24
BART Briefing for Mayor’s Transportation 2030 Task Force April 30, 2013

BART Briefing for Mayor’s Transportation 2030 Task Force

  • Upload
    sahkyo

  • View
    62

  • Download
    0

Embed Size (px)

DESCRIPTION

BART Briefing for Mayor’s Transportation 2030 Task Force. April 30, 2013. Meeting Agenda. Intro: San Francisco and BART State of Good Repair Cars (Fleet Upgrades) San Francisco BART Stations BART Metro Update Priorities. 2/3rds of BART trips start or end on Market Street. - PowerPoint PPT Presentation

Citation preview

Page 1: BART Briefing for  Mayor’s Transportation 2030 Task Force

BART Briefing for

Mayor’s Transportation 2030 Task Force

April 30, 2013

Page 2: BART Briefing for  Mayor’s Transportation 2030 Task Force

Meeting Agenda

Intro: San Francisco and BART

State of Good Repair

Cars (Fleet Upgrades)

San Francisco BART Stations

BART Metro Update

Priorities

Page 3: BART Briefing for  Mayor’s Transportation 2030 Task Force

3

2/3rds of BART trips start or end on Market Street

Page 4: BART Briefing for  Mayor’s Transportation 2030 Task Force

BART’s Market Area in Downtown SF

4

Page 5: BART Briefing for  Mayor’s Transportation 2030 Task Force

BART Share of SF Transit Trips

5

1) MTC Transit Statistical Summary, June 20122) BART Operating Budgets, 20123) Transit Center District Plan, DEIR Transportation Impact Study, Technical Appendix ,Vol. 1, San Francisco Planning Department

80%

20%

External Transit Trips to/from downtown San Francisco

(3)

BART

Other Re-gional Carriers

8%

92%

Internal Transit Trips within San Francisco (1,2)

BARTSFMTA

Page 6: BART Briefing for  Mayor’s Transportation 2030 Task Force

BART’s SOGR Status

• Held our own up to now Customer expectations high System resiliency/redundancy low

• 40-year old plant is decaying

• We operate at the limits of capacity to meet growing demand

• Increased service demand is consuming the assets

• Reduces asset useful life and pushes forward needed capital rehabilitation projects

6San Francisco Bay Area Rapid Transit District

Page 7: BART Briefing for  Mayor’s Transportation 2030 Task Force

BART ASSETS (~$20B)

7

GUIDEWAYS59%

REVENUE VEHICLES

11%

FACILITIES12% SYSTEMS

17%

SUPPORT1%

BART owns 40,000 assetsSan Francisco Bay Area Rapid Transit District

Page 8: BART Briefing for  Mayor’s Transportation 2030 Task Force

“CONDITION” of ASSETS(at current level of investment)

Poor34%

Fair35%

Good31%

Poor64%

Fair35%

Good1%

TODAY +10 YEARS (2022)

$6B Poor $12.4B Poor

The state of the asset, including its stage in life cycle

8San Francisco Bay Area Rapid Transit District

Page 9: BART Briefing for  Mayor’s Transportation 2030 Task Force

BART’s SOGR Need

• $6B need for 10 year high priority projects

• $17B need for next 30 years• 539 capital projects identified

• At 40, BART is facing its FIRST comprehensive rehabilitation cycle

9San Francisco Bay Area Rapid Transit District

Page 10: BART Briefing for  Mayor’s Transportation 2030 Task Force

10

New York MTA in the 1970s

It took three decades to recover.

Page 11: BART Briefing for  Mayor’s Transportation 2030 Task Force

BART: The Next 40 Years

BART Capacity Needs• Peak Direction Trains are getting too crowded

• Peak Morning Platform Escalator Queues at Embarcadero & Montgomery stations are getting too long

• Peak Afternoon Platforms are also getting too crowded

• Growth Scenarios:• At 500,000 riders, thresholds exceeded during delays• At 750,000 riders, thresholds exceeded during on-time service

11

Page 12: BART Briefing for  Mayor’s Transportation 2030 Task Force

Weekday BART Ridership since SF Airport Extension Opening

Record Ridership: Avg. 6% growth over 2 years

1212

A O D F A J A O D F A J A O D F A J A O D F A J A O D F A J A O D F A J A O D F A J A O D F A J A O D F A J A O D FFY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13

280,000

300,000

320,000

340,000

360,000

380,000

400,000

420,000

BART Average Weekday Ridership since Opening of SF Airport ExtensionHas Increased by nearly 100,000 trips!

