāļĢāļ“

Slide 10 Poowadol C. / Service Department

03/10/2020

Introduction: Definitions – Turn Down āļĨāļ”āļĒāļēāļ™āļāļēāļĢāļ§āļ”āļ‚āļ­āļ‡ sensor

1 bar0

4 mA 20 mA12 mA

20 mA4 mA

0,5 bar

0,5 bar0

31,3 mbar 1 mA

62,5 mbar 1 mA

1 bar

TD 1:1

TD 2:1

Slide 11 PPoowadol C. / Service Department

03/10/2020

Introduction: Definitions – Turn Down āļĨāļ”āļĒāļēāļ™āļāļēāļĢāļ§āļ”āļ‚āļ­āļ‡ sensor

Slide 12 Poowadol C. / Service Department

03/10/2020

Introduction: Definition of terms

Slide 13 Poowadol C. / Service Department

03/10/2020

Introduction: āļ„āļ§āļēāļĄāļŦāļĄāļēāļĒāļ‚āļ­āļ‡āļ„āļē sensor

LRL= Lower range limit āļ„āļēāļ• āļēāļŠāļ”āļ—āđ€āļ„āļĢāļ­āļ‡āļŠāļēāļĄāļēāļĢāļ–āļ§āļ”āđ„āļ”URL=Upper range limit āļ„āļēāļŠāļ‡āļŠāļ”āļ—āđ€āļ„āļĢāļ­āļ‡āļŠāļēāļĄāļēāļĢāļ–āļ§āļ”āđ„āļ”

LRV=Lower range value āļĒāļēāļ™āļāļēāļĢāļ§āļ”āļ— 4.000 mA

URV=Upper range value āļĒāļēāļ™āļāļēāļĢāļ§āļ”āļ— 20.000 mA

MWP=Maximum working pressure āļ„āļēāļ„āļ§āļēāļĄāļ”āļ™āļŠāļ‡āļŠāļ”āļ—āđ€āļ„āļĢāļ­āļ‡āļŠāļēāļĄāļēāļĢāļ–āļ— āļēāļ‡āļēāļ™āđ„āļ”OPL=Over pressure limit āļ„āļ§āļēāļĄāļ”āļ™āļ—āđ€āļāļ™āļ‚āļ”āļˆ āļēāļāļ”āļ‚āļ­āļ‡āđ€āļ„āļĢāļ­āļ‡

Poowadol C. / Service DepartmentSlide 14

03/10/2020

Introduction: Performance Characteristics

āļˆāļ°āđ€āļ›āļ™āļ„āļē accuracy āļ•āļēāļĄāļāļēāļĢ Turn down āļ‚āļ­āļ‡āļ„āļē measuring cell

Slide 15 Poowadol C. / Service Department

03/10/2020

Introduction: Device overview – current segmentation

Ceraphant

Pressure/Switch

Cerabar

Pressure/Level

Deltabar

Diff. Pressure/Level/Flow

Deltapilot

Pressure/Level

Waterpilot

Pressure/Level

S

M

T

Cerabar S

Ceraphant

Cerabar M

Cerabar

Deltabar S

Deltabar M

Deltapilot S

Deltapilot M

Waterpilot

Process Pressure Diff.Pressure Hydrostatics

Slide 16 Poowadol C. / Service Department

03/10/2020

Introduction: Device overview – current segmentation

Ceraphant

Pressure/Switch

Cerabar

Pressure/Level

Deltabar

Diff. Pressure/Level/Flow

Deltapilot

Pressure/Level

Waterpilot

Pressure/Level

S

M

T

Cerabar S

Ceraphant

Cerabar M

Cerabar

Deltabar S

Deltabar M

Deltapilot S

Deltapilot M

Waterpilot

Process Pressure Diff.Pressure Hydrostatics

Slide 17 Poowadol C. / Service Department

03/10/2020

Certified Basic Service Training - Process Pressure

Introduction: Cerabar (Product Line)

Cerabar T P

ast

PMC11 PMC21

PMC131 PMP131

PMP 11 PMP21

Ceramic cell Utility/Process line

Metal cell Utility/Process line

PMP 135

PMP23

Metal cell Hygienic line

Slide 18 PCM /MVS

03/10/2020

Certified Basic Service Training - Process Pressure

Introduction: Cerabar M

PMC51 PMP51 PMP55

Ceramic cell Metal cell

Slide 19 PCM /MVS

03/10/2020

Certified Basic Service Training - Process Pressure

Introduction: Cerabar S

PMC71 PMP71 PMP75

Ceramic cell Metal cell

Slide 20 PCM /MVS

03/10/2020

â€Ē Introduction

â€Ē Installation

â€Ē Commissioning

â€Ē Maintenance

â€Ē Diagnosis

â€Ē Repair

â€Ē Application & Case study

Slide 21 Poowadol C. / Service Department

03/10/2020

Installation

- Installation & Wiring & Commissioning

- āļ•āļ”āļ•āļ‡āļ­āļ›āļāļĢāļ“āļ—āļ”āļēāļ™āļšāļ™ / āļ—āļ”āļēāļ™āļĨāļēāļ‡ / āļ”āļēāļ™āļ‚āļēāļ‡āļ‚āļ­āļ‡āļ–āļ‡āļŦāļĢāļ­āđƒāļ™āļ—āļ­

Slide 22 Poowadol C. / Service Department

03/10/2020

Commissioning: Installation in a tank

â€Ē āļ•āļ”āļ•āļ‡āļ­āļ›āļāļĢāļ“āļ”āļēāļ™āļĨāļēāļ‡āļˆāļ”āļ§āļ”āļ• āļēāļŠāļ”āđ€āļŠāļĄāļ­āļŠ āļēāļŦāļĢāļšāļāļēāļĢāļ§āļ”āļĢāļ°āļ”āļšāđƒāļ™āļ–āļ‡

