18
Baltimore City Department of Public Works Baltimore City Department of Public Works

Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works

Baltimore City Department of Public Works

Page 2: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 2

Van Sturtevant and Bilal SarayraDepartment of Public WorksCity of Baltimore

June 2016

Chasing Compliance: Baltimore's Use of IDDE Methods for Bacteria Reduction

Page 3: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 3

Bacteria TMDLs for Baltimore

Watershed Issue Date PollutantMS4 Baseline

LoadWLA Units Description

% Reduction

Back River (Herring Run)

2007 E.coli 5,860,942 214,920Billion

MPN/yearAnnual Avg. 96.3%

Gwynns Falls 2007 E.coli 98,157 322Billion

MPN/dayDaily 99.7%

Jones Falls 2008 E.coli 8,608 314Billion

MPN/dayDaily 96.4%

Lower N. Branch Patapsco

2009 E.coli 5,393 3,902Billion

MPN/yearAnnual Avg. 27.6%

• Capital infrastructure improvements

• Traditional, ESD, and Alternative BMPs

• Septic system improvements

• Preventive maintenance• Education• IDDE

Page 4: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 4

Baltimore’s Stormwater System

53,716 inlets

Clear water connections

Collect

1,208 miles pipe

116 miles stream

Convey

285 Harbor outfalls

1,424 other outfalls

Discharge

Page 5: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 5

DPW Operations for IDDE

• 14 positions • 1 supervisor• 8 field• 1 data mgt. • 4 vacant

• Scientists and engineers, min. bachelors degree

• $2.0 M / year budget

• 3 funding sources• Some private

partnerships and volunteer programs

• Weekly field screening at over 80 locations

• FY 2015: 244 pollution source tracking (PST) investigations

Stream Impact Sampling � Chemical & Biological Assessment � 311 ResponseSSO Abatement Confirmation � ERP SSO Sampling � Flood ALERT Management � Education

Page 6: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 6

Assessing Pollutant Reductions

Field ScreenPST

InvestigationIdentify Source*

Abate SourceConfirm

Abatement*

*TKNAmmonia - N

Nitrate-nitrite-N Bacteria

Page 7: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 7

Field Screening & PST

Page 8: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 8

Traditional Dye Testing

Method Cost

One-point-repair $7,800

Lining * $18,000

Pipe Bursting* $60,000

D11

D13

SAN

ST

S01 S02 S03

1. Single dye deployment here

2. Dye viewed here within a short timeframe.

* Assumes 400 LF pipe segment.

Page 9: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 9

Alternate 1: Mass Dye

Example:Small leak with a 130-acre drainage area.Discharge in stream, not storm sewer system.

Page 10: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 10

Alternate 2: Segmental Dye

ST

S01 S03

D11 D13

SAN

1. Deploy dye bag here

4. See dye here

2. Move dye bag here

3. Slowly move dye bag up line

Example: 370 LF previously lined 14-inch sanitary pipe, where CCTV showed no defects

Page 11: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 11

Other Dye Deployment Methods

Dye tea bag

Dye diffuser

Page 12: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 12

Alternate 3: Long Term Dye

Example:Closest sanitary asset was not the source.

Page 13: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 13

• Storm System

– Pipe walk with Go Pro

– Pole camera

– Push camera

– Pipeline camera (crawler)

– Camera locator

• Sanitary System

– CCTV truck

Visual Assessment

Page 14: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 14

Case Study: Downtown Investigation

Page 15: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 15

Communication as a Tool

Detection

Notification

EducationEnforcement

Abatement

Page 16: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 16

Case Study: Small but Complex

Page 17: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works 17

• An ounce of detection is worth a pound of elimination.

• Double check your work.

• Think outside the pipe.

• Practice patience.

• Communication is key!

• Find your inner McGyver.

Final Thoughts

Page 18: Baltimore City Department of Public Works · Baltimore City Department of Public Works 5 DPW Operations for IDDE • 14 positions • 1 supervisor • 8 field • 1 data mgt. •

Baltimore City Department of Public Works

Thank You for Your Time.

Office of Compliance and LaboratoriesDepartment of Public Works410-396-0732Van Sturtevant, [email protected] Sarayra, [email protected]