Page 13: BART Briefing for  Mayor’s Transportation 2030 Task Force

BART: The Next 40 Years

Projected Weekday Ridership

13

Page 14: BART Briefing for  Mayor’s Transportation 2030 Task Force

Operations Planning 14

Peak Transbay Vehicle Load Standard: 107 Passengers per Car

60 Seated plus 47 Standees 6.4 Square Feet per Standee

Page 15: BART Briefing for  Mayor’s Transportation 2030 Task Force

Operations Planning 15

Standee Area Grows as Crowding GrowsMorning Standee Limits Noted In Purple

107130

Travel time to Embarcadero(in minutes)

40’ 30’

28’

43’

32’

36’32’

24’

Page 16: BART Briefing for  Mayor’s Transportation 2030 Task Force

Operations Planning 16

The Trade-Off Between Capacity and Service Quality

Date Ridership Peak Hr_DirectionPAX per Car

Train On TimePerformance

Pax On TimePerformance

Nov. 2012 393,328 107 94.8% 96.7%

11/03/2010* 522,198 120 51.3% 71.7%

10/31/2012* 568,061 140 69.9% 79.2%

*2010 and 2012 SF Giants World Series Parade Day

Page 17: BART Briefing for  Mayor’s Transportation 2030 Task Force

Operations Planning 17

Peak Hour Vehicle Load Levels with 775 Cars

Plan Year SRTP Ridership Growth ~1.8% yr

Core RidershipGrowth = 3% yr

2020 115 avg (132 max) 130 avg (149 max)

2030 134 (154) 177 (202)

Compared to current standard of 107 avg (122 max)

Page 18: BART Briefing for  Mayor’s Transportation 2030 Task Force

Operations Planning 18

Fleet Sizes Needed to Achieve Vehicle Load Target of 107 Per Car

Plan Year SRTP Ridership Growth ~1.8% yr

Core RidershipGrowth = 3% yr

2020 880 cars 1,000 cars*

2030 1,020 cars* 1,070 cars*

* Assumes Train Control System Modernization Project @ 30 peak trains/ hour

Page 19: BART Briefing for  Mayor’s Transportation 2030 Task Force

Station Capacity is a Peak Period Issue at Embarcadero & Montgomery

4:004:45

5:306:15

7:007:45

8:309:15

10:0010:45

11:3012:15

13:0013:45

14:3015:15

16:0016:45

17:3018:15

19:0019:45

20:3021:15

22:0022:45

23:300

500

1000

1500

2000

2500

3000

3500

4000

BART Station Entries & ExitsNov. 15, 2012 (15 minute increments)

MT EMPL CC19th BK16th 12th24th MABP EDPH WCFM DCFV ENGP RRWP MBLM CNSL UCAS OWCL HYBF NBLF EPWD SBOR RMNC SHSO CMSS CV

Embarcadero Montgomery

Powell

19

Page 20: BART Briefing for  Mayor’s Transportation 2030 Task Force

20

BART: The Next 40 Years

Interim Access & Capacity Measures

Infrastructure• Reduce platform furniture footprint: benches, pay phones• High capacity elevators• Higher performance escalators• Platform screen doors• Street Escalator Canopies

System Management• Metering Measures: real time platform headcount system• Skip Stop Service: Montgomery has more capacity than

Embarcadero (New Years Eve Plan)• In Station Crowd Management (Giants Parade Day)• Transbay bus to Transbay Terminal

Page 21: BART Briefing for  Mayor’s Transportation 2030 Task Force

BART: The Next 40 Years

The Ultimate Solution: New Side Platforms

21

Total Estimated Construction Cost: $615 million (2009 dollars)Mission Critical Improvement as ridership starts to exceed 500,000 per weekday

Page 22: BART Briefing for  Mayor’s Transportation 2030 Task Force

Operations Planning 22

BART Metro Service Plan: 30 Peak Hour Transbay Trains

Page 23: BART Briefing for  Mayor’s Transportation 2030 Task Force

BART Metro Service Plan:Enhanced Evening/Weekend Service

Page 24: BART Briefing for  Mayor’s Transportation 2030 Task Force

Proposed Priorities for SF Funding

• San Francisco Stations State of Good Repair

• San Francisco Station Access Improvements

• San Francisco Stations Capacity Expansion