â€Ē āđ„āļĄāļ•āļ”āļ­āļ›āļāļĢāļ“āđƒāļ™āļĨāļāļĐāļ“āļ°āļ™

- āđƒāļāļĨāļˆāļ”āđ€āļ•āļĄāļ‚āļ­āļ‡

- āđƒāļ™āļāļēāļĢāđ„āļŦāļĨāļ­āļ­āļāļ‚āļ­āļ‡āļ–āļ‡

- āđƒāļāļĨāļ›āļĄ

- āđƒāļāļĨāļāļšāļ§āļēāļĨāļ§

- āđƒāļāļĨāđƒāļšāļāļ§āļ™āđƒāļ™āļ–āļ‡

Slide 23 Poowadol C. / Service Department

03/10/2020

Commissioning: Installation in a tank

â€Ē Level measurement

- āļāļēāļĢāļŠāļ­āļšāđ€āļ—āļĒāļšāđāļĨāļ°āļāļēāļĢāļ—āļ”āļŠāļ­āļšāļāļēāļĢāļ— āļēāļ‡āļēāļ™āļ‚āļ­āļ‡āļ­āļ›āļāļĢāļ“ āļ™āļ™āļŠāļēāļĄāļēāļĢāļ–āļ— āļēāđ„āļ”āļ‡āļēāļĒāļ‚āļ™āļŦāļēāļāļ•āļ”āļ•āļ‡āļ­āļ›āļāļĢāļ“āļ§āļēāļĨāļ§

- āļ­āļ›āļāļĢāļ“āļˆāļ°āļ•āļ­āļ‡āļĢāļ§āļĄāļ­āļĒāđƒāļ™āļ‰āļ™āļ§āļ™āļāļ™āļ„āļ§āļēāļĄāļĢāļ­āļ™āļŠ āļēāļŦāļĢāļšāļœāļĨāļ•āļ āļ“āļ‘āļ—āđāļ‚āļ‡āļ•āļ§āđ€āļĄāļ­āļĄāļāļēāļĢ cooling down

Slide 24 Poowadol C. / Service Department

03/10/2020

Installation in a pipe

â€Ē Pressure measurement in gases

â€Ē Pressure measurement in steams

â€Ē Pressure measurement in liquids

Slide 25 Poowadol C. / Service Department

03/10/2020

Installation in a pipetemperature reduction ( Siphon)

- āļ•āļ”āļ•āļ‡āđ€āļžāļ­āļĨāļ”āļ­āļ“āļŦāļ āļĄāđāļĨāļ°āđāļĢāļ‡āļ”āļ™ āļāļ­āļ™āļ—āļˆāļ°āļĄāļēāļāļĢāļ°āļ—āļšāļ— sensor āļ›āļ­āļ‡āļ„āļ§āļēāļĄāđ€āļŠāļĒāļŦāļēāļĒāļ‚āļ­āļ‡āđ€āļ„āļĢāļ­āļ‡

Slide 26 Poowadol C. / Service Department

03/10/2020

Installation

â€Ē GORE-TEXÂŪ filter āļ•āļ§āļŠāļ”āđ€āļŠāļĒāđāļĢāļ‡āļ”āļ™āļāļšāļšāļĢāļĢāļĒāļēāļāļēāļĻāļ•āļ­āļ‡āļŠāļĨāļ‡ āđ€āļžāļ­āļ›āļ­āļ‡āļāļ™āļ™ āļēāđ€āļ‚āļēāđ„āļ›āļ āļēāļĒāđƒāļ™āļŦāļĢāļ­āļ„āļĢāļēāļšāļ āļ™āđ€āļāļēāļ°āļ— āļēāđƒāļŦāļ•āļ™

Slide 27 Poowadol C. / Service Department

03/10/2020

Installation – Sealing – Flanges

â€Ē āļŦāļēāļĄāđƒāļŦāļ‹āļĨāļāļšāđ„āļ”āļ­āļ°āđāļŸāļĢāļĄāđ€āļ‹āļ™āđ€āļ‹āļ­āļĢāļāļ”āļ—āļšāļāļ™ āđ€āļ™āļ­āļ‡āļˆāļēāļāļ­āļēāļˆāļŠāļ‡āļœāļĨāļ•āļ­āļœāļĨāļāļēāļĢāļ§āļ”āļœāļ”āđ€āļžāļĒāļ™

Slide 28 Poowadol C. / Service Department

03/10/2020

Installation – Sealing – Threads

â€Ē NPT thread G thread

â€Ē āđƒāļŠ teflon tape āđƒāļŠāđ€āļ‰āļžāļēāļ° flat seal

Slide 29 Poowadol C. / Service Department

03/10/2020

Installation

â€Ē āļ›āļ”āļāļēāļ„āļĢāļ­āļšāļ•āļ§āđ€āļ„āļĢāļ­āļ‡āđāļĨāļ° o-ring āđƒāļŦāđāļ™āļ™āđ€āļŠāļĄāļ­ āđ€āļžāļ­āļ›āļ­āļ‡āļāļ™āđ„āļĄāđƒāļŦāļ„āļ§āļēāļĄāļŠāļ™āđ€āļ‚āļēāđ„āļ›āļ āļēāļĒāđƒāļ™āđ€āļ„āļĢāļ­āļ‡

â€Ē āļ­āļĒāļēāļ— āļēāļ„āļ§āļēāļĄāļŠāļ°āļ­āļēāļ”āļŦāļĢāļ­āļŠāļĄāļœāļŠāļāļšāđāļœāļ™āđ„āļ”āļ­āļ°āđāļŸāļĢāļĄāļ”āļ§āļĒāļ§āļ•āļ–āđāļ‚āļ‡āļŦāļĢāļ­āļ›āļĨāļēāļĒāđāļŦāļĨāļĄ

â€Ē āđƒāļ™āļāļĢāļ“āļ‚āļ­āļ‡āļŠāļēāļĒ capillaries : āļ„āļ§āļĢāļĄāļ§āļ™āļŠāļēāļĒāđƒāļŦāļĄāļĢāļĻāļĄāļāļēāļĢāđ‚āļ„āļ‡āļĄāļ§āļ™āļ‚āļ­āļ‡āļŠāļēāļĒāļĄāļēāļāļāļ§āļē 100 āļĄāļĄ.

