33
1.UF - 4.UF 5.UF GF BF Bv 01 Fv 01 Fv 02 Fv 03 Fv 04 SOv 01 Bv 06 Bv 02 Bv 03 Bv 04 Bv 05 Tv 02 Tv 03 Tv 01 Av 01 Av 02 Av 03 Av 04 Av 05 FEv 02 FEv 01 FEh 01 Bv 08 Bv 07 CAD detail catalogue KLH Massivholz GmbH Gewerbestraße 4 A - 8842 Teufenbach-Katsch [email protected] Version number: 01/2019 basement SOv 01 standard basement façade Fv 01 ETICS (high acoustic req.) Fv 02 wooden façade (high acoustic req.) Fv 03 wooden façade (normal acoustic req.) Fv 04 wooden façade (normal acoustic req. decoupled) Fv 05 brickwork support Fv 06 concrete support balcony / terrace Bv 01 balcony FF (RC wall) Bv 02 balcony UF (CLT façade) Bv 03 balcony suspension Bv 04 balcony support / pillar Bv 05 balcony door Bv 06 balcony rainwater pipe Bv 07 balcony verge Bv 08 balcony side wall Tv 01 terrace parapet Tv 02 terrace node Tv 03 terrace door staircase STv 01 staircase CLT-plasterboard STv 02 staircase RC STv 03 staircase CLT-DVQ attic / flat roof Av 01 attic Av 02 drainage flat roof Av 03 attic window connection Av 04 attic form element Av 05 attic EW ventilated window / door FEv 01 window sill FEv 02 external blind element FEh 01 side connection Th 01 door connection STC shaft Sv 01 shaft cut Sh 01 shaft allocation Note: The detailed examples shown are intended as planning aids and must be adapted to the respective project conditions and requirements. The completeness of the information and a standard-compliant execution must be checked and supplemented by the responsible planner. Further assistance on the KLH product and the general terms of use can be found at https://www.klh.at Project: CAD-Details Date: 09.2019

basement attic / flat roof Av 03attic window connection Fv

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

CAD detail catalogue

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Version number:01/2019

basement

SOv 01 standard basement

façade

Fv 01 ETICS (high acoustic req.)Fv 02 wooden façade

(high acoustic req.)Fv 03 wooden façade

(normal acoustic req.)Fv 04 wooden façade

(normal acoustic req. decoupled)Fv 05 brickwork supportFv 06 concrete support

balcony / terrace

Bv 01 balcony FF (RC wall)Bv 02 balcony UF (CLT façade)Bv 03 balcony suspensionBv 04 balcony support / pillarBv 05 balcony doorBv 06 balcony rainwater pipeBv 07 balcony vergeBv 08 balcony side wallTv 01 terrace parapetTv 02 terrace nodeTv 03 terrace door

staircase

STv 01 staircase CLT-plasterboardSTv 02 staircase RCSTv 03 staircase CLT-DVQ

attic / flat roof

Av 01 atticAv 02 drainage flat roofAv 03 attic window connectionAv 04 attic form elementAv 05 attic EW ventilated

window / door

FEv 01 window sillFEv 02 external blind elementFEh 01 side connectionTh 01 door connection STC

shaft

Sv 01 shaft cutSh 01 shaft allocation

Note:The detailed examples shown are intended as planning aids and must be adapted to the respective project conditions and requirements.The completeness of the information and a standard-compliant execution must be checked and supplemented by the responsible planner.

Further assistance on the KLH product and the general terms of use can be found at https://www.klh.at

Proj

ect:

CAD

-Det

ails

Date:09.2019

BW

base

men

t wat

erpr

oofin

gi.a

.w. Ö

NO

RM

B 3

692

air-t

ight

join

t sea

ling

FS

fast

enin

gsi.a

.w. Ö

NO

RM

B 1

995-

1-1,

app

endi

x K

FFL

drai

nage

Sw ≥ 300

Ah & Sp ≥ 300 prot

ectiv

e la

yer e

.g.

stud

ded

mem

bran

e

wat

erpr

oofin

g ag

ains

tas

cend

ing

hum

idity

mor

tar s

ill

join

t sea

ling

acco

rdin

gto

the

insu

latio

n sy

stem

≥2%

base

men

t ins

ulat

ion

pane

l i.a

.w.

