24
© 2010 Chevron Basic Concepts of Oil Well Cementing Presented to the Garfield County Energy Advisory Board February 3, 2011

Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

Embed Size (px)

Citation preview

Page 1: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Basic Concepts ofOil Well Cementing

Presented to the Garfield CountyEnergy Advisory BoardFebruary 3, 2011

Presenter
Presentation Notes
This series presents a basic overview of cementing. We do not attempt to go into detail in this presentation but will use this as a foundation for additional materials.
Page 2: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Cementing

Page 3: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Reasons for Cementing the Casing

Seal formations penetrated

Protect casing from burst, collapse, drilling shock, and corrosive fluids

Maintain control of well

Presenter
Presentation Notes
The four reasons we use cement for primary casings are indicated in this slide. There are other applications but these are usually variants of the above and many are in work over operations.
Page 4: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Cement Applications

Presenter
Presentation Notes
The picture above illustrates some of the areas in a wellbore where cement is usually required.
Page 5: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Fluid Flows

The following fluid flow diagrams, while very basic, demonstrate the typical cement job sequence.

Presenter
Presentation Notes
Rapidy go through the simple sequence to see how a primary casing job is pumped.
Page 6: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Page 7: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Circulating to condition drilling fluid

Page 8: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Page 9: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Drop bottom plug and Pump Lead Cement

Page 10: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Page 11: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Page 12: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Page 13: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Page 14: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Page 15: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Page 16: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Drop Top Plug & Start Displacing with Water

Page 17: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Page 18: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Page 19: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Page 20: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Page 21: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Page 22: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Page 23: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Cement Bond Log - Production Casing

Page 24: Basic Concepts of Oilwell Cementing Meeting 2... · Basic Concepts of Oil Well Cementing. Presented to the Garfield County. ... The four reasons we use cement for primary casings

© 2010 Chevron

Pressure Testing

Production casing is pressure tested to above maximum treating pressure prior to perforating.

Bradenhead pressure between production and surface casing is continuously monitored during fracturing operations.

A change in the Bradenhead pressure during the fracturing operations may shut down the operation and indicate wellbore issues.

Chevron has not had a Bradenhead pressure indicated issue in the Piceance Basin since starting fracturing operations in 2006.

In the Piceance Basin, Chevron has had one production casing not pressure tested prior to fracturing that required repair.