Slide 30 Poowadol C. / Service Department

03/10/2020

â€Ē Introduction

â€Ē Installation

â€Ē Commissioning

â€Ē Maintenance

â€Ē Diagnosis

â€Ē Repair

â€Ē Application & Case study

Slide 31 Poowadol C. / Service Department

03/10/2020

Connecting the device – M-class

Test terminals

Grounding terminal

Push buttons

Terminal for supply voltage

Dip switches:Left: Hardware locking

Slide 32 Poowadol C. / Service Department

03/10/2020

Two-wire vs. four-wire concept

4-wire transmitter

230 VAC

DC+-

Internal power supply

Current output0 / 4 – 20 mA

mA

V or fSignal processing

2-wire transmitter

Power supply unit

4 – 20 mA

230 VAC

24 VDC

+-

Auxiliary power~ 15V/4mAi 60 mW

Data logger, PLC, remote display

4 ..

.. 1

6 m

A

Signal processing

4 mA

Slide 33 Poowadol C. / Service Department

03/10/2020

Commissioning: Connecting the device – S-class

Grounding terminal

Terminal for supply voltage

Dip switches:Left: Hardware locking

Test terminals!!jumper position!!

Push buttons

Slide 34 Poowadol C. / Service Department

03/10/2020

Wiring

Slide 35 Poowadol C. / Service Department

03/10/2020

Commissioning: Operation - Possibilities of operation

None Push buttons Communication protocol

On display On electronicmodule (inside)

On housing (outside)

DeviceCareSFE100

Slide 36 Poowadol C. / Service Department

03/10/2020

Commissioning: Operation

Ceraphant

LED for statusgreen = okred =errorblinking = warning

Switch output LEDs on = switch closedoff = switch open

Operating keys (following VDMA guidelines)

Measured value and unit

Slide 37

03/10/2020

Commissioning – Operation of the Transmitter

â€Ē Ceraphant T(KA225P)

Certified Basic Service Training - Process Pressure

Slide 38 Poowadol C. / Service Department

03/10/2020

Commissioning – Operation of the Transmitter

Ceraphant

â€Ē Press E for 2 sec to release Keylock

â€Ē No service interface

â€Ē Max. Turn Down: TD 5:1

â€Ē SP > RSP

â€Ē URV > LRV

â€Ē Load required for current output

Certified Basic Service Training - Process Pressure

Slide 39 PCM /MVS

03/10/2020

Commissioning : IO Link for PMP23

â€Ē Zero point setting

â€Ē Adjust measuring range

â€Ē Switch functionality

â€Ē Adjust delays

â€Ē Simulation of outputs / Loop

check

â€Ē Sensor diagnosis

â€Ē Min/Max indicator

PMP23 with

IO-Link

Setting of lower range value and upper range value

under consideration of span and upper range limit is

possible through IO-Link even after installation

If IO-Link is not used for communication, the port

acts as a switching output which can be configured in

the field or can be ordered preconfigured

This parameter makes it possible to call up

retroactively the lowest/highest value measured for

pressure

Slide 40 Poowadol C. / Service Department

03/10/2020

Commissioning : IO Link for PMP23

â€Ē Bluetooth LE and WLAN

â€Ē Built-in battery

â€Ē Automatic device identification

â€Ē Automatic driver download (IODD)

â€Ē SAP order number from PC-PS

â€Ē In future a label is planned with integration in the SmartBlue App

Slide 41 Poowadol C. / Service Department

03/10/2020

Commissioning : IO Link for PMP23

â€Ē 3-wire operation

â€Ē 4-wire operation

C/Q: IO-Link or DC-PNP

C/Q: IO-Link or DC-PNP Out2: 4â€Ķ20mA

1

2

3

4

L+

L-

C/Q

1

2

3

4

L+

L-

C/Q

OUT2

â€Ē No 2-wire operation like

the standard 4-20mA

device

Slide 42 Poowadol C. / Service Department

03/10/2020

Commissioning: Operation - M-class with display

āļ›āļĄāļāļ”āļ‚āļ™āļŦāļĢāļ­āļĨāļ‡āđāļāđ„āļ‚āļ„āļēāļ•āļ§āđ€āļĨāļ‚āđāļĨāļ°āļ•āļ§āļ­āļāļĐāļĢ (āļ āļēāļĒāđƒāļ™āļŸāļ‡āļāļŠāļ™)

āļ›āļĄāļāļ”āļĒāļ™āļĒāļ™āļ‚āļēāļĄāđ„āļ›āļĢāļēāļĒāļāļēāļĢāļ–āļ”āđ„āļ› āļāļēāļĢāđ€āļĨāļ­āļāļĢāļēāļĒāļāļēāļĢāđ€āļĄāļ™āđāļĨāļ°āļāļēāļĢāđ€āļ›āļ”āđƒāļŠāļ‡āļēāļ™āđ‚āļŦāļĄāļ”āđāļāđ„āļ‚

āļāļ”āļžāļĢāļ­āļĄāļāļ™āđ€āļžāļ­āļ­āļ­āļāļĄāļēāļ­āļāļŦāļ™āļē āđ€āļĄāļ™āļāļ­āļ™āļŦāļ™āļēāļ­āļ­āļāļˆāļēāļāđ‚āļŦāļĄāļ”āđāļāđ„āļ‚āđ‚āļ”āļĒāđ„āļĄāļšāļ™āļ—āļ

āļāļ”āļ›āļĄ E āļāļš (-) āđ€āļžāļ­āļ›āļĢāļšāļ„āļ§āļēāļĄāļŠāļ§āļēāļ‡āļŦāļ™āļēāļˆāļ­āļ™āļ­āļĒāļĨāļ‡āļāļ”āļ›āļĄ E āļāļš (+) āđ€āļžāļ­āļ›āļĢāļšāļ„āļ§āļēāļĄāļŠāļ§āļēāļ‡āļŦāļ™āļēāļˆāļ­āļĄāļēāļāļ‚āļ™

