PPP Project Profile Presentation:Operation and Service Management PPP for the
Distribution of 41MLD Bulk Water Supply in Bandar
Lampung CityBKPM Auditorium, Jakarta
Tuesday, 21 May 2013
www.hllnl.com 2
Agenda
1. Introduction
2. Project Background
3. Project Scope
4. Proposed Commercial Structure
5. Procurement Process and Timeline
6. Pre-Qualification Bid Assessment
7. Q&A
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
2/20
www.hllnl.com 3
Section 1: Introduction
www.hllnl.com
Introduction
Tender Committee - PDAM Way Rilau, Municipal
Government of Bandar Lampung ("MGBL")
Indonesia Infrastructure Guarantee Fund ("IIGF")
Hogan Lovells Lee & Lee (International Legal Counsel)
Castalia (Financial / Technical Adviser)
4
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
3/20
www.hllnl.com 5
Section 2: Project Background
www.hllnl.com 6
Project Background
Municipality of Bandar Lampung
Objectives of the Project
Overall Lampung Project Structure (PPP1 and PPP2)
Illustration of Project Scheme
Interaction between PPP1 and PPP2
Importance of the Project
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
4/20
www.hllnl.com 7
Municipality of Bandar Lampung
Municipality of Bandar Lampung, the capital of
Lampung Province, is located in a strategic territory at
the entrance to the island of Sumatra and is a 45-
minute flight away from Jakarta. With a total area of 200 km2, Bandar Lampung is
administratively divided into 20 Districts and 126 Sub-
Districts.
Municipality of Bandar Lampung has a population of
over 1 million and an average population growth rate
of approximately 1.6 % per year.
Residential and commercial areas are growing rapidly
and reflects a need for critical infrastructure.
Main economic activities include trade, construction,
retail, manufacturing and provision of public services.
Development of critical infrastructure, such as water supply facilities, will be
crucial to Bandar Lampungs socio-economic development.
www.hllnl.com 8
Objectives of the Project
Support the city's economic growth especially in the provision of
clean water to the public.
Increasing the capacity of drinking water services in the
Municipality of Bandar Lampung.
Ensuring an experienced operator can be incentivised to
appropriately assess demand for water distribution and to operate
and maintain a newly constructed distribution network utilising
best practices.
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
5/20
www.hllnl.com 9
Overall Lampung Project Structure (PPP1 and
PPP2)
PPP2
PPP2 is a project for the management,
operation and maintenance of the
Distribution System constructed under
PPP1.
Three phases:
Pre-Operation Period demand /
design input
First Phase Operation Period for
20.5MLD output
Second Phase Operation Period -
for full 41MLD output
PPP1
PPP1 comprises two main components:
1. Design, Build Finance and Operation
of a 41 MLD bulk water supplysystem ("BWSS"); and
2. Build and Finance of a secondary
and tertiary water distribution pipe
network ("Distribution System")
Two Project Phases:
Phase 1 to be operational 2 years fromcooperation agreement financial close
with a required net output capacity of
20.5MLD Phase 2 to be operational 5 years (or
earlier) from cooperation agreement
financial close with a total net output
capacity of 41MLD
www.hllnl.com 10
Main
Transmission
Pipeline
Secondary &
Tertiary
Distribution
Pipeline
Last Mile
Connection to End
Users
Illustration of Project Scheme - Construction
LEGEND
PPP1
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
6/20
www.hllnl.com 11
Illustration of Project Scheme - Operation
Main
Transmission
Pipeline
Secondary &
Tertiary
Distribution
Pipeline
Last Mile
Connection to End
Users
PPP1
LEGEND
PPP2
www.hllnl.com 12
Illustration of Project Scheme - Geographical
Intake for 500LPS fromRiver Way
Sekampung
Reservoir
Bulk Supply /TransmissionPipeline
Operation ofDistributionNetwork toConsumers
PPP1
PPP2
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
7/20
www.hllnl.com 13
Illustration of Zones that Distribution System will
Supply
www.hllnl.com 14
PPP1 and PPP2 Key Information
Capacity delivered to the Bulk
Water Meter
41MLD Estimated length of the
Bulk Supply /
Transmission Pipeline
28 km
Water quality Potable to
specified
standard
Estimated length of the
secondary mains
40 kms
Estimated operations
commencement
2015/2016 Estimated length of the
tertiary mains
340 kms
Number of existing
connections (2010)
7,000 Duration of PPP1 27 years
Estimated number of peak
connections (4 years after
COD)
44,000 Duration of PPP2 Pre-COD: 2 years
Post-COD: 8 - 10
years
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
8/20
www.hllnl.com
Signing of
PPP1
Cooperation
Agreement
Financial Close
Phase 1
Commercial
Operation
P
Com
Op
n of
d
of
GBL
Concess
PPP1 - Timeline
Period to financial close Phase 1 Construction Phase 2 Construction Operation Period
2013 2014 2016 2019 2041
LEGEND
www.hllnl.com 16
Signing of the
Cooperation
Agreement
CP SatisfactionDate
Phase 1
Commercial
Operation
PhCom
Ope
PPP2 - Timeline
Period to CP Satisfaction(short period anticipated)
Pre-Operation Period First Phase Operation Period
Second Phase Operation Period
econd
rationd
Termination
of the
agreement
Renewal Term (if agreed)
LEGEND
2013 2013/14 2016 2019 2024-26
Optional
renewal period
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
9/20
www.hllnl.com 17
Interaction between PPP1 and PPP2
Design, Build and
Finance
Managing Network
Services
Operation
Design, Build and
Finance
Design input
(based on demand
analysis)
www.hllnl.com 18
Interaction between PPP1 and PPP2 (contd)
Fee
Product WaterProduct Water
Payment
Fee
Raw Water
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
10/20
www.hllnl.com 19
Small capex investment but important long term role in a growing
industry.