man

ufac

ture

r´ssp

ecifi

catio

ns

EW2

edge

rubb

erst

ripe

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Plan content:Façade/basement compartment floor, CLT basement on reinforced concrete

SOv01

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

ETICS ex.external thermal insulationcomposite system with plaster

trickle protection

FS

EW1

air-tight adhesive tape

PE foam mat / acoustic foil

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K

elast. hanger

edge rubber stripe

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Facade-dividing ceiling, CF with high soundproof requirements

Scale:1:5

Size:A3

DETAIL Fv 01

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

trickle protection

FS

EW2

air-tight adhesive tape

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K

elast. hanger

PE foam mat / acoustic foil

closed wooden façade

edge rubber stripe

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Facade-dividing ceiling, CF with high soundproof requirements

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Version number:01/2019

Fv 02

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

trickle protection

gravel filling

concrete blocks

PE foam mat / acoustic foil

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K

Note:In the case of a high number ofconnection (high node stiffness), thenode must be checked with regard tosound insulation.

air-tight adhesive tape

FS

EW2

edge rubber stripe

closed wooden façade

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Facade-dividing ceiling, CF with normal acoustic requirements

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Version number:01/2019

Fv 03

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

trickle protection

FS

PE foam mat / acoustic foil

concrete blocks

gravel filling

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K

soundproofing support

Note:In the case of a high number ofconnection (high node stiffness), thenode must be checked with regard tosound insulation.

air-tight adhesive tape

closed wooden façade

EW2

edge rubber stripe

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Plan content:Facade-dividing ceiling, CF with normal soundproof requirements

Version number:01/2019

Fv 04

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

trickle protection

FS

EW

PE foam mat / acoustic foil

elast. hanger

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix Kor static requirement

RC ring beam

elastic support

air-tight adhesive tape

e.g. glued-in threaded bar

ETICSi.a.w. manufacturer's data

EW1

edge rubber stripe

Note:In the case of a high number ofconnection (high node stiffness), thenode must be checked with regard tosound insulation.

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Plan content:Facade-dividing ceiling, brickwork support, CF with high soundproof req.

Version number:01/2019

Fv 05

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

trickle protection

FS

EW

PE foam mat / acoustic foil

Note:In the case of a high number ofconnection (high node stiffness), thenode must be checked with regard tosound insulation.

elast. hanger

RC ring beam

e.g. glued-in threaded bar

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix Kor static requirement

elastic support

air-tight adhesive tape

ETICSi.a.w. manufacturer's data

edge rubber stripe

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Plan content:Facade-dividing ceiling, RC support, CF with high soundproof requirements

Version number:01/2019

Fv 06

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

drainage level terrace gutter

connection i.a.w. ETICS guidelines

FSB

vertical waterproofing,top edge min. 30 cm A.F.F.

hard wood decking

wooden support impregnated

terrace drainagechannel

formwork plate

air-tight foil with lowvapor permeability

air-tight foil with highvapour permeability

edge rubber stripe

wooden slope

substructure on bearing elastomeraccording to acoustic requirements

XPS HD insulation

sheet covering

FFL basement

functional material (e.g. PUR)

protective layere.g. studded membrane

perimeter insulationi.a.w. processing guideline ormanufacturer's specifications

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Connection balcony with balcony´s door at 1st storey

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Version number:01/2019

Bv 01

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

connectioni.a.w. ETICS guidelines

air-tight foil with low vapourpermeability

trickle protection

edge rubber stripe

FS

drainage level terrace gutter

hard wood decking

wooden support impregnated

terrace drainagechannel

air-tight foil with highvapour permeability

wooden slope

substructure on bearing elastomeraccording to acoustic requirements

XPS HD insulation

sheet covering

air-tight tape

PE foam mat/ acoustic foil

functional material (e.g. PUR)

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K

elast. hanger

EW1

≥ 2%

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Connection balcony with balcony´s door at standard storey