Slide 43 Poowadol C. / Service Department

03/10/2020

Commissioning: Operation Display

1. āļ— āļēāļāļēāļĢāļ•āļ‡āļ„āļē set up āđ‚āļ”āļĒāļāļēāļĢāļāļ”āļ›āļĄ E

2. āļāļ”āļ›āļĄ E āđ€āļ‚āļēāđ„āļ›āđƒāļ™āđ€āļĄāļ™ Set up āđāļĨāļ§āđ€āļĨāļ­āļāđ‚āļŦāļĄāļ”āļāļēāļĢāļ§āļ”āđ€āļ›āļ™ Pressure

Slide 44 Poowadol C. / Service Department

03/10/2020

Commissioning: Operation Display

Poowadol C. / Service DepartmentSlide 45

3. āđ€āļĨāļ­āļ™āļĨāļ‡āļĄāļē Press.eng. Unit āđ€āļžāļ­āļ— āļēāļāļēāļĢāđ€āļĨāļ­āļāļŦāļ™āļ§āļĒāļāļēāļĢāļ§āļ” āđāļĨāļ§āļāļ” E āđ€āļ‚āļēāđ„āļ›

4. āđ€āļĨāļ­āļ™āļĨāļ‡āļĄāļēāļ— Pos. zero adjust āđ€āļžāļ­āļ— āļē zero āđƒāļ™āļŠāļ āļēāļ§āļ°āļ–āļ‡āļ§āļēāļ‡āļŦāļĢāļ­āļ—āļ­āļ§āļēāļ‡

Certified Basic Service Training - Pressure General

03/10/2020

Commissioning: Operation Display

Poowadol C. / Service DepartmentSlide 46

5. āđ€āļĨāļ­āļ™āļĨāļ‡āļĄāļēāļ— āļēāļāļēāļĢāļ•āļ‡āļ„āļē LRV (4.000 mA)

6. āđ€āļĨāļ­āļ™āļĨāļ‡āļĄāļēāļ— āļēāļāļēāļĢāļ•āļ‡āļ„āļē URV (20.000 mA)

Certified Basic Service Training - Pressure General

03/10/2020

Commissioning: Simulation 4-20 mA

Slide 47

āļāļēāļĢāļ—āļ”āļŠāļ­āļšāļŠāļāļāļēāļ“ 4-20 mA. Test loop to PLC āļ— āļēāđ„āļ”āļ”āļ‡āļ™

1. āļ•āļ­āļŠāļēāļĒāļĄāđ€āļ•āļ­āļĢāđāļšāļšāļ­āļ™āļāļĢāļĄāđ€āļ‚āļēāļāļšāļ‚āļ§ (+) āđāļĨāļ° (-)

2.āļāļ”āļ›āļĄ E āđ€āļžāļ­āđ€āļ‚āļēāđ€āļĄāļ™ Diagnosis

Poowadol C. / Service Department

03/10/2020

Commissioning: Simulation 4-20 mA

Slide 48

3.āļāļ”āļ›āļĄ (-) āđ€āļĨāļ­āļ™āļĄāļēāļ—āđ€āļĄāļ™ Simulation āđāļĨāļ§āļāļ”āļ›āļĄ E āđ€āļ‚āļēāđ„āļ›

4.āļāļ”āļ›āļĄ E āđ€āļ‚āļēāđ„āļ›āđƒāļ™ Simulation mode āđ€āļ›āļ™ Current āđāļĨāļ§āļāļ”āļ›āļĄ E

Certified Basic Service Training - Pressure General

Poowadol C. / Service Department

03/10/2020

Commissioning: Simulation 4-20 mA

Slide 49

5.āļ— āļēāļāļēāļĢāļ›āļ­āļ™āļ„āļēāļāļĢāļ°āđāļŠāļ—āļ•āļ­āļ‡āļāļēāļĢ (4-20 mA)

6.āļŦāļĨāļ‡āļˆāļēāļ simulation āđ€āļŠāļĢāļˆāđāļĨāļ§āđƒāļŦāļ›āļ”āđ‚āļŦāļĄāļ”āļāļēāļĢ sim āđ€āļ›āļ™ none

Certified Basic Service Training - Pressure General

Poowadol C. / Service Department

03/10/2020

Commissioning: āļāļēāļĢāđƒāļŠāļ•āļēāļĢāļēāļ‡ Linearization

â€Ē 5x-series / M-class (PMP51, PMC51,PMD55)

Poowadol C. / Service Department

03/10/2020

Commissioning: āļāļēāļĢāđƒāļŠāļ•āļēāļĢāļēāļ‡ Linearization

â€Ē āļ— āļēāđ„āļ”āđ‚āļ”āļĒāļāļēāļĢāđ€āļŠāļ­āļĄāļ•āļ­āļāļšāļ­āļ›āļāļĢāļ“āļ”āļ‡āļ™

â€Ē 1. āļāļĨāļ­āļ‡ Comubox FXA195 HART

â€Ē 2. āđ‚āļ›āļĢāđāļāļĢāļĄ Device care SFE100

Poowadol C. / Service DepartmentSlide 51

03/10/2020

Commissioning: Linearization

â€Ē āļ‚āļ™āļ•āļ­āļ™āļ— 1 āļ— āļēāļāļēāļĢāļ•āļ‡āļ„āļēāđ‚āļŦāļĄāļ”āļāļēāļĢāļ§āļ”āđ€āļ›āļ™ Level āļžāļĢāļ­āļĄāđ€āļ›āļĨāļĒāļ™āļŦāļ™āļ§āļĒ

Poowadol C. / Service DepartmentSlide 52

03/10/2020

Commissioning: āļāļēāļĢāđƒāļŠāļ•āļēāļĢāļēāļ‡ Linearization

â€Ē āļ‚āļ™āļ•āļ­āļ™āļ— 2 āļ•āļ‡āļ„āļē level āđƒāļ™āđ€āļĄāļ™ Extended Setup āđ€āļĨāļ­āļāđ‚āļŦāļĄāļ”āđ€āļ›āļ™ In pressure āļžāļĢāļ­āļĄāđƒāļŠāļ„āļē Empty āđāļĨāļ°āļ„āļē Full