Foothold in Lampung (which also has an existing network) and potential
for expansion of role. This Project together with existing PDAM capacity
will supply 38% of the existing population.
May be a model replicated in other regions of Indonesia.
Opportunity to become a key player in Indonesia's growing water
distribution industry.
Involvement in Indonesia's first PPP in the water sector.
Pathfinder project representing a new approach to enhancing publicservices.
Opportunity for Operator to demonstrate the benefit of private sector
involvement in the maintenance of the Indonesian water distribution
system.
Importance of the PPP2 Project
www.hllnl.com 20
Section 3: PPP2 Project Scope
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
11/20
www.hllnl.com 21
PPP2 Project Scope
Design input
Assist and advise on the
Distribution System design
and location so as to
ensure appropriate
optimisation of the system
to predicted demand.
New Connections
Promote connection to the
Distribution System
Build and maintain a Customer
Database.
Sign up new Customers.
Operate and maintain the
Distribution System
Operating the water system
from (and including) the outlet
of the reservoir to the
customers' meter.
Ensure Customers receive
water meeting specified levels
of service (e.g. continuity,
pressure, quality and response
times).
Measurement
Recording of customer
meters.
Read, maintain or replace
water meters.
Assisting PDAM on billing.
Despatch instructions
Assist in the authorisation of
despatch from the bulk treated
water reservoir.
Asset management
Set up and maintain an asset
database and produce rolling assetmanagement plans setting out how
the distribution system will be
expanded, operated and
maintained.
Develop the systems and plan
to manage Distribution System
Build and maintain
Management InformationSystem
Prepare standard operatingprocedures / manual
SCADA system
www.hllnl.com 22
Section 4: Proposed Commercial Structure
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
12/20
www.hllnl.com 23
Proposed Commercial Structure
Contract Structure
High Level Risk Allocation
Payment Mechanism
Escrow Arrangement
www.hllnl.com 24
Contract Structure
Project structure developed in conjunction with market
consultations. Project is being progressed as a PPP under
Indonesia's PPP Regulations in parallel with PPP1.
Private sector will enter into the Cooperation Agreement withMGBL as the Government Contracting Agency.
Project commences on signing and will expire 8-10 years
from handover of Phase 1 Distribution System (subject to
MGBL's right to extend).
Cooperation Agreement will follow internationally accepted
water distribution O&M services agreements as well asrelevant Indonesian regulations.
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
13/20
www.hllnl.com
High Level Risk Allocation
25
Key Risks: Allocated to:
Government PPP2 Co
Land/ site access risk
Delay in construction of
Distribution System
Management of non-revenue
water
Physical water losses
Illegal connections
Network construction defects
Collection / revenue risk
Insufficient Product Water Supply
www.hllnl.com
High Level Risk Allocation (contd)
26
Key Risks: Allocated to:
Government PPP2 Co
Default by the PPP1 Contractor
Inadequate Product Water Quality
Force majeure risk
Change in law risk
Operating and lifecycle risk
Financing risk (if applicable)
Optimal Risk Al location between Government and Private Sector
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
14/20
www.hllnl.com 27
Payment Mechanism
The Payment Mechanism is being developed by MGBL / PDAM.
The following is the indicative view for the payment terms:
Pre-Operation Period Fee Fee to cover demand analysis, design input, marketing.
Fixed Fee
Fee to cover regular cost of operations.
Subject to meeting technical (NRW, water quality, pressure, etc.) and
commercial (e.g. number of connections, volume sold, etc.) targets.
Connection Fee (to be determined) Incentive Payment
Sharing of upside revenue.
www.hllnl.com
Payment Mechanism (contd)
28
Operation Year New
connections
per year
Number of
connection at
beginning yearof operation
1 7,000 *) 7,000
2 7,000 14,000
3 10,000 24,000
4 10,000 34,000
5 10,000 44,000
*) Conversion from existing connections to new ones
Example: Commercial Target - Required
Connections
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
15/20
www.hllnl.com
Payment Mechanism (contd)
29
Operation Year NRW Tolerance
Year 0 5.0%
Year 1 7.00%
Year 2 9.00%
Year 3 11.00%
Year 4 13.00%
Year 5 15.00%
Year 6 15.25%
Year 7 15.50%
Year 8 15.75%
Year 9 16.00%
Year 10 16.25%
Example: Technical Target - NRW
www.hllnl.com 30
Escrow Arrangement
All collections from End-Users to be paid into an Escrow Account.
Payment to the Operator to be made from the Escrow Account.
Escrow Agent to be a reputable Indonesian bank.
Mitigates credit and payment delay risk.
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
16/20
www.hllnl.com 31
Section 5: Procurement Process and Timeline
www.hllnl.com 32
Procurement Process 2 stage process
Objective of the pre-qualification
(PQ) stage is to establish and pre-
qualify PQ Applicants who havedemonstrated, among other things,
the financial capability and technicalexpertise to execute the Project.
PQ Applicants will be pre-qualified in
accordance with the criteria set out
in the pre-qualification document.
Applicants who have been selected
pursuant to the pre-qualification
process will be invited to participatein the invitation to tender process.
Draft invitation to tender (ITT)
documents will be issued to
shortlisted PQ Applicants forcomments and clarification.
Interactive clarification sessions willbe held to gather feedback from
shortlisted PQ Applicants on the
draft ITT documents.
Final ITT documents will be issued
to shortlisted PQ Applicants with
submissions to be evaluated based
on pre-determined set of criteria setout in the ITT documents.
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
17/20
www.hllnl.com 33
Procurement Process Indicative Timeline
PQdocuments
made
available forcollection by
interested
investors
24 April
2013
4 June
2013
PQsubmission
4 June 18
June 2013
Evaluation ofbidders
Bidders to be
shortlisted
Oct 2013
ITT bid
submission
Nov 2013
Appointment
of preferred
bidder
Nov/Dec 2013
Cooperation
Agreementsigned
21 May
2013
PQConference
25 May
2013
Deadline forsubmission
of questions
on PQD
18 June
2013
Announcementof PQ results
Objectionperiod
18 June
25 June
2013
July 2013
Release of
draft ITT
documents to
shortlisted
bidders
Aug 2013
Consultation
with shortlisted
bidders on draft
ITT documents
Sept 2013
Release of final
ITT documents
to shortlisted
bidders
ontd
www.hllnl.com 34
Section 6: Pre-Qualification Bid Assessment
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
18/20
www.hllnl.com 35
General Evaluation Criteria for PQ stage
1. Financial strength of the Applicant and if applicable, each
member of the JV / Consortium.
2. Technical track record / experience including: General experience in water sector O&M;
Specific experience in contracts that are similar to the Services;
Specific experience in the following: implementation of marketing programs
and management of new connections; implementation of leakage
management programs; meter installation and tamper-proofing; network
planning and optimisation; and water distribution network maintenance.
3. Personnel including: Resident project manager with at lease 3 years' experience working in
similar market conditions in such a position; and
Indonesian recruited management staff with at least 10 years experience in
water distribution network O&M.
www.hllnl.com 36
PQ Evaluation Assessment
The Tender Committee assisted by the PQ Working Group will evaluate
the PQ submissions.
Assessment method for all criteria will be on a "Pass / Fail" basis.
Criteria to be considered achievable for appropriately qualified
Indonesian and / or international entities and partnering is permitted.
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
19/20
www.hllnl.com 37
Pre-Qualification Documents will be provided to interested parties upon:
o a written expression of interest to the Tender Committee; and
o
payment of IDR 5,000,000 and proof of payment. Payment details for the Pre-Qualification Documents will be provided
upon the receipt of a written expression of interest.
Expression of interest to be submitted by email or writing to the
following address:
Panitia Lelang KPS2
Jln. Pangeran Emir M. Noor No. 11A
Kota Bandar Lampung 35215, IndonesiaContact Person : Ibu Gunarti Kumarasari, ST
Phone : +62721 483855 484611
Email : [email protected],
Pre-Qualification Document
www.hllnl.com 38
Questions and Answers
8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1
20/20
www.hllnl.com
www.hoganlovells.com
Hogan Lovells has offices in:
licante
msterdam
altimore
eijing
erlin
russels
udapest*
Caracas
Colorado Springs
Denver
Dubai
Dusseldorf
Frankfurt
Hamburg
Hanoi
HoChi Minh City
Hong Kong
Houston
Jakarta*
Jeddah*
London
Los Angeles
Madrid
Miami
Milan
Moscow
Munich
New York
Northern Virginia
Paris
Philadelphia
Prague
Riyadh*
Rome
San Francisco
Shanghai
Silicon Valley
Singapore
Tokyo
Ulaanbaatar
Warsaw
Washington DC
Zagreb*
ogan Lovells" or the "firm" is an international legal practice that includes Hogan Lovells International LLP, Hogan Lovells US LLP and their affiliated businesses.
e word "partner" is used to describe a partner or member of Hogan Lovells International LLP, Hogan Lovells US LLP or any of their affiliated entities or any employee or consultant with equivalent standing. Certain individuals, who are designated as pa rtners, but
ho are not members of Hogan Lovells International LLP, do not hold qualifications equivalent to members.
r more information about Hogan Lovells, the partners and their qualifications, see www.hoganlovells.com.
here case studies are included, results achieved do not guarantee similar outcomes for other clients. Attorney Advertising.
Hogan Lovells 2013. All rights reserved.
ssociated offices