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Version number:01/2019

Bv 02

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

sheet covering

connectioni.a.w. ETICS guidelines

clamping profile

XPSi.a.w. ÖNORM B3691

ETICSi.a.w. manufacturer´s specifications

connectioni.a.w. ETICS guidelines

drainage level

hard wood decking

wooden support impregnated

formwork panels trickle protection

FSemergency sealingi.a.w. ÖNORM B3691

EW1

wooden slope

air-tight tape

PE foam mat/ acoustic foil

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K

elast. hanger

edge rubber stripe

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Connection balcony at standard storey

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Bv 03

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

elast. hanger

FS

air-tight tape

PE foam mat/ acoustic foil

balcony´ssuspension

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K

edge rubber stripe

EW1

XPS 30cmabove cladding

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Balcony suspension

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Bv 04

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

sheet covering

connectioni.a.w. ETICS guidelines

clamping profile

XPSi.a.w. ÖNORM B369130 cm above cladding

ETICS i.a.w.manufacturer´s specifications

drainage level

hard wood decking

wooden support impregnated

formwork panels trickle protection

FSemergency sealingi.a.w. ÖNORM B3691

EW1

wooden slope

PE foam mat/ acoustic foil

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K

elast. hanger

≥ 2%

edge rubber stripe

connecting profilei.a.w. ETICS guidelines

air-tight tape

spreading screwingi.a.w. static

bearing sound insulation orthermal separation

position securing

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Connection balcony - standard storey on balcony door

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Bv 05

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

mounting metalprofile

glass balustrade (2xVSG)

clamping profile

laminated sheet metal

steel angle

drainage level

hard wood decking

wooden support impregnated

terrace drainagechannel

formwork panels

steelsupport

wooden slope

stainless steel gutterdrain DN50

substructure on bearing elastomeraccording to acoustic requirements

drip edge

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Balcony eaves

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Bv 06

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

mounting metalprofile

clampingprofile

gutterdrain DN50

steel angle

laminated sheet metal

steelsupport

glass balustrade (2xVSG)

hard wood decking

wooden support impregnated

formwork panels

wooden slope

drip edge

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Balcony verge

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Bv 07

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

RW drain DN50

insects screen

insects screen

laminated sheet metal

mounting profile (ventilation)

façade platei.a.w. EN 438-6

hard wood decking

wooden support impregnatedlaminatedsheet metal

emergency sealingi.a.w. ÖNORM B3691

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Balcony sides

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Bv 08

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Date:09.2019

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdf

inse

cts

scre

en

inse

cts

scre

en

connecting profilei.a.w. ETICS guidelines

faça

de p

late

i.a.

w. E

N 4

38-6

mou

ntig

pro

file

(ven

tilat

ion) woo

d or

alu

min

ium

sub

stru

ctur

e

terra

ce d

ecki

ng

conc

rete

sla

b on

dra

inag

e el

emen

t

EW1

shee

t cov

erin

g

subs

truct

ure

on b

earin

g el

asto

mer

acco

rdin

g to

aco

ustic

requ

irem

ents

emer

genc

y se

alin

g i.a

.w. Ö

NO

RM

B36

91

air-t

ight

tape

vapo

ur b

arrie

r

fast

enin

gsi.a

.w. Ö

NO

RM

B 1

995-

1-1,

app

endi

x K

elas

t. ha

nger

≥ 3

°

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Terrace parapet

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Tv 01

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Date:09.2019

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdf

wooden spacer

IW1

trickle protection

edge rubber stripe

FS

emergency sealing i.a.w. ÖNORM B3691

clamping profile

protective plate

XPS 30cmabove cladding

ETICSi.a.w. manufacturer´sspecifications

PE foam mat/ acoustic foil

vapour barrier

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K

elast. hanger

≥ 3°

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Connection terrace - wall

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Tv 02

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

bonded vapour-tight i.a.w. ÖNORM B5320

elastisc joint

trickle protectionedge rubber stripe

FS

substructure on bearing elastomeraccording to acoustic requirements

XPS HD insulation

steel angle

PE foam mat/ acoustic foil

vapour barrier

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K

elast. hangerIW1

≥ 3°

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Connection terrace - balcony´s door

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Tv 03

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

WD

apartment staircase

Z-profile

compression band

doorsillbuck frame

permanent elastic seal

WTW

FS

entrance door

PE foam strip

apartment staircase

PE foam mat/ acoustic foil

elast. hanger

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K

edge rubber stripe

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:STC (CLT with gypsum plasterboard) connection floor - door

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

STv 01

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

FS

apartment staircase

Z-profile

compression band

doorsillbuck frame

permanent elastic seal

WTS

FSS

entrance door

PE foam strip

apartment staircase

PE foam mat/ acoustic foil

elast. hanger

edge rubber stripe

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:STC (RC) connection floor - door

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

STv 02

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

WD

apartment staircase

Z-profile

compression band

doorsillbuck frame

permanent elastic seal

WTW

WD

entrance door

PE foam strip

apartment staircase

PE foam mat

elast. hanger

edge rubber stripe

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:STC (visual quality CLT) connection floor - door

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

STv 03

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

EW1

clamping profile

FD

metal sheet

connecting profilei.a.w. ETICSguidelines

air-tightadhesive tape

≥ 3°

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K

sealing layerconsider emergency spillway

emergency sealing i.a.w. ÖNORM B3691

elast. hanger

vapour barrier / emergency roof / waterproofing construction period(connection air-tight level EW)

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Attic connection wall

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Av 01

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

clam

ping

pro

file

FD

met

al s

heet

stai

nles

s st

eel

edge

pro

tect

ion

exte

nsio

n pr

ofile

silic

on c

ompr

essi

on b

and

insu

latio

n zo

nesu

pppo

rting

blo

ck

exte

rnal

blin

del

emen

t

air-t

ight

foil

with

high

vap

our

perm

eabi

lity

drip

edg

e

≥ 3

°

fast

enin

gsi.a

.w. Ö

NO

RM

B 1

995-

1-1,

app

endi

x K

elas

t. ha

nger

vapo

ur b

arrie

r / e

mer

genc

y ro

of /

wat

erpr

oofin

g co

nstru

ctio

n pe

riod

(con

nect

ion

air-t

ight

leve

l EW

)

seal

ing

laye

rco

nsid

er e

mer

genc

y sp

illway

air-t

ight

adh

esiv

eta

peconn

ectin

g pr

ofile

i.a.w

. ETI

CS

guid

elin

es

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Attic connection window

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Av 02

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

EW1

clamping profile

FD

metal sheet

connecting profilei.a.w. ETICSguidelines

air-tight tape

≥ 3°

sealing layerconsider emergency spillway

emergency sealing i.a.w. ÖNORM B3691

emergency spillway

free outlet for eavy rain event

guard outlet vapour barrier (insulated)drain to wastewater network

vapour barrier / emergency roof / waterproofing construction period(connection air-tight level EW)

roof drain

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Attic drainage

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Av 03

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

clam

ping

pro

file

attic

ele

men

t

FD

met

al s

heet

stai

nles

s st

eel e

dge

prot

ectio

n

exte

nsio

n pr

ofile

silic

on c

ompr

essi

on b

and

insu

latio

n zo

nesu

pppo

rting

blo

ck

≥ 3

°

elas

t. ha

nger

vapo

ur b

arrie

r / e

mer

genc

y ro

of /

wat

erpr

oofin

g co

nstru

ctio

n pe

riod

(con

nect

ion

air-t

ight

leve

l EW

)

seal

ing

laye

rco

nsid

er e

mer

genc

y sp

illway

exte

rnal

blin

del

emen

t

air-t

ight

foil

with

high

vap

our

perm

eabi

lity

drip

edg

e

air-t

ight

adh

esiv

eta

peconn

ectin

g pr

ofile

i.a.w

. ETI

CS

guid

elin

es

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Attic alternative flat roof element - connection window

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Av 04

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

EW2

clamping profile

vapour barrier / emergency roof / waterproofing construction period(connection air-tight level EW)

FR

metal sheet

air-tight adhesivetape

≥ 3°

fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K

sealing layerconsider emergency spillway

emergency sealing i.a.w. ÖNORM B3691

façade membrane/ windproofing(diffusion-open)

ventilation layer

insects screen

subconstructione.g. OSB

closed woodenfaçade

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Attic connection wall, EW ventilated