Empty āļ„āļ­āļ„āļēāļ„āļ§āļēāļĄāļ”āļ™āđ€āļĄāļ­āļ–āļ‡āļ§āļēāļ‡ āđ€āļ›āļ™ 0 mbar

Empty calibrate āļˆāļ°āđ€āļ—āļēāļāļšāļ„āļē Empty

Full pressure āļ„āļ­āļ„āļēāļ„āļ§āļēāļĄāļ”āļ™āļŠāļ‡āļŠāļ”āđ€āļĄāļ­āļ–āļ‡āđ€āļ•āļĄāļ–āļ‡

Full Calibrate āļˆāļ°āđ€āļ—āļēāļāļšāļ„āļē full pressure

Poowadol C. / Service DepartmentSlide 53

03/10/2020

Commissioning: āļāļēāļĢāđƒāļŠāļ•āļēāļĢāļēāļ‡ Linearization

â€Ē āļ‚āļ™āļ•āļ­āļ™āļ— 3 āđ€āļ‚āļēāđ€āļĄāļ™ Linearization āđ€āļĨāļ­āļāļŦāļ™āļ§āļĒāļ—āđ€āļ›āļ™āļ›āļĢāļĄāļēāļ•āļĢ āļ—āļ•āļ­āļ‡āļāļēāļĢāđāļŠāļ”āļ‡āļœāļĨ

â€Ē āļ‚āļ™āļ•āļ­āļ™āļ— 4 āļāļ”āđ€āļĄāļ™ linearization table āļ—āļ”āļēāļ™āļšāļ™

Poowadol C. / Service DepartmentSlide 54

03/10/2020

Commissioning: āļāļēāļĢāđƒāļŠāļ•āļēāļĢāļēāļ‡ Linearization

â€Ē āļ‚āļ™āļ•āļ­āļ™āļ— 5 āļ— āļēāļāļēāļĢāļ›āļ­āļ™āļ„āļēāļ•āļēāļĢāļēāļ‡ āđ„āļ”āļŠāļ‡āļŠāļ” 32 āļ„āļē āļ„āļēāļ•āļēāļĢāļēāļ‡ table āļĢāļ°āļŦāļ§āļēāļ‡āļ„āļēāļ•āļ­āļ‡āļĄāļēāļāļāļ§āļē >0,5% āļ‚āļ­āļ‡āļĢāļ°āļ”āļš rang

â€Ē āļ‚āļ™āļ•āļ­āļ™āļ— 6 āļŦāļĨāļ‡āļˆāļēāļāļ›āļ­āļ™āļ„āļēāđ€āļŠāļĢāļˆāđāļĨāļ§āļāļ”āļ—āđāļ–āļš Write

Poowadol C. / Service DepartmentSlide 55

03/10/2020

Commissioning : Installation for Flow measurement

â€Ē Flow measurement in steam with PMD70/PMD75

Slide 56 Poowadol C. / Service Department

03/10/2020

Commissioning: Marking of High- and Low Pressure side

PCM / MVSSlide 57

Certified Basic Service Training - Differential Pressure

High Pressure side Low Pressure side

Deltabar M P1 (changeable via switch) P2 (changeable via switch)

Deltabar S + -

Diaphragm seal + -

Deltabar HP (bottom) LP (top)

03/10/2020

Commissioning: Flow measurement Process connection; Orifice

orifice plate

Slide 58 Poowadol C. / Service Department

03/10/2020

Commissioning: Flow measurementExample for delivery

Slide 59 Poowadol C. / Service Department

03/10/2020

Commissioning: Function of condensate pot

Poowadol C. / Service DepartmentSlide 60

(1) Steam from process

(2) condensate get created

(3) condensate flow back to process

(if condensate pot is filled with

condensate)

(4) constant water column

3

21

4

03/10/2020

Commissioning: Accessories

Poowadol C. / Service DepartmentSlide 61

â€Ē Manifold

Certified Basic Service Training - Differential Pressure

03/10/2020

Commissioning: Function of manifold

PCM / MVSSlide 62

â€Ē 3 valve manifold at PMD75

Certified Basic Service Training - Differential Pressure

+ -

03/10/2020

Commissioning: Function of manifold

Poowadol C. / Service DepartmentSlide 63

â€Ē 3 valve manifold at PMD75

Certified Basic Service Training - Differential Pressure

+ -

03/10/2020

Commissioning: Function of manifold

Poowadol C. / Service DepartmentSlide 64

â€Ē Check zero point at Deltabar

Certified Basic Service Training - Differential Pressure

+ -

03/10/2020

Commissioning: Function of manifold

Slide 65

â€Ē Perform zero position adjust if needed.

Certified Basic Service Training - Differential Pressure

Poowadol C. / Service Department

03/10/2020

Commissioning: Function of manifold

Poowadol C. / Service DepartmentSlide 66

â€Ē Bring the transmitter back to normal function

Certified Basic Service Training - Differential Pressure

+ -

03/10/2020

dp-flow basics

Commissioning: Flow measurement From complex to simple

Slide 67

nomm pd

CQ

−= 2

1

1

4 4

2

nomm pKQ = 2

pQ

Poowadol C. / Service Department

03/10/2020

Commissioning: Operation Flow measurement

Slide 68

1. āļ— āļē zero adjust

2. āļ— āļēāļāļēāļĢāļ•āļ‡āļ„āļē parameter āđ‚āļ”āļĒāļœāļēāļ™āđ‚āļ›āļĢāđāļāļĢāļĄ device care āđ‚āļ”āļĒāđ€āļ‚āļēāđ„āļ›āļ—āđ€āļĄāļ™ Set up

Certified Basic Service Training - Pressure General

Poowadol C. / Service Department

03/10/2020

Commissioning: Operation Flow measurement

Slide 69

3. āļ— āļēāļāļēāļĢāļ•āļ‡āļ„āļē Max flow āļ„āļ­āļ„āļē flow rate āļŠāļ‡āļŠāļ”āļ—āđ„āļ”āļˆāļēāļāļāļēāļĢ Sizing flow āļˆāļēāļāļāļēāļĢāđ€āļ­āļēāļ„āļē Temp,pressure,āļ‚āļ™āļēāļ”āļ—āļ­āđ„āļ›āļ„ āļēāļ™āļ§āļ“

