Upload
len-morales
View
31
Download
0
Embed Size (px)
DESCRIPTION
BASIC PBN Flight Procedure Design Training Hanoi, 17 July – 10 August 2012 OPENING 08:30-09:00 17 July 2012. proceeding. ✈Opening Remarks by JICA Experts ✈Welcome Remarks by CAAV ✈Introduction of Japanese Instructors & Participants ✈Schedule of Lectures and Exercise ✈Others. - PowerPoint PPT Presentation
Citation preview
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
1
BASIC PBNFlight Procedure Design Training
Hanoi, 17 July – 10 August 2012
OPENING08:30-09:00
17 July 2012
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
✈Opening Remarks by JICA Experts
✈Welcome Remarks by CAAV
✈ Introduction of Japanese Instructors & Participants
✈Schedule of Lectures and Exercise
✈Others
2
PROCEEDING
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
PBN INSTRUCTORS
3
Mr. Yoshinobu NAKANISHI (MA&Sc)Project ManagerFlight Procedure Design, Airspace GroupFirst Division, NTT DATA i CorporationBackground: Proc. Design, Flt Ops, Charting
Ms. Naomi KODA (MEng)Chief Flight Procedure DesignerFlight Procedure Design, Airspace GroupFirst Division, NTT DATA i CorporationBackground: Proc. Design, Education
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
Mr. Chhun Sivorn, SSCA Mr. Peang Sary, SSCA Mr. Kim Rathanak, SSCA Mr. Moeung Sovann, SSCA
PARTICIPANTS–PBN DRAGON GROUP (1)
4
Mr. Sohnsacksit Khameko, DCA Ms. Soukanya Vayaphat, DCA Mr. Sompasong Tannavong, LATM Ms. Inseelee Bouapao, LATM
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
5
Ms. Tran Duc Hoai Phuong, CAAV Mr. Trinh Hoa Liem, CAAV Mr. Nguyen Nang Khanh, VATM Mr. Truong Cong Tuan, VATM Mr. Nguyen Ngoc Tuan, VATM Mr. Nguyen Cong Chinh, ACV Mr. Le Anh Dung, ACV Mr. Le Xuan Thang, Vietnam Airlines
PARTICIPANTS–PBN DRAGON GROUP (2)
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
Hiroshi INOGUCHIProject Leader and Air Traffic Management (ATM) Advisor
Contact: [email protected]
Ryuichi NAGAICommunications, Navigation, Surveillance (CNS) Advisor
Contact: [email protected]
Atsushi YAMANEFlight Procedure Office (FPO) Advisor
Contact: [email protected]
6
PROJECT TEAM SUPPORTAdministration for running the Training Course
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
Tomonori ORITAProject Coordinator
Contact: [email protected]
7
Ngo Thi THOMAdministrative Assistant (Secretary)
Contact: [email protected]
Project OfficeRoom 505, Civil Aviation Authority of Vietnam (CAAV)
119 Nguyen Son, Long Bien, Hanoi, Vietnam
Tel: +84(0)43-872-2397 (direct)
Fax: +84(0)43827-4194
PROJECT TEAM SUPPORT
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
OBJECTIVE OF THE TRAINING
To acquire knowledge & skill for the design of PBN Procedures based on PANS-OPS.
We will not use PANADES during this training.
8
Please keep these OBJECTIVE in mind during the training program
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
COURSE CONTENTS
✈ Lecture & desk exercises PANS-OPS as a main textbook PowerPoint to indicate right part of PANS-
OPS
✈ Overall exercise Design a series of Approach and Departure
Procedures of an airport Group Work
METHOD: LECTURE
Main Textbook is YOUR ICAO Doc 8168, PANS-OPS Vol. II :Take notes as much as you want and bring them back to daily workPowerPoint presentation is just an aid to refer to PANS-OPS
PowerPointPowerPoint PANS-OPSPANS-OPS
P1S2C3, 3.3.3Part 1, Section2,Chapter 3, para 3.3.3
means
METHOD: EXERCISE
Exercise (WEEK 4) will be conducted
as a group work
Work on Paper Topographical Map (mainly 1/50,000)
Classical Way!
Followed by Final Exam!
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
TECHNICAL DOCUMENTS & TOOLS
13
Technical documents: ICAO PANS-OPS (Doc 8168) Volume.2, 5th edition with Amendment
No.3 & Corrigendum No.2 (individual participant should have his own copy);
ICAO PBN Manual (Doc 9613) 3rd edition (group sharing); ICAO Instrument Flight Procedures Construction Manual (Doc 9368)
2nd edition (group sharing); ARINC 424-17 Navigation System Data Base (group sharing).Drafting tools: Pocket/desk-top functional calculator (individual participant); Ruler (individual participant); Set square (individual participant); Semicircular Protractor (diameter 180mm) (individual participant); Circular Protractor (diameter 180mm) (if any); Compasses (Max circle diameter 370mm) (individual participant).
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
SCHEDULE OF THE TRAINING (1)
14
DAY 1 (Tuesday, 17 July)08:30-09:00 Opening09:00-12:00 Session12:00-13:30 Lunch13:30-16:30 Session
DAY 2 (Wednesday, 18 July) - DAY 18 (Thursday, 9 August)08:30-12:00 Session12:00-13:30 Lunch13:30-16:30 Session
DAY 19 (Friday, 10 August)08:30-11:00 Session11:00-12:00 Closing13:30-14:30 Report to CAAV
Any change to Shedule and Administrative matters will be advised to participants by JICA Experts
WEEK 1
16 JUL 17 JUL 18 JUL 19 JUL 20 JUL
Admin. ILS APCH (& LOC APCH) PBN concept
WEEK 2
23 JUL 24 JUL 25 JUL 26 JUL 27 JUL
PBN (cont’d)
General Criteria Sensor-Specific Criteria
(DME/DME, GNSS)
WEEK 3
30 JUL 31 JUL 1 AUG 2 AUG 3 AUG
RNAV SID & STAR RNP APCH RNAVHolding
WEEK 4
6 AUG 7 AUG 8 AUG 9 AUG 10 AUG
Integrated Exercise (APCH, DEP, etc)+ Final Presentation
Lecture
Exercise
SCHEDULE OF THE TRAINING (2)
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
Certificate of Attendance
✈Certificate will be issued to participants who have attended more than 95% of Programs and achieved 80% (or higher) of examinations, which will be conducted during the Training to assess the level of understanding (Participants will also be evaluated by JICA).
✈Certificate is jointly signed by JICA Short-term Expert and Project Leader
Evaluation/Assessment of the Training
✈ Feedback from participating counterpart in the Training is essential for JICA and Project to improve our programs.
No Interpretation/Translation Services
16
CERTIFICATE AND ASSESSMENT (1)
Achievement by Participants are Evaluated
(1) Progress Test Light Paper Exam to evaluate if participants
have acquired ESSENTIAL part of PANS-OPS Ad-hoc Basis during lectures
(2) Final Examination Presentation on your design for Integrated Exercise Oral Q & A about the result
• Understandings on PANS-OPS• Validity of your determination
on your design
80% Achievement required to be certified!
CERTIFICATE AND ASSESSMENT (2)
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
18
Participants are requested to provide their Feedback by
✈ Submitting Country Group Evaluation/Assessment (in English) everyday after Lectures/Exercise (Country Leader summarizes feedback of all participants). Group Evaluation Form will be provided to Country Leader every afternoon.
✈ Submitting Individual Evaluation/Assessment (in English) on 10 August. Individual Evaluation Form will be provided to the Participants in advance.
✈ Copy of Country Group Evaluation and Individual Evaluation Forms submitted will be made available to respective CAA (SSCA, DCA, CAAV) for records.
CERTIFICATE AND ASSESSMENT (3)
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
✈ “Basic PBN Training Course” in Hanoi from 17 July till 10 August. 4 from Cambodia, 4 from Lao PDR and 8 from Vietnam.
✈ “Training for Flight Procedure Regulations, Guidelines and Manual Development” in Hanoi from 13 till 24 August. 4 from Cambodia, 4 from Lao PDR and 10 from Vietnam.
✈OJT on “Airport Obstacle Survey” will start in Cambodia (Phnom Penh, 27 August-7 September), followed by Lao PDR (Vientiane, 10-21 September) and Vietnam (Hue, 10-21 September). Approximately 8 participants for each OJT.
✈OJT on “PBN Procedure Design with PANADES” (2 weeks) will start on 24 September. 2 courses for Vietnam from 24 September till 5 October, and from 8 October till 19 October. 1 course for Lao PDR from 22 October till 2 November, and 1 course for Cambodia from 5 till 16 November. 4 participants for each course. 19
TRAINING PLAN (1) You are here
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
✈OJT on “Design Verification/Ground Validation” will start in Vietnam (Hue, 22 October-2 November), followed by Lao PDR (Vientiane, 19-30 November) and Cambodia (Phnom Penh, 3-14 December). Approximately 8 participants for each OJT.
✈ “Familiarization Training on PBN Operations for ATC” in Hanoi is being coordinated for 2 weeks from 24 September till 5 October.
✈ “Flight Inspection/Validation” is under consideration for early 2013.
20
TRAINING PLAN (2)
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
2012 July Aug Sep Oct Nov Dec
Procedure Design
Regulations/Quality Assurance
ATC
21
TRAINING PLAN AT GLANCE
Basic PBN
Regulation Development
OJTObstacle
C L
V
OJTPANADES
VV L C
OJTValidation
V L C
PBN Familiarization
GOALS: 4 PBN Designers in Cambodia, 4 PBN Designers in Lao PDR, and 8 PBN Designers in Vietnam by end of 2012
Asia-Pacific States with PBN Approach
1) Based on Jeppensen Database for January 20122) Only approaches to international airports are shown.
LNAV APVAustralia 56 4New Zealand 14 18Japan 10 9China 4 4Republic of Korea 5 2Solomon Islands 7 0Cook Islands 4 2Indonesia 6 0Kiribati 4 2Maldives 4 2Micronesia 6 0Thailand 6 0Fiji 4 0Marshall Islands 4 0Papua New Guinea 4 0Philippines 2 2Samoa 2 2Singapore 2 2Tonga 4 0Afghanistan 3 0Vanuatu 3 0Hong Kong, China 0 2Malaysia 2 0
PBN, yet to be implemented
Your mission isto change
white to green!
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
23
Please Switch Off Your Mobile Phone or
Use Vibration Mode in the Training Room
Thank Youfor Your Understanding and Cooperation