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Av 05

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

foil (2nd waterproof layer)

air-tight foil with low vapour permeability

air-tight foil with highvapour permeability

insulation wedge

insulation zone,supporting block

thin plastering

ETICSi.a.w. manufacturer´sspecifications

connectioni.a.w. ETICS guidelines

permanentelasticexpansion joint

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Window´s bottom connection

Scale:1:2,5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

FEv 01

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

stainless steeledge protection

extension profile

external blindelement silicon compression band

air-tight foil with highvapour permeability

air-tight foil with lowvapour permeability

drip edge

insulation zone,supporting block

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Window´s top connection

Scale:1:2,5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

FEv 02

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

EW 01

stainless steeledge protection

stainless steel edge protection

air-tight foil with highvapour permeability

air-tight foil with low vapourpermeability

insulation zone

silicon compression band

external blind´s rail

external blind

inside windowsill

outside windowsill

window´s connectionprofile

sealing tape

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Window´s side connection

Scale:1:2,5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

FEh 01

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

stainless steel edge protection

sealing tape

6 x 4

installation angle

hardwood strip + siliconcompression band

installation connectioni.a.w. manufacturer´sspecifications

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:STC connection wall - door

Scale:1:5

Size:A3

DETAIL

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Th 01

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

shaf

t sys

tem

Kna

uf W

635

REI

60or

equ

ival

ent

fire

prot

ectio

n co

llar

vent

ilatio

n

fire

caps

ule

(air-

tight

glu

ed)

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

Plan content:Shaft section

Scale:1:5

Size:A3

DETAIL Sv 01

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019

VIIIShaft system Knauf W635 REI60or equivalent

Sh 02

1.UF - 4.UF

5.UF

GF

BF

Bv 01

Fv 01Fv 02Fv 03Fv 04

SOv 01

Bv 06

Bv 02Bv 03Bv 04Bv 05

Tv 02Tv 03

Tv 01

Av 01Av 02Av 03Av 04Av 05

FEv 02

FEv 01

FEh 01

Bv 08

Bv 07

1 x sewage Ø1102 x sup. air 25/20 cm2 x exh. air 25/20 cm1 x cold water Ø502 x heating Ø50Shaft: 140/30 cm

VIII

Legende Farben:

AllgemeinHeizung:

VorlaufRücklaufÖlIsolierung

Kälte:AllgemeinVorlaufRücklaufIsolierung

Gase:GasAzetylenArgon

HeliumKohlendioxidSauerstoffStickstoff

AllgemeinSanitär:

KaltwasserKaltwasser WeichLöschwasserDesinfektionswasser

ZirkulationswasserRegenwasserSchmutzwasserSchmutzwasser Fett

Lüftung:AllgemeinAbluftZuluftAußenluftFortluftSaugluft

Warmwasser

Isolierung

Druckluft

BrandschutzAllgemein:

HT BauangabenET Bauangaben

Isolierung

AllgemeinSchraffuren:

FußbodenheizungHeizflächenEinrichtungsgegenständeAbluftZuluft

AußenluftFortluft

Legende Symbole:Leitung nach obenLeitung nach untenLeitung nach oben und untenKugelhahnAbsperrklappe

Eckventil

AbsperrschieberRegulierventilDifferenzdruckreglerMagnetventil

M DurchgangsventilDreiwegeventil

M Dreiwegeventil mit StellantriebRückschlagventilRückschlagklappe

SchrägsitzventilDruckminderventil

Sicherheitsventil

Thermometer

Manometer

Manometerhahn

EntlüftungsventilEntleerungPumpe

SchmutzfängerFilterLuftabscheider

Wärmemengenzähler

PassstückKompensator

Wasserzähler

Fühler

ReglerRaumthermostatZeitschaltuhr

Leitungen an der DeckeLeitungen im BodenLeitungen an/in der Wand

Schalldämpfer

Volumenstromregler

Jalousieklappe

MotorantriebM

Ventilator

Plan content:Shaft section

Scale:1:5

Size:A3

DETAIL Sh 01

KLH

Mas

sivh

olz

Gm

bHG

ewer

best

raße

4A

- 884

2 Te

ufen

bach

-Kat

sch

offic

e@kl

h.at

Version number:01/2019

Proj

ect:

CAD

-Det

ails

Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!

Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof

General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019