Max pressure flow āļ„āļ­āļ„āļēāļ„āļ§āļēāļĄāļ”āļ™āļŠāļ‡āļŠāļ”āļˆāļēāļāļāļēāļĢ Sizing flow āļˆāļēāļāļāļēāļĢāđ€āļ­āļēāļ„āļē Temp,pressure,āļ‚āļ™āļēāļ”āļ—āļ­āđ„āļ›āļ„ āļēāļ™āļ§āļ“

Certified Basic Service Training - Pressure General

Poowadol C. / Service Department

03/10/2020

Commissioning: Operation Flow measurement

Slide 70

4. āđ€āļ‚āļēāđ„āļ›āļ•āļ‡āļ„āļēāđƒāļ™āđ€āļĄāļ™ Extended setup āđƒāļ™āļŦāļ§āļ‚āļ­ flow āđāļĨāļ§āđ€āļĨāļ­āļāđ‚āļŦāļĄāļ”āļāļēāļĢāļ§āļ”āļˆāļ°āđ€āļ›āļ™ volume āļŦāļĢāļ­ mass āđāļĨāļ°āđ€āļĨāļ­āļāļŦāļ™āļ§āļĒāđāļŠāļ”āļ‡āļœāļĨ

5. āļ•āļ‡āļ„āļē Current output 4-20 mAāđ‚āļ”āļĒāļ—āļ„āļē LRV,URV āļˆāļ°āđ€āļ—āļēāļāļš max flow āđ‚āļ”āļĒāļ­āļ•āđ‚āļ™āļĄāļ•

Certified Basic Service Training - Pressure General

Poowadol C. / Service Department

03/10/2020

Commissioning: Operation Flow measurement

Slide 71

6. āļ•āļ‡āļ„āļēāđƒāļ™āļŠāļ§āļ™āļ‚āļ­āļ‡āļœāļĨāļĢāļ§āļĄāļŠāļ°āļŠāļĄāļ—āđ€āļĄāļ™ Totalizer āđ€āļĨāļ­āļāļŦāļ™āļ§āļĒāļāļēāļĢāļ§āļ” āđ‚āļŦāļĄāļ”āļ—āļĻāļ—āļēāļ‡āļāļēāļĢāđ„āļŦāļĨ

7. āļ•āļ‡āļ„āļēāđƒāļ™āļŠāļ§āļ™āļ‚āļ­āļ‡ display āđƒāļŦāļĄāļāļēāļĢāđāļŠāļ”āļ‡āļ„āļēāļœāļĨāļĢāļ§āļĄāļ”āļ§āļĒ āđ‚āļ”āļĒāļ—āļŦāļ™āļēāļˆāļ­āļˆāļ°āļŠāļĨāļšāļāļēāļĢāđāļŠāļ”āļ‡āļœāļĨ

Certified Basic Service Training - Pressure General

Poowadol C. / Service Department

03/10/2020

dp-flow basics

Commissioning: Flow measurementHow to calculate quickly the dp or the flow

Slide 72

xx QQ

dp

dp= max

max

To know the flow value at a certain dpx

Poowadol C. / Service Department

03/10/2020

Commissioning: Flow measurementHow to calculate quickly the dp or the flow

Slide 73

xx dpdp

Q

Q=

max

2

max

To know the dp value at a certain flow Qx

mbar 127mbar 250mÂģ/h 500mÂģ/h 356

2

=

500 mÂģ/h at 250 mbar

Poowadol C. / Service Department

03/10/2020

dp-flow basics

Commissioning: Flow measurementHow to calculate quickly the dp or the flow

Slide 74

xx QQ

dp

dp= max

max

To know the flow value at a certain dpx

500 mÂģ/h at 250 mbar

356mÂģ/hmÂģ/h 500mbar 250mbar 127

=

Poowadol C. / Service Department

03/10/2020

â€Ē Introduction

â€Ē Installation

â€Ē Commissioning

â€Ē Maintenance

â€Ē Diagnosis

â€Ē Repair

â€Ē Application & Case study

Slide 75 Poowadol C. / Service Department

03/10/2020

Maintenance

Pressure compensation element

â€Ē āļ›āļ­āļ‡āļāļ™āļāļēāļĢāđ€āļ›āļ­āļ™ āļ­āļ”āļ•āļ™āļ‚āļ­āļ‡ Filter Membrane

āļ•āļĢāļ§āļˆāļŠāļ­āļšāļ§āļēāļĄāļ„āļ§āļēāļĄāđ€āļŠāļĒāļŦāļēāļĒāļ‚āļ­āļ‡āđ€āļĒāļ­āļŦāļĄāļŦāļĢāļ­āđ„āļĄ

āļ•āļĢāļ§āļˆāļŠāļ­āļšāļ§āļēāļĄāđ€āļĻāļĐāļ‚āļ­āļ‡āđƒāļ™āđ€āļĒāļ­āļŦāļĄāļŦāļĢāļ­āđ„āļĄ

Slide 76 Poowadol C. / Service Department

03/10/2020

â€Ē Introduction

â€Ē Installation

â€Ē Commissioning

â€Ē Maintenance

â€Ē Diagnosis

â€Ē Repair

â€Ē Application & Case study

Slide 77 Poowadol C. / Service Department

03/10/2020

Diagnosis: Troubleshooting - How to act

â€Ē āļ›āļāļŦāļēāļ„āļ­āļ­āļ°āđ„āļĢ ?

â€Ē āļ„ āļēāļ­āļ˜āļšāļēāļĒāļ‚āļ­āļœāļ”āļžāļĨāļēāļ”āļ„āļ­āļ­āļ°āđ„āļĢ ?

â€Ē error message āļ„āļ­āļ­āļ°āđ„āļĢ ?

