TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 1 of 30
DATE OF ISSUE:
NUCLEAR POWER CORPORATION OF INDIA LIMITED(A Govt.of India Enterprise)
TARAPUR ATOMIC POWER PROJECT-3&4
Concurred BY
Name & design.
NPC Design Group
PREPAREDBY
CHECKED BY REVIEWEDBY
APPROVEDBY
ISSUED BY
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
7/30/2019 Barring Gear
2/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 2 of 30
DATE OF ISSUE:
-This page is intentionally left blank-
7/30/2019 Barring Gear
3/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 3 of 30
DATE OF ISSUE:
REVISION LOG
Revision Details Preparation Details
Issue No. Rev.No. Details DatePageNo.
Prepared byChecked byReviewed by
Concurred byApproved by
7/30/2019 Barring Gear
4/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 4 of 30
DATE OF ISSUE:
-This page is intentionally left blank-
7/30/2019 Barring Gear
5/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 5 of 30
DATE OF ISSUE:
CONTENTS
SL
NO.TITLE CLAUSE PAGE NO.
Cover sheet 1
Revision log3
Contents5
1.Purpose
6
2.
Pre-requisites
2.1 Status of other systems2.2 System Requirements2.3 Manpower requirements2.4 Requirement of special Equipments2.5 Requirement of outside agencies
2.6 Hazards & precautions
6
3.General method
8
4.Design intents
14
5.Expected process parameters
15
6.Work plan
16
7.Test report format
16
8.Reference
28
9.Verification process
28
10. COMMISSIONING PROCEDURE ACCEPTANCE NOTE 30
7/30/2019 Barring Gear
6/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 6 of 30
DATE OF ISSUE:
1.0 Purpose:
The purpose of this procedure is to provide guidelines forcommissioning of the barring gear system.
2.0 Pre-requisites:
2.1 Status of other systems:
Normal LT supply to AOPs, JOPs, EOP, VEFs,
DC supply to DCEOP and DCSOP
Control room readiness with all recorders, indicators, for
Turbovisory readings, bearing temperatures, expansions.
Lab facility to test oil.
Readiness of seal oil system
Other systems as per following list:
a All erection activities should be completed.
b Oil flushing of the system should be completed.
c System should be available with fresh oil.
d Pipes should be normalized in all respects.
e Temporary supports should be removed.
f AOPs are available for running & no leakage is persisting in
the system.
g Oil Purification System should be in operation.
h Service air should be available near filters for cleaning.
i Cooling water at oil cooler should be available.
7/30/2019 Barring Gear
7/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 7 of 30
DATE OF ISSUE:
2.2 System Requirements
The following equipments and Instruments shall be made available.
a) Dial gauges with Magnetic Base 0-10 mm for measuring each
journal lift.
b) Different sizes of spanner set (double end)
c) Ring spanner 3 mm to 27 mm one set.
d) Allen Key one set 3 mm to 10 mm.
e) Screwdriver small to big one set.
2.3 Manpower requirements:
Commissioning team of mechanical, electrical & C&I engineers &
supporting manpower of BHEL & NPCIL.
2.4 Requirement of special Equipments:
Nil
2.5 Requirement of outside agencies
Nil
2.6 Hazards& precautions
While testing and adjusting the barring gear system no insulation
work shall be allowed.
Fire fighting equipments shall be made available.
The operating personnel shall be aware of the procedure.
7/30/2019 Barring Gear
8/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 8 of 30
DATE OF ISSUE:
Debris in and around oil systems and MOT floor to be removed.
Approach/Stair Case/Platform wherever required are made
available.
Sign boards to be displayed at strategic location to indicate that Oil
System is charged and oil pumps are ON.
3.0 General method
Check the completion of erection as per the design flow sheets and
drawings. Check the completion of equipments and supports in all oil pipe
systems.
Ensure that at least one oil Vapour exhauster fan is running and the
butterfly valves in the bearing and MOT are adjusted for having
negative pressure in the bearings (approx 10-40 mm WLC).
Ensure that adjustment of Lub oil line throttles have been
completed as mentioned in the commissioning procedure for oil
system. for proper bearing oil flow as per the throttle
characteristics. Record the throttle lift in each bearing and MOTroom injectors
Start DC EOP and fill up the system.
Ensure there is no leakage and the drain oil flow in each bearing is
o.k.
7/30/2019 Barring Gear
9/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 9 of 30
DATE OF ISSUE:
Ensure that the Lub oil duplex filter elements are not in choked
condition.
Start AOP I and keep it running.
Change over AOP I to AOP II and ensure there is no abnormality
with the system.
Ensure installation of the JOP line filters and pressure regulating
valve
Release the limiter spring.
Closed inlet valves to all bearings.
Start JOP I and adjust the JOP header pressure to 150 kg/cm2.
Install the Dial gauges with Magnetic Base 0-10 mm for measuring
each journal lift.
Adjust the lift of rotor in each bearing (between 0.08 to 0.1 mm)
with dial gauge.
Carry out hand barring
Ensure that the rotor is free with hand barring.
7/30/2019 Barring Gear
10/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 10 of 30
DATE OF ISSUE:
Record the lift and JOP pressure of each bearing.
Run the other JOP and ensure its proper operation.
Ensure that one seal oil vacuum pump and one generator bearing
chamber exhauster fan is running.
Ensure that there is vacuum in the seal oil tank.
Ensure that seal oil filter elements are installed in the filters.
Ensure that oil is taken in seal oil system and there is normal level
in SOT and IOT.
Run Seal Oil Pump I and ensure proper operation of CPR (Constant
Pressure Regulator) and DPR-I (Differential Pressure Regulator).
Ensure proper operation of the second DPR-II and ensure change
over of CPR.
Adjust the ring relief oil flow.
Ensure that the SOT level is maintained by the SOT Float valve.
Run other AC seal oil and DC seal oil pump one by one and adjust
the CPR of the respective pump.
7/30/2019 Barring Gear
11/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 11 of 30
DATE OF ISSUE:
Ensure that the DPR is functioning o.k. with any one seal oil pump.
Ensure that the calibration of Turbovisory work is completed
and bearing metal temperature thermocouple are installed.
Ensure that the Turbovisory readings and bearing metal
temperature indicators are commissioned and reading in control
room
Ensure that following oil drives are operable from control
room.
AOP I/II
DC EOP
JOP I/II
OVE I/II
SOP I/II
DC SOP
SEAL OIL VAC PUMP I/II
GEN BEARING CHAMBER EXHAUSTE I/II
BARRING GEAR VALVE WITH INTRLOCK OF LUB OIL
HEADER PRESSURE
OIL TEMPERATURE CONTROL VALVE
Ensure that fire-fighting system is commissioned and floor lighting
is completed.
7/30/2019 Barring Gear
12/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 12 of 30
DATE OF ISSUE:
Ensure the completion of all oil line pressure switches and
transmitters with HEAD CORRECTION. (INSTRUMENT LIST,
DRG.NO. 4 13300 98 001, REV02 NPC DOC. TAPP-
3/64110/5516/SCH/RO)
Ensure the field checks of SGC OIL are completed.
Ensure that readings are available in control room as per format.
Ensure the following interlocks of oil pump before putting the
machine on barring gear:
LUB OIL PUMPS
AOP I ON with SLC OFF and AOP II OFF with SLC ON
Stop AOP I, AOP II should pick up on Auto.
Repeat the same with AOP II running and AOP I in auto.
AOP I /AOP II On with SLC OFF DC EOP OFF with SLC ON
Stop running AOP DC EOP will pick up on auto.
JOP
JOP I ON with SLC OFF JOP II OFF with SLC ON
7/30/2019 Barring Gear
13/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 13 of 30
DATE OF ISSUE:
Stop JOP I JOP II will pick up on auto
Repeat the same in vice versa
SEAL OIL PUMPS
SOP I ON with Auto OFF SOP II OFF with Auto ON
DC EOP OFF with Auto OFF
Stop running SOP II will pick up on Auto
Repeat the same in vice versa with SOP II and DC SOP running.
PUTTING THE MACHINE ON BARRING GEAR
Ensure the all oil pumps are ready mechanically and module are ON
from switch gear with SLC s in OFF condition
Ensure the seal oil system is in operation with all interlocks and
protection
Ensure that safety clearance has been signed by all concerned
Agencies for Barring Gear operation.
Ensure that oil purifier is in operation.
Ensure that ACW system is in operation.
Switch ON SGC OIL programme from control room and ensure that
programme follows as per design steps.
7/30/2019 Barring Gear
14/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 14 of 30
DATE OF ISSUE:
Attend to the problems if programme is held at any step and ensure
that machine comes to barring gear on auto.
Ensure there is no rubbing sound from seals of turbines when
machine comes to barring.
Allow the machine to come to a steady speed and take a set of
readings as per the format.
4.0 Design intents:
On hand barring, rotor shaft system should be free.
Speed at barring gear (without vacuum ) is expected to be
around 60-70 mw,which shall increase with vacuum in
condenser.
During speeding up barring gear valve will close at about 240
rpm.
JOP will cut-off at 540 rpm.
During coast down JOP will cut-in at 540 rpm.
Barring gear valve will open at 210 rpm.
7/30/2019 Barring Gear
15/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 15 of 30
DATE OF ISSUE:
5.0 Expected process parameters
BEARING OIL FLOWS
Bearing Oil flow (cu.dm)
Bearing 1 8.0
Bearing 2 2.7
Bearing 3 11.8
Bearing 4 12.9
Bearing 5 6.35
Bearing 6 6.35
Bearing 7 1.37
JACKING OIL PRESSURE AND ROTOR LIFT
Brg
no.
JOP pressure
(Kg/Cm2)
Rotor lift
(mm)-
approx.
1 0.07
2 0.07
3 0.07
4 0.07
5 0.07
6 0.07
7 0.07
6.0 Work plan:
a Commissioning of Lube oil system
b Commissioning of JOP system
7/30/2019 Barring Gear
16/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 16 of 30
DATE OF ISSUE:
c Commissioning of Seal Oil System.
d Putting the set on Barring Gear.
7.0 Test report formats:
LUB OIL FLOW ADJUSTMENT (MACHINE AT STAND STILL)
Brgno.
Throttleliftadjusted
l.o.
Press.Bef.throttle
l.o.
Press.Aft.Throttle
DP acrossthrottle
Lub oilflow
Remarks
1
2
3
4
5
6
7
Motinj.
LUB OIL FLOW ADJUSTMENT (MACHINE ON BARRING GEAR)
Brgno.
Throttleliftadjusted
l.o.Press.Bef.
throttle
l.o.Press.Aft.
Throttle
DP acrossthrottle
Lub oilflow
Remarks
1
2
3
4
5
6
7
Motinj.
7/30/2019 Barring Gear
17/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 17 of 30
DATE OF ISSUE:
JACKING OIL PRESSURE AND ROTOR LIFT
Brgno.
JOP pressure(Kg/Cm2)
Rotor lift(mm)
1
2
3
45
6
7
CONTROL ROOM READINGS FOR EVALUATING PERFORMANCE AT BG
SLNO
PARAMETERSSTANDSTILL
BARRINGGEAR
REMARKS
1. Speed
2. AOP dish pr
3. L.o. header pr.
4. J.O. header pr.
5.L.o.temp befcooler
6.L.o.temp aft
cooler7. MOT level
8. Shaft I vib
9. Shaft 2 vib
10. Shaft 3 vib
11. Shaft 4 vib
7/30/2019 Barring Gear
18/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 18 of 30
DATE OF ISSUE:
12. Shaft 7 vib
13. Brg 1 vib
14. Brg 2 vib
15. Brg 3 vib
16. Brg 4 vib
17. Brg 5 vib
18. Brg 6 vib
19. Brg 7 vib
20. Brg 1 temp.
21. Brg 2 temp.
22. Brg 3 temp.
23. Brg 4 temp.
24. Brg 5 temp.
25. Brg 6 temp.
26. Brg 7 temp.
27. Th. Brg temp.
28. A.S.
29. Diff. Exp
30. SOP (TE)
31. SOP (EE)
32. SO temp
7/30/2019 Barring Gear
19/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 19 of 30
DATE OF ISSUE:
7/30/2019 Barring Gear
20/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 20 of 30
DATE OF ISSUE:
System: ATRS Logic- Oil Supply
The following systems were checked under ATRS Logic for Oil Supply
1. SGC Oil supply operation
2. SGC Oil supply shutdown
3. SLC Aux Oil Pump 1
4. SLC Aux Oil Pump 2
5. SLC Emergency Oil Pump DC
6. SLC Jacking Oil Pump 1
7. SLC Jacking Oil Pump 2
8. Drive logic for AOP 1, AOP 2, EOP DC, JOP 1, JOP 2, Oil Temperature
Control Valve, Turning Gear Valve, Oil Vapour Extractor 1 and Oil
Vapour Extractor 2.
9. Associated alarms.Live checks were carried out for all the above systems and checks were
found satisfactory in all respect.
For ensuring readiness of complete oil system (including control oil
system) instruments as per next sheets were checked for their
healthiness:
7/30/2019 Barring Gear
21/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 21 of 30
DATE OF ISSUE:
OIL SYSTEM-INSTRUMENT CHECKS
TAG DESCRIPTION OK/NOT OKMAD11CT021AMAD11CT021BMAD11CT021CMAD11CT022AMAD11CT022BMAD11CT022CMAD11CT023AMAD11CT023BMAD11CT023CMAD11CT024AMAD11CT024BMAD11CT024CMAD11CT031AMAD11CT031BMAD11CT031CMAD11CT032A
MAD11CT032BMAD11CT032CMAD11CT033AMAD11CT033BMAD11CT033CMAD11CT034AMAD11CT034BMAD11CT034CMAD11CY011MAD11CY012MAD11CY013
MAD11CY021MAD11CY041MAD11FY901
MAD12CT014AMAD12CT014BMAD12CT014CMAD12CT018AMAD12CT018BMAD12CT018CMAD12CY021
MAD12CY041MAD12FY901
RAD BRG HP F TOP LHRAD BRG HP F TOP LHRAD BRG HP F TOP LHRAD BRG HP F TOP RHRAD BRG HP F TOP RHRAD BRG HP F TOP RHRAD BRG HP F BOT LHRAD BRG HP F BOT LHRAD BRG HP F BOT LHRAD BRG HP F BOT HRRAD BRG HP F BOT HRRAD BRG HP F BOT HRAXL BRG FRONT LHAXL BRG FRONT LHAXL BRG FRONT LHAXL BRG FRONT RH
AXL BRG FRONT RHAXL BRG FRONT RHAXL BRG REAR LHAXL BRG REAR LHAXL BRG REAR LHAXL BRG REAR RHAXL BRG REAR RHAXL BRG REAR RHAXIAL SHIFTAXIAL SHIFTAXIAL SHIFT
BRG VIBR HP FRNTPEDREL SHAFT VIBR HP FABS SHAFT VIBR HP F(MAD11CY021&041)RAD BRG HP R BOT RHRAD BRG HP R BOT RHRAD BRG HP R BOT RHRAD BRG HP R BOT RHRAD BRG HP R BOT RHRAD BRG HP R BOT RHBRG VIBR HP R-PED
REL SHAFT VIB HP RABS SHAFT VIBR HP R
7/30/2019 Barring Gear
22/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 22 of 30
DATE OF ISSUE:
MAD13CT014AMAD13CT014BMAD13CT014CMAD13CT018AMAD13CT018BMAD13CT018CMAD13CY021MAD13CY041
MAD13FY901
MAD14CT014AMAD14CT014BMAD14CT014CMAD14CT018AMAD14CT018BMAD14CT018CMAD14CY005MAD14CY021MAD14CY041
MAD14FY901
(MAD12CY021&041)RAD BRG LP1 R BOTRHRAD BRG LP1 R BOTRHRAD BRG LP1 R BOTRHRAD BRG LP1 R BOTRHRAD BRG LP1 R BOTRHRAD BRG LP1 R BOTRHBRG VIBR LP 1 R -PEDREL SHAFT VIB LP1 RABS SHAFT VIBR LP1 R
(MAD13CY021&CY041)RAD BRG LP2 R BOTRHRAD BRG LP2 R BOTRHRAD BRG LP2 R BOTRHRAD BRG LP2 R BOTRHRAD BRG LP2 R BOTRHRAD BRG LP2 R BOTRHABS EXP LP2 CASE RBRG VIBR LP2 R-PEDREL SHAFT VIB LP2 RABS SHAFT VIBR LP2 R(MAD14CY021&041)
MAV10CL001MAV10CL002MAV10CL006MAV10CL007MAV10CL008MAV10CL521MAV21CP001MAV21CP010
MAV21CP011MAV21CP012MAV21CP521MAV22CP501MAV23CP501MAV24CP501MAV31CP501MAV32CP501MAV35CP001MAV35CP011MAV35CP016
MAV41CP501MAV41CP521
LEVEL IN MAIN OIL TANKLEVEL IN MAIN OIL TANKLEVEL IN MAIN OIL TANKLEVEL IN MAIN OIL TANKLEVEL IN MAIN OIL TANKLEVEL IN MAIN OIL TANKHYD OIL HEADERHYD OIL HEADER
HYD OIL HEADERHYD OIL HEADERSUC LINE MOPHYD OIL AUX OIL PMP1HYD OIL AUX OIL PMP2LUB OIL EMERG OIL PUMPJACK OIL AFT PUMP1JACK OIL AFT PUMP2JACK OIL PRESSUREJACK OIL PRESSUREDP FILTR JACK OIL
LUBE OIL BEF COOLERLUBE OIL BEH COOLER
7/30/2019 Barring Gear
23/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 23 of 30
DATE OF ISSUE:
MAV41CT001AMAV41CT001BMAV41CT501MAV42CP001MAV42CP011MAV42CP012MAV42CP013MAV42CP014MAV42CP015MAV42CP016
MAV42CP017MAV42CP018MAV42CP412MAV42CP413MAV42CP414MAV42CP417MAV42CP418MAV42CP421MAV42CP422MAV42CT001AMAV42CT001BMAV42CT501MAV44CP411MAV44CP412MAV44CP413MAV44CP414MAV44CP415MAV44CP416MAV51CP501MAV66CP501MAV66CP503
MAV66CP507MAV66CP508MAV66CP511MAV66CP512MAV67CP501MAV67CP503MAV67CP506MAV71CT501MAV71CT502MAV71CT504MAV71CT506
MAV71CT511MAV72CT501
LUBE OIL BEF COOLERLUBE OIL BEF COOLERLUBE OIL BEF COOLERLUBE OIL PRESSURELUBE OIL PRESSURELUBE OIL PRESSUREDP FILTER 1 LUBE OILLUBE OIL PRESSUREDP FILTER 2 LUBE OILLUBE OIL PRESSURE
LUBE OIL PRESSURELUBE OIL PRESSUREHP F BRG OIL BEH ORFHP R BRG OIL BEF ORFHP R BRG OIL BEH ORFLP1 R BRGOIL BEF ORFLP1 R BRGOIL BEH ORFLP2 R BRGOIL BEF ORFLP2 R BRGOIL BEH ORFLUBE OIL BEH COOLERLUBE OIL BEH COOLERLUBE OIL BEH COOLERGEN F BRGOIL BEF ORFGEN F BRGOIL BEH ORFGEN R BRGOIL BEF ORFGEN R BRGOIL BEH ORFEXR BRG OIL BEF ORFEXR BRG OIL BEH ORFBEH TURNING GATE VJACK OIL BRG1.CAS FJACK OIL BRG1.CAS R
JACK OIL BRG1.CAS RJACK OIL BRG2.CAS RJACK OIL 1BRG3.CAS RJACK OIL2 BRG3.CAS RJACK OIL GEN BRG TSJACK OIL GEN BRGJACK OIL EXR BRGHP F BRG DRAIN OILHP R BRG DRAIN OILLP1 R BRG DRAIN OILLP2 R BRG DRAIN OIL
EXR BRG DRAIN OILGEN F BRG DRAIN OIL
7/30/2019 Barring Gear
24/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 24 of 30
DATE OF ISSUE:
MAV72CT502MAV91CF516MAV91CL001MAV91CL012MAV91CL521MAV91CL522MAV91CL523MAV91CP011MAV91CP501MAV91CP502
GEN R BRG DRAINFLOW BEH OIL-PURIFOIL-PURIFIEROIL-PURIFIEROIL-PURIFIEROIL-PURIFIEROIL-PURIFIERDP FLTR OIL-PURIFIERBEH PUMP OIL-PURIFBEH FILTER OIL-PURIF
MAX16CP011MAX16CP021MAX16CP501MAX16CP502MAX18CP501MAX18CP502MAX31CP001MAX31CP511MAX31CP512MAX31CP516
MAX31CP517MAX31CP541MAX31CP542MAX31CP543MAX31CP544MAX31CP545MAX31CP546MAX31CP547MAX31CP548MAX32CP011MAX32CP081MAX32CP511MAX32CP513MAX32CP514MAX41CP001MAX41CP501MAX41CP521MAX41CP522MAX42CP011MAX42CP012MAX42CP013
MAX42CP014MAX42CP501
HP CNT FLD BEH PMP1HP CNT FLD BEH PMP2HP CNT FLD BEHHP CNT FLD BEHLP CNT FLD BEH PMP1LP CNT FLD BEH PMP1HP CONTROL FLUIDACCUM1 HP-ESVACCUM2 HP-ESVACCUM3 HP-ESV
ACCUM4 HP-ESVACCUM1 BEH HP FLDPMPACCUM2 BEH HP FLDPMPACCUM3 BEH HP FLDPMPACCUM4 BEH HP FLDPMPACCUM5 BEH HP FLDPMPACCUM6 BEH HP FLDPMPACCUM7 BEH HP FLDPMPACCUM8 BEH HP FLDPMPDP FILTR HP-ESVDP FILTR BYP VALVESBEH FILTR HP-ESVFILTER 1 HP-ESVFILTER 1 HP-ESVLP CONTROL FLUIDLP CONTROL FLUIDACCUM BYP CNT CUB1ACCUM BYP CNT CUB2CNT FLD INTLK BYPCNT FLD INTLK BYPCNT FLD INTLK BYP
CNT FLD INTLK BYPLP CONTROL FLUID
7/30/2019 Barring Gear
25/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 25 of 30
DATE OF ISSUE:
MAX42CP502MAX42CP503MAX42CP504MAX42CP511MAX42CP512MAX42CP513MAX42CP514MAX42CP517MAX42CP518MAX42CP519
MAX42CP520MAX42CP531MAX42CP532MAX42CP541MAX42CP542MAX42CP543MAX42CP544MAX44CP501MAX45CG001AMAX45CG001KMAX45CG001TMAX45CG002AMAX45CG002KMAX45CG002TMAX45CP001MAX45CP006MAX45CP041MAX45CP042MAX45CP043MAX45CP501MAX46CG001A
MAX46CG001BMAX46CP001MAX46CP002MAX46CP501MAX46CP502MAX47CG001AMAX47CG001BMAX47CG001CMAX47CG001DMAX47CG001FMAX47CP001
MAX47CP501MAX48CP201
LP CONTROL FLUIDLP CONTROL FLUIDLP CONTROL FLUIDCNT FLD INJ WTR V 1CNT FLD INJ WTR V 2CNT FLD INJ WTR V 3CNT FLD INJ WTR V 4CNT FLD INJ WTR V 5CNT FLD INJ WTR V 6CNT FLD INJ WTR V 7
CNT FLD INJ WTR V 8ACCUM 1 CNT CUBACCUM 2 CNT CUBACCUM1 BYP CNT CUB 1ACCUM2 BYP CNT CUB 1ACCUM1 BYP CNT CUB 2ACCUM2 BYP CNT CUB 2PRIMARY FLUIDEHYD CONV 1 TURB GOVEHYD CONV 1 TURB GOVEHYD CONV 1 TURB GOVEHYD CONV 2 TURB GOVEHYD CONV 2 TURB GOVEHYD CONV 2 TURB GOVSEC FLD HP-GOVVALVESEC FLD HP-GOVVALVESEC FLD HP-GOVVALVESEC FLD HP-GOVVALVESEC FLD HP-GOVVALVESEC FLD HP-GOVVALVESPEED CHANGER
SPEED CHANGERSEC AUX FLUID 1SEC AUX FLUID 2SEC AUX FLUID 1SEC AUX FLUID 2STARTING DEVICESTARTING DEVICESTARTING DEVICESTARTING DEVICESTARTING DEVICESTART-UP FLUID
START-UP FLUIDSTART-UP AUX FLUID
7/30/2019 Barring Gear
26/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 26 of 30
DATE OF ISSUE:
MAX48CP202MAX48CP501MAX51CG005CMAX51CG005EMAX51CG006CMAX51CG006EMAX51CG205CMAX51CG205EMAX51CG206CMAX51CG206E
MAX51CG211BMAX51CG211CMAX51CP001MAX51CP013MAX51CP016MAX51CP017MAX51CP018MAX51CP021MAX51CP022MAX51CP023MAX51CP209MAX51CP210MAX51CP211MAX51CP212MAX51CP221MAX51CP222MAX51CP223MAX51CP226MAX51CP227MAX51CP228MAX51CP501
MAX51CP522MAX51CP523MAX51CP527MAX51CP528MAX52CG005CMAX52CG005EMAX52CP211MAX52CP212MAX52CP213MAX52CP214MAX52CP501
MAX53CG001AMAX53CG001T
START-UP AUX FLUIDSTART-UP AUX FLUIDEMERG TRP DEVICE1 NBEMERG TRP DEVICE1 NBEMERG TRP DEVICE2 NBEMERG TRP DEVICE2 NBEMERG TPP DEVICE1 WPEMERG TRP DEVICE1 WPEMERG TRP DEVICE2 WPEMERG TRP DEVICE2 WP
CHANGEOVER VLVCHANGEOVER VLVTRIP FLUIDTRIP FLUIDTRIP FLUIDTRIP FLUIDTRIP FLUIDTRIP FLUIDTRIP FLUIDTRIP FLUIDBEF TRIP DEVICE DOBEF TRIP DEVICE DOBEF TRIP DEVICE DTBEF TRIP DEVICE DTBEF TEST V HP-ESV 1UP PISTON HP-ESV 1BEL PISTON HP-ESV 1BEF TEST V HP-ESV 2UP PISTON HP-ESV 2BEL PISTON HP-ESV 2TRIP FLUID
UP PISTON HP-ESV 1UP PISTON HP-ESV 2UP PISTON HP-ESV 2BEL PISTON HP-ESV 2MANUAL TRIPMANUAL TRIPAUXILIARY TRIP FLUIDAUXILIARY TRIP FLUIDAUX TRIP FLUID WPAUX TRIP FLUID WPAUXILIARY TRIP FLUID
EHYD CONV BYP CNT 1EHYD CONV BYP CNT 1
7/30/2019 Barring Gear
27/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 27 of 30
DATE OF ISSUE:
MAX53CG002AMAX53CG002TMAX53CG003AMAX53CG003TMAX53CG004AMAX53CG004TMAX53CP031MAX53CP032MAX53CP033MAX53CP034
MAX53CP035MAX53CP036MAX53CP037MAX53CP038MAX53CP501MAX53CP502MAX53CP503MAX53CP504MAX61CP215MAX62CG001BMAX62CG001CMAX62CP211MAX62CP212MAX62CP213MAX62CP501MAX89CL001MAX89CL015MAX89CL521MAY01EP001AMAY01EP001BMAY01EP001C
MAY01EP001DMAY01EP001EMAY01EP001FMAY10CG001MAY10CG001CMAY10CG001EMAY10CG002MAY10CG002CMAY10CG002EMKA02FE001AMKA02FE001A
MKA02FE001BMKA02FE001C
EHYD CONV BYP CNT 2EHYD CONV BYP CNTEHYD CONV BYP CNTEHYD CONV BYP CNTEHYD CONV BYP CNTEHYD CONV BYP CNTCNT FLD CSDV 1CNT FLD CSDV 1CNT FLD CSDV 2CNT FLD CSDV 2
CNT FLD CSDV 3CNT FLD CSDV 3CNT FLD CSDV 4CNT FLD CSDV 4CNT FLD CSDV 1CNT FLD CSDV 2CNT FLD CSDV 3CNT FLD CSDV 4LATCH TRIP DEVICE DTTEST DEVICETEST DEVICETEST OSPD TRIP DEVTEST OSPD TRIP DEVTEST OSPD TRIP DEVTESTFLD OSPD TRP DEWASTE OIL TANKWASTE OIL TANKWASTE OIL TANKESV UP MARGINESV LOWER MARGINHP SHAFT 50%
HP SHAFT UPPER MARGINHP SHAFT LOWER MARGINACTUAL SPEED/LOADOVERSPEED TRIP DEV 1 INDICATOR LAMPOVERSPEED TRIP DEV 1OVERSPEED TRIP DEV 1OVERSPEED TRIP DEV 2 INDICATOR LAMPOVERSPEED TRIP DEV 2OVERSPEED TRIP DEV 2ACTUAL POWER GENERATEDACTUAL POWER
ACTUAL POWER GENERATEDCURRENT TRANSDUCER GENERATED
7/30/2019 Barring Gear
28/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 28 of 30
DATE OF ISSUE:
MYA01CS011MYA01CS012MYA01CS013MYA01CS014MYA01DS001AMYA01DS001BMYA01FS001AMYA01FS001BMYA01FS001CMYA01FS002
MYA01GS005PGB20CT001APGB20CT001BPGB21CT501PGB21CT502PGB22CT501PGB22CT502PGB23CT001APGB23CT001B
TURBINE SPEEDTURBINE SPEEDTURBINE SPEEDTURBINE SPEEDTURBINE SPEEDTURBINE SPEEDTURBINE SPEEDTURBINE SPEEDTURBINE SPEEDLAMP TEST
PUSH BUTTON SWCLG WTR BEF OIL CLRCLG WTR BEF OIL CLRCLG WTR BEF OIL CLR1CLG WTR BEH OILCLR1CLG WTR BEF OIL CLR2CLG WTR BEH OIL CLR2CLGWTR BEH OILCLRCLGWTR BEH OILCLR
8.0 Reference
1. Volume of EAST Package2. O&M manual
9.0 Verification process
Verification points are included in 4.0 general methods
Verification requirements- all functional requirements have been listed ingeneral method.
7/30/2019 Barring Gear
29/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 29 of 30
DATE OF ISSUE:
APPENDIX
VERIFICATION TABLE
COMMISSIONING PROCEDURE FOR BARRING GEAR SYSTEM
COMMISSIONING PROCEDURE NO._________________________________
SL.NO
ACTIVITYVERIFIED
ACCEPTANCECRITERIA
VERIFYINGAGENCY
CERTIFICATION BY VERIFYING AGENCY
PROCEDUREVERIFICATION
INSPECTIONWITNESS
FUNCTION-AL TEST
RESULTVERIFICA-TION
GENERALREMARKS
1 Pl refer4.0
Pl refer 4.0
7/30/2019 Barring Gear
30/30
TAPP-3&4 COMMISSIONINGPROCEDURE
PROCEDURE NO: 3&4-
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
ISSUENO:01
REV NO:0
Page 30 of 30
DATE OF ISSUE:
ANNEXURE
NUCLEAR POWER CORPORATION OF INDIA LIMITED(A Govt. of India Enterprise)
TARAPUR ATOMIC POWER PROJECT3&4
COMMISSIONING PROCEDURE ACCEPTANCE NOTE
Contractor commissioning procedure number ___________________________ forthe commissioning of BARRING GEAR SYSTEM submitted by BHEL under thecontract number ______________ is received and found conforming to therequirement of NPCIL specifications & Norms & hence accepted.
Commissioning procedure number:
Commissioning procedure title:
_____________________________________
COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM
NAME & DESIGNATION SIGNATURE
Reviewed by:Concerned Commg. Engs./Sr.Commg. Engs/SMEs
Concurredby:
ConcernedENCs/Suptds.
NPC DesignGroup
Approved by: