    PPP Project Profile Presentation:Operation and Service Management PPP for the

    Distribution of 41MLD Bulk Water Supply in Bandar

    Lampung CityBKPM Auditorium, Jakarta

    Tuesday, 21 May 2013

    www.hllnl.com 2

    Agenda

    1. Introduction

    2. Project Background

    3. Project Scope

    4. Proposed Commercial Structure

    5. Procurement Process and Timeline

    6. Pre-Qualification Bid Assessment

    7. Q&A

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    2/20

    www.hllnl.com 3

    Section 1: Introduction

    www.hllnl.com

    Introduction

    Tender Committee - PDAM Way Rilau, Municipal

    Government of Bandar Lampung ("MGBL")

    Indonesia Infrastructure Guarantee Fund ("IIGF")

    Hogan Lovells Lee & Lee (International Legal Counsel)

    Castalia (Financial / Technical Adviser)

    4

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    3/20

    www.hllnl.com 5

    Section 2: Project Background

    www.hllnl.com 6

    Project Background

    Municipality of Bandar Lampung

    Objectives of the Project

    Overall Lampung Project Structure (PPP1 and PPP2)

    Illustration of Project Scheme

    Interaction between PPP1 and PPP2

    Importance of the Project

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    4/20

    www.hllnl.com 7

    Municipality of Bandar Lampung

    Municipality of Bandar Lampung, the capital of

    Lampung Province, is located in a strategic territory at

    the entrance to the island of Sumatra and is a 45-

    minute flight away from Jakarta. With a total area of 200 km2, Bandar Lampung is

    administratively divided into 20 Districts and 126 Sub-

    Districts.

    Municipality of Bandar Lampung has a population of

    over 1 million and an average population growth rate

    of approximately 1.6 % per year.

    Residential and commercial areas are growing rapidly

    and reflects a need for critical infrastructure.

    Main economic activities include trade, construction,

    retail, manufacturing and provision of public services.

    Development of critical infrastructure, such as water supply facilities, will be

    crucial to Bandar Lampungs socio-economic development.

    www.hllnl.com 8

    Objectives of the Project

    Support the city's economic growth especially in the provision of

    clean water to the public.

    Increasing the capacity of drinking water services in the

    Municipality of Bandar Lampung.

    Ensuring an experienced operator can be incentivised to

    appropriately assess demand for water distribution and to operate

    and maintain a newly constructed distribution network utilising

    best practices.

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    5/20

    www.hllnl.com 9

    Overall Lampung Project Structure (PPP1 and

    PPP2)

    PPP2

    PPP2 is a project for the management,

    operation and maintenance of the

    Distribution System constructed under

    PPP1.

    Three phases:

    Pre-Operation Period demand /

    design input

    First Phase Operation Period for

    20.5MLD output

    Second Phase Operation Period -

    for full 41MLD output

    PPP1

    PPP1 comprises two main components:

    1. Design, Build Finance and Operation

    of a 41 MLD bulk water supplysystem ("BWSS"); and

    2. Build and Finance of a secondary

    and tertiary water distribution pipe

    network ("Distribution System")

    Two Project Phases:

    Phase 1 to be operational 2 years fromcooperation agreement financial close

    with a required net output capacity of

    20.5MLD Phase 2 to be operational 5 years (or

    earlier) from cooperation agreement

    financial close with a total net output

    capacity of 41MLD

    www.hllnl.com 10

    Main

    Transmission

    Pipeline

    Secondary &

    Tertiary

    Distribution

    Pipeline

    Last Mile

    Connection to End

    Users

    Illustration of Project Scheme - Construction

    LEGEND

    PPP1

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    6/20

    www.hllnl.com 11

    Illustration of Project Scheme - Operation

    Main

    Transmission

    Pipeline

    Secondary &

    Tertiary

    Distribution

    Pipeline

    Last Mile

    Connection to End

    Users

    PPP1

    LEGEND

    PPP2

    www.hllnl.com 12

    Illustration of Project Scheme - Geographical

    Intake for 500LPS fromRiver Way

    Sekampung

    Reservoir

    Bulk Supply /TransmissionPipeline

    Operation ofDistributionNetwork toConsumers

    PPP1

    PPP2

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    7/20

    www.hllnl.com 13

    Illustration of Zones that Distribution System will

    Supply

    www.hllnl.com 14

    PPP1 and PPP2 Key Information

    Capacity delivered to the Bulk

    Water Meter

    41MLD Estimated length of the

    Bulk Supply /

    Transmission Pipeline

    28 km

    Water quality Potable to

    specified

    standard

    Estimated length of the

    secondary mains

    40 kms

    Estimated operations

    commencement

    2015/2016 Estimated length of the

    tertiary mains

    340 kms

    Number of existing

    connections (2010)

    7,000 Duration of PPP1 27 years

    Estimated number of peak

    connections (4 years after

    COD)

    44,000 Duration of PPP2 Pre-COD: 2 years

    Post-COD: 8 - 10

    years

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    8/20

    www.hllnl.com

    Signing of

    PPP1

    Cooperation

    Agreement

    Financial Close

    Phase 1

    Commercial

    Operation

    P

    Com

    Op

    n of

    d

    of

    GBL

    Concess

    PPP1 - Timeline

    Period to financial close Phase 1 Construction Phase 2 Construction Operation Period

    2013 2014 2016 2019 2041

    LEGEND

    www.hllnl.com 16

    Signing of the

    Cooperation

    Agreement

    CP SatisfactionDate

    Phase 1

    Commercial

    Operation

    PhCom

    Ope

    PPP2 - Timeline

    Period to CP Satisfaction(short period anticipated)

    Pre-Operation Period First Phase Operation Period

    Second Phase Operation Period

    econd

    rationd

    Termination

    of the

    agreement

    Renewal Term (if agreed)

    LEGEND

    2013 2013/14 2016 2019 2024-26

    Optional

    renewal period

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    9/20

    www.hllnl.com 17

    Interaction between PPP1 and PPP2

    Design, Build and

    Finance

    Managing Network

    Services

    Operation

    Design, Build and

    Finance

    Design input

    (based on demand

    analysis)

    www.hllnl.com 18

    Interaction between PPP1 and PPP2 (contd)

    Fee

    Product WaterProduct Water

    Payment

    Fee

    Raw Water

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    10/20

    www.hllnl.com 19

    Small capex investment but important long term role in a growing

    industry.

    Foothold in Lampung (which also has an existing network) and potential

    for expansion of role. This Project together with existing PDAM capacity

    will supply 38% of the existing population.

    May be a model replicated in other regions of Indonesia.

    Opportunity to become a key player in Indonesia's growing water

    distribution industry.

    Involvement in Indonesia's first PPP in the water sector.

    Pathfinder project representing a new approach to enhancing publicservices.

    Opportunity for Operator to demonstrate the benefit of private sector

    involvement in the maintenance of the Indonesian water distribution

    system.

    Importance of the PPP2 Project

    www.hllnl.com 20

    Section 3: PPP2 Project Scope

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    11/20

    www.hllnl.com 21

    PPP2 Project Scope

    Design input

    Assist and advise on the

    Distribution System design

    and location so as to

    ensure appropriate

    optimisation of the system

    to predicted demand.

    New Connections

    Promote connection to the

    Distribution System

    Build and maintain a Customer

    Database.

    Sign up new Customers.

    Operate and maintain the

    Distribution System

    Operating the water system

    from (and including) the outlet

    of the reservoir to the

    customers' meter.

    Ensure Customers receive

    water meeting specified levels

    of service (e.g. continuity,

    pressure, quality and response

    times).

    Measurement

    Recording of customer

    meters.

    Read, maintain or replace

    water meters.

    Assisting PDAM on billing.

    Despatch instructions

    Assist in the authorisation of

    despatch from the bulk treated

    water reservoir.

    Asset management

    Set up and maintain an asset

    database and produce rolling assetmanagement plans setting out how

    the distribution system will be

    expanded, operated and

    maintained.

    Develop the systems and plan

    to manage Distribution System

    Build and maintain

    Management InformationSystem

    Prepare standard operatingprocedures / manual

    SCADA system

    www.hllnl.com 22

    Section 4: Proposed Commercial Structure

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    12/20

    www.hllnl.com 23

    Proposed Commercial Structure

    Contract Structure

    High Level Risk Allocation

    Payment Mechanism

    Escrow Arrangement

    www.hllnl.com 24

    Contract Structure

    Project structure developed in conjunction with market

    consultations. Project is being progressed as a PPP under

    Indonesia's PPP Regulations in parallel with PPP1.

    Private sector will enter into the Cooperation Agreement withMGBL as the Government Contracting Agency.

    Project commences on signing and will expire 8-10 years

    from handover of Phase 1 Distribution System (subject to

    MGBL's right to extend).

    Cooperation Agreement will follow internationally accepted

    water distribution O&M services agreements as well asrelevant Indonesian regulations.

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    13/20

    www.hllnl.com

    High Level Risk Allocation

    25

    Key Risks: Allocated to:

    Government PPP2 Co

    Land/ site access risk

    Delay in construction of

    Distribution System

    Management of non-revenue

    water

    Physical water losses

    Illegal connections

    Network construction defects

    Collection / revenue risk

    Insufficient Product Water Supply

    www.hllnl.com

    High Level Risk Allocation (contd)

    26

    Key Risks: Allocated to:

    Government PPP2 Co

    Default by the PPP1 Contractor

    Inadequate Product Water Quality

    Force majeure risk

    Change in law risk

    Operating and lifecycle risk

    Financing risk (if applicable)

    Optimal Risk Al location between Government and Private Sector

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    14/20

    www.hllnl.com 27

    Payment Mechanism

    The Payment Mechanism is being developed by MGBL / PDAM.

    The following is the indicative view for the payment terms:

    Pre-Operation Period Fee Fee to cover demand analysis, design input, marketing.

    Fixed Fee

    Fee to cover regular cost of operations.

    Subject to meeting technical (NRW, water quality, pressure, etc.) and

    commercial (e.g. number of connections, volume sold, etc.) targets.

    Connection Fee (to be determined) Incentive Payment

    Sharing of upside revenue.

    www.hllnl.com

    Payment Mechanism (contd)

    28

    Operation Year New

    connections

    per year

    Number of

    connection at

    beginning yearof operation

    1 7,000 *) 7,000

    2 7,000 14,000

    3 10,000 24,000

    4 10,000 34,000

    5 10,000 44,000

    *) Conversion from existing connections to new ones

    Example: Commercial Target - Required

    Connections

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    15/20

    www.hllnl.com

    Payment Mechanism (contd)

    29

    Operation Year NRW Tolerance

    Year 0 5.0%

    Year 1 7.00%

    Year 2 9.00%

    Year 3 11.00%

    Year 4 13.00%

    Year 5 15.00%

    Year 6 15.25%

    Year 7 15.50%

    Year 8 15.75%

    Year 9 16.00%

    Year 10 16.25%

    Example: Technical Target - NRW

    www.hllnl.com 30

    Escrow Arrangement

    All collections from End-Users to be paid into an Escrow Account.

    Payment to the Operator to be made from the Escrow Account.

    Escrow Agent to be a reputable Indonesian bank.

    Mitigates credit and payment delay risk.

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    16/20

    www.hllnl.com 31

    Section 5: Procurement Process and Timeline

    www.hllnl.com 32

    Procurement Process 2 stage process

    Objective of the pre-qualification

    (PQ) stage is to establish and pre-

    qualify PQ Applicants who havedemonstrated, among other things,

    the financial capability and technicalexpertise to execute the Project.

    PQ Applicants will be pre-qualified in

    accordance with the criteria set out

    in the pre-qualification document.

    Applicants who have been selected

    pursuant to the pre-qualification

    process will be invited to participatein the invitation to tender process.

    Draft invitation to tender (ITT)

    documents will be issued to

    shortlisted PQ Applicants forcomments and clarification.

    Interactive clarification sessions willbe held to gather feedback from

    shortlisted PQ Applicants on the

    draft ITT documents.

    Final ITT documents will be issued

    to shortlisted PQ Applicants with

    submissions to be evaluated based

    on pre-determined set of criteria setout in the ITT documents.

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    17/20

    www.hllnl.com 33

    Procurement Process Indicative Timeline

    PQdocuments

    made

    available forcollection by

    interested

    investors

    24 April

    2013

    4 June

    2013

    PQsubmission

    4 June 18

    June 2013

    Evaluation ofbidders

    Bidders to be

    shortlisted

    Oct 2013

    ITT bid

    submission

    Nov 2013

    Appointment

    of preferred

    bidder

    Nov/Dec 2013

    Cooperation

    Agreementsigned

    21 May

    2013

    PQConference

    25 May

    2013

    Deadline forsubmission

    of questions

    on PQD

    18 June

    2013

    Announcementof PQ results

    Objectionperiod

    18 June

    25 June

    2013

    July 2013

    Release of

    draft ITT

    documents to

    shortlisted

    bidders

    Aug 2013

    Consultation

    with shortlisted

    bidders on draft

    ITT documents

    Sept 2013

    Release of final

    ITT documents

    to shortlisted

    bidders

    ontd

    www.hllnl.com 34

    Section 6: Pre-Qualification Bid Assessment

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    18/20

    www.hllnl.com 35

    General Evaluation Criteria for PQ stage

    1. Financial strength of the Applicant and if applicable, each

    member of the JV / Consortium.

    2. Technical track record / experience including: General experience in water sector O&M;

    Specific experience in contracts that are similar to the Services;

    Specific experience in the following: implementation of marketing programs

    and management of new connections; implementation of leakage

    management programs; meter installation and tamper-proofing; network

    planning and optimisation; and water distribution network maintenance.

    3. Personnel including: Resident project manager with at lease 3 years' experience working in

    similar market conditions in such a position; and

    Indonesian recruited management staff with at least 10 years experience in

    water distribution network O&M.

    www.hllnl.com 36

    PQ Evaluation Assessment

    The Tender Committee assisted by the PQ Working Group will evaluate

    the PQ submissions.

    Assessment method for all criteria will be on a "Pass / Fail" basis.

    Criteria to be considered achievable for appropriately qualified

    Indonesian and / or international entities and partnering is permitted.

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    19/20

    www.hllnl.com 37

    Pre-Qualification Documents will be provided to interested parties upon:

    o a written expression of interest to the Tender Committee; and

    o

    payment of IDR 5,000,000 and proof of payment. Payment details for the Pre-Qualification Documents will be provided

    upon the receipt of a written expression of interest.

    Expression of interest to be submitted by email or writing to the

    following address:

    Panitia Lelang KPS2

    Jln. Pangeran Emir M. Noor No. 11A

    Kota Bandar Lampung 35215, IndonesiaContact Person : Ibu Gunarti Kumarasari, ST

    Phone : +62721 483855 484611

    Email : [email protected],

    cc: [email protected]

    Pre-Qualification Document

    www.hllnl.com 38

    Questions and Answers

  • 8/9/2019 Bandar Lampung City PPP Conference - 21 May 2013-1

    20/20

    www.hllnl.com

    www.hoganlovells.com

    Hogan Lovells has offices in:

    licante

    msterdam

    altimore

    eijing

    erlin

    russels

    udapest*

    Caracas

    Colorado Springs

    Denver

    Dubai

    Dusseldorf

    Frankfurt

    Hamburg

    Hanoi

    HoChi Minh City

    Hong Kong

    Houston

    Jakarta*

    Jeddah*

    London

    Los Angeles

    Madrid

    Miami

    Milan

    Moscow

    Munich

    New York

    Northern Virginia

    Paris

    Philadelphia

    Prague

    Riyadh*

    Rome

    San Francisco

    Shanghai

    Silicon Valley

    Singapore

    Tokyo

    Ulaanbaatar

    Warsaw

    Washington DC

    Zagreb*

    ogan Lovells" or the "firm" is an international legal practice that includes Hogan Lovells International LLP, Hogan Lovells US LLP and their affiliated businesses.

    e word "partner" is used to describe a partner or member of Hogan Lovells International LLP, Hogan Lovells US LLP or any of their affiliated entities or any employee or consultant with equivalent standing. Certain individuals, who are designated as pa rtners, but

    ho are not members of Hogan Lovells International LLP, do not hold qualifications equivalent to members.

    r more information about Hogan Lovells, the partners and their qualifications, see www.hoganlovells.com.

    here case studies are included, results achieved do not guarantee similar outcomes for other clients. Attorney Advertising.

    Hogan Lovells 2013. All rights reserved.

    ssociated offices