Barents 2020 Phase 4 Working Group RN04 - EER Presentation to Barents2020 Conference, 9 December 2010, Moscow
Gus Cammaert Sergey Kovalev
© Det Norske Veritas AS: All rights reserved.
Barents 2020 Phase 4 - Working Group RN04
December 2010
2
TOPICS
SUMMARY OF 2010
ACTIVITIES STATUS AND FORMAT OF
DRAFT EER REPORT FUNCTIONAL
SPECIFICATIONS PLANS FOR 2011
© Det Norske Veritas AS: All rights reserved.
Barents 2020 Phase 4 - Working Group RN04
December 2010
Expert Organisation Location
Sergey Kovalev Gazprom VNIIGAZ Moscow
Yevgeniy Taranukha 40th GNII MO RF St. Petersburg
Vladimir Shlyachkov Krylov's Research Institute St. Petersburg
Dmitriy Melekhov Gazprom Moscow
Sergey Myagkov Gazprom Dobycha Shelf Moscow
Sergey Morozov Gosmorspassluzhba Moscow
Albert Shigabutdinov CNIIMF St. Petersburg
Anatoliy Suvalov 40th GNII MO RF St. Petersburg
Alexey Sakharov 40th GNII MO RF St. Petersburg
Barents 2020 Phase 4 – Panel RN04 Members
Expert Organisation Location
Gus Cammaert DNV R& I Høvik, Norway
Ekaterina Safonova DNV Høvik, Norway
Sigurd Jacobsen PTIL Stavanger, Norway
Rune Bråthen Statoil Stavanger, Norway
Frederic Turlan Total Paris, France
Alexandre Viaud SDAGTotal Paris, France
Terje Hatlen Transocean Stavanger, Norway
Ron Sainsbury ** ExxonMobil Leatherhead, UK
Panel RN04 (Russian members)
Panel RN04 (International members)
** resigned
© Det Norske Veritas AS: All rights reserved.
Barents 2020 Phase 4 - Working Group RN04
December 2010
EER Technical Challenges
“Extreme environmental conditions varying from solid stationary ice, dynamic ice, grounded and ungrounded ice rubble to partial cover, and open water pose formidable challenges
No single evacuation method currently available (is) suitable for abandonment under the full range of environmental/ ice conditions
ISO 19906 (Arctic Offshore Structures Standard) enhances existing requirements by establishing performance based goals from which designers set the functional requirements of the EER system rather than relying on prescriptive measures alone
(It) addresses primarily design requirements (and design optimization) for ice-covered waters plus some key operational provisions impacted by cold climate”
from a presentation by Jim Poplin of ExxonMobil at an OGP Workshop (Working in Extreme Conditions) in 2008
© Det Norske Veritas AS: All rights reserved.
Barents 2020 Phase 4 - Working Group RN04
December 2010
RN04 Mandate for Phase 4 In the Phase 3 report we reported the following:
We are now suggesting two additional reports – functional specifications for an Arctic lifeboat and an emergency preparedness vessel
© Det Norske Veritas AS: All rights reserved.
Barents 2020 Phase 4 - Working Group RN04
December 2010
RN04: Summary of Phase 4 Activities Workshop at Krylov Marine
Institute, St. Petersburg, Oct. 19-20, all members Meeting with PSA in Stavanger
Nov. 8, DNV Circulation of commentary forms
on ISO19906 Recommended report formats Commenced preparation of outline
EER report based on comments Table of contents for two
functional requirements reports Technical discussions and
reviews of other standards Finalizing terms and definitions
© Det Norske Veritas AS: All rights reserved.
Barents 2020 Phase 4 - Working Group RN04
December 2010
RN04: Deliverables Phase 4 Table of Contents Commentary on ISO19906 – EER Provisions 18.1 General 18.2 Escape, evacuation and rescue philosophy 18.3 EER strategy 18.4 Environment 18.5 Hazard and risk analysis 18.6 Continuous assessment 18.7 EER system design 18.8 Emergency response organization 18.9 Competency assurance 18.10 Communications and alarms 18.11 Personal protective equipment 18.12 Man overboard recovery 18.13 Escape design 18.14 Evacuation design 18.15 Rescue Design Functional Requirements – Arctic Lifeboats Functional Requirements – Emergency Preparedness Vessels
© Det Norske Veritas AS: All rights reserved.
Barents 2020 Phase 4 - Working Group RN04
December 2010
RN04: Format of EER Report
EER Report is organized to reflect the ISO19906 sections Informative sections
following Normative (middle column), and comments or suggested revisions in right-hand column Report is now 25%
complete
© Det Norske Veritas AS: All rights reserved.
Barents 2020 Phase 4 - Working Group RN04
December 2010
RN04: Emergency Preparedness Vessel Report
Outline Table of Contents: - Objectives / Introduction - Main mission and general
requirements - Performance requirements - Winterization - Environmental conditions - Hull structure - Main and auxiliary power plant - Deck machinery - Special deck equipment and
systems (recovery equipment)
No functional specification has been published for Barents Sea conditions
Separate document planned
Final format (GOST/DNV/ISO) to be decided
© Det Norske Veritas AS: All rights reserved.
Barents 2020 Phase 4 - Working Group RN04
December 2010
RN04: Arctic Lifeboat Functional Specifications:
Outline Table of Contents: - Objectives - Environmental conditions - Materials - Structural design - Launching method in ice - Operational requirements - Occupant safety and comfort - Model scale testing and full scale
testing - Equipment (communication system,
heating, etc)
Also: No functional specification available for Barents Sea conditions
Separate document planned
To concentrate on ice strengthening and winterization of “conventional” lifeboats
© Det Norske Veritas AS: All rights reserved.
Barents 2020 Phase 4 - Working Group RN04
December 2010
VNIIGAZ Plans for EER Documents
In 2011 VNIIGAZ will start working on development of 2 normative documents for personnel evacuation and rescue on offshore oil and gas installations.
GOST P “Oil and gas industry. Offshore production installations. Evacuation and rescue systems. Main requirements.”
GOST P “Oil and gas industry. Offshore production installations. Evacuation routes and temporary refuge. Main requirements.”
These GOST standards will be based on the following documents: - ISO 19906, - ISO 15544, - ISO 13702, - NORSOK Z-013, - NORSOK S-001, - DNV-OS-A101, - Russian Federal Law No. 116-ФЗ “About industry safety of dangerous production objects”, - Russian Federal Law No. 123-ФЗ “Fire safety technical regulations”, - Doc no. ПБ 08-623-03 “Safety regulations during exploration and development of offshore oil
and gas fields”
© Det Norske Veritas AS: All rights reserved.
Barents 2020 Phase 4 - Working Group RN04
December 2010
12
Breaking News!
Subcontract being discussed with Krylov Marine Institute to prepare a draft report on emergency preparedness vessel
Krylov Marine Institute will share information on lifeboats used on Russian icebreakers
SDAG has given RN04 panel a presentation on lifeboat design for Shtokman Project
© Det Norske Veritas AS: All rights reserved.
Barents 2020 Phase 4 - Working Group RN04
December 2010
13
RN04 – Plans for 2011 December 2010
By end April 2011
May 2011
September 2011
December 2011
Moscow Not specified Oslo Moscow or St. Petersburg
Moscow
Confirm goals Review progress, identify concerns, correct direction if required. Agree on report formats Report to Barents 2020 conference Get feedback.
Meetings of subgroups on specific topics
Norway, Russia or via teleconference
Main contributions received
Finalizing content
Draft report 60% ready, all unclear, controversial issues identified and discussed
Draft proposals for final report format
Draft report 95% ready for discussion and review, solutions proposed for all important issues.
Discuss changes or improvements
Discuss final, cosmetic changes only (1%?)
Present group report and deliverable at VNIIGAZ conference, and get final comments from invited experts.