â€Ē āđ€āļ›āļ™āļ›āļāļŦāļēāđāļ­āļ›āļžāļĨāđ€āļ„āļŠāļ™āļŦāļĢāļ­āđ„āļĄ ?

- āđ€āļ›āļ™āļ­āļ›āļāļĢāļ“āļ—āđ€āļŦāļĄāļēāļ°āļŠāļĄāļāļšāđāļ­āļžāļžāļĨāđ€āļ„āļŠāļ™āļŦāļĢāļ­āđ„āļĄ

- āļ•āļĢāļ§āļˆāļŠāļ­āļšāđāļœāļ™nameplate āđāļĨāļ°āđāļ­āļ›āļžāļĨāđ€āļ„āļŠāļ™

- āļ•āļĢāļ§āļˆāļŠāļ­āļšāļ„āļēāļ­āļ“āļŦāļ āļĄāđāļĨāļ°āđāļĢāļ‡āļ”āļ™āļŠāļ‡āļŠāļ” āļ—āļ§āļ”āđ„āļ”

āđ€āļ›āļ™āļ›āļāļŦāļēāļ—āļāļēāļĢāļ•āļ‡āļ„āļēāļŦāļĢāļ­āđ„āļĄ ?

Slide 78 Poowadol C. / Service Department

03/10/2020

Certified Basic Service Training - Pressure General

Local display?

Display is working?

Output signal ok?

Transmitter ok

Supply voltage ok?

Check wiring and power

supply

Display connection

ok?

Supply voltage ok?

Device setup ok?

Replace display

Check wiring and power

supply

See operating instructions

Connect display

Device is

working fine?

Replace main electonics

No error message?

Device ok?

Replace sensor or device

Diagnosis: Troubleshooting - How to act

Slide 79 Poowadol C. / Service Department

03/10/2020

Diagnosis: Troubleshooting

â€Ē Messages error

â€Ē F = failure

â€Ē â€Ē M (warning) = maintenance required

â€Ē â€Ē C (warning) = function check

â€Ē â€Ē S (warning) = out of specification

Slide 80 Poowadol C. / Service Department

03/10/2020

Diagnosis: āļāļēāļĢāđƒāļŠāļ‡āļēāļ™āđāļ­āļ› operations

Poowadol C. / Service DepartmentSlide 81

â€Ē āļāļēāļĢāļ„āļ™āļŦāļēāļ‚āļ­āļĄāļĨāļ‚āļ­āļ‡āļ­āļ›āļāļĢāļ“āļœāļēāļ™āđāļ­āļ› Operations āđ‚āļ”āļĒāļāļēāļĢdownload

â€Ē āļžāļĄāļž S/N āļ āļēāļĒāđƒāļ™āđāļ­āļ›āļˆāļ°āļĄāļ‚āļ­āļĄāļĨāļ”āļ‡āļ™ order code, manufacturing date

03/10/2020

Diagnosis: āļāļēāļĢāđƒāļŠāļ‡āļēāļ™āđāļ­āļ› operations

Poowadol C. / Service DepartmentSlide 82

â€Ē āđ€āļ‚āļēāđ„āļ›āļ”āļ„āļĄāļ­āđ„āļ”āļ—āđāļ–āļš Documentation

â€Ē āđ€āļ‚āļēāđ„āļ›āļ”āļŦāļĄāļēāļĒāđ€āļĨāļ‚ Spare parts āđ‚āļ”āļĒāļāļ”āļ—āđāļ–āļš spare parts

03/10/2020

Diagnosis: āļāļēāļĢāđƒāļŠāļ‡āļēāļ™āļœāļēāļ™ www.endress.com

Poowadol C. / Service DepartmentSlide 83

â€Ē āđ€āļ‚āļēāļ— www.endress.com āđ‚āļ”āļĒāļŠāļēāļĄāļēāļĢāļ–āļžāļĄāļž S/N āđ€āļ‚āļēāđ„āļ›āđ€āļ„āļĢāļ­āļ‡āļāļˆāļ°āđāļŠāļ”āļ‡āļĢāļēāļĒāļĨāļ°āđ€āļ­āļĒāļ”āļ‚āļ­āļ‡āļ•āļ§āļ­āļ›āļāļĢāļ“

â€Ē āļŠāļĄāļēāļĢāļ–āļ”āļ„āļĄāļ­ āļŦāļĄāļēāļĒāđ€āļĨāļ‚ spare part āđ„āļ”āđ€āļĨāļĒ

03/10/2020

â€Ē Introduction

â€Ē Installation

â€Ē Commissioning

â€Ē Maintenance

â€Ē Diagnosis

â€Ē Repair

â€Ē Application & Case study

Slide 84 Poowadol C. / Service Department

03/10/2020

Repair: Service concept

A No repairDevice replacement

B Repair with spare parts including Ex-devices

C Repair by exchange of reworked spare parts in SC-workshop

D Repair using special production process in PC

Slide 85 Poowadol C. / Service Department

03/10/2020

Repair: Service concept – service concept for pressure (with exclusions)

Certified Basic Service Training - Pressure General

Ceraphant

Pressure/Switch

Cerabar

Pressure/Level

Deltabar

Diff. Pressure/Level/Flow

Deltapilot

Pressure/Level

Waterpilot

Pressure/Level

S

M

T

Cerabar S

Ceraphant

Cerabar M

Cerabar

Deltabar S

Deltabar M

Deltapilot S

Deltapilot M

Waterpilot

Process Pressure Diff.Pressure Hydrostatics

Slide 86 Poowadol C. / Service Department

03/10/2020

Repair: Service concept

Certified Basic Service Training - Process Pressure

A Cerabar

Ceraphant

B Cerabar M

Cerabar S

Display, cover, electronic insert, el. Connections, pressure compensation element, mounting bracket, sealings

â€Ķadditionally: Sensor

Spare Part Finding Tool

Slide 87 Poowadol C. / Service Department

03/10/2020

Repair: Sensor Replacement

Slide 88

Certified Basic Service Training - Differential Pressure

PMD55

No spare sensor available

PMD75

sensor available as structured spare part PMD75X

Sensor + process seal Complete compensated

sensor group

Poowadol C. / Service Department

03/10/2020

â€Ē Introduction

â€Ē Installation

â€Ē Commissioning

â€Ē Maintenance

â€Ē Diagnosis

â€Ē Repair

â€Ē Application & Case study

Slide 89 Poowadol C. / Service Department

03/10/2020

Application & Case study

Application: Application in Tank Process

Case : transmitter āļĄāļāļēāļĢāļ•āļ­āļšāļŠāļ™āļ­āļ‡ āļ­āļēāļ™āļ„āļēāļŠāļē āđ„āļĄāļŠāļēāļĄāļēāļĢāļ–āļ— āļē Zero āđ„āļ”

Used Instrument :

Slide 90 Poowadol C. / Service Department

03/10/2020

Application & Case study

Problem : āđ€āļāļ”āļˆāļēāļāļ•āļ§ Filter āđ€āļ›āļ™āđāļšāļšāđ€āļāļē āļ—āļĄāļĢāļ°āļĒāļ°āļŠāļ™āđāļĨāļ°āļĄāļ™ āļēāđ€āļ‚āļēāđ„āļ›āļ āļēāļĒāđƒāļ™ āļ— āļēāđƒāļŦ filter āļ­āļ”āļ•āļ™

Slide 91 Poowadol C. / Service Department

03/10/2020

Application & Case study

āđāļ™āļ§āļ—āļēāļ‡āļāļēāļĢāđāļāđ„āļ‚ : āđ€āļ›āļĨāļĒāļ™ Filter āđ€āļ›āļ™āđāļšāļšāđƒāļŦāļĄāļ—āļĄāļ‚āļ™āļēāļ”āļĒāļēāļ§āļ‚āļ™āļ›āļ­āļ‡āļāļ™āļāļēāļĢāđ„āļŦāļĨāļ‚āļ­āļ‡āļ™ āļēāđ€āļ‚āļēāđ„āļ› āđāļĨāļ°āļ— āļē Zero āđƒāļŦāļĄ

Slide 92 Poowadol C. / Service Department

03/10/2020

Application & Case study

â€Ē Application: āļ§āļ”āļĢāļ°āļ”āļšāļ™ āļēāđƒāļ™āļ–āļ‡āļŠāđāļ•āļ™āđ€āļĨāļŠ

â€Ē Case : Pressure āļ‚āļ™ Error F283 Permanent mem.

â€Ē Used Instrument : Cerabar M PMP55

Slide 93 Poowadol C. / Service Department

03/10/2020

Application & Case study

Poowadol C. / Service DepartmentSlide 94

â€Ē āļ›āļāļŦāļēāļ‚āļ­āļ‡āļĨāļāļ„āļē / āļĢāļ­āļ‡āđ€āļĢāļĒāļ™: āđ€āļ„āļĢāļ­āļ‡āļ•āļ§āđƒāļŦāļĄ āđ„āļĄāļŠāļēāļĄāļēāļĢāļ–āđƒāļŠāļ‡āļēāļ™āđ„āļ”

â€Ē āļ•āļĢāļ§āļˆāļŠāļ­āļšāļ„āļē Error āļ—āđ€āļāļ”āļ‚āļ™āļˆāļēāļāļ„āļĄāļ­ Main electronic āļ­āļēāļˆāđ€āļŠāļĒ

â€Ē āļˆāļēāļāļ„āļĄāļ­āļ­āļēāļˆāđ€āļāļ”āļˆāļēāļ 1. āļĄāļ„āļĨāļ™āđāļĄāđ€āļŦāļĨāļāļĄāļēāļĢāļšāļāļ§āļ™ , 2. āļ­āļēāļˆāđ€āļāļ”āļˆāļēāļ power supply

03/10/2020

Application & Case study

āļ•āļĢāļ§āļˆāļŠāļ­āļšāļāļēāļĢāļ•āļ”āļ•āļ‡ āļžāļĢāļ­āļĄāļāļšāļāļēāļĢ Wiring āđāļĨāļ° āļĢāļ°āļšāļšāļŠāļēāļĒāļāļĢāļēāļ§āļ™

Poowadol C. / Service DepartmentSlide 95

03/10/2020

Application & Case study

â€Ē āļŠāļēāđ€āļŦāļ• : āđ€āļāļ”āļˆāļēāļāļĢāļ°āļšāļš Ground āļ‚āļ­āļ‡āļĢāļ°āļšāļšāļ—āļĄ Ground power āđāļĨāļ° Ground Instrument āļĄāļēāļĨāļ‡āđƒāļ™āļˆāļ”āđ€āļ”āļĒāļ§āļāļ™

â€Ē āđ„āļĄāđ„āļ”āļ•āļ­ Ground āļ—āļ•āļ§āļ­āļ›āļāļĢāļ“

Poowadol C. / Service DepartmentSlide 96

03/10/2020

Application & Case study

Poowadol C. / Service DepartmentSlide 97

â€Ē āļāļēāļĢāđāļāđ„āļ‚

â€Ē Reset āļ„āļē āđ‚āļ”āļĒāđ€āļ‚āļēāđ„āļ›āļ— "Diagnosis“ āđāļĨāļ§āđ€āļĨāļ­āļ™āļĄāļēāļ— "Reset" āđāļĨāļ§āđƒāļŠ reset code “7864”

03/10/2020

Application & Case study

Poowadol C. / Service DepartmentSlide 98

â€Ē āļ•āļ­āļŠāļēāļĒāļ— Ground āļ‚āļ­āļ‡āđ€āļ„āļĢāļ­āļ‡āļžāļĢāļ­āļĄāļāļšāļ•āļ‡āļ„āļēāđƒāļŦāļĄ

â€Ē āđ€āļĄāļ­āļ•āļ­āļŠāļēāļĒāđāļĨāļ§ āđ€āļ„āļĢāļ­āļ‡āļ— āļēāļ‡āļēāļ™āļ›āļāļ•

03/10/2020

Products Solutions Services

Questions?

Slide 99 EHTH