2
Barrie Park - Final Concept 4A Park District of Oak Park 06.11.2015 0 20’ 80’ 40’ N Grass Field Soccer 240’x165’ Multipurpose Field Garfield Street Harvard Street Lombard Avenue Taylor Avenue (2) 14’x70’ Batting Cages Basketball Half Courts W/ Soccer Kick Wall (2) 10’x30’ Golf Practice Cages Benches 40’x40’ Checker Board Community Garden Existing Sled Hill To Remain Workout Stations (TYP.) Training Slope Expanded Tot Lot Rain Garden Backstop 5-12 YR Traditional Playground @ Poured- In-Rubber Surfacing Pavilion Speed Table and Drop-off 5-12 YR Natural Playground W/ Earth Berms @ Engineered Wood Filber Surfacing Players Bench (TYP.) Bleacher (TYP.) Concrete Retaining Wall/Seating 6’ W. Concrete Walk (TYP.) Picnic / Viewing (TYP.) Rain Garden Brick Paver Plaza Sled Hill Top Platform Rain Garden Workout Stair Case Rain Garden W/ Stone Steppers (TYP.) New Tree (TYP.) Berm W/ New Trees Rain Garden Rain Garden Barrie Center Building Rental Area Fence W/ Playground Entry Gate Brick Wall Seating (TYP.) Rain Garden Rain Garden Plaza Ramp Existing Stairs Case To Remain Storage Tension Structure

Barrie Park - Final Concept 4ABarrie Park - Final Concept 4B Park District of Oak Park 06.11.2015 0 20’ 40’ 80’ N Turf Field U13-U19 Soccer 290’x165’ Multipurpose Field Garfield

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Barrie Park - Final Concept 4ABarrie Park - Final Concept 4B Park District of Oak Park 06.11.2015 0 20’ 40’ 80’ N Turf Field U13-U19 Soccer 290’x165’ Multipurpose Field Garfield

Barrie Park - Final Concept 4APark District of Oak Park 06.11.2015

0 20’ 80’40’N

Grass Field Soccer 240’x165’

Multipurpose Field

Garfield Street

Harvard Street

Lom

bard

Ave

nue

Tayl

or A

venu

e

(2) 14’x70’ Batting CagesBasketball Half Courts W/ Soccer Kick Wall

(2) 10’x30’ Golf Practice Cages

Benches

40’x40’ Checker Board

Community Garden

Existing Sled Hill To Remain

Workout Stations (TYP.)

Training Slope

Expanded Tot Lot Rain GardenBackstop

5-12 YR Traditional Playground @ Poured-In-Rubber Surfacing

Pavilion

Speed Table and Drop-off

5-12 YR Natural Playground W/ Earth Berms @ Engineered Wood Filber Surfacing

Players Bench (TYP.)

Bleacher (TYP.)

Concrete Retaining Wall/Seating

6’ W. Concrete Walk (TYP.)

Picnic / Viewing (TYP.)

Rain Garden

Brick Paver Plaza

Sled Hill Top Platform

Rain Garden

Workout Stair Case

Rain Garden W/ Stone Steppers (TYP.)

New Tree (TYP.)

Berm W/ New Trees

Rain Garden

Rain Garden

Barrie Center Building

Rental Area

Fence W/ Playground Entry GateBrick Wall

Seating (TYP.)

Rain Garden

Rain Garden

Plaza

Ramp

Existing Stairs Case To Remain

Storage

Tension Structure

Page 2: Barrie Park - Final Concept 4ABarrie Park - Final Concept 4B Park District of Oak Park 06.11.2015 0 20’ 40’ 80’ N Turf Field U13-U19 Soccer 290’x165’ Multipurpose Field Garfield

Barrie Park - Final Concept 4BPark District of Oak Park 06.11.2015

0 20’ 80’40’N

Turf Field U13-U19

Soccer 290’x165’

Multipurpose Field

Garfield Street

Harvard Street

Lom

bard

Ave

nue

Tayl

or A

venu

e

(2) 14’x70’ Batting CagesBasketball Half Courts W/ Soccer Kick Wall

(2) 10’x30’ Golf Practice Cages

Benches

40’x40’ Checker Board

Community Garden

Existing Sled Hill To Remain

Workout Stations (TYP.)

Training Slope

Expanded Tot Lot Rain GardenBackstop

5-12 YR Traditional Playground @ Poured-In-Rubber Surfacing

Pavilion

Speed Table and Drop-off

5-12 YR Natural Playground W/ Earth Berms @ Engineered Wood Filber Surfacing

Players Bench (TYP.)

Bleacher (TYP.)

Concrete Retaining Wall/Seating

6’ W. Concrete Walk (TYP.)

Picnic / Viewing (TYP.)

Rain Garden

Brick Paver Plaza

Sled Hill Top Platform

Rain Garden

Workout Stair Case

Rain Garden W/ Stone Steppers (TYP.)

New Tree (TYP.)

Berm W/ New Trees

Rain Garden

Rain Garden

Barrie Center Building

Rental Area

Fence W/ Playground Entry GateBrick Wall

Seating (TYP.)

Rain Garden

Rain Garden

Plaza

Ramp

Existing Stairs Case To Remain

Storage